2 PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 4 (iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY 4 /REGION (iv) DEMAND-SUPPLY GAP 4 (v) IMPORTS VS. INDIGENOUS PRODUCTION 4 (vi) EXPORT POSSIBILITY 5 (vii) DOMESTIC/EXPORT MARKETS 5 (viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO 5 THE PROJECT 3.0 PROJECT DESCRIPTION 5 (i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT 5 PROJECTS, IF ANY (ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC 5 LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES (iii) DETAILS OF ALTERNATIVE SITE CONSIDERED 7 (iv) SIZE OR MAGNITUDE OF OPERATION 7 (v) PROJECT DESCRIPTION WITH PROCESS DETAILS 8 (vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED 9 QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT (vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED 9 IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED (viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER 9 REQUIREMENT AND SOURCE (ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) 9 AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL 4.0 SITE ANALYSIS 9 (i) CONNECTIVITY 9 (ii) LAND FORM, LAND USE AND LAND OWNERSHIP 10 (iii) TOPOGRAPHY ALONG WITH MAP 10 (iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON- AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF 10 i

3 S. NO. CONTENTS PAGE NO. NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION (v) EXISTING INFRASTRUCTURE 13 (vi) SOIL CLASSIFICATION 13 (vii) CLIMATIC DATA FROM SECONDARY SOURCES 13 (viii) SOCIAL INFRASTRUCTURE AVAILABLE PLANNING BRIEF 13 (i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND 13 TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION (ii) POPULATION PROJECTION 14 (iii) LAND USE PLANNING 14 (iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & 14 SOCIAL) (v) AMENITIES/FACILITIES PROPOSED INFRASTRUCTURE 14 (i) INDUSTRIAL AREA (PROCESSING AREA) 14 (ii) RESIDENTIAL AREA (NON PROCESSING AREA) 14 (iii) GREEN BELT DEVELOPMENT 14 (iv) SOCIAL INFRASTRUCTURE 14 (v) CONNECTIVITY 14 (vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF 15 WATER) (vii) SEWERAGE SYSTEM 15 (viii) INDUSTRIAL WASTE MANAGEMENT 15 (ix) SOLID WASTE MANAGEMENT 15 (x) POWER REQUIREMENT & SUPPLY/SOURCE REHABILITATION AND RESETTLEMENT (R& R) PLAN 15 (i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE 15 PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 8.0 PROJECT SCHEDULE & COST ESTIMATES 15 (i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE 15 OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN) (ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF 16 ECONOMIC VIABILITY OF THE PROJECT 9.0 ANALYSIS OF PROPOSAL 16 (i) FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION IF ANY 16 ii

4 LIST OF TABLES TABLE NO. NAME OF TABLE PAGE NO. 1. BRIEF OF THE PROJECT 1 2. LOCATION AND AREA OF THE PROJECT 7 3. YEAWISE PRODUCTION DETAILS 8 4. ENVIRONMENTAL SETTINGS 10 i

