Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &
|
|
|
- Fay Wright
- 10 years ago
- Views:
Transcription
1 Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent Ha) FORM -1
2 (I) Basic Information FORM I THIRU.R. VIJAYAKUMAR. S. Ite Detail 1 Name of the project/s MM THIRUPAIR Village Rough stone m Quarry project. 2 S.. in the schedule 1 (a) 3 Proposed capacity/area/length /tonnage to be handled /command area/lease area /number of wells to be drilled. Rough stone for Two Months & Two Years = 8500m ³ Top soil = 2676m ³ in Hectares. 4 New/Expansion/Modernization Existing Quarry 5 Existing Capacity/Area etc. Avg. 95.0m(L) x 36.0m(W) x25.0m(d) 6 Category of Project i.e. A or B Category B (B2) 7 Does it attract the general condition? If, please specify. 8 Does it attract the specific condition? If, please specify. Location: Plot/Survey/Khasra.. It doesn t attract any items mentioned in the general conditions. It doesn t attract the specific Conditions 332/1, 321/1 & 321/3 (Patta Land) 9 Village Taluk District State 10 Nearest railway station/airport along with distance in kms 11 Nearest Town, city, district Headquarters along with distance in kms. THIRUPAIR ULUNDURPET VILUPPURAM TAMILNADU ULUNDURPET Railway station 6.0Km CHENNAI 200 kms Town - ULUNDURPET 6.0 km city - ULUNDURPET 6.0 km District - V I L U P P U R A M 48.0 Km 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Village Panchayat Taluk District - THIRUPAIR - THIRUPAIR - ULUNDURPET - VILUPPURAM Name of the applicant THIRU.R. VIJAYAKUMAR 14 Registered Address S/o. Thiru.VENKATESAN, SOUTH STREET, THIRUPAIR VILLAGE, SEEDIVI POST, ULUNDURPET TALUK, VILUPPURAM DISTRICT. 15 Address for correspondence: Name Designation (Owner/Partner /CEO) Address Same as above THIRU.R. VIJAYAKUMAR Owner Same as above
3 Pin code Mobile Fax. 16 Details of Alternative Sites examined, if Any. Location of these sites should be shown on a topo sheet. Nil There is no alternative site examined as The project is site specific. 17 Interlinked Projects There is no inter linked projects 18 Whether separate application of Interlinked project has been submitted? There is no inter linked projects 19 If yes, date of submission Does not arise 20 If no, reason Since the project involves rough stone Operation only, there is no interlinked projects. 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. tification, 1991? (i)the project doesn t attract the Forest (Conservation) Act There is no Forest land involved within the quarry lease applied area (ii) There is no wild life with in 10 km radius from the project site area under the Wildlife (protection) Act1972. (iii) The quarry is located 190 km away from Bay of Bengal. Hence, the project doesn t attract the C.R.Z. tification, Whether there is any Government Order/Policy relevant/ relating to the site. The Proponent has obtained Precise area Letter from the District Collector, VILUPPURAM vide letter. Rc.. 349/2015 (G&M) dated and the Mining Plan was approved by The Assistant Director of Mines and Geology, VILUPPURAM dated Forest Land involved ( hectares) Forest land is involved in the core zone. vide Roc. B/G&M/675/ Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case. c) Orders/directions of the Court, if any and its relevance with the proposed project. litigation is pending with court as against this project.
4 (II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. / Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, Vegetation and buildings? Nil t required, since the project is dry, vacant, uncultivable area, strewn with boulders of various sizes, few shrubs and weeds, cutting of trees or demolition of buildings involved. 1.3 Creation of new land uses? The total quarrying activity is proposed to be carried out within the quarry lease applied area and hence there is no proposal for the creation of new land use 1.4 Pre-construction investigations E.g. bore houses, soil testing? t Applicable 1.5 Construction works? Office building will be constructed in The quarry leases hold area. 1.6 Demolition works? demolition work is involved. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunnelling? temporary site for construction works is involved. There will not any high rise buildings underground working is involved Reclamation works? There is no proposal for backfilling. The Quarrying operation will be performed to exploit 95% of the total reserves Dredging? There is no scope for dredging 1.12 Offshore structures? There is no such activities involved 1.13 Production and Manufacturing Process Rough stone Production for Two Months & Two Years = 8500 m³ and there is no manufacturing process here.
