Environment Management Plan



Similar documents
Environment Management Plan

Environment Management Plan

Environment Management Plan

CHANDAM7AIL,P SAND DEPOSIT

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Environmental Management Plan

Project Details- Minor Minerals (Other Than Sand)

PROPOSED TERMS OF REFERENCE

Project Details- Minor Minerals (Other Than Sand)

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

Project Details-Minor Minerals (Other Than Sand)

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENT MANAGEMENT PLAN

PRE - FEASIBILITY REPORT

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn: TPa

ENVIRONMENTAL MANAGEMENT PLAN

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

Pre- FEASIBILITY REPORT

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P.

Project Details-Minor Minerals ( Rajula Building Stone)

Proposed Terms of Reference for EIA studies

Pre- FEASIBILITY REPORT

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

Pre- FEASIBILITY REPORT

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

ENVIRONMENTAL MANAGEMENT PLAN

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

Pre- FEASIBILITY REPORT

Environmental Management Plan

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: Ha)-B2 Project

Form -1 Mining Plan & Pre-feasibility Report

PRE-FEASIBILITY REPORT

PRE- FEASIBILITY STUDY REPORT

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & & Ammendments

BHARAT PETROLEUM CORPORATION LIMITED

PRE- FEASIBILITY REPORT

How To Conduct An Environmental Impact Assessment

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

RISK ASSESSMENT REPORT

PRE-FEASIBILITY REPORT

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

RISK ASSESSMENT REPORT

M/s. Karshanbhai Bhagvanbhai Rabari

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

Pre-feasibility Report

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

NIMAPALLI STONE QUARRY

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Project Details-Minor Minerals (Sand Stone)


Building Stone Quarry

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Form -1 Mining Plan & Pre-feasibility Report

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

PROPOSED TERMS OF REFERENCE

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD

ENVIRONMENTAL MANAGEMENT PLAN

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

Sustainable Resource Management Ltd

For Building Stone Quarry

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

ENVIRONMENTAL MANAGEMENT PLAN

PRE FEASIBILITY REPORT

Extent : Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Proposed Terms of Reference for EIA studies

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

PROPOSED TOR FOR EIA STUDY

Environment Impact Assessment study:

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Transcription:

Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN LAL RESI VILL-DULHAPUR, TEH- BARGHAT, DISTT-SEONI, MADHYA PRADESH PREPARED BY Seoni Pran Moti Gandhi Ganj Ke Peeche Chhindwara (M.P.) Registration No. VALID UP TO 20.05.2018 1

ENVIRONMENTAL MANAGEMENT PLAN: - A) BASE LINE INFORMATION Existing land use pattern: The proposed quarry lease area is gentle sloping flat ground and having undulating topography surrounded by agriculture land. The area is mostly covered with thin occasionally soil layer. There is no activity in the area excepting proposed quarry operation and the area is present barren. As the deposit is in small ground and the surrounding area is agriculture land of single crop pattern depending on proper and the surrounding area rainfall. The surrounding area is mostly revenue and private agriculture land. In the proposed lease area as well as in surrounding area there is sufficient cover of alluvial soil so that agriculture activities are being carried out properly. The EMP has been prepared according to Rule 48 of MPMMR 1996 and Madhya Pradesh gazette notification, dated 23 rd March 2013, The 14 points given in Notification with replies and references. A detailed study having baseline data, impact assessment and management plan is given in the proceeding section incorporating all the desired information. AREA UNDER 1. Pits 2. Dump 3. Approach Road 4. Plantation 5. Un Used Total EXISTING LAND USE PATTERN 0.100 0.000 0.000 0.000 1.900 2.000 Hectare 1. Name and Address of the Holder of Quarry Lease / Auction Quarry Name of Lessee : SHRI LAKHAN LAL S/O SHRI CHETAN LAL Residence : RESI VILL-DULHAPUR, TEH- BARGHAT, DISTT-SEONI, MADHYA PRADESH 2