5 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report 1.0 EXECUTIVE SUMMARY PRE-FEASIBILITY REPORT Table 1 Brief of the Project S. No. Particulars Details A. Location Details 1. Village(s) Akleempur, Utwala, Odela, Odoka, Kamalpur, Kaririya, Keshavnagar, Kesroli, Kanor, Kala Ghata, Khuteta Kalan, Khunteta Khurd, Kharkhada, Khushpuri, Khalsa Nagar, Khojaka, Khodakarmali, Khohar, Googdod, Gujarbas, Gadi, Govindpura, Chaprada, Chidwai, Choroti Pahar, Choroti Ishtmurar, Jugrawar, Jatpur, Todali, Dhodholi, Nangla Chirawada, Nangla Bajeerka, Naiwara, Nakachpur, Nakhnaul, Nakhnaul, Naharpur Khurd, Naugawa, Poothi, Parawada, Pata, Piproli, Podipur, Bagarrajput, Bujaka, Barwara, Baira, Bairawas, Bahala, Baangholi, Bamni Khera Bamboli, Bas Thokdar, Bilaspur, Beejwa, Mrangleshpur, Mandapur, Manduka Bas, Moonpur, Moonpur Karmala, Mubarikpur, Mewkhera, Mastabad, Mandla Khurd, Malpur, Milakpur, Raghunathgarh, Roopbas, Rasgan, Ladpur, Lalpuri, Loharwadi, Saithali, Sadhan Ka Bas 2. Tehsil Ramgarh 3. District Alwar 4. State Rajasthan 5. Latitude/Longitude 27 45'50.57"N to 27 26'54.09"N 76 56'52.43"E to 76 40'42.06"E 6. Toposheet No 54A/9, 54A/10, 54A/11, 54A/13, 54A/14, 54A/15, 54E/1, B. Lease Area Details 54E/2, & 54E/3 7. Lease area ha 8. Type of land Govt. Land (Gair Mumkin Nadi & Nallah) C. Cost Details 9. Total Project Cost Rs 1 Crores/- 10. Cost for Environmental Protection Measures D. Requirements of The Project Capital cost Rs. 4 Lacs/- Recurring Cost per annum : Rs. 2.5 Lacs per annum/- 11. Water Requirement 40 KLD which will be required for (Plantation and drinking) sourced from nearby villages. 12. Power Requirement Electric power is not required as mine will be operated in day hours only. The machinery will be diesel operated. M/s Mateshwari Mintech Pvt.Ltd 1

6 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report S. No. Particulars Details 13. Man Power Requirement 480 (Direct Employment) ENVIRONMENTAL MANAGEMENT PLAN Guidelines for sustainable mining of minor mineral which lays down the parameters of riverbed mining, evolved by MoEF, New Delhi vide their letter no. Z-1102/3/2009-IA.II (M) dated June 1 st, 2010 will be followed. Also, the State Govt. Policy Notification GSR 27 dated 21 st June, 2012 (Annexure-III) will be followed. Geological Survey of India, GSI have also issued guidelines relating to river bed guidelines S. No. PARTICULARS DETAILS Water sprinkling will be done during loading, transportation over approach roads Regular maintenance of machinery will be carried out. Overloading will be prevented Air Quality Management Water Quality Management Noise Quality Management Trucks will be covered by tarpaulin covers It will be ensured that all transportation vehicles carry a valid PUC certificate. Plantation will be carried out at the approach road, river bank and vicinity area. Periodic air quality monitoring will be done and adequate measures will be taken. Waste water will not be generated during mining operations as it involves only collection of bajri. Ground Water will not be intersected during mining activities. Excavation will be carried out upto a maximum depth of 3 m from surface of bajri deposit and not less than one metre from the water level of the River channel whichever is earlier. No waste water will be generated from the mining activities. Toilets will be made available near mine s office away from the river. Septic tanks and soak pits will be provided for the disposal of domestic/toilet waste Sources of noise will be during operation of excavators and transport vehicles. For this proper maintenance will be done at regular intervals. M/s Mateshwari Mintech Pvt.Ltd 2