5 1.14 Facilities for storage of goods or Materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic During construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing Transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? Top soil will be stacked in the lease boundary.. And waste will be proposed to The wastes are generated during the mining period is 3123m 3 shall be proposed to dump is removed initially and Backfilled all side of the 7.5m boundary barrier of the lease area. The over burden will be removed with the Excavator and will be dump on the lease boundary. The wastes are generated during the mining period is 3123m 3 shall be proposed to dump is removed initially and Backfilled all side of the 7.5m boundary barrier of the lease area. The proposed project is for a period of Two Months & Two Years where local people will be employed and there is no scope for long term housing for workers. The existing road is adequate. It will be properly laid or strengthened. t required. This project will not cause any changes to the existing traffic movement The project doesn t involve diversion of transmission or pipe lines 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? The project does not involve impoundment, damming, culverting, realignment or other changes Stream crossings? There is no stream crossing within the proposed area 1.23 Abstraction or transfers of water Form ground or surface waters? About 2.5 KLD water will be used for dust suppression, green belt and domestic sanitary needs Changes in water bodies or the land surface affecting drainage or runoff? 1.25 Transport of personnel or Materials for construction, operation or de commissioning? changes in the water bodies or the land surface under this project. There is no proposal for transport of personnel or material for construction, operation or de-commissioning
6 1.26 Long-term dismantling or Decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? dismantling, De-commissioning or restoration works required or planned such type of activities involved in the Project Considering the small magnitude of the operation of the employment of locals mainly, no major influx of the people will happen Introduction of alien species? introduction of any species is Involved 1.30 Loss of native species or genetic diversity? As the area is devoid of any vegetation and habitation, there is no loss of any native species Any other actions? ne 2. Use of Natural resources for Construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.. Information/checklist 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD / Details there of (with approximate quantities /rates, wherever possible) with source of information data The mining area of Hectares is a Undeveloped Patta Land. The land dry, uneven and unfit for any other use. It becomes fit for rainwater storage use after removal of Rough Stone. About 2.5 KLD water will be used for dust suppression, green belt and domestic sanitary needs. Drinking & Domestic Purposes (in KLD) Dust Suppression (in KLD) Green belt (in KLD) Total KLD KLD KLD KLD 2.3 Minerals (MT) Top Soil = 2676M3 Rough stone = 8500M3 for Two Months & Two Years Rough stone /year = 4250m3 2.4 Construction material stone, aggregates, Sand /soil (expected source MT) The proposed working is open cast Mechanised mining method for quarrying Rough stone. After removal of overburden drilling and blasting will be required for obtaining blasted boulders.
7 2.5 Forest and Timber (Source-MT) t Applicable 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Diesel will be utilized for operating compressors and other machineries. Electricity will be used only for administrative and other buildings. ne. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? / Details thereof (with approximate quantities/rates, wherever possible) with source of information data hazardous materials used in this Project. t envisaged Welfare of the nearby people will get improved due to the employment generation activities of this project. 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., There is no effect for the mentioned Vulnerable groups. 3.5 Any other causes other cause envisaged 4. Production of solid wastes during operation or decommissioning (MT/month) 4.1 Spoil, overburden or mine wastes 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) / Details thereof (with approximate quantities/rates, wherever possible) with source of information data The overburden is to be generated from this project will be dump on the along lease boundary and it will act as a green belt barrier. The wastes are generated during the mining period is 3123m 3 shall be proposed to dump is removed initially and Backfilled all side of the 7.5m boundary barrier of the lease area. Municipal waste will be generated during this project The proposed quarrying of boulders will t produce any hazardous waste.
8 4.4 Other industrial process wastes industrial process is undertaken and There by no such waste is generated. 4.5 Surplus product Surplus product developed. 4.6 Sewage sludge or other sludge from effluent treatment 4.7 Construction or demolition wastes sewage sludge or other sludge is generated this project activ4ity. Does not involve any construction or demolition activities. 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials machinery is left redundant There is no contaminated soil or other material noticed in the area 4.10 Agricultural wastes agricultural waste envisaged 4.11 Other solid wastes The project does not generate any other solid waste than the items mentioned against 4.1 above. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. / Details thereof (with approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from Construction activities including plant and equipment Only minor quantities of gaseous pollutants due to operation of diesel operated machineries like hydraulic excavators, compressors, transport vehicles, etc. But these will be controlled through proper effective remedial measures and proper environment management plan. Due to simple process of small drilling and soft blasting no major emission of gases from the process involved. Fugitive emissions will be abated to insignificant minimal levels due to water sprinkling on roads, black topping of roads, good maintenance practices, green belt development, etc. construction activities are Planned.