Mineral to mine out : CRUSHER STONE Capacity : 4985 M3/Year Grant of Lease is applied for Quarry lease for the period for 10 years the lease approval letter is enclosed with Mine plan. 2. Details of Area i. Detail of Principle Approval: The Crusher Stone/Gitti Stone Quarry Lease has been sanctioned through The Collector office SEONI order vide letter no. 2015/Khanij/2010/QL/10 SEONI Dated: 06/10/2010. ii. Period Ten years iii. Map Showing Boundary of Sanctioned Area. Khasra Map is enclosed with Mine plan iv. Khasra Number 42/2 v. Area 2.000 ha. vi. Name of Village/ Tehsil/District of Sanctioned Area Village : THANWARI, Tehsil: SEONI, Distt. SEONI (M. P.) vii. Existence of Public Road / Railway Line [if any nearby and approximate distance] S.N0 Place Distance (KM) 1. SEONI 14 2. THANWARI (Village) 1.25 3. Details of Machines to be used in Mining Operation: The method of mining is open cast mining operation will be carried out manually as well mechanized. The machine will be used as follows: JCB for excavation activity, loading of stone shall be done manually, if required the following machine will be used. 3

Type Nos. Size/ capacity Make L&T PC- 1 0.9 cum L&T, 110/Hyd. TATA Excavator Motive HP power Diesel 110 Transportation of Stone from quarry head to destination Stone transported by Hired Trucks per day 16 M 3 per day Heaped Capacity of the dumpers = 18 M 3 Hence number of dumpers required = 0-1 Scheme for tree Plantation The quarry lease is sanctioned for the period of ten years. During the lease period we will plant 16-20/YEAR plant and species in the boundary area of quarry zone in consultation with Forest Department and revenue department. 4.0 Proposed annual production of mineral Production 4985 M3/Year Mineral Crusher Basalt Stone 5.0 Effect on ground water level due to mining operation and its prevention measures. The mining of Stone during the lease period will be worked out from the top surface above the ground water table. Thus no ground water pollution is expected, as mining will not intersect the ground water. Ground water is not likely to be affected, as the mining will not intersect water table. The stone is inert and do not react or dissolve with water and non-toxic. No discharge of water effluents from the mines. 6.0 Details of scheme of development of the land degradation due to mining. At the end of lease period following land will be mined out as per present knowledge land will be redeveloped as under. 4

Present At the end of Ten year Mined out land 0.000 HA 1.300 Ha BACKFILLED - 0.00HA Plantation - 0.660 ha No. trees = 16-20 trees Per year Water Body - Mined Out Area with proper safety norms i.e. proper fencing with stepping of pit land 5 7.0 RQP Site Inspection proposal Lessee proposed site inspection and mining activity monitoring at every six month interval by registered RQP. He will prepare compliance report for MoEF and giving guidelines to lessee for mining activity as per mining plan and proposed EMP. 8.0 Details of preventive and control scheme of air and water pollution. Air Pollution Control The air quality in the lease area as well as in the nearby zone is below the permissible limits. Following mitigative measures shall be adopted for air pollution control due to mining, crushing activity and Transportation of Minerals. S.No. Dust Source Control Measures 1. Mining activity Regular water Spraying in dry area of quarry Wetting of land and dump stock in case it is dry. Water sprinkling at dust sources. The angle of dip is 45 degrees. # Dust Mask shall be provided to all working

workers in dusty atmosphere. # Minimizing drop height of stone in trippers/provide telescopic chutes to drop crushed stone on the stockpile Crushing Of Stone # In The QL area 2. Transportation # No overloading of tractors, dumpers, trucks Proper maintenance of vehicles # Periodic maintenance of kachha/approach road # Regular sprinkling of water on roads in the morning and also at a moment if observed that the dust on road is easily getting airborne # Fortnightly scraping/bulldozing of road to prevent accumulation of lose dust on road, to shift it to sides and to keep roads almost leveled to ensure smooth movement of vehicles and also prevent spillage, thereby, minimizing fugitive dust emissions from the roads towards the villages # Covering the carrying vehicles with tarpaulin to prevent spillage. # Proper tuning of vehicles to keep the CO gas emissions and noise as per norms. # Restriction of vehicle speed 6 Water Consumption: Water used for different mining activities are given below: (a) Drinking (b) Mining (c) Afforestation (d) Dust Suppression