7 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report S. No. PARTICULARS DETAILS Oiling and greasing at regular interval will be done. Adequate silencers will be provided in all the diesel engines of vehicles. Minimum use of horns and speed limit of 10 km/hr in the village area. Plantation will be carried out at the sides of approach road, river bank and vicinity area 4 Solid Waste Management Waste will not be generated in the mining activities as the project involves collection of Bajri. There is no toxic element present in the mineral. Plantation will be carried out along the approach road, river banks and at all strategic points in the vicinity area. Trees of adequate height will be planted. Plantation will also be done outside the lease area in consultation with Gram Panchayats. It is proposed that the plantation development will be carried out in the vicinity of river banks, along the approach roads, around Govt. 5 Plantation buildings, schools. About 1500 trees will be planted per year. Trees of adequate height will be planted. Species proposed for greenbelt development are Aam (Magnifera Indica), Jamun (Syzygium cumini), Arjun (Terminalia arjuna), Shahtoot (Morus Alba), Neem (Azadiracta indica), Pipal (Ficus religiosa), Babool (Acacia nilotica), Ber (Ziziphus mauritiana), etc. will be planted. Other Fruit bearing species, native species and plants useful for local etc. will also be planted in consultation with Forest department. 6 Socio Economics Measures The laboures will be from nearby villages that are purely dependent upon such mining activities because they are not skilled in any other trade and vocation and are engaged in this same trade since long time. 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT M/s Mateshwari Mintech Pvt.Ltd has proposed River Bed Mining Project of Bajri, Area ha, with Production Capacity 1.65 MTPA from Gair Mumkin Nadi & Nallah at Tehsil: Ramgarh, District: Alwar, State: Rajasthan. M/s Mateshwari Mintech Pvt.Ltd 3

8 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report Letter of Intent (LOI) for grant of mining lease for Bajri over an area of ha has been issued by the Joint Administrative Secretary Department of Mines, Government of Rajasthan, vide letter no. P. 6 (3)/ Mine/ Group- 2/ 2014 dated for the period of five years. (ii) BRIEF DESCRIPTION OF THE NATURE OF PROJECT As per EIA Notification dated 14 th September, 2006 amended as on date, the project falls under S. No 1 (Mining of Minerals), Project or Activity 1(a) - (3), Category A. General condition is applicable, as interstate boundary (Alwar, Rajasthan & Mewat, Haryana) is adjacent to lease area. (iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY AND OR REGION The Bajri (Sand) is the main material required for construction activities. The mining activities will increase better employment opportunities. Average income level which is the indicator of socio-economic status of house hold is expected to increase and in turn it will uplift the economic standard. The Bajri is deposited in the river bed during rainy season. To avoid risk of spreading the river and channelize the flow of river, the excavation of Bajri from river bed is necessary or we can say unavoidable as assessed and estimated by State Govt. Therefore the project will contribute in development of infrastructure and construction activities in the region as the Bajri is main raw material for the construction activities. (iv) DEMAND SUPPLY GAP Considering the demand of Bajri and sufficient availability of the mineral in the area, it is necessary to have the mining project to sustain the uninterrupted supply of raw material for construction activities in the region & also to provide employment opportunities to nearby habitants. (v) IMPORTS VS. INDIGENOUS PRODUCTION The Bajri is a cheap raw material and available in abundance on river bed, therefore its import is not required. M/s Mateshwari Mintech Pvt.Ltd 4

9 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report (vi) EXPORT POSSIBILITY There is no export possibility as these minerals are quite cheap and locally available in abundance. Also, export will entail huge logistics cost. (vii) DOMESTIC/EXPORT MARKETS Bajri has only domestic market and there is no possibility of export (viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT The proposed production from this mining project in the area is about 1.65 million tonnes per year. The daily production will be about 6904 tonnes. Direct Employment to 480 persons will be required to meet the said production capacity and many persons will get indirect employment in transportation. Due to movement of the men and transport vehicles, the satellite occupation in the form of small hotels, shops etc will boost economic activity in the area and many persons will get indirect employment in and around the area. 3.0 PROJECT DESCRIPTION (i) Type of Project Including Interlinked And Independent Projects, If Any: No Interlinked Project(s) is there. This is a site specific single mining project. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates- Incorporated as Fig no. 1 M/s Mateshwari Mintech Pvt.Ltd 5

10 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report Figure No. 1: Map showing general & specific location of the proposed mine site (Mine Area ha) M/s Mateshwari Mintech Pvt.Ltd 6

