1 TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED

2 1.0 INTRODUCTION M/s. Bharat Petroleum Corporation Ltd. (BPCL) is one of the three major integrated Petroleum refining and marketing companies in India. BPCL s Kochi Refinery (KR) is situated in Ambalamugal, Kochi in an area of approximately 1300 acres. The refinery was commissioned in 1966 and presently has an installed capacity of 9.5 MMTPA. Bharat Petroleum Corporation Ltd. is committed to energy conservation and abatement of pollution. Various modernisation and up-gradation projects have been carried out over the years to improve the processing capability and for optimizing the yield pattern to meet the demand / requirements of petroleum products of the country. Bharat Petroleum Corporation Limited (BPCL) intends to set up an BS VI MS Block unit consisting of Naphtha Hydrotreating Unit, Naphtha Splitter Unit, Light Naphtha Isomerisation Unit and Continuous Catalytic Reformer Unit at their Kochi Refinery. In order to meet the requirement under notification of MoEF dated and amended notification dated , TOR of EIA has been prepared and presented here under. 2.0 Scope of Baseline Data Collection 2.1 Air Environment Meteorology A meteorological station will be set up suitably at/ near to the refinery to continuously collect meteorological data. The meteorological data in terms of rainfall, ambient temperature, Hourly Wind Speed, Hourly Wind Direction, Cloud cover, Wet Bulb and Dry Bulb Temperature, Humidity shall be collected, compiled and presented for a period of one season (proposed for one month) Air Pollution The following parameters shall be monitored in 12 nos. locations as per relevant IS codes: Parameter No. Of Locations No. Of seasons (1 month) Total Weeks of Study No. Of Samples/ week/location Total No. Of Samples PM 10, µg/m 3, (24 hrly) PM 2.5, µg/m 3, (24 hrly) SO x, µg/m 3, (24 hrly)

3 NO x, µg/m 3, (24hrly) CO, mg/m 3, (8 hrly) Ozone O3, µg/m 3 (8 hrly) HC (Methane & Nonmethane), µg/m 3, (24 hrly) Benzene, µg/m 3, (24 hrly) Benzo(α)Pyrene ng/m 3, (24 Hrly) VOCs (xylene, toluene, ethyl benzene all inclusive) µg/m 3, ( 24 Hrly), 12 3 (thrice in a day) 3 (thrice in a day) Water Environment Scope of Baseline Data Collection for EIA study - Water Environment Sampling and Analysis of water samples shall be done for one season (proposed for one month). Analysis shall be carried out as per relevant IS procedures/apha for the following parameters: Parameter ph, Temperature, Turbidity, Total Suspended solids, Total Dissolved Solids, Total alkalinity, total Hardness, Ca/Mg-hardness, chloride, Sulphate, Sodium, Potassium, Nitrate, Total phosphate, phosphorous, nickel, cadmium, chromium, copper, lead, iron, manganese, zinc, DO, COD, BOD 3,27, Total coliforms, Locations 5 (4 surface and 6 ground) Samples / Location / Season Season 1 1 Total No. of Samples 10 samples 2.3 Noise Environment Plant and Equipment noise Plant and equipment noise levels shall be designed and engineered to meet the OSHA requirements. Noise level at the battery limit shall comply with stipulated norms.

4 2.3.2 Noise level and traffic The noise levels shall be monitored hourly and shall be represented in terms of hourly L eq, L day,and L night at each location as following: Sl. No. Paramet er location Season Months of study Frequency/location Total samples 1. Traffic Density Twice (2) in one month every hour for 24 hrs at each location for each season Noise level Twice (2) in one month every hour for 24 hrs at each location for each season Land Environment Scope of Baseline Data Collection for EIA study - Land Environment Land use / Land Cover Mapping Collection of the land use/ land covers data for study area of 10 kms covering the following features using satellite imagery at a scale of 1:50, Soil Quality Forests Other forms of greenery Water body / Geo-Hydrology Built-up areas Waste Land Drainage pattern of the site. Agriculture land Other important heritage/archeological sites The soil quality at various locations shall be collected as given below:

