PRE-FEASIBILITY REPORT

Size: px
Start display at page:

Download "PRE-FEASIBILITY REPORT"

Transcription

1 PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur (Rajasthan) PROJECT PROPONENT R/o Village- Survari Tehsil- Chhata, District- Mathura (UP) Contact Person: Mangtee Ram Choudhary Contact No

2 INDEX S. NO. PARTICULARS PAGE NO. 1.0 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2 I Identification of Project and Project Proponent 2 II Brief Description of the Nature of Project 2 III Need for the Project & Its Importance to the Country/ Region 2 IV Demand Supply Gap 2 V Imports vs. Indigenous Production 2 VI Export Possibility 2 VII Domestic/Export Markets 3 VIII Employment Generation (Direct and Indirect) due to the Project PROJECT DESCRIPTION 3 1. II Type of Project Including Interlinked And Independent Projects, If Any Location (map showing general location, specific location, and project boundary & project site layout) with coordinates 3 3 III Details of alternative site considered 5 IV Size and magnitude of operation 5 V Project Description with Process Detail 5 1. Salient features along with project vicinity details of the Mining 5 2. Geology of the area 6 3. Estimation Of Reserves 6 4. Mineable Reserves And Anticipated Life Of The Mine 6

3 S. NO. PARTICULARS PAGE NO. 5. Method of Mining 6 6. Proposed Year Wise Production Details Of The Next First Five Years 7 7. Details of Blasting Parameters 7 8. Loading & Transport 7 9. Waste Generation & Disposal Conceptual Plan 8 VI VII Raw material required along with estimated quantity, likely source, marketing area of final products, mode of transport of raw material and finished product. Resources optimization/recycling and reuse envisaged in the project, if any should be briefly outlined 8 8 VIII Availability of water its source, energy/power requirement and source 8 IX Quantity of waste be generated (liquid and solid) and scheme for their management/disposal SITE ANALYSIS 9 (I) Connectivity 9 (II) Land form, land use and land ownership 9 (III) Topography 9 (IV) Existing land use pattern {agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the gazette notification should be given. 9

4 S. NO. PARTICULARS PAGE NO. (V) Existing infrastructure PLANNING BRIEF 12 (I) Planning concept (type of industries, facilities, and transportation etc.) Town and country planning/development authority classification. 12 (II) Population projection 12 (III) Land use planning 12 (IV) Assessment of infrastructure demand (physical & social) 12 (V) Amenities/facilities PROPOSED INFRASTRUCTURE 12 (I) Residential area (Non Processing Area) 12 (II) Green belt development 13 (III) Connectivity 13 (IV) Water Management (Source& Supply of water) 13 (V) Sewerage system 13 (VI) Industrial waste management 13 (VII) Solid Waste Management 13 (VIII) Power Requirement & Supply/ Source REHABILITATION AND RESETTLEMENT (R & R) PLAN 13 (I) Policy to be adopted (central/state)in respect of the project affected persons including home oustees, land oustees and landless labourers PROJECT SCHEDULE & COST ESTIMATES 14 (I) Likely date of start of construction and likely date of completion 14

5 S. NO. PARTICULARS PAGE NO. (II) Estimated project cost along with analysis in terms of economic viability of the project ANALYSIS OF PROPOSAL ENVIRONMENTAL MANAGEMENT PLAN AIR POLLUTION CONTROL WATER MANAGEMENT NOISE POLLUTION CONTROL LAND RECLAMATION SOLID WASTE MANAGEMENT GREEN BELT DEVELOPMENT 15