11 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report TABLE 2 Location and Area of the Project S. No. Particulars Details A. Location Details 1. Village(s) Akleempur, Utwala, Odela, Odoka, Kamalpur, Kaririya, Keshavnagar, Kesroli, Kanor, Kala Ghata, Khuteta Kalan, Khunteta Khurd, Kharkhada, Khushpuri, Khalsa Nagar, Khojaka, Khodakarmali, Khohar, Googdod, Gujarbas, Gadi, Govindpura, Chaprada, Chidwai, Choroti Pahar, Choroti Ishtmurar, Jugrawar, Jatpur, Todali, Dhodholi, Nangla Chirawada, Nangla Bajeerka, Naiwara, Nakachpur, Nakhnaul, Nakhnaul, Naharpur Khurd, Naugawa, Poothi, Parawada, Pata, Piproli, Podipur, Bagarrajput, Bujaka, Barwara, Baira, Bairawas, Bahala, Baangholi, Bamni Khera Bamboli, Bas Thokdar, Bilaspur, Beejwa, Mrangleshpur, Mandapur, Manduka Bas, Moonpur, Moonpur Karmala, Mubarikpur, Mewkhera, Mastabad, Mandla Khurd, Malpur, Milakpur, Raghunathgarh, Roopbas, Rasgan, Ladpur, Lalpuri, Loharwadi, Saithali, Sadhan Ka Bas 2. Tehsil Ramgarh 3. District Alwar 4. State Rajasthan 5. Latitude/Longitude 27 45'50.57"N to 27 26'54.09"N 76 56'52.43"E to 76 40'42.06"E 6. Toposheet No 54A/9, 54A/10, 54A/11, 54A/13, 54A/14, 54A/15, 54E/1, 54E/2, & 54E/3 (iii) Details of Alternate Sites Considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. This is a site specific mining project. Adequate quantity of Bajri reserves is available. Therefore, no Alternative Sites are examined. (iv) Size or Magnitude of Operation This is a Bajri mining project for collection of Bajri from Gair Mumkin Nadi & Nallah bed. The lease area is ha and proposed production capacity is 1.65 million tonnes per annum. The collection will be done manually as well with excavators of low bucket capacity. No other operation is required. M/s Mateshwari Mintech Pvt.Ltd 7

12 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report TABLE 3 Year wise Production details Year Bajri (in million tonnes) 1 st nd rd th th 1.65 Total 8.25 Source: Mining plan & progressive Mine Closure Plan (v) Project Description with Process Detail (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given) In respect of river bed mining, State Govt. Policy Notification GSR 27 was issued on 21 st June, The MoEF, New Delhi has also issued a report of working group in 2010 which also lays down the parameters of riverbed mining. Geological Survey of India, GSI have also issued guidelines relating to river bed guidelines. Mining will be done following all of the above mentioned guidelines. Mining will be done for 3 metre thick strip at a time in the direction of river, to avoid ponding effect and maintaining the uniform surface. No Mining will be done below water level and 45 m from any bridge, culvert, or any water works setup, if any etc. No mining will be done within 10 m from the either side of river banks to maintain its river banks and for their protection. Mining will proceed along the river in the direction from downstream to upstream in each block. No mining will be done across the river-nalla. In order to make adequate replenishment, blocks will be mined in alternate year, so that one block is kept idle/ non working while the other block is being worked. Every mining block will have clearly identified approach road/ entry points into the rivers-nalla and similarly the exit points. No mining will be done on curves of the rivers-nalla to avoid the meandering effect. No mining will be carried out during monsoon season. M/s Mateshwari Mintech Pvt.Ltd 8