5 Parameters (i) Type of soil (ii) ph (iii) Bulk Density (iv) Porosity (v) Soil Texture (vi) Sand % (vii) Silt % & Clay % (viii) Organic Matter % (ix) Sodium Adsorption Ratio (x) Specific Gravity (xi) Electrical Conductivity (xii) NPK Values Locations Samples / Location / Season Seasons Total Samples Biological Environment Scope of Baseline Data Collection for EIA study - Biological Environment The biological environment in terms of flora and fauna shall be identified within 10kms around the proposed site To review the project in the light of legislation s for the protection of forests and wildlife. Collection of the baseline status of the flora/fauna, forests and other wild habitats and species (both rare and endangered) in the study area Direct and indirect impacts on ecology of plants and animals in the area due to clearing of trees, strips of land, etc. Preparation of the Environmental Management Plan (EMP) for forest/wild life protection (if applicable) during the construction and operational phase of the proposed facilities. Aquatic and terrestrial ecology around the project site shall be established by literature review and field investigation Migration path of birds (if any) shall be identified 2.6 Socio Economic Environment Scope of Baseline Data Collection for EIA study Socio Economic Environment Socio Economic Profile The scope of work delineated below is to be carried out in detail in a study area encompassing 10 km radius around the project area. Collection of baseline data related to socio-economic profile of the study area with reference to: a) Human settlements, demographic profile, health status, occupational structure, employment and income patterns b) Infrastructure resource base including medical, education, water resources, power supply, communication & transportation and industrial areas

6 c) Economic activity/ resource base: Agriculture, industry, forestry, trade and commerce d) Project perception and socio-economic expectations including projections for economic benefits from the proposed project expansion plans along with delineation of measures to minimise the adverse impacts e) Assessment of impacts on places of historical/archaeological importance and aesthetic impairments, if any. 3.0 COVERAGE OF EIA REPORT 3.1 Introduction This chapter will cover the following: (i) (ii) (iii) (iv) (v) (vi) A brief description of the project. Purpose of the proposed plant, plant site and brief description of the plant i.e. name, nature, size, and location Profile of the project proponents, name and address with Id., phone/fax etc of the implementing organization, organizational chart, project consultants etc. Any litigation pending against the proposed project and/or any direction/order passed by any court of law against the project should be clearly mentioned with full details thereof The environmental compliance status for the existing project. Environmental Impact assessment methodology followed its advantages over other methods and its salient features. 3.2 Project Description This chapter will cover the broad details of the plant/s, location, layout and implementation schedule of the project. a) Availability of power, water etc during construction and operation of the project b) Estimated water budget during construction and operation of the project c) Estimated Power requirement during construction phase d) Cost of each project stage including environmental cost, if any e) Man-power requirements and time frame for implementation Essential Maps to be provided: a) Map indicating the project site in the state, district, tehsil / taluka etc. b) Land use map of the study area to 1:50,000 scale based on recent satellite imagery of the proposed area and 10 kms from the proposed project boundary delineating the cropping pattern, wastelands, forest area and built-up areas, water bodies indicating source of water supply for the plant/s, human habitation and other surface features such as railway tracks, ports, airports, roads, NH, major industries etc. Plant Details a) Process description b) Plant facilities including utilities

7 c) Gaseous emissions, liquid and solid discharges 3.3 Description of Environment Spatial Framework As mentioned above, the spatial framework for the study shall be 10 kms around both the project site Temporal Framework All activities to be undertaken during Construction and Operation phases shall be identified and listed. The same shall be the framework and each of the activity shall be reviewed, assessed for its impact on the environment Establishment of Present Levels of Various components of environment Consideration of background data about each of the component of environment is essential to plan the scope of baseline environmental data collection. The same is described and the scope of baseline environmental data collection is given in section 2.0 of this document. 3.4 Anticipated Impact and Mitigation Measures In the construction phase of the project the environmental pollution is due to the conventional sources and noise. The data on both is collected as part of the baseline measurements. The environmental impact and mitigation measures due to these conventional pollutants (soil, water, air and noise) shall be detailed out. Environmental Impacts of refinery complex are primarily due to air, dust emissions to the environment through their stacks and in the form of effluents. The height of stacks is so calculated that at full power, under all meteorological conditions by the time the air from stack reaches ground at fence post, its emission value is below the permitted limit. The total stack emission of air and pollutants and the dose there from at the fence post is estimated using AERMOD to assess if it is within stipulated limit. Similarly, in water discharge of liquid effluents, many parameters are measured and are checked within permitted limit. 3.5 Environmental Monitoring Program The chapter will include details of the environmental monitoring programs. It shall include technical aspects of monitoring the effectiveness of mitigation measures (including measurement methodologies, data analysis, reporting schedules, emergency procedures, detailed budget and procurement schedules). Summary matrix of environmental monitoring during construction and operation stage Monitoring facilities. Frequency, location, parameters to be monitored. Compilation and analysis of data, comparison with baseline data and compliance to stipulated norms and reporting system.

