2 CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION PROJECT PROPONENT Project Location and Accessibility Infrastructure and communication 1 3. GEOLOGY AND EXPLORATION Topography Regional Geology Local Geology 3 4. EXPLORATION 3 5. RESERVES 4 6. MINING METHODOLOGY Mining program for next five years Man power requirement for mining operations 4 7. ENVIRONMENTAL SETTING Air Environment Noise Environment Water Environment Mine Drainage Solid Waste Generation Flora & Fauna Human Settlements Power Site Amenities Climatic Conditions 6 8. ENVIRONMENTAL MANAGEMENT PLAN Air Pollution Control Noise Pollution Control Measures Greenbelt Development Water Pollution Control Measures Solid Waste Management Socio-economic Environment Occupational Safety & Health Management Monitoring during Project Phase Monitoring Strategy Ambient Air Monitoring Noise Monitoring Water Quality Monitoring Machine and Equipment Safety Budgets for EMP Reclamation Progressive Mine Closure Plan CONCLUSION 12

3 List of Tables Table No. Title Page No. 1.1 Salient Features of Proposed Quarry Lease Area 2 5(a) Total Geological Reserves Manpower Requirement for Mining Operations Water Requirement Plantation EMP Bugdet Mine closure plan 11

4 1. Introduction In a developmental activity like Silica sand mining, all the exercise must co-exist satisfactorily with its surrounding condition so as to minimize the adverse impact on the environment. To control the likely adverse impacts and to achieve this goal, it is necessary to prepare a sound and Environmental Management Plan, which has to be implemented by the proponents, in order to achieve environmental protection along with production profits. Hence, Environmental Management Plan has been prepared for submission to State Environmental Impact Assessment Authority / State Expert Appraisal committee as per EIA notification 2006 and the amendments thereof for clearance of the proposed mining area. Smt. S.K. Heena Hameed has filed an application for quarry lease for Silica Sand Mine over an extent of Hectares/ Acres in Sy. No. 107/P of Karlapudi Village, Kota Mandal, Nellore District, Andhra Pradesh to the Director of Mines and Geology, Hyderabad vide Notice No /R3(1)/2000 dated The Director of Mines & Geology, Hyderabad has decided to grant a quarry lease in favor of Smt. S.K. Heena Hameed for a period of 20 years subject to submission of Approved Mining Plan within a period of 6 months as per Rule 12 (5) (c) and Rule 12 (5) (f) of Andhra Pradesh Minor Mineral Rules, Mining Plan approval was approved by Joint Director of Mines & Geology, and ZJDM&G, Hyderabad vide Letter No. 3176/MP-II/03 dated Mining Scheme Approval Letter No. 4484/MS/NLR/2015 dated , Deputy Director of Mines & Geology, Hyderabad. 2. Project proponent Smt. S.K. Heena Hameed, Nellore District has been granted quarry lease for mining of Silica sand in Sy. No. 107/P of, Andhra Pradesh. She is a private Lessee. 2.1 Project Location and Accessibility The proposed project is located in in Sy. No. 107/P of Karlapudi Village, Kota Mandal, SPSR Nellore District, Andhra Pradesh over an area of Hectares/ Acres. The nearest habitation, Kakuvaripalem village is located at a distance of 0.59 km due West from lease area. The proposed production is 27, MT/Annum for a period of 5 years. The location of the mine area comes under, Survey of India, Topo-sheet number 66 B/4. The Geo Co-ordinates of the mine lease are:- GCP Latitude Longitude 1 14º N 80º E 2 14º N 80º E 3 14º N 80º E 4 14º N 80º E 5 14º N 80º E 6 14º N 80º E 1

