Environmental Management Plan
|
|
|
- Shonda Parrish
- 10 years ago
- Views:
Transcription
1 Environmental Management Plan
2 ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project phase. The environmental management plan is prepared to minimize the impact of atmospheric emissions, liquid effluents, solid wastes and noise generation on the surrounding environment. PART A: During Construction phase Air Environment: During Construction ready mix concrete in enclosed container shall be used. We will take appropriate measures to minimize the generation of dust as a result of construction works. Such measures include frequent spraying during low rainfall periods or by other means approved by the CEO or Site Manager Dust dispersion from construction activities, unsurfaced roads, spoil dumps and other construction locations shall be limited and suppressed to the maximum extent practical. The purpose of the fenced areas is to control construction and personal activity within the designated areas, and limit unauthorized access. Barricades will be provided along with the periphery of the site. If fencing is removed temporarily for the execution of work, we shall reinstate it as soon as practicable. Until re-instatement, we will demarcate the working area by surrounding it with danger tape marking. Dust covers will be provided on trucks that would be used for transportation DG as per CPCB norms. Ambient air quality monitoring for the parameters So 2,, No x, PM 10,, PM 2.5 will be done regularly. PUC certified vehicles would be allowed in the campus. Water Environment: All latrines provided will be efficient, sanitary and no offensive. A minimum of one toilet shall be provided per 10 persons at each working area such as the construction camp. The latrines will be serviced on regular basis to avoid overflowing. Treated water will be used in construction works. We will dispose of all refuse generated by the staff on a weekly basis at a registered Domestic Waste Disposal Site or through packaged STP. Water analysis shall be done as per IS: Land Environment: Temporary storage of construction waste will be limited within the site and Separate storage of Construction material will be done in areas designated by CEO Storage of HSD 50 lit in drum at designated place. Noise Environment:
3 Ear plugs will be provided to all Labors. High noise generating construction activities would be carried out only during day time. Proper lubrication and servicing of machineries on regular intervals will carried out as a part of Preventive maintenance of machines. Acoustic enclosures will be provided for DG sets for noise reduction. Noise monitoring will be carried out on site at regular intervals. Biological Environment: Plantation of 148Nos of trees will start in mid of construction phase. There will be no impact on biological environment during construction phase. Socio-Economical Environment: Constant supply of potable water for human consumption and other domestic use on site will be provided. Chemical testing of water samples on a monthly basis, or more frequently if suspected by the CEO, will be carried out. 05Nos of toilets for 50 nos. workers are provided for toilet and bathing facilities Proposed project will require manpower during construction phase thereby creating job opportunities. Proper training will be provided regarding fire fighting equipments, maintenance of Health, Personal protective and safety equipments will be provided. Approved safety helmets and other protective clothing shall be worn where deemed necessary by the Supervisor First aid facility will be provided for adequate first aid services. PART A: During Operation Phase Air environment: Green Belt with no trees around the site will be provided. Use of indigenous plants will be insisted. The air quality surveillance program may be strengthened keeping in view the combined maximum impacts from post-project activities particularly in critical downwind directions. DG sets 1 No of 82.5 KVA D.G. Set & 2 No s of 100 KVA D.G. Set will be installed with acoustic measures as per CPCB norms and Generator exhaust will be taken above top level of building as per CPCB norms. Acoustical Enclosures for DG set will be provided to reduce noise intensity in the surrounding area. Proper parking facilities and demarcated areas will be allotted on site to Smoothen traffic flow inside the campus. Ambient air quality monitoring for the parameters So 2,, No x, PM 10,, PM 2.5 will be done on regular intervals. PUC certified vehicles for flat owners will be insisted. Water Environment: The sewage will be treated in full fledged sewage treatment plant =240m 3 /day and sewage shall be reused for flushing and landscaping ( m 3 /day).