13 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report (vi) Raw Material required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product This is a mining project with proposed production capacity of bajri 1.65 MTPA. No any raw material is required for river bed mining for Bajri. The collected bajri will be directly sold in the open market. The Bajri produced from the area will be transported by tippers trucks / tractor trolleys to different destinations around the area. (vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be briefly Outlined. No waste water will be generated from the mining operations. There will no other product from the area, therefore reuse and recycling of the same is not envisaged. (viii) Availability of Water Its Source, Energy /Power Requirement and Source A. Water Requirement Total Water requirement for the mining project is estimated 40 KLD which will be required for (dust suppression, plantation and drinking) sourced from nearby villages. B. Power Requirement Electric Power will not be required in the mining operations as mining activities will be carried out during day time only. (ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their Management/Disposal: Waste will not be generated in the mining activities as the project involves collection of Bajri. There is no toxic element present in the mineral. 4.0 SITE ANALYSIS (i) Connectivity Nearest Railway station is Alwar at an aerial distance of about 6.0 km in West direction. State Highway-13, 14 and 45 are passing through lease area. SH-25 is about 5.0 km in WNW direction & SH-35 is about 8.0 km in SE direction. Nearest railway station is Alwar (~6.0 km in West direction) & Airport is Indira Gandhi International Airport, Delhi (~90 km in NNE direction). District M/s Mateshwari Mintech Pvt.Ltd 9

14 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report headquarter Alwar is about 6.0 km in West direction. Post and Telegraph, Hospital, Bank, Education and all market facilities are available at these places. (ii) Land Form, Land Use and Land Ownership Total mine area of ha for the proposed project is Gair Mumkin Nadi & Nallah as available in revenue records. It is not expected to have permanent change in land use but the same will be changed temporarily during the period when mining operations of Bajri will be undertaken. Natural replenishment of bajri during rainy season will be there. Plantation will be done on the Gair Mumkin Nadi & Nallah banks & approach road of the nearby villages. (iii) Topography along with Map The proposed mine area comprises of part of Gair Mumkin Nadi & Nallah. There is neither road nor habitation in the area. (iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies (Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified Industrial Area, A Copy Of The Gazette Notification. The proposed mine area is ha. There is neither agriculture land nor forest land in the area. TABLE - 4 ENVIRONMENTAL SETTING S. No. Particulars Details 1 State Highway within 10 km State Highway-13 (Passing through lease area radius of study area in NE direction) State Highway- 14 (Passing through lease area) State Highway-45 (Passing through lease area in ESE direction) State Highway- 25 (~5.0 km in NW direction) State Highway-35 (~8.0 km in SE direction) 2 Nearest Railway Station Alwar Railway Station (~6.0 km in West direction). 3 Nearest Airport Indira Gandhi International Airport, Delhi (~90 M/s Mateshwari Mintech Pvt.Ltd 10

15 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report 4 National Park, Wildlife Sanctuary, Biosphere Reserve, etc. within 10 km radius 5 Interstate boundary within 10 km radius 6 Inter district boundary within 10 km radius 7 Reserved / Protected Forests within 10 km radius 8 Water Bodies (within 10 km radius) km in NNE direction) None within 10 Km radius study area Alwar, Rajasthan and Mewat, Haryana (Adjacent to lease area) Inter District Boundary (Alwar & Bharatpur in Rajasthan in East direction) Five Reserved Forests Gol RF (~ 8.5 km in North direction). Duninath RF (~0.5 km in South direction). Khunteta Kalan RF (~1.0 km in South direction). Maujpur RF (~ 4.5 km in South direction). Alwar RF (~ 8.0 km in West direction). Eight Protected Forests Patkhori PF (~ 5.0 km in North direction). Firozpur Jhirka PF (~ 8.5 km in North direction). Hasanpur Bilonda PF (~ 6.0 km in North direction). Dhadhauli PF (~ 6.5 km in SE direction). Ghasoli PF (~ 9.0 km in SW direction). Khanpur PF (~ 9.0 km in NW direction). Ismailpur PF (~ 9.0 km in NW direction). Bambora PF (~ 9.0 km in NW direction). Ruparel or Barah Nadi (Part of Lease Area) 9 Seismic Zone Zone II as per IS: 1893 (Part-I) : 2002 M/s Mateshwari Mintech Pvt.Ltd 11

