NIMAPALLI STONE QUARRY

Size: px
Start display at page:

Download "NIMAPALLI STONE QUARRY"

Transcription

1 EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha)

2 CONTENTS CHAPTER PARTICULARS PAGE NO 01 Introduction of the Project/background Information 02 Project Description 03 Site Analysis 04 Planning Brief 05 Proposed Infrastructure 06 Rehabilitation and Resettlement 07 Project Schedule & Cost Estimates 08 Analysis of Proposal ( Final Recommendations )

3 Introduction of the Project Chapter Identification of Project and Project Proponent The proposed project, Nimapalli Stone Quarry is a Stone quarry, which has been given on long term quarry lease basis to Sri Sanjay Kumar Nayak in Ganjam district of Odisha State. In this Stone quarry mining method is done by opencast semi mechanized method and the proponent is a businessman. 1.2 Brief Description of Nature of Project Nimapalli Stone Quarry Area is over Ha. in village Nimapalli, Tahasil Purushottampur, District Ganjam has been allotted to Sri Sanjay Kumar Nayak, the lessee through long term quarry lease basis for quarrying of ordinary stone / Stone (minor mineral) by the Tahasildar Purushottampur, on behalf of Odisha in accordance with the provision of the Minor Mineral Concession Rules ( amendment), 2014 through long term quarry lease for the excavation of stone. The current allotment through long term quarry lease basis in the name of Sri Sanjay Kumar Nayak for five years form to Need for the Project and its Importance to the Country and the Region The need and the importance of this Quarry Project are mainly for the construction infrastructural development of the area. The Stone excavated from the quarry is crushed in the crushing unit to produce the desirable material to be used in construction of house and road domestic market. 1.4 Imports Vs Indigenous Production As far as ordinary stone production is concerned with reference to the importing of the said material, it is advantageous to mine mineral rather to be used in construction of house and road in domestic market. 1.5 Export Possibility The excavation of stone/boulders is solely for the use in crusher and finished product in domestic market. 1.6 Domestic / Export Markets There is a huge domestic market for the ordinary stones/boulders.

4 1.7 Employment Generation (Direct and Indirect) due To the Project Total number of employment will be around 8 including Management, Supervisory personnel, Skilled, Semiskilled and Unskilled. Chapter 2 Project Description 2.1 Type of the Project Including Interlinked and Interdependent Project. Stone in the quarry area is proposed to be excavated by conventional method of opencast mining through the formation of safe benches which will be semi mechanized and on single shift basis. Benches will be formed and worked in a top to downward manner. Because of presence of hard and compact rock mass, drilling and blasting will be performed for loosening of the rock mass. 2.2 Location (Map Showing Generation Location, Specific Location and Boundary & Project Site Layout) with Coordinates. The quarry area is located in Southern part of village Nimapalli, under Purushottampur Tahasil of Ganjam district, Odisha State. Nimapalli Stone Quarry areas form a part of Survey of India Toposheet No. 74 A/15. The quarry area bounded the between the latitude of N to and longitude E to E. The quarry area is earmarked in the Toposheet. 2.3 Details of Alternate Sites Condition and the Basis of Selecting the Proposed Site, Particularly the Environmental consideration gone into should be highlighted. Being a Stone Quarry it is site specific. No alternate site can be carried out within quarry area to be allotted by the State Government of Odisha as per the conditions of lease agreement document. As far as the environmental considerations, the proponent is abiding by all relevant is abiding by all relevant acts & rule and provisions of EP Act.