5 7 14º N 80º E 8 14º N 80º E The Salient features of the proposed Quarry Lease (QL) area is presented in Table 1.1 Table 1.1: Salient Features of Proposed Quarry Lease Area Name of the Applicant & Address Type of activity Production Capacity Location of the Proposed project or activity Appraisal Category Quarry Lease (QL) Area & Period Type of Land Nearest habitation and distance Nearest Seaport Source of water Nearest Railway station Total investment of the Rs. 50 Lakhs project/activity. Funds allocated for EMP (capital cost and recurring cost per annum) Survey of India Topo sheet 66B/4 (1:50,000) Man power requirement 15 Persons Smt. S.K. Heena Hameed W/o. S.K. Shahul Hameed H. No. 12/1138, Giddangi Street, Chinna Bazaar, SPSR Nellore District Andhra Pradesh Silica Sand Mining 27, MT/Annum Sy. No. 107/P, Karlapudi Village, Kota Mandal, SPSR Nellore District, Andhra Pradesh Category B (B2) Hectares/ Acres & 20 years Government Land Kakuvaripalem Village 0.59 km due W Krishnapattanam Seaport km due NE Through tankers from nearby villages Gudur Railway station km due NW Rs lakhs(capital Cost) Rs Lakhs/annum (Recurring Cost) 2.2 Infrastructure and communication:- The quarry lease applied area is situated at a distance of km due NW from Hyderabad. The district headquarters Nellore is at a distance of km NW. Amenities like post & telegraph office, police station, primary health centre etc are available at Nellore. Nellore is the district head quarters of Nellore district. Krishnapattanam Seaport is about km due NE and Tirupati Airport is about km due SW from Q.L applied area. Gudur Railway station is about km due NW. Water is available at the nearby site in agricultural bore wells from Q.L area. Power connection is available up to Kota Mandal, SPSR Nellore District. Agriculture is important occupation of the local people. Degree level educational facilities exist at Gudur which is km due NW. Further vast employment potential exists for the skilled. The processing of the raw blocks is not available at the Quarry site. 2

6 3. Geology 3.1 TOPOGRAPHY The subject area is almost a plain land covered by the sand and the area is gently sloping from north to south. There is only 3 m relief. The sand excavation up to the ground water table in this area is not going to do any impact on ground water table. Due to sandy area, there is no vegetation in the applied area. 3.2 Regional Geology The geology of the area is comprised of Nellore Schist belt covered by the sand formation in recent period. The sand is widely exposed to surface; rather the area is covered by sand everywhere. Whereas the Nellore schist and Silica rich Quartz veins are available as country rock situated much away from the subject area. 3.3 Local Geology The Sand occurs in entire applied area and surrounding lands right from surface without any overburden. The sand occurring here is not a replenishing type unlike other sand deposits in India. It consists 96 to 98 % SiO 2, negligible quantities of Al 2 O 2 and Fe 2 O 3. The raw sand is fine to medium grained pale brown to white in color and found suitable for molding purposes. The field observations and as well as reconnaissance study of the working mines in the area revels that the sand above the water table is more suitable and as well as viable for mining. Therefore, it is concluded that the entire applied area is silica sand bearing and its approximate thickness is about 4m (100 m to 97 m RL) for economical mining. (Source: Mining plan) 4. Exploration Sand thickness of about 1 m (100 m R.L 98 m R.L = 2/2) to the surface of the applied area. Three samples were collected from sand bed to a thickness of 1 m from the surface. Even though the sand is available below 3 m thickness i. e below water table, it is not economical to mine the sand. Mining work has been carried out by open cast semi-mechanized loading of silica sand is being done manually into tractors and tippers. Trench Grids 1 N & E Area (Sq. Average Length (m) Width (m) m) Depth (m) The area has been surveyed by Total Station and a Surface Geological Plan was prepared on the scale of 1: 1000 for an extent of Hectares/ Acres and is enclosed as Plate III. The Geological Sections were drawn across the deposit at regular interval on the scale of 1: 1000 scale showing the geology and categorization of reserves, enclosed as Plate IV. 3

7 5. Reserves The reserves are re-assessed based on the guidelines issued and the following reserves are projected as 'Proved Category' for enabling to mine the mineral from above 1 m of water table. Table 5 (a): Total Geological Reserves Sections Volume ROM 98% A-A B-B C-C D-D E-E F-F G-G Total Proved Reserves a) Reserves of the buffer zone and under 50 m Safety Barrier Zone of Canal: Non-Mineable Reserves: The sand reserves are going to be blocked under final pit slopes on all four side of the area is 26,550 MT and 37,162 MT. b) Minable Reserves and Life of the quarry Mineable reserves = 1, 86, , 012 = 1, 21, 062 MT The Silica Sand average production is proposed raise around 24, MT per year on an average in this plan period. At this rate of production the expected life of the mine is 5 years. (Source: Mining plan) 6. Mining Methodology 6.1 Mining program for next five years The sand occurs right from the surface without any overburden in this area. Hence, no development work is required for pre production of silica sand. It is proposed to produce the silica sand in the SE of the mining lease area of the mining lease area during next five years. The year- wise workings are shown in plate-4 and bench wise-production details for each year are given in Annexure-III. Production of five years is 1, 17, MT. 6.2 Manpower Requirement for Mining Operations A total of 15 persons shall be engaged to carry out the various operations at the mine area. There is a scope of another 5 person s employment as indirect employment. TABLE 6.2: Manpower at the QL area S. No. Category No. s 1. Mines Manager 1 2. Mining Engineer 1 4