Water Consumption & source WATER (3.0 KLD) 1. DRINKING PURPOSE (0.2KLD) 1. GREEN BELT DEVELOPMENT (0.3KLD) 2. DUST SUPPRESSION (2.5 KLD) SOAK PIT 3. Water will be purchased from nearby available sources. 9.0 Provision for separate stacking of surface soil excavated from mining operation and its utility. Top soil is not available in the quarry lease area. Therefore, no separate stacking of soil is required. If top soil generated during mining will be use for plantation. 10.0 Details of social and economic up gradation of mining effected area due to proposed project. The implementation of stone mining project will generate direct and indirect employment. 7

Details of Budgetary Arrangement for Environment Management. Cost of EMP Sl. No. Description Cost to be Incurred (in lacs/annum) 1. Air Quality: a) Cost of dust suppression i.e. water sprinkling b) Cost of bulldozing the accumulated dust on road c) Air Quality Monitoring by third party (approx. expense) 0.25 0.25 0.25 2 Water Quality Monitoring by third party (approx. expense) 0.25 3 Reducing of Noise Level By regular maintenance of quarry 0.10 vehicle and machine. 4 Socio-economic welfare of local, and 0.10 5 Population i.e. school Aganwadi 6 Infrastructure development 0.10 0.10 7 Tree plantation, survival etc 0.10 Total 1.50/year 11. Any other details desired to be submitted by mineral concession holders Leasee will comply all rules and norms as prescribed by regulatory authority. 8

NOISE LEVEL: Blasting, Drilling and movement of truck/ dumper, etc will create the transitional noise level. However noise generated by these will be occurring at low level and will be within the prescribed upper limit. For all workers shall be provided with earmuff, ear plugs etc. Muffle blasting will be done to control flying rock particles to avoid effect of blasting on nearby agricultural fields. Blasting operation will be done as per approved mining plan. Unnecessary use of horns by the drivers of vehicles shall be avoided. VIBRATION: Proposed mining operations will be of small scale and Low intensity blasting proposal is only for removing the boulder material which will be very very less, hence the blasting will be very occasionally and whatever the transient vibration will be in under norms. FLORA : Regionally the area falls under subtropical climatic zone and sustaining dry tropical forest. The common trees are Seja (Terminals tormentors) Achar (Narcissus latifolia) Lundiya (Lagers toemia purvilora) Amaltas (Cassia fistula) and Mahuwa. Apart from this many verities of grass creepers and climber are found. Quarry Lease area has no trees. FAUNA: - The area itself though devoid of much fauna except occasional languor, Mangos and birds such as Heron, Crow, Parrots etc. Apart from this many kinds of snakes other reptiles are found. No wild life found in surrounding of QL area. Public Building, places, Monuments: There is no any public building, places or monumental construction seen in the vicinity of the area great importance. 9

Protection of Flora & Fauna We will protect flora and fauna with proper fencing around the lease area and transport route. Also improve plantation around the lease area. Protection/Safety of Habitation on the Transport Route We will protect habitation on the transport route with proper water sprinkling for dust suppression and also maintain roads for better and safe transport. ENVIRONMENTAL IMPACT STATEMENT DESCRIBING THE IMPACT OF MINING AND BENEFICIATION OF ENVIRONMENT Due to mining operation, there will be change in the environment whatsoever may be the small nature of mining activities. The proposed mining activity of manual in nature and quarry leasehold area is not large and also the area is devoid of good flora and fauna. The socio-economic status of the surrounding villages is rural with dominant agriculture economy. The surrounding area is thin populated. There will be no adverse impact due to mining on socio economic environment. 10