5 2.4 Size or Magnitude of Operation Size of the quarry area is Ha. Magnitude of the proposed operation is excavation of 990 cu.m/ annum of ordinary Stone. 2.5 Project Description with Process Details (a Schematic Diagram / Flow chart showing the Project Layout, Components of the Project etc. should be given) Method of Quarrying: Stone in the quarry area is excavated by conventional method of opencast mining through the formation of safe benches which is semi mechanized and on single shift basis. Benches are formed and worked in a top to downward manner. Because of presence of hard and competent rock mass, drilling and blasting is performed for loosening of the rock mass. Bench Geometry: Height/Width of the quarry benches are kept at 2.5m/ 5m. Time Schedule: Total working days are 250 days in a year. Number of shift per day is 01 (One). The working hour in a shift is 8.00 hours. Production Planning: The maximum production of construction stone from this quarry is 990cu.m/annum. Extent of Mechanization: A standard equipment selection has been made in respect of major earth moving machines consisting of 0.9m 3 hydraulic excavators, 10MT capacity dumpers and 100 mm dia DTH drills. Loosening of the hard rock mass is effected by the blasting of DTH drilled holes. Excavator of 0.9m 3 capacity is utilized for excavation & loading of blasted rocks. Rock breaker is used for breaking of big boulders. Tipper /trucks/ dumpers of 10MT capacity are used for transporting of rock from quarry site to stone crushing units. Transportation: Ordinary Stone excavators from the quarry are transport to the crushing unit material through 10MT capacity trucks/ dumpers. During transportation overfilling of trucks and consequent spillage of materials on the roads will be avoided by covering tarpaulin in the loaded trucks.

6 List of Machinery /Equipment Proposed: The nature and quantity of machinery required for excavation and /or blasting of ordinary stone / rock depends on the production capacity of the quarry. However, the machines used are as follows: Table No. 01 List of Machinery Sl. No. Name of the No of the Power of machine machine machine 1 Composer 1 175HP 2 Jack Hammer 1 7.5Kgf/ sq. cm Blasting: Nimapalli area is enriched with Stone which is hard in nature. Since the hill track is boulder in nature, jointed & fractured, about 65% of the total excavation will be subjected to drilling & blasting fragmentation for ease in production and remaining is excavated by the machine. 2.6 Raw Material Required along with Estimated Quantity, likely Source, Marketing Area of Final Product/s, Mode of Transport of Raw Material and Finished Product. The said project is ordinary Stone excavation project. It does not require any other raw material for stone excavation rather only production of ordinary stones from the available reserve within the quarry area. 2.7 Resource Optimization / Recycling and Reuse Envisaged in the Project, if any, Should be briefly outlined. Excavation of stone / rock will be carried out strictly as per condition given in the lease agreement with a view to optimize all resources available Availability of Water, Its Source, Energy / Power Requirement and Source should be given Availability of Water and Its Source Water is only for drinking, potable use, dust suppression and plantation. A total 2,000 litters per day of water is used per day for the above activities. The water is made available from bore wells exist within the quarry area.

7 2.8.2 Energy / Power Requirement and Its Source No electricity is required as no operation after sun set. 2.9 Quantity of Wasters to be generated (Liquid and solid) and Scheme for Their Management / Disposal During plan period 550cu.m of waste will be generated. For dumping these waste materials a proposed dump has been suggested in the South- western part of quarry area covering an area around the dump will be 3mt. A retaining wall around the dump will be constructed to prevent the wash off of dumps. Around the retaining wall a garland drain and settling tank will be provided to prevent the possible transportation of mine dust or fines. Liquid Waste / Waste Water: The said Quarry area dose not has any workshop within the area. Thus, no trade effluent is generated from the quarry site. However, during rainy season surface runoff containing suspended and solids and silts flows out. 3.7 Schematic Representation of the Feasibility drawing which give information of EIA Purpose. As per the guide lines of MOEF, GOI vide letter no.j-13012/12/2013-ia-ii (I) of dated , this prefeasibility report is prepared for Nimapalli Stone Quarry (Category B2) project for grant of environmental clearance. The lease period 5 years. 3.1 Connectivity Chapter 3 Site Analysis The quarry area is located in south of village Nimapalli, under Purushottampur Tahasil of Ganjam district in Odisha State. The quarry is accessible from state head quarter Bhubaneswar by covering a distance of 252 km and district head quarter at a distance of 73 Km by road. The quarry is 65 km away from the state highway.