8 3. Mining Superior/clerk 1 4. Mine watchman 2 5. Unskilled Labor 10 Total 15 (Source: Mining plan) 7. ENVIRONMENTAL SETTING The present environmental quality in the vicinity of a QL area identified for further mining serves as the baseline status and also for identification of environmental concerns/ impacts arising owing to project activities in the study area. The main features in the area covering 10 km radial distance around the proposed QL area is shown in Figure 7.1 above. 7.1 Air Environment Fugitive dust is from the transportation of mineral and waste from mining benches to stock yard and dump yard and other related activities etc. The transportation is done by tippers/ trucks. The major sources of air pollution are during loading & unloading, transportation, D.G. set etc. The subject is away from industries and human settlements at present. So the air and water are fresh in the area. Quarrying operations are manual thus involvement of labor is important. 7.2 Noise Environment The noise levels are dependent upon the activities at the QL area. As the mine is being operated with manual, noise from the mine will be mainly from transport vehicles. The subject is away from industries and human settlements at present so no chance for noise generation before mining operations. 7.3 Water Environment Effect of quarrying activities on the ground water regime are meager and deterioration of ground water quality is ruled out as quarrying operations are in a small scale and mining will be located at higher levels than the ground water table. The dumping yard may contribute by way of leaches during rainy season only, but every measure will be taken to stabilize the waste dumps. Total water requirement for the mining lease area is 4 KLD. This requirement will be met through bore wells / water tankers. The water will be used for domestic purposes, dust suppression and green belt development. Domestic wastewater will be sent to the septic tank followed by soak pit. The break-up of daily water requirement for the proposed quarry lease area is presented table below. Table 7.3: Water Consumption Details S. No. Description Water Requirement (KLD) 1. Domestic 0.8 5

9 2. Dust suppression Greenbelt Processing 1.0 Total Mine Drainage The drainage system of mine in this area consists of surface run of generated from rain fall and seepage. The rain water flows through the slopes of the area and drained off through a seasonal nalas. Care shall be taken to avoid fuel spillage and all the waste oils from the vehicles shall be properly collected and there shall be no spillages Solid Waste Generation About 2% of the sand production is going to be as mineral waste, which consists of intercalation of dust and coarse grained material. During first five years about m3 of mineral waste will be generated. This waste will be stocked in southern side buffer zone area over an area of 930 Sq. m and to an average height of 1.50 m as shown in Plate Flora & Fauna The subject area is sandy terrain and does not consist any trees or major vegetation. Except the presence of reptiles and other minor wild life s rabbits, field rats etc., no major wild life exists in this area. 7.5 Human Settlements No public buildings, important places and monuments are seen in and around the quarry lease area; however, the lessee will adopt the safety measures while conducting the quarry operations as per the Regulations. The applied area is surrounded by villages and few areas of workers concentration. The Kakuvaripalem village is situated 0.59 km due West of the quarry lease area. Agriculture and sheep breeding are important profession of the people living in the village besides involving themselves in quarrying activity. The literacy of the area is very less. 7.6 Power Estimated Power: 80 KVA Source: D.G. set of 80KVA Fuel consumption: 100LPD 7.7 Site Amenities: Site services like office & rest shed will be constructed on Western corner of the area, where the location is shown on plate-4. Drinking water will be supplied to the workers from the bore well opened in the adjacent quarry site & agricultural fields. 7.8 Climatic Conditions The peak summer will be in the month of May, highest temperature of 43.4 o C is recorded in the area during the month of May and the lowest temperature 18 o C is recorded in the month 6