9 5.5 Dust or odours from handling of materials including mining materials, sewage and waste 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) sewage will be generated from this project. There is no Sewage System available in the Mining proposed area. There will be dust emission with in permissible limit during handling of over burden, drilling and transport by excavator and tippers which will be controlled by sprinkling water and wet drilling. The project will not have any odours, since it is removal of Blasted boulders only. The project does not involve waste incineration. incineration of solid waste or materials 5.8 Emissions from any other sources There are no emissions from other Sources. 6. Generation of ise and Vibration, and Emissions of Light and Heat: S. 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / Details thereof (with Approximate quantities/rates, wherever possible) with source of information data with source of information data During drilling the noise will be Under permissible limit. During blasting delay electric detonators will be used for control of noise and vibration. The sound produced during vehicle movement will be under permissible limit. 6.2 From industrial or similar processes There is no processing plant involved 6.3 From construction or demolition construction or demolition work envisaged 6.4 From blasting or piling During drilling the noise will be Under permissible limit. During blasting delay electric detonators will be used for control of noise and vibration. 6.5 From construction or operational traffic ise generation will be from Excavator and tippers. It should be maintained less than 85dB as prescribed by DGMS 6.6 From lighting or cooling systems lighting or cooling system required 6.7 From any other sources Nil
10 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. / Details thereof (with Approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water hazardous materials area used or spilled in the quarry lease area. However, for sake of precaution the provisions of hazardous waste (Management and Handling) rules 1989 and subsequent amendments of same will be strictly observed, in case of need. Hence no risk is involved in this regard. sewage or disposal of effluents or waste All the emissions from the quarry operations will be controlled and will be in compliance with CPCB/SPCB norms. 7.4 From any other sources The project does not utilize any other sources which can cause risk of contamination. 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? There is no scope for long term built up of pollutants in this project 8. Risk of accidents during construction or operation of the Project, which could affect Human health or the environments / Details thereof (with Approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes During b l a s t i n g e x p l o s i o n s will be produced and in the blasted area Nitrous Oxide gas will be generated. For safety working all persons will be kept more than 300mts away of the vicinity of the blasting labours will be permitted to work in the quarry face. All regulations under MMR 1961 will be followed. Mines safety precautions will be followed while Quarrying. The labours will be provided with safety equipments. unauthorised persons will be allowed inside the quarry while working in the quarry face.
11 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? The quarrying area is in the safe zone as far as the earthquake is concerned. There are no major water bodies in the area to cause flooding of the mine. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/Chec klist / Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting. Utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other The supporting infrastructure like roads of the area will be improved leading to improved transportation facilities. The socio-economic condition will be improved by way of generation of direct/indirect employment opportunities, improved water facilities, etc. 9.2 Lead to after-use of the site, which could have an impact on the environment After excavation the excavated Area will be used as water reservoir and this will enable to increase the ground water potentiality in the nearby areas. 9.3 Set a precedent for later developments This project will be set precedence in the area for environmental preservation and socioeconomic improvement. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects such effects will occur
12 (III) Environmental Sensitivity S. Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, 3 forests Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration There are no sensitive water bodies, biospheres, national parks, sanctuaries, reserve forest in 15 kms radius from proposed project site. Coastal zone is located in the nearby area. Bay of Bengal lies more than 124 kms. Nil. 4 Inland, coastal, marine or underground waters Nil. 5 State, National boundaries Nil 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas There are no routes or facilities used by the public for access to recreation or other tourist in the proposed project site 7 Defence installations There are no Defence installations near by 8 Densely populated or built-up area Direction Village Distance in Kms Population rth VELLAIYUR 10km 1000 East EDAIKKAL 2km 600 South THAKKA 3km 500 West SERUVATHUR 1km Areas occupied by sensitive man- made land uses (hospitals, schools, places of worship, community facilities) There is no hospital or Primary school, village temples and primary health centres within 500m radius of the quarry.
13 10 Areas containing important, high quality or scarce Resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) There is no high quality or scarce resources s u c h as g r o u n d w a t e r resources, surface resources, forestry, agriculture, fisheries, tourism, a n d r a r e m i n e r a l s n e a r t h e site. 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) It is an Existing quarry. 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) ne. Area is not prone to earthquakes, floods etc. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place: VILUPPURAM R. VIJAYAKUMAR Signature of Project Proponent\Applicant
APPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI
Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)
APPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
RISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,
RISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning
Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN
Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT
FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353
FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,
APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details
1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity
APPENDIX I FORM I. Basic Information
APPENDIX I (I) Basic Information FORM I S.. Item Details 1 Name of the project/s Enhancement of Phosphoric Acid Production from 700 MTPD to 1000 MTPD P2O5 and other auxiliary Facilities within the Existing
Form-I for seeking clearance for project attracting CRZ notification
Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under
1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details
1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity
FORM 1. Basic Information
(I) Basic Information FORM 1 S. Item Details 1 Name of the Project /s Establishment of 1.5 M KCal/Hr (500 kg/hr) Hazardous Waste Incinerator (Upgradation) by M/s Ramky Enviro Engineers Limited. 2 S.. in
M/s Gokul Stone Industries
Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance
Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu
PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State
Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)
(1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in
ROUGH STONE QUARRY. S.F.NO: 33, Pudunaduvalur village, Perumabalur Taluk & District, Tamil Nadu. LEASE PERIOD: 28.05.2007 to 27.05.