8 3.2 Land From, Land Use and Ownership The quarry lease area over Hac. is Govt. owned non-forest area as per land schedule of the revenue department as given in below Table No. 02. Table No. 02 Land Schedule Mouza Khata No Plot No Kissam Area In hact. Nimapalli Parbata Topography The area covers a land of Hects. and is located at south of village Niapalli in Ganjam district of Odisha. The area can be featured in Survey of India Toposheet No. 74 A/15. The substantial part of the area represents gently sloping terrain with highest altitude of 36 mrl in South part where as the North-East part shows the lowest altitude of 34mRL having an elevation difference of 4m. The general slope is towards North-East. 3.4 Existing Land Use Pattern (Agriculture, Non- Agriculture, Forest, Water Bodies (including area under CRZ)), shortest distances from the periphery of the Project to the periphery of the forest, National Park, Wild Life Sanctuary, eco-sensitive areas, water bodies (distance from the HFL of the River), CRZ. The quarry area over hectares is Govt. owned non-forest area as per land schedule of the revenue department as given in below Table No. 03 Table No. 03 Land Schedule Mouza Khata No Plot No Kissam Area In Acres Nimapalli Parbata 4.046

9 The land use of the quarry including temporary road. Distance of Various Physical Features from the Boundary of the Lease Area There is no Ecological Sensitive area as per Hon ble Supreme Court Civil writ petition No. 460 of There is no national park/ wild life sanctuary/ biosphere/ tiger reserve/elephant reserve in the lease area and buffer zone (10.0 km radius of the quarry area). There is no seasonal or perennial nala in the quarry area. There is no endangered fauna like elephant, sloth bear, python etc in & around the Quarry area. 3.5 Existing Infrastructure Location of the Quarry Lease area with respect to the infrastructure is as follows: Market is at Purushottampur which is located at a distance of 8 km from the quarry site. Water supply for the Quarry including drinking is made available from existing bore well from Nimapalli. Medical facilities are available at Berhampur at a Distance of 20kms from the quarry area. High School for educational facilities is at Nimapalli at a distance of 7Kms. 3.6 Soil Classification and Geology both Regional & Local Regional Geology: Geologically, the quarry lease area falls in the coastal tract of Odisha and is characterized by subtropical transitional climate with temperature ranging from 35 0 C to 49 0 C. The Eastern Ghats are represented by Khondalite suite of gneisses, basic have been permeated by quartz veins and quartz- feldspathic neosomes. The Archaeans are overlain by Cainozoic sediments at coastal margin. Local Geology: The lease area is characterized by having elevation from RL 39m above M.S.L. A geological study and the surface exposure the stone is extended to 6 mtrs.

10 3.7 Social Infrastructure Available: Accessibility: The quarry area is accessible by all weather & Well connected by road and rail. The quarry site is connected through 252 Km road state head quarter Bhubaneswar and 73 Km long road from district head quarter. The nearest railway station is Berhampur located at a distance 20 km from the quarry area. Location of the Quarry Lease area with respect to the infrastructure is given as follows: Market is at Purushottampur which is located at a distance of 8 km from the quarry site. Water supply for the Quarry including drinking is made available from existing bore well from Nimapalli. Medical facilities are available at Berhampur at a Distance of 20 kms from the quarry area. High School for educational facilities is at Nimapalli at a distance of 6 Kms. Chapter 4 Planning Brief 4.1 Planning Concept (type of industries, facilities, transportation etc.) Town and Country Planning / Development Authority Classification The said proposal is a ordinary stone mine industry. The Lessee does not have any plan for construction of town ship for its employees. Mostly local villagers are employed. They are commuting from local area. Public and self transport facilities are used for commuting from their residence to the Quarry site. 4.2 Population Projection There is no human settlement in the Quarry area. People of the buffer zone area mostly engaged in business and agriculture.