8 3.6 Additional Studies Risk Assessment Risk assessment report prepared by specialists in the field as per international practice in refinery industry and conclusions mentioned in the report. 3.7 Environment Management Plan This chapter shall contain the following aspects: Summary of potential adverse impacts and recommended mitigation measures Allocation of resources and responsibilities for implementation Administrative and Technical setup for the Management of Environment Environmental specifications for the contractors should contain adequate safeguards to ensure that management measures will not be compromised under adverse field conditions or time constraints. Construction Phase Environmental Management during construction, operation and commissioning phases: Site preparation Sanitation Air Environment Noise Environment Water Environment Land Environment Socio-economic environment Green-belt Development 3.8 Summary and Conclusions It will be the summary of the full EIA Report condensed to ten A-4 size pages at the maximum. It will cover in brief the following chapters of the full EIA report. Introduction/ Project Description / Description of the Environment/ Anticipated Impacts and Mitigation measures/ Environmental Monitoring Program/Additional Studies/ Environmental Management Plan/ Summary and Conclusions / Disclosure of Consultants engaged.

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Guidance for assessment of representativeness and reliability of baseline environmental attributes

Guidance for assessment of representativeness and reliability of baseline environmental attributes Annex IV Methods of Monitoring and Analysis Guidance for assessment of representativeness and reliability of baseline environmental attributes (Also Please Refer CPCB Guidelines on Methods of Monitoring

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Proposed Terms of Reference (TOR) For

Proposed Terms of Reference (TOR) For Proposed Terms of Reference (TOR) For OBJECTIVE Environmental Impact Assessment of Proposed Delhi to Jaipur Expressway of 8/6/4 lanes ( Green Field Project) Terms of Reference (TOR) are proposed for preparation

More information

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Executive Summary For POL Depot At Village Malom,Imphal EXECUTIVE SUMMARY

Executive Summary For POL Depot At Village Malom,Imphal EXECUTIVE SUMMARY Page I of VII EXECUTIVE SUMMARY 1.1 INTRODUCTION Indian Oil is India s flagship energy major and the country s largest commercial enterprise with a turnover of Rs. 2,71,000 crore (US$ 61.3 billion) and

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that

More information

GUIDELINES FOR LEACHATE CONTROL

GUIDELINES FOR LEACHATE CONTROL GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

TORs for proposed EIA & RA study

TORs for proposed EIA & RA study TORs for proposed EIA & RA study 1. The EIA study for the proposed project shall be carried out based on the latest environmental quality status around the project site (10 km radial distance) for one

More information

Storm Water Runoff from Natural Gas Well Sites in North Texas: Sampling, Modeling, and Management Options

Storm Water Runoff from Natural Gas Well Sites in North Texas: Sampling, Modeling, and Management Options Storm Water Runoff from Natural Gas Well Sites in North Texas: Sampling, Modeling, and Management Options Kenneth E. Banks David J. Wachal City of Denton, Texas David Wachal is now with ESRI Professional

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans OVERVIEW The objective of a Combined Sewer Overflow (CSO) Facility Plan is to abate CSO discharges

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

sustainability report

sustainability report sustainability report Sustainable development In the midst of turbulent macro-economic conditions adversely impacting the coal sector, we maintain our focus on building a business that has a viable, long-term

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

Tree Management Policy

Tree Management Policy Tree Management Policy This policy is designed to be a policy framework for the management of trees owned and managed by the Connect HA. It sets out the guiding principles for managing our stock, to assist

More information

PRC: Zhanghewan Pumped Storage Power Station Project

PRC: Zhanghewan Pumped Storage Power Station Project Environmental Monitoring Report Project Number: 28212-013 Quarterly Report January March 2006 PRC: Zhanghewan Pumped Storage Power Station Project Prepared by Hebei Zhanghewan Pumped Storage Co., Ltd.