6 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT The proposal for Masonry Stone (Cheja Pathar) Mining Project, M.L. No. 65/2011, ML Area 1.0 ha. Near Village:. This is new mining lease and letter of Intent for the same has been issued by Superintendent Mining Engineer Bharatpur Circle, Bharatpur vide letter no. SME/Bharat./Ri.Sha./ MM/Rehabi./Applicant/65/11/2012/6513 dated and Environmental Clearance is required as per EIA Notification dated 2006, as amended time to time, this project is comes under B Category. Table-1 Salient features of the Project S. No. Particulars Details A. Mining Lease Details 1. Name of the Project Masonry Stone (Cheja Pathar) Mining Project, M.L. No. 65/2011, ML Area 1.0 ha 2. Mineral Masonry Stone (Cheja Pathar) 3. Mining Lease Number M.L. No.65/ Mining Lease Area 1.0 ha 5. Lease Holder B Location 6. Village Gangora 7. Tehsil Pahari 8. District Bharatpur 9. State Rajasthan 10. Latitude & Longitude Pillars Latitude Longitude A 27 42'25.04"N 77 00'35.45"E B 27 42'27.13"N 77 00'31.54"E C 27 42'29.36"N 77 00'33.04"E D 27 42'27.27"N 77 00'36.95"E C. Other details 11. Cost of the project Rs. 10 Lakh 12. Cost for Environmental Protection Measures Rs lakh per annum 13. Seismic Zone II Page no.1

7 ENVIRONMENTAL MANAGEMENT PLAN AIR POLLUTION CONTROL Plantation will be developed within ML areas and will also be developed outside the ML area equal to 33% of the lease area. Periodical water spraying on the roads will be done. Proper maintenance of all machines will be carried out that will control emission of gaseous pollutant. WATER MANAGEMENT There is no surface water body in and around the mining lease area. The rain water collected in mining pit will be used in plantation and dust suppression. NOISE POLLUTION CONTROL Proper maintenance of all machines will be carried out which will reduce noise generation during operations. LAND RECLAMATION At the end of life of mine, total excavated area will be about 0.80 ha, which will be converted into water reservoir, and 0.20 ha will be covered under greenbelt. SOLID WASTE MANAGEMENT The generated solid waste will be used for construction and maintenances of kucha approach road time to time. There will no waste dump at the end of life of the mine. GREEN BELT DEVELOPMENT Green Belt/plantation will be developed equal to 33% of total lease area. The trees will be planted at suitable spacing to encourage proper growth around the lease boundary. The dead plants will be replaced by fresh plants. Native Plant species will be planted SOCIO ECONOMIC IMPROVEMENT As the mining activities will increase, better employment opportunity. Page no.2

8 Semi skilled & unskilled workers will be recruited from the nearby villages. Adult Education programme are proposed for up-gradation of literacy level. The leesee will associate awarness programe. HEALTH & SAFETY Protective respiratory devices will be provided to personnel working in dusty areas with adequate training. The lessee will associate in various health and safety awarness program in nearby villages. 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION (i) Identification of Project and Project Proponent This is a new masonry stone (Cheja Patthar) Mining lease, with production capacity-1,11,780 TPA, near village: Gangora, Tehsil: Pahari, District: Bharatapur (Rajasthan). letter of Intent for the same has been issued by Superintendent Mining Engineer Bharatpur Circle, Bharatpur vide letter no. SME/Bharat./Ri.Sha./ MM/Rehabi./Applicant/65/11/2012/6513 dated Mining operation will be worked by semi mechanized open cast method. Environmental Clearance is required as per EIA Notification dated 2006, as amended time to time, this project is comes under B Category. (ii) Brief Description of the Nature of Project This proposal for masonry stone (Cheja Patthar) mining project, M.L. No. 65/2011, ML Area 1.0 ha. Near Village: Gangora, Tehsil: Pahari, District: Bharatapur (Rajasthan). This is new mining lease and letter of Intent for the same has been issued by Superintendent Mining Engineer Bharatpur Circle, Bharatpur vide letter no. SME/Bharat./Ri.Sha./MM/Rehabi./Applicant/65/11/2012/6513dated Environmental Clearance is required from as per EIA Notification dated 2006, as amended time to time, this project is comes under B Category. Page no.3

9 (iii) Need for the Project & Its Importance to the Country/ Region The mineral Masonry stone (Cheja Patthar) is used in various construction activities and will be sold to nearby markets to fulfill the requirements of the local people. (iv) Demand Supply Gap Considering the demand of mineral sufficient availability of the mineral in the area, it is essential to have Masonry stone (Cheja Patthar) mine to sustain the supply of mineral for construction purpose. (v) Imports vs. Indigenous Production It is a cheap mineral used in construction activities in rural areas therefore export is not possible (vi) Export Possibility There is no export possibility as these mineral is quite cheap and locally available in abundance and used in rural areas. (vii) Domestic/Export Markets These minerals have only domestic market and will fulfill the requirement of local. The stone may also be supplied to stone crusher proposed to be installed outside the lease area. (viii) Employment Generation (Direct and Indirect) due to the Project The total 29 skilled and unskilled manpower needed to run the mine 3.0 PROJECT DESCRIPTION (i) Type of Project Including Interlinked And Independent Projects, If Any This is opencast semi-mechanized mining project. There is no interlinked or interdependent project based on mineral produced. The mineral will be sold directly. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates Page no.4