11 4.3 Plantation Program Afforestation and Reclamation/Rehabilitation: There is no forest growth in the quarry site. The arial extent of the Nimapalli lease area is hect. Is likely to be utilized / degraded. As far the as present exploration is concerned, conceptual quarry boundaries are delineated. 1. Watering and maturing will be done periodically as per requirement. 2. Post plantation care such as soil working, pruning etc will be done. 3. Casual replacement will be done. 4. Insecticides will be spread for pest control. 5. Proper watch and ward will be there to save the trees from cattle and fire. 4.4 Assessment of Infrastructure Demand (Physical & Social) No new infrastructures will be constructed to handle the proposed production. Existing facilities are adequate. 4.5 Amenities / Facilities Market is at Nimapalli which is located at a distance of 8 km from the quarry site. Water supply for the Quarry including drinking is made is made available from existing bore well from Nimapalli. Medical facilities are available at Berhampur at a Distance of 20 kms from the quarry area. High School for educational facilities is at Purushottam Pur at a distance of 8 Kms. Facilities at Site: First-aid facilities equipped with sterilized dressing materials such as cotton wool, bandages, iodine and antiseptic solution etc for treatment of the quarry workers before hospitalization, if any accident occurs in the quarry. Rest shed is provided at the quarry site to take food & water and rest during lunch time. Site office is used for day to day quarry administration and management.

12 Chapter 5 Proposed Infrastructure 5.1 Industrial Area the Processing Area It is an excavation of Stone quarry project. Area around Ha will be used for excavation. The detail of land use of the area is given as below: Table No. 05 LAND USE Sl. No Heads Area put to use in hect. 1 Area under excavation Area for plantation Dump area Total area in use Residential Area (Non Processing Area) No residential facilities envisaged in the project. 5.3 Social Infrastructure Accessibility: The quarry area is accessible by all weather & Well connected by road and rail. The quarry site is connected through 252 Km road state head quarter Bhubaneswar and 73 Km long road from district head quarter. The nearest railway station is Berhampur located at a distance 8 km from the quarry area. Location of the Quarry Lease area with respect to the infrastructure is given as follows: Market is at Purushottampur which is located at a distance of 8 km from the quarry site. Water supply for the Quarry including drinking is made available from existing bore well from Nimapalli. Medical facilities are available at Berhampur at a Distance of 20 kms from the quarry area. High School for educational facilities is at Nimapalli at a distance of 6 Kms.

13 Postal & Telephone facilities: Postal and telephonic facilities are available at Nimapalli. Facilities at Site: First-aid facilities equipped with sterilized dressing materials such as cotton wool, bandages, iodine and antiseptic solution etc for treatment of the quarry workers before hospitalization, if any accident occurs in the quarry. Rest shed is provided at the quarry site to take food 7 water and rest during lunch time. Site office is used for day to day quarry administration and management. So no social infrastructures are required for this Quarry. 5.4 Connectivity (traffic and transportation Road / Rail / Metro / Waterways etc.) The quarry area is accessible by all weather roads and Well-connected by road and rail. The quarry site is connected through 252 Kms road from state head quarter Bhubaneswar & 73 Km long road from district head quarter towards. The nearest railway station is Berhampur located at a distance 20 km from the quarry area. 5.5 Drinking Water management (Sources & supply of Water). Water is used only for drinking, portable use, dust suppression and plantation. A total 2,000 liters of water is used per day for the above activities. The water is made available from bore wells bore wells available in quarry area. 5.6 Sewerage System No residential facilities envisaged in the project. Quarry is operating only in single shift. So no sewerage system is available in this quarry area. 5.7 Industrial Waste Management There is no industrial waste from the Quarry site.