16 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report Figure -2: Environmental Setting Map M/s Mateshwari Mintech Pvt.Ltd 12

17 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report (v) Existing Infrastructure Nearest Railway station is Alwar at an aerial distance of about 6.0 km in West direction. State Highway-13, 14 and 45 are passing through lease area. SH-25 is about 5.0 km in WNW direction & SH-35 is about 8.0 km in SE direction. Nearest railway station is Alwar (~6.0 km in West direction) & Airport is Indira Gandhi International Airport, Delhi (~90 km in NNE direction). District headquarter Alwar is about 6.0 km in West direction. Post and Telegraph, Hospital, Bank, Education and all market facilities are available at these places. (vi) Soil Classification The soils in general are clay loam to clay in texture and moderately to less permeable and developing cracks in dry season. (vii) Climatic Data from Secondary Sources The area has semi arid zone type climate. Average rainfall remains between 300mm to 350mm per year. The maximum, minimum and mean temperatures of the area are 45ºC, 3ºC and 24ºC respectively. (viii) Social Infrastructure Available The site is well connected with social infrastructure facilities like medical, post office, schools, police stations etc. and as such no constraints are envisaged in this aspect. 5.0 PLANNING BRIEF (i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town and Country Planning/Development Authority Classification Proposed mining area falls in Govt. land (Gair Mumkin Nadi & Nallah). The mining lease will be granted after grant of Environmental Clearance by MoEF, New Delhi. Nearest State Highway-13, 14 and 45 which is passing through the lease area. Transportation of Bajri from river bed face to consumers will be by trucks/ tractor trolleys to consumer sites. The truck/ tractor owners purchased the Bajri from the face. The approach roads will be provided up to the river bed face of Bajri. The lease area comprises flat cum undulated terrain. M/s Mateshwari Mintech Pvt.Ltd 13

18 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report (ii) Population Projection Total 480 manpower will be required for bajri mining project which will be sourced from nearby areas. So significant influx of people is anticipated in the area. (iii) Land Use Planning The proposed mining lease area is ha which comprises of Government land. Plantation will be done along the river banks outside the lease area during the lease period of 5 years. Infrastructure like offices, rest shelter will be maintained outside the lease area. The approach roads will be made in the lease area as well as outside the lease area. (iv) Assessment of Infrastructure Demand (Physical& Social) The applicant will assess the demand of infrastructure (Physical & Social) in nearby area of the proposed project site and same will be developed under corporate social responsibilities programs. (v) Amenities/Facilities The applicant will develop the Amenities/Facilities in the nearby area of the proposed project site as per requirement of local people the nearby area of under corporate social responsibilities programs. 6.0 PROPOSED INFRASTRUCTURE (i) Industrial Area (Processing Area) Proposed mining lease area is ha and located in the rural area. All required infrastructure for the mining activities will be provided. (ii) Residential Area (Non Processing Area) This is not required as mine workers will come from nearby villages. (iii) Green Belt Development Plantation will be carried out at the approach road and river bank Within 5 years of lease period. (iv) Social Infrastructure The laborers will be from nearby villages that are purely dependent upon such mining activities because they are not skilled in any other trade and vocation. (v) CONNECTIVITY Nearest Railway station is Alwar at an aerial distance of about 6.0 km in West direction. State Highway-13, 14 and 45 are passing through lease area. SH-25 M/s Mateshwari Mintech Pvt.Ltd 14