4 The storm water management will be implemented on site to avoid run-off. 7Nos of recharge pits will be provided for rain water harvesting on site. During operation phase no waste water stream or solid/hazardous waste will be discharged to any water body. Land Environment: Proper disposal of waste through well managed Solid waste Management team kg/day Dry waste will be sold out. 559 kg/day Wet garbage will be composted using Organic Waste Composter. The processed waste will be used as Manure. Noise Environment: Adequate tree plantation and Compound wall will be to act as noise buffer. DG set will be provided, it should have acoustic enclosures for effective noise reduction of 25 db (A). Noise suppression measures such as enclosures, and/ or protective measures should be provided (wherever noise level is more than 90dB (A). Extensive oiling, lubrication and preventive maintenance will be carried out of the machineries and equipments to reduce noise generation. Monitoring of noise levels is essential to assess the efficacy of maintenance schedules undertaken to reduce noise levels and noise protection measures. The sources of intermittent noise generating equipment (pumps for lifts or water pumping, DG sets etc) will be provided with appropriate acoustic barriers so that the noise level within 100m of these facilities when in operation will be less than 70dB(A). Biological Environment: Implementation of greenbelt development (148Nos. of trees), landscaping, horticulture etc. Plant species selected based on adaptability to geographic conditions and keeping in view the local species and their benefits to site. Development of green belt surrounding the project area with reference to maintain the biological environment. Socio-Economic Environment: Improvement in transport, communication facilities, lifestyle and social status etc. due to ancillary development. Local skilled and laborers will have opportunities for employment directly and indirectly. Environmental Monitoring Plan Environmental monitoring of critical parameters is essential to assess the changes in environmental conditions, if any, during construction and operation of the project, to monitor the effective implementation of mitigation measures, and to suggest for any additional mitigation measures in case of significant deterioration of environmental quality
5 It is proposed to monitor essential parameters for ambient air quality, ambient noise quality, ground water quality, and waste water quality both during the construction and operation phases of the project. A. During Construction phase Component Parameters Location Frequency Duration Ambient Air Quality PM 10, PM 2.5, SO2, NOx, At the identified stations near the dust generating sources. (24 Hrs sampling ) Noise level Leq day, Leq night, db(a) Daily Day Time (6 AM to 10 PM) and Night Time (10 PM to 6 AM) Effluent Analysis Physical- chemical PH, TSS, COD & BOD, TKN, Ammonical-N, PO 4 -p Oil and Grease, Faecal Coliform Surface Water Analysis All the parameters for surface water bodies basing on the classification as per their utilization pattern three month Ground Water As per IS: three month Soil Quality Texture, ph, Electrical conductivity, Alkalinity SAR, Permeability, Water holding capacity, Porosity At 1 location (HSD storage area/parking area) At the start and end of construction activity -- Health All relevant parameters including HIV Regular check ups Every Month B. During Operational Phase
6 Component Parameters Location Frequency Duration Ambient Air Quality SO2, NOx, CO, HC,PM 10,PM 2.5, Pb, Benzene, NH3, Ozone At the identified stations near the dust generating sources. 24 hrs sampling Noise level Leq day, Leq night, db(a) Day Time (6 AM to 10 PM) and Night Time (10 PM to 6 AM) Source emissions Particulates, SO2, NOx, CO, HC Each stack for flue gas Quarter As per the recommendations of MPCB Waste Water quality Physical-chemical parameters, ph, BOD, COD, TSS, TKN, Ammonical-N, PO 4 -P, O & G, Faecal Coliform Inlet and outlet of each STP unit Composite flowweighted sampling Solid waste Parameters: ph, Moisture content, Organic Carbon, Nitrogen Content, Phosphorus content, C:N ratio, Bulk Density, Potash, Particle Size, Color, Odour Solid waste disposal location Once during each season One time sample
ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP
Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP Project Location: S.No. 8/3/2, 8/3/3, Mundhwa, Tal- Haveli, Dist- Pune. Project Details: 1 Plot Area 14200 sqm
PROPOSED TOR FOR EIA STUDY
JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS
PRC: Zhanghewan Pumped Storage Power Station Project
Environmental Monitoring Report Project Number: 28212-013 Quarterly Report January March 2006 PRC: Zhanghewan Pumped Storage Power Station Project Prepared by Hebei Zhanghewan Pumped Storage Co., Ltd.
PROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
Environment Management Plan. Residential & Commercial project
For Residential & Commercial project at S. No. 44 (P), 45 (P) & 46 (p), Village Balewadi, Tehsil Haveli, District Pune Contents Introduction... 3 1.1 During construction phase... 3 1.2 During operation
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
TERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
BHARAT PETROLEUM CORPORATION LIMITED
TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd.
Environment Management Plan of At Khasra No. 605 PTC Road, Village & Tehsil Narender Nagar, District Tehri Garhwal (Uttarakhand) Brief Features of the Project: Name of the Project Hotel & Resort Project
TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
Guidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
Temporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
Guidance for assessment of representativeness and reliability of baseline environmental attributes
Annex IV Methods of Monitoring and Analysis Guidance for assessment of representativeness and reliability of baseline environmental attributes (Also Please Refer CPCB Guidelines on Methods of Monitoring
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
Project Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
Environment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN
ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN Pact Real Estate Pvt. Ltd proposes at Construction project at Pirangut. Proposed project of Construction project is coming up in Pirangut, Tal. Mulshi. This area
Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
(IV) Proposed Terms of Reference for EIA Studies
ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project
Introduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
PROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment
WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,
PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
MBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
Environmental Management Plan
Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Environmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust
Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,
ENVIRONMENT MANAGEMENT PLAN
1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of
History of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,
Iron and Steel Manufacturing
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
Package Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter
ALL YOU NEED TO KNOW...