More information

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities 40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香 港 灣 仔 告 士 打 道 5 號 稅 務 大 樓 40 樓 ACE-EIA Paper 2/2009 For advice Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment

More information

Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems

Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems Fred Bowers 1,2, Ph.D. New Jersey Department of Environmental Protection Division of Water Quality August 14,

More information

Texas Commission on Environmental Quality

Texas Commission on Environmental Quality Matrix: Drinking Water Method EPA 1603 (modified mtec) AB ID Method ID Escherichia coli (enumeration) TX 2525 10236201 Method EPA 200.5 AB ID Method ID Arsenic TX 1010 10213975 Beryllium TX 1020 10213975

More information

Smoke Management Plan

Smoke Management Plan Smoke Management Plan December 2007 TABLE OF CONTENTS 1.0 Introduction 3 2.0 Background 6 3.0 Smoke Management Plan 7 3.1 Authorization to Burn 10 3.2 Minimizing Air Pollutant Emissions 11 3.3 Smoke Management

More information

How To Manage Water Resources

How To Manage Water Resources NB: Unofficial translation; legally binding texts are those in Finnish and Swedish Ministry of the Environment, Finland Government Decree on Water Resources Management (1040/2006) Given in Helsinki on

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW) Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Industry Description and Practices. Waste Characteristics

Industry Description and Practices. Waste Characteristics Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Industry Description and Practices The petroleum industry is organized into four broad sectors: exploration and production

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report: Introduction Snowy Hydro Limited (Snowy Hydro) relies on precipitation falling over the catchments of the Snowy Mountains to supply water for the production of hydro-electricity. Cloud seeding over this

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD

U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD A. Kamil S. Azoury of Goleta Sanitary District provided comments on

More information

GENERAL SPECIFICATION

GENERAL SPECIFICATION R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT

More information

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM

WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM LeifBasherg (1) OlujZejlllJul Jessen (1) INTRODUCTION The current paper is the

More information

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT TERMS OF REFERENCE for an ENVIRONMENTAL IMPACT ASSESSMENT for a PROPOSED RESORT DEVELOPMENT at BIG AND LITTLE PELICAN CAY PORTLAND BIGHT, ST. CATHERINE, JAMAICA TABLE OF CONTENTS BACKGROUND 4 1. Executive

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA VISAKA INDUSTRIES LIMITED TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA Proposed Capacity : 200000 TPA Phase 1 : 40000 TPA

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Water and Wastewater. Sample Collection and Analysis

Water and Wastewater. Sample Collection and Analysis Water and Wastewater Sample Collection and Analysis December 2011 Introduction Accurate testing of drinking water is crucial to maintaining the health and safety of Islanders who rely on this resource.

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Environment Management Plan. Residential & Commercial project

Environment Management Plan. Residential & Commercial project For Residential & Commercial project at S. No. 44 (P), 45 (P) & 46 (p), Village Balewadi, Tehsil Haveli, District Pune Contents Introduction... 3 1.1 During construction phase... 3 1.2 During operation

More information

Ground Water Contamination by Leachate

Ground Water Contamination by Leachate Ground Water Contamination by Leachate Manoj P. Wagh, Piyush K. Bhandari, Swapnil Kurhade Assistant Professor, Department of Civil Engineering, P. D. V. V. P. College of Engineering, Ahmednagar, India.

More information

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 September 2013 Environmental Protection: Policies, Programs and Procedures Regulatory Document REGDOC-2.9.1

More information

STORMWATER MONITORING: POLLUTANTS, SOURCES, AND SOLUTIONS

STORMWATER MONITORING: POLLUTANTS, SOURCES, AND SOLUTIONS RICHLAND COUNTY STORMWATER MANAGEMENT DIVISION STORMWATER MONITORING: POLLUTANTS, SOURCES, AND SOLUTIONS As part of the federal government s National Pollutant Discharge Elimination System Permit (NPDES)

More information

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 HEALTH Kindergarten: Grade 1: Grade 2: Know that litter can spoil the environment. Grade 3: Grade 4:

More information

State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015

State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015 State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions

More information

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

Published in Official Gazette of the Republic of Macedonia No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa Finance, Mining & Sustainability The Gamsberg Zinc Project South Africa Project Summary Discovered in 1971 Anglo American purchased 33% interest in 1974 and increased interest to 100% in 1998 Feasibility

More information

Welcome to the Understanding Dissolved Oxygen learning module. This section provides information on the following topics:

Welcome to the Understanding Dissolved Oxygen learning module. This section provides information on the following topics: Introduction Welcome to the learning module. This section provides information on the following topics: How dissolved oxygen is defined and measured in numbers Why dissolved oxygen is important Natural

More information