19 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report is about 5.0 km in WNW direction & SH-35 is about 8.0 km in SE direction. Nearest railway station is Alwar (~6.0 km in West direction) & Airport is Indira Gandhi International Airport, Delhi (~90 km in NNE direction). District headquarter Alwar is about 6.0 km in West direction. Post and Telegraph, Hospital, Bank, Education and all market facilities are available at these places. (vi) Drinking Water Management (Source& Supply of water) Water requirement for drinking purpose will be fulfilled from nearby villages. (vii) Sewerage System The domestic wastewater generated from mine and utilities will be disposed in Septic tanks and soak pits. No other sewerage system is required. (viii) Industrial Waste Management No industrial waste will be generated from mining activities; therefore, its management is not required. (ix) Solid Waste Management No waste will be generated from the bajri mining operations. The small boulders generated during excavations will be used for constructions of haul roads. Unused material including mineral or spillage (if any) should not be stacked on the banks as it will hinder the flow of river in monsoon season. (x) Power Requirement & Supply/Source Electric power is not required as mine will be operated in day hours only. The machinery will be diesel operated. 7.0 REHABILITATION AND RESETTLEMENT (R& R) PLAN (i) Policy To Be Adopted (Central/State)In Respect Of The Project Affected Persons Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To Be Given) The entire mine Area i.e ha is Govt. land (Gair Mumkin Nadi & Nallah) and as there is no habitation, therefore, no displacement of population is involved. 8.0 PROJECT SCHEDULE & COST ESTIMATES (i) Likely Date Of Start Of Construction And Likely Date Of Completion The mine will be started after obtaining Environmental Clearance from the MoEF, New Delhi. M/s Mateshwari Mintech Pvt.Ltd 15

20 Proposed River Bed Mining Project of Bajri, Area ha with production capacity 1.65 million TPA At Tehsil- Ramgarh, District: Alwar (Rajasthan) Pre-Feasibility Report (ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the Project Total cost of the Project is : Rs 1.0 Crores/- Cost for Environment Protection for the Proposed Mining Project Capital cost : Rs 4.0 Lacs/- Recurring Cost per annum : Rs. 2.5 Lacs per annum/ ANALYSIS OF PROPOSAL (i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population if any. Proposed riverbed mining project will result in growth of the surrounding areas by increased direct and indirect employment in the region. Development of social amenities will be in the form of medical facilities, education to under-privileged children and creation of self help groups. No major adverse effects on environment are envisaged in collection of Bajri from Gair Mumkin Nadi & Nallah. M/s Mateshwari Mintech Pvt.Ltd 16

21 LIST OF ANNEXURE S. NO. PARTICULAR 1. LETTER OF INTENT 2. KHASRA DETAILS 3. NOTIFICATION ISSUED BY RAJASTHAN GOVT. i

22

23 English Translation of Letter of Intent Government of Rajasthan Department of Mines (Group-2) Reference: - P.6(3)Mine/Group-2/2014 Dated M/s. Mateshwari Mintech Pvt Ltd Flat No 706, B Block, Athena building, Jaysingh Highway, Bani Park Jaipur (Rajasthan) Subject:-Mining lease area ha Khasra area of Gair Mumkin Nadi & Nallah falling in Revenue Villages of Tehsil-Ramgarh, District: Alwar (Rajasthan) in favor of M/s. Mateshwari Mintech Pvt Ltd Flat No 706, B Block, Athena building, Jaysingh Highway, Bani Park Jaipur (Rajasthan) Sir, With reference to the above subject State Government has intention for the grant of Mining Lease in your favor for ha as per Rajasthan Minor Mineral Concession Rules, So, fulfill the following condition within one year period. 1. Approved Mining Plan along with Progressive Mine Closure Plan by concerned authority. 2. Environment Clearance under notification of MoEF may be obtained. 3. Financial guarantee may be submitted as per rule 37 (J). faithfully Yours Joint Secretary, Ref.No Copy forwarded for information and necessary action to: 1. Director, Mines & Geology Deptt, Rajasthan, Udaipur Joint Secretary,

24 S.No Village Khasra 1 Akleempur Total 3 2 Utwala Total 22 3 Odela Total 2 4 Odoka Total 4 5 Kamalpur 249 Total 