10 Masonry Stone (Cheja Pathar) Mining Project, M.L. No. 65/2011, ML Area 1.0 ha. Near Village: Figure1: Location Map Page no.5

11 (iii) Details of Alternate Sites Considered No alternative site has been taken into consideration due to availability of mineral resources in the area. (iv) Size and magnitude of operation The Production of Masonry stone (Cheja Patthar) will be 1, 11,780 TPA from the mine located Near Village: Gangora, Tehsil: Pahari, District: Bharatapur (Rajasthan) (v) Project Description with Process Detail (1) Salient features along with project vicinity details of the Mining project is given below: Table - 2 Salient Features of the Project S. No. Particulars Details 1. Name of the Project Masonry Stone (Cheja Pathar) Mining Project, M.L. No. 65/2011, ML Area 1.0 ha. 2. Mineral Masonry stone (Cheja Pathar) 3. Mining Lease Number M.L. No. 65/ Mining Lease Area 1.0 ha 5. Lease Holder 6. Method of mining Opencast Semi-Mechanized 7. Mineable Reserves Tonnes 8. Life of the Mine 4 TPA 9. Bench Height & Width 6 m 10. Ultimate Pit Slope angle Ultimate working depth 25 m bgl 12. Elevation Range 305 mrl to 285 mrl 13. General Ground Level 305 mrl 14. Ground Water table 25 meter bgl (180 mrl) (2) GEOLOGY OF THE AREA Regional Geology The regional stratigraphic succession of rocks is as follows Page no.6

12 REGIONAL STRATIGRAPHIC SUCCESSION Recent Post Delhi Delhi Super group Ajabgarh Group Alwar group Soil Pegmatite, Granite, Albetite Phylite inter-banded with quartzite, quartzite,, Carbonaceous phyllite, Carbonaceous shale, Conglomerate Spongy quartzite Flaky quartzite, Massive quartzite, schist Phylite Local Geology Recent Post delhi Delhi Super Group Ajabgarh Group Soil Absent Gritty Quartzite and quartzite (3) Method of Mining Proposed method of mining will be semi mechanized opencast by forming proper benches. The mining is proposed as per present situation of the deposit. Excavation is proposed by blasting. Hydraulic excavator/loader is proposed for removal and loading of blasted stone.the haul/ approach roads have been provided up to the proposed working faces and will be provided in future also. The stone and waste are proposed to be transported by tractor trolley and tippers. The mining will be carried out by opencast method by developing the bench of height 5-6 m height and width. Four slices are considered in a bench. The calculations are as per the four slices of a bench. Thus the end position of the bench is 6 meter height. Width is also proposed 6 meter. Table-3 EXTENT OF MECHANIZATION S. Machinery Number 1. Hydraulic Excavator/Loader with rock breaker 1 arrangement 2. Air compressor tractor mounted or wheel 1 mounted 3. Jack hammer 2 4. Drill roads as required Page no.7

13 5. Water tank trroley munted 1 6. Tippers 2 7. Hand tools as required Source: Draft mining plan (4) PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS The proposed Year-wise production plan for next five years is mentioned in the table given below: Table 4 Year Wise Production for Next Five Years Year Quartzite (Masonry Stone) (tones) I II III IV V Source: Source: Draft mining plan (5) LOADING & TRANSPORT Tyre mounted Hydraulic machinaries will be deployed from time to time as and when required. Trucks and tracor troley will be deployed for transportation of masonry stone from working to consumer. (6) WASTE GENERATION & DISPOSAL Around 49,850 tonnes of waste will be come across during period of mining plan. The waste will be used in construction and maintenance of approach roads, construction of site services. The waste also lifted by local habitants for constructing the walls along the agriculture field. (7) CONCEPTUAL PLAN (vi) The conceptual mining plan considering proposed capacity of mine for the mineral has been prepared by considering the probable category of reserve. At the end of life of mine, total excavated area will be about 0.80 ha, which will be converted into water reservoir, and 0.20 ha will be covered under greenbelt. Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product This is Masonry stone (Cheja Pathar) Mining Lease. The mineral will be used for construction purposes. No raw material will be required to dependent industries. (vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be briefly Outlined Page no.8