10 of January, Annual Mean Heaviest rainfall in 24 hours is about mm. The mean wind speed is 8.3 km/hr. 8. ENVIRONMENTAL MANAGEMENT PLAN The activities at the QL area shall have both positive and negative impacts. In order to reduce the negative impacts owing to activities in the QL area under consideration, measures have been integrated in the process at the planning stage itself. Environmental management approach includes actions to protect environment by using various means at different stages of the project. The measures result in reduction of the impacts at the sources itself. Some of the measures result in the change in technology / process thereby reducing and or eliminating some of the adverse impacts. In a few inevitable cases the remedial solutions are provided to counter / minimize the negative impacts. 8.1 Air Pollution Control Measures Air pollution from mining activities in the present case is not anticipated to significantly extend beyond the immediate vicinity of the QL area. This is said based in the quantum of mining that is being taken up, the plant and machinery being used and the technology being adopted. Workers working directly in the vicinity of the loading and unloading operations will be issued breathing masks for regular use. The Air Pollution Control measures are required to be assessed based on the specific mining activity and location. Following measures shall be taken to mitigate the effect of mining operations. Dust suppression on haul road with sprinkling of water. All overburden dumps shall be stabilized with legumes and grass to prevent the erosion of soil and arrest the dust emission during windy days. Regular maintenance of vehicles and DG set shall be carried out in order to minimize the emissions. The area is surrounded by agricultural lands and there are no industries nearby. Hence natural air is available in this area. There are chances for air pollution at the time transportation of Mineral and waste. But this air pollution will be controlled to the ambient air quality standards (24 hours). The mine roads will be sprayed with water before starting the transportation of mineral and wastes to minimize air pollution. 8.2 Noise Pollution Control Measures The major sources of noise in mining are from the operations of trucks and DG set etc. Mitigation measures that are proposed to be adopted for control of noise levels are: All vehicles will be properly lubricated and maintained regularly. The sound level should be within the limits of 90 db. 8.3 Greenbelt Development In every year about an area of 200 Sq. m will be planted during this plan period. The plantation will be carried out on northern side of the area, along the boundary line. About 40 7

11 plants of cashew nut & teak plants will be planted per year in alternate rows at 3 m interval (Ref: Plate-IV). Table 8.3: Plantation details Year Area (Sq.m) No. of Plants 1 st ( ) nd ( ) rd ( ) th ( ) th ( ) Total Water Pollution Control Measures There are no chances for changes in quality of surface water or ground water the quarry operations will be carried out on plain sandy terrain. Hence neither the ground water table nor the general surface drainage pattern is affected. No water will be discharged from the quarry. Following measures shall be taken: Pumps of adequate capacity shall be installed to lift the accumulated rain water. It shall be ensured that good quality potable water is provided for drinking purposes. Good sanitation facilities (toilets with septic tank followed by soak pits) shall be provided and maintained for good hygienic conditions. The spillages form fuelling of vehicles shall be avoided and in case of any spillage the same shall be handled properly. Likewise the spent lubricating oils etc., shall be safely collected and properly disposed off. 8.5 Solid Waste Management During first five years about m 3 of mineral waste will be generated. This waste will be stocked in southern side buffer zone over an area of 930 Sq. m and to an average height of 1.50 m as shown in Plate-4 Management of waste material shall include the following: The waste generated during the mining will also be used for back filling of the mine pit after completion of mining. 8.6 Socio-economic Environment The occupation of the local inhabitants in surrounding villages of the mine area is Agriculture. The mining activity in this belt will benefit the locals both directly and indirectly. The directly beneficiaries will be those who get employed in the mines as skilled and unskilled workers. The indirect beneficiaries will be those who open small business to sell goods required by the residents whose per capita income will be enhanced by the mining activity, and thereby their purchasing power will be increased. In the long run a lot of social goods are expected in the comparatively backward area when the inhabitants will be able to send their children to school. 8