ROUGH STONE QUARRY S.F.NO: 33, Pudunaduvalur village, Perumabalur Taluk & District, Tamil Nadu LEASE PERIOD: 28.05.2007 to 27.05.2017 Quarry lease area 0.90.0 Ha Proposed Rough Stone Production - 31359m
Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu
Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu
Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu
Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance
Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX
INDEX Sl.. Contents Page. 1 FORM I APPLICATION FOR CLAY MINING FOR BRICK KILN 3 BASIC INFORMATION 6 ACTIVITY 7 2 PRE-FEASIBILITY REPORT 21 3 MINING PLAN 35 ` ENCLOSURES Sl.. Contents 1 UNDERTAKING 2 UNDERTAKING
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
Project Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:
PROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra
PRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
APPLICATION FOR ENVIRONMENTAL CLEARANCE
APPLICATION FOR ENVIRONMENTAL CLEARANCE CREATIVE ENGINEERS & CONSULTANTS NABET ACCREDITED, NABL ACCREDITED TESTING LABORATORY& ISO 9001: 2008 CERTIFIED COMPANY 9B/4, BHARATHWAJAR STREET, EAST TAMBARAM,
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
APPENDIX I. Revised FORM 1
APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,
List of Documents. List of Annexure
List of Documents S.No. Description Page No. 1 Form I Application 1 to 15 2 Standard Template and Checklist 16 to 24 3 Form IA for Building & Construction Projects 25 to 35 4 Environmental Management Plan
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS
2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?
Form -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.
STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,
COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS
COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS At Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk,
APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project.
1568651343757 01234567418199129126 76566544740738 313148746568 012204653107 81664 633840 91 APPENDIX I FORM 1 Basic Information Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial
APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
Environment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1
Environment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
Environment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT
PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT At, Survey Nos. 65/1, 65/2 and 65/3, Thubarahalli Village, Varthur Hobli, Bangalore East Taluk, Bangalore. Submitted By M/s. Vaswani Estates
APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant
BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area
FORM 1 FORM 1 (I) Basic Information FORM-1 Item Details 1 Name of the Project Bombay XI 2 S.. in the Schedule 8(a) 3 Proposed capacity/area /length/tonnage to be handled/command area/lease area/ number
APPENDIX-I (See paragraph-6) FORM 1. S. No. Item Details. 1 Name of the project/s: Sand mining
(I) Basic Information: APPENDIX-I (See paragraph-6) FORM 1 S.. Item Details 1 Name of the project/s: Sand mining Gram Panchayat Dubeumargaon 2 S.. in the schedule t mentioned schedule 3 Proposed capacity/area/length/tonnage
FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd.
June 2015 FORM 1 FORM 1 Residential Development At S.No: 163/1, 163/2,164/2, Thalambur village, Thiruporur Taluk, Kanchipuram District. Project Proponent: M/s Casa Grande Private Limited Prepared By: EQMS
PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
APPENDIX I (See Paragraph 6) FORM 1
vi(a) (i) Basic information APPENDIX I (See Paragraph 6) FORM 1 Serial Item Details number 1. Name of the project/s "JANA JEEVA ORCHID" 2. S.no. In schedule B Category item 8 3. Proposed capacity/area/length/tonnage
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
Form -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
Proposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT
Sub: Submission of application for Environmental Clearance.
Date: 10/10/2015 To, The Member Secretary, SEIAA, Dept. of Ecology Environment & Forest 7 th Floor, M.S. Building, Bangalore-560 001 Dear Sir, Sub: Submission of application for Environmental Clearance.
M/s. Karshanbhai Bhagvanbhai Rabari
PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,
Environment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.
Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
TAMIL NADU POLLUTION CONTROL BOARD FORM I
TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu
STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE
STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE OF THE PROPOSED COLOUR GRANITE MINING PROJECT APPLICATION. AT SURVEY NO. 54/P,2.0 HECTARE
PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
APPENDEX I FORM 1. including Kharab Kharab Area ----- 3,540.96m 2. Net Plot Area 1,86, 759.82 m 2 1,38,943.43 m 2. Total Built up Area
(I) Basic Information APPENDEX I FORM 1 Sl.No. Item Details 1. 1Name of the project/s Residential Development. 2. 2Sl. No. in the schedule 8 (b) Township and Area development Project. 3. 3Proposed capacity/area/length/
Project Details Minor Minerals
M/s.Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya Survey. 24/ 4 paiki Vill. Miyani, TAL: Porbandar, Dis. Porbandar. Mo.. 9825919283 To. State Level Expert Appraisal Committee, Paryavaran Bhavan,
ENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.
Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES
The Electricity, Gas, Water and Waste Services Division comprises units engaged in the provision of electricity; gas through mains systems; water; drainage; and sewage services. This division also includes