14 No waste water will be generated from mining operation Domestic sewage water generated from office toilet will be disposed in soak pits via septic tank. (viii) Availability of Water Its Source, Energy /Power Requirement and Source A. Water requirement: Total water requirement for the project will be 2.0 KLD which will be sourced from nearby villages. B. Power requirement: The electric power will not be use for the process of mining. Only HSD Fuel will be required for operating machineries. (ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their Management/Disposal: 4.0 SITE ANALYSIS (i) Connectivity Domestic sewage water generated from office toilet will be disposed in soak pits via septic tank. solid waste will be generated which will also be sold. The lease area about ~ 7.0 km in East direction from Pahari. Dispensary is available at Chhapra at distance of ~ 3.0 km. in NE direction. Nearest Railway station is Alwar Railway Station at a distance of ~42.0 km. in SW direction from Mining Lease area. Nearest Airport is Indra Ghandi International Air Port, New Delhi at a distance of around ~94 km. in North direction from Mining Lease area. (ii) Land Form, Land Use and Land Ownership Existing Land Use Pattern The total ML area of 1.0 ha comprises of Government Land (Gair Mumkin Pahar). (iii) Topography The lease area comprises part of a mount trending north-south. The highest contour is 305 mrl and lowest is 285 mrl. The mining lease area is 1.0 ha which a Government land (Gair Mumkin Pahar). (iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies (Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified Industrial Area, A Copy Of The Gazette Notification Table 5 Environmental Settings S. No. Particular Details 1. Nearest Village Village Gangora at a distance of ~ 1.5 km. in East direction from the mining lease area. 2. Nearest city/ town Pahari at distance of ~ 7.0 km. in East direction Page no.9

15 from the mining lease area. 3. National Highway/State Highway SH-22 is approx ~ 7.0 km in SE direction from the mine site Nearest Railway Station Nearest Airport Alwar Railway Station at a distance of ~42.0 km. in SW direction from Mining Lease area. Indra Ghandi International Air Port, New Delhi at a distance of around ~94 km. in North direction from Mining Lease area. 6. Archaeological Place Important None, within 10 km radius area of mine site. 7. Ecological Sensitive Areas (National Park, Wildlife Sanctuary, Biosphere Reserve etc.) 8. Reserved/Protected Forest within 10 km radius There is no National Park, Wild Life Sanctuaries, Biosphere Reserves, Tiger Reserves, Wildlife Corridors, etc. within 10 km radius There is no reserve/protected forest are present within 10 km radius area. 9. Nearest River / water body There is no reserve/protected forest are present Source: preliminary site visit within 10 km radius area. Page no.10

16 Masonry Stone (Cheja Pathar) Mining Project, M.L. No. 65/2011, ML Area 1.0 ha. Near Village: Figure 2: Key plan Page no 11

17 (v) Existing Infrastructure: There is no building & structure within mining lease area except some vegetations existing on the lease area which will be cleared when required. Total lease area is Government Land (Gair Mumkin Pahar). The lease area about ~ 7.0 km in East direction from Pahari. Dispensary is available at Chhapra at distance of ~ 3.0 km. in NE direction. Nearest Railway station is Alwar Railway Station at a distance of ~42.0 km. in SW direction from mining Lease area. Nearest Airport is Indra Ghandi International Air Port, New Delhi at a distance of around ~94 km. in North direction from mining Lease area. 5.0 PLANNING BRIEF (i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town and Country Planning/Development Authority Classification This is a mining Project. (ii) Population Projection Manpower required will be engaged from nearby areas. No significant influx of people is anticipated in the area. (iii) Land Use Planning The extent of proposed mining lease area is 1.0 ha. The area comprises of Government Land (Gair Mumkin Pahar). At the end of life of mine, total excavated area will be about 0.80 ha, which will be converted into water reservoir, and 0.20 ha will be covered under greenbelt. (iv) Assessment of Infrastructure Demand (Physical & Social) Lessee will assess the demand of infrastructure (Physical & Social) in nearby area of the mine site and same will be developed under social work (v) Amenities/Facilities Mining Management will develop the Amenities/Facilities in the nearby area of the mine site as per requirement of local people of the nearby area under corporate social responsibility programs. 6.0 PROPOSED INFRASTRUCTURE (i) Residential Area (Non Processing Area) This is not required as mine workers comes from nearby villages. Rest shelter to the workers will be provided outside the lease area. Page no 12