12 8.7 Occupational Safety & Health Management Periodical Medical Examination (PME) of all workers before recruitment and during mining operations. Total workers in the mine 15 Mine operators were provided with personal protective equipments (PPEs) include safety helmets and footwear, in addition to ear, eye, and hand protection devices. Dust masks were provided for workers. Potable drinking water & shelter for mine workers will be provided. 8.8 Monitoring during Project Phase (active mining) Pollution monitoring program includes periodic analysis of air, noise levels and groundwater samples. Groundwater samples at representative locations within and nearby the lease area shall be periodically analyzed to detect contamination if any. In the event of any contamination, concerned authorities shall be notified immediately and appropriate corrective measures shall also be initiated. The monitoring shall also help in knowing the effectiveness of abatement measures and also be a guide for further steps to be taken, if required Monitoring Strategy The monitoring of various environmental parameters is necessary and is a part of environmental protection measures. Monitoring is as important as that of control of pollution since the efficiency of control measures can only be determined by monitoring. A welldefined environmental monitoring program would be employed with trained and qualified staff to monitor the ambient air quality to check whether the quality of emissions/effluents is maintained within the permissible limits. Environmental attributes should be monitored as given below: Ambient Air quality Water quality Noise levels Soil characteristics Locations and frequency of monitoring should be as per the guidelines of APPCB Ambient Air Monitoring As per MoEF there is a need to identify 3 ambient air stations at 120 o angle keeping the main source in the center. The ground level concentrations of suspended particulate matter, sulphur dioxide and nitrogen oxides in the ambient air within the project boundaries will be monitored at regular intervals Noise Monitoring Noise levels in the workspace environment will be monitored periodically. If any deviation is observed necessary corrective measures will be taken. Monitoring noise levels is essential to assess the efficacy of maintenance of schedules undertaken to reduce noise levels and noise protection measures. A good quality sound pressure level meter is essential for this purpose. 9

13 This work can be handled by plant authorities themselves or by hiring services of an external agency Water Quality Monitoring Groundwater near the project site will be routinely tested for its quality. No contamination of groundwater is expected. Groundwater is recommended to be monitored in at least other wells/ bores in the area adjacent to the QL area in the direction of ground water flow to keep surveillance on the groundwater quality Machine and Equipment Safety To prevent and control hazards related vehicle use, measures for the enhancement of visibility should be applied throughout the mine. Specific visibility management practices may include the following: Use of reflective markings on structures, traffic junctions, and other areas with a potential for accidents. Installing safety barriers in high-risk locations of internal roads / transport corridors. Barriers may be constructed with refuse or other materials capable to stopping vehicles 8.9 Budgets for Environmental Protection Measures Smt. S.K. Heena Hameed have allocated budget of 3.00 Lakhs (Capital Cost) and 1.36 Lakhs (Recurring Cost) for the environmental protection measures. The component wise budget break-up for environmental management plan is given in table below S. No. Work Name Total fixed Maintenance/ recurring cost (Rs.) cost with periodicity (Rs.) 1. Safety shoe Helmet Hand gloves Ear plugs Cloth for protection from dust Gunny bags for drill hole coverage Dust Masks Water sprinkling Green belt establishment Medical examination Environmental Monitoring Social welfare measures Total 3,00,490 1,35, Reclamation The worked out pit will be reclamated at the end of the mining by the waste material, which is going to be generated from the mining and the reclaimed area will be used for plantation. 10

14 But, there is no proposed for reclamation of pit during first five years the bottom silica sand has to excavate. Reclamation and rehabilitation of the lands affected by mining will be done by back filling and afforestation Progressive Mine Closure Plan a. Mined out land As of now no part of the QL area is totally mined out. An extent of about 42,004 Sq. m area will be sliced down during next five years to a depth of 1.50 m. Type of land use Table 8.11: Mine closure plan At the time of beginning of the scheme period (Ha.) At the end of the ensuring scheme period (Ha.) During Conceptual period (Ha.) Mining Overburden Dump Mineral Storage Infrastructure Roads Green Belt Area Total Land Degradation Area which will Remain Untouched Total b. Water Quality Management The mining lease area is a part of elevated; it does not have any water body. The surrounding area is also free from any water tanks or big nalas in 500 M circumference. The ground water is found to be reached at beyond 10 m depth in the borewell nearby areas on lower level. The mining lease area is proposed to a maximum depth of 5 m. Therefore, the effect of mining is not anticipated on ground water regime. Other effects such as sedimentation etc., is also not expected in this area. c. Air Quality Management The air in this area is pollution free as there is no pollutant factories are there. The mining in this area will create air pollution due to emission of dust during mining and transportation. That will be suppressed by putting cloth at drilling spot, spraying water on mine layout road etc. d. Solid Waste Management The waste dump will be stabilized with soil on slopes. Erosion shall be prevented by plantation of grass and shrubs. The status of the dumps shall be periodically checked and corrective and safety measures adopted. The waste generated will be dumped temporarily in the South of the mining lease area (Within the mining lease area) between the grids N & E covering an area of 930 Sq. m with an average height of 1.50 M. This waste will be utilized for reclamation of the pits by rehandling. 11