ALL YOU NEED TO KNOW... What do you know about your septic tank system? For the purposes of this booklet, a septic tank system refers to any kind of on-site sewage management system including traditional
SILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
Sewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
SAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT
SAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT Compliance to the conditions laid down by MoEF for issuing Modified Environmental Clearance for the proposed Modernization / Expansion of Bokaro Steel
PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
Lance DeClue, REHS Environmental Health Specialist II County of San Diego Department of Environmental Health
Lance DeClue, REHS Environmental Health Specialist II County of San Diego Department of Environmental Health Basic OWTS system design and function OWTS maintenance OWTS failures & repairs OWTS-STS (Supplemental
Wastewater Production, Treatment, and Use in Malaysia
Wastewater Production, Treatment, and Use in Malaysia Engku Azman Tuan Mat 1, Jamil Shaari 2, and Voon Kok How 3 Wastewater production and treatment Malaysia has a population of 28.3 million based on the
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. [email protected] to make the right decision or call
Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel
Environmental Management Systems in Hotels 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel 2 15 STEPS 1. Assemble the team 2. Initial Review 3. Environmental
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that
Environment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the control of environmental pollution and damage that the Contractor must consider for air,
Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.
WQ-3 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design and Operation Standards Section 1. Introduction According to the EPA, the majority of water pollution
EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
Environment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
What Is An On-Lot Sewage Disposal System?
What Is An On-Lot Sewage Disposal System? Most rural homes and communities in Monroe County are not served by a public sewer system. In order to dispose of the wastewater (sewage) generated by homes and
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer
Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater
Homeowners and Home Buyers Guide to Wells and Private Sewage Systems
Homeowners and Home Buyers Guide to Wells and Private Sewage Systems What every homeowner should know about living with a well and a private sewage system. YOUR ENVIRONMENTAL SYSTEMS Out of sight out of
Robert D. Trimborn Airport Director Santa Monica Airport
Robert D. Trimborn Airport Director Santa Monica Airport Association of California Airports Conference - September 18, 2009 Noise Air Emissions Ground Support Equipment Alternative Fuels and Green
Best Management Practices
for The City of Paso Robles is required to implement a Phase II Municipal Water Program in order to reduce or eliminate the pollutants that enter our waterways from both storm water and non-storm water
THE NEW NSF 350 AND 350-1
THE NEW NSF 350 AND 350-1 These American National Standards help in evaluating and approving water reuse treatment technologies. BY TOM BRUURSEMA Figure 1 At the NSF residential wastewater treatment system
ENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
6 Chemicals from human settlements
6 Chemicals from human settlements 6.1 Introduction The world is becoming increasingly urban, particularly in developing countries. The transition of people from rural areas to cities represents a major,
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
Grease Trap Maintenance, Procedures and Cleaning Logs
SAWS Grease Reduction Program Grease Trap Maintenance, Procedures and Cleaning Logs Don t Feed the Grease Monster Best Management Practices for Commercial Food and Restaurant Facilities Train kitchen staff
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
CONCEPTUAL PLAN. For project namely: The ParkSyde
CONCEPTUAL PLAN For project namely: The ParkSyde by Khasara No. : 319/ 1 to 2, 320/ 8, 320/ 12-13, 321/8, 321/12-13, 343, 344/2, 345/1, 358/1-3, 359/1-3, Village : Kachna Tehsil : Raipur District : Raipur
New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses
New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov Environmental Self Audit For Small Businesses Disclaimer The materials in this document are intended
City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses
City of San Diego Urban Runoff Management Program This Page Left Intentionally Blank. Minimum Best Management Practices (BMPs) for Mobile Businesses No. BMP Title Description and Examples Justification
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office
BP Texas City Refinery
BP Texas City Refinery ENVIRONMENTAL STATEMENT FOR YEAR 2010 (Review of Y2009 Performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
Application Form 2E. Facilities Which Do Not Discharge Process Wastewater
United States Environmental Protection Agency Office of Water Enforcement and Permits Washington, DC 20460 EPA Form 3510-2E Revised August 1990 Permits Division Application Form 2E Facilities Which Do
Environment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,