18 (ii) (iii) (iv) (v) (vi) Green Belt Green Belt/plantation will be developed equal to 33% of total Mining lease area. The dead plants will be replaced by fresh plants. Native Plant species will be planted. Connectivity The lease area about ~ 7.0 km in East direction from Pahari. Dispensary is available at Chhapra at distance of ~ 3.0 km. in NE direction. Nearest Railway station is Alwar Railway Station at a distance of ~42.0 km. in SW direction from Mining Lease area. Nearest Airport is Indra Ghandi International Air Port, New Delhi at a distance of around ~94 km. in North direction from Mining Lease area. Water Management (Source & Supply of water) Total water requirement for the project will be 2.0 KLD which will be used for domestic as well as dust supression purpose and sourced from nearby village. Sewerage System Domestic sewage water generated from office toilet will be disposed in soak pits via septic tank. Outside discharge is not envisaged. Industrial Waste Management No industrial waste water will be generated from this mine during mining operation. (vii) Solid Waste Management Around 49,850 tonnes of waste will be come across during period of mining plan. The waste will be used in construction and maintenance of approach roads. (viii) Power Requirement & Supply/Source Electric power will not be required in mining operations. 7.0 REHABILITATION AND RESETTLEMENT (R& R) PLAN (i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected Persons Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To Be Given) Not Applicable as the lease area falls in Government Land (Gair Mumkin Pahad). 8.0 PROJECT SCHEDULE & COST ESTIMATES Page no 13

19 (i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time Schedule For The Project To Be Given) The mining activity will be started after obtaining Environmental Clearance from MoEF, New Delhi and acquiring the valid mining lease from Mines and Geology Department of the State Government. (ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the Project Cost of the project Cost for Environmental Protection Measures 9.0 ANALYSIS OF PROPOSAL : Rs. 10 lakh : Rs lakhs The Masonry Mining Lease will result in growth of the surrounding areas by increasing direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. Special emphasis on Financial and Social benefits will be given to the local people including tribal population, if any, in the area. Development of social amenities will be in the form of medical facilities, education to underprivileged and creation of self help groups. No major adverse effect on environment is envisaged as the required mitigation measures are inbuilt in the project. Page no 14

20

21

22

23

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR MARBLE MINE(MINOR MINERAL) NEAR VILLAGE KHO(PALPUR), TEHSIL: RAJGARH, DISTRICT: ALWAR, RAJASTHAN NON- FOREST LAND PRE-FEASIBILITY REPORT CATEGORY A (Sariska Wild life Sanctuary is located in 5.0 km

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM 72000 TPA TO 175000 TPA OF Limited JASIDIH Dist.: Deoghar 814 142 (Jharkhand) INDEX Contents

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

APPLICATION FOR ENVIRONMENTAL CLEARANCE

APPLICATION FOR ENVIRONMENTAL CLEARANCE APPLICATION FOR ENVIRONMENTAL CLEARANCE CREATIVE ENGINEERS & CONSULTANTS NABET ACCREDITED, NABL ACCREDITED TESTING LABORATORY& ISO 9001: 2008 CERTIFIED COMPANY 9B/4, BHARATHWAJAR STREET, EAST TAMBARAM,

More information

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS 2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

LORE SILICA SAND MIINE

LORE SILICA SAND MIINE PRE FEASIBILITY REPORT OF Submitted to MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE GOVT. OF INDIA Paryavaran Bhawan, CGO Complex Jor Bagh Road, New Delhi-110 003 LORE SILICA SAND MIINE Village: Lore,

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information