15 e. Top Soil Management No soil exists in the mining lease area. f. Infrastructure The infrastructure is temporary in nature; the roads will be altered time to time at mining lease area. The permanent road, electric lines, telephone lines are far away. g. Disposal of Mining Machinery In this area machinery deployed is on hire basis. However, the mining operations are continuous in this mine. Hence, the question of disposal of machinery will not arise. h. Safety and Security Since the mine is an ongoing mine, all statutory obligations will be implemented i. Disaster Management and Risk Assessment In this area the mining does not involve disaster of land etc. j. Care and Maintenance during Temporary Closure For the protection of mine and mined - out pits the watchman will be engaged when the mine is temporarily discontinued. 9. CONCLUSION The mining activities of the applicant Smt. S.K. Heena Hameed in Sy. No. 107/P of, Andhra Pradesh will be environmentally compatible to the surrounding with the proposed environmental control measures implemented during quarry operations. The study identified the environmental issues viz., dust generation, noise levels and solid waste due to mining and material transportation, haulage of roads etc. Fugitive dust emissions from waste dumps, stockpiles and other exposed areas should be minimized by using dust suppression techniques for roads and work areas, optimization of traffic patterns, and reduction of travel speeds. Solid waste dumping yards, mining pits management measures shall be followed to protect human health, safety and the environment. Thus it can be stated that the quarry operations will not have any adverse effect on the surrounding environment and habitation, if the proposed environmental management plan is adopted. 12

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1.0 Introduction: Background: The Quarry lease, for Black Granite over an extent of 1.482 ha. in Sy Nos. 10 & 23, Sankavaram Village, Kanigiri

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P) VILLAGE : DEVGAON TEHSIL : RITHI DISTRICT : KATNI MINERAL : SAND STONE KHASRA NO : 7 PART AREA : 2.00 HECTARE PRPOSED PRODUCTION: 800 M 3 /YEAR STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED UNDER

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

G. M. Nagaraju Environment Management Plan

G. M. Nagaraju Environment Management Plan ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a 1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Environment Impact Assessment study:

Environment Impact Assessment study: (A) Environment Impact Assessment study: 1. Pollution Potential: Air Emission: Dust Emission during Mining, Transportation & Crushing of the Stones which will be controlled by water sprinkling and development

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P.

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P. VILLAGE : SALIYA BINEKA TEHSIL : BANDA DISTRICT : SAGAR MINERAL : CRUSHER STONE KHASRA NO : 270 AREA : 2.00 HECTARE PRPOSED PRODUCTION : 18000 M 3 /Year STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

SRI R. HANUMANTHA RAO (QUARTZITE MINE 21.85 ha) SURVEY NO.1, SARAYAVALASA VILLAGE, DATTIRAJERU MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH

SRI R. HANUMANTHA RAO (QUARTZITE MINE 21.85 ha) SURVEY NO.1, SARAYAVALASA VILLAGE, DATTIRAJERU MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH SRI R. HANUMANTHA RAO (QUARTZITE MINE 21.85 ha) SURVEY NO.1, SARAYAVALASA VILLAGE, DATTIRAJERU MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH 1. ENVIRONMENTAL IMPACT ASSESSMENT REPORT 2. ENVIRONMENT MANAGEMENT

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE OF THE PROPOSED COLOUR GRANITE MINING PROJECT APPLICATION. AT SURVEY NO. 54/P,2.0 HECTARE

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

Building Stone Quarry

Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01

More information

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

RISK ASSESSMENT. STONE QUARRY (2.40 Ha) RISK ASSESSMENT FOR STONE QUARRY (2.40 Ha) Gat no. 85, A/p Karanjvihire, Tahsil Khed, District Pune, Maharashtra OF M/s Shankar Ramchandra Earthmovers Pvt. Ltd. Risk Assessment for Stone Quarry Mining

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information