14 5.8 Solid Waste Management During plan period 550cu.m of waste will be generated. For dumping these waste materials a proposed dump has been suggested in the South-western part of the quarry area covering an area of 2.539ha and the proposed dump height will be 3mt. A retaining wall around the dump will be constructed to prevent the wash off of dumps. Around the retaining wall a garland drain and setting tank will be provided to prevent the possible transpiration of mine dust or fines. 6.1 Power Requirement & Supply / Source No electric required at quarry site. Only diesel is used for operating mining equipment only. For which 4 KL of HSD will be used and sourced from local market. Chapter 6 Rehabilitation and Resettlement (R & R Plan) 6.1 Policy to be adopted (Central / State) in respect of the project affected person including Home Oustees, Land Oustees and Land Less Laborers (a Brief Out line to be given) The Quarry area is over Ha. Is Govt. owned non-forest area as per land schedule of the revenue department and the kissam is parbat. There is no human settlement with in the Quarry area. People of the buffer zone are mostly engaged in business and agriculture. R & R Policy of Govt. of Odisha will not be required as there is no human settlement within the quarry area.

15 Chapter 7 Project Schedule & Cost Estimate 7.1 Likely date of Start of Construction and Likely Date of Completion. For the financial year to , it is allotted to Sri Sanjay Kumar Nayak through long term quarry lease process. The commencement of production is after obtaining environmental clearance. The excavated construction stone will be completely used for stone crushing unit. 7.2 Estimated Project Cost along with Analysis in terms of Economic Viability of the Project. The approximate cost of the project is comes round Rs 8 lakhs.

16 Chapter 8 Analysis of Proposal: Final Recommendations 8.1 Financial and Social Benefits with Emphasis on the Benefit to the Local People including Tribal Population, if any, in the area. As the project is to process and generate road construction material, it brings improvements in the physical social infrastructures in the area definitely to some extent, apart from providing direct employment, contractual employment and indirectly employment and mostly from the local community due to construction Stone Mining. Tangible Benefits: Local community near the Quarry area finds good employment potential in the quarry directly and in ancillary activities indirectly. The construction Stone mining operations also result in financial gains for the state and central exchangers, through collection of various taxes like royalty, welfare cess and central excise. Improvement of the general living standard of the people in the vicinity to some extent. Growth of allied industries in the area to some extent. 8.2 Recommendation for EC The said Stone Quarry project is categorized as B2 project as per office Memorandum no: J-13012/12/2013-IA II(I), dtd of Government of India, Ministry of Environment and Forests, New Delhi (Annexure - 1). Hence issuance of E.C. by SEIAA Bhubaneswar may kindly be considered. Sri Sanjay Kumar Nayak At Pallyama Dist Ganjam (Odisha)

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR DANKARI BLACK STONE QUARRY EXTENT-4.00Acres PLOT NO-600, KHATA NO-221 SAIRAT CASE NO-74/2014-15 VILLAGE: DANKARI, TAHSIL: DHARMASALA DISTRICT: JAJPUR, STATE-ODISHA. LESSEE M/S

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

Sub: Submission of application for Environmental Clearance.

Sub: Submission of application for Environmental Clearance. Date: 10/10/2015 To, The Member Secretary, SEIAA, Dept. of Ecology Environment & Forest 7 th Floor, M.S. Building, Bangalore-560 001 Dear Sir, Sub: Submission of application for Environmental Clearance.

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi- 110 003 To The Managing Director

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS 2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

Andhra Pradesh Latitude & Longitude 13 0 30 36.2 N 78 0 29 59.6 E Toposheet No 56 K/6, 56 K/7, 56 K/10 & 56 K/611

Andhra Pradesh Latitude & Longitude 13 0 30 36.2 N 78 0 29 59.6 E Toposheet No 56 K/6, 56 K/7, 56 K/10 & 56 K/611 1.0 EXECUTIVE SUMMARY: The Granite Mining[Black Granite] project (Minor Mineral) of Sri Suresh Jain 2.0 Ha is located at Survey No: 691, of Madanapalli Village & Mandal,. The Mine Lease[Quarry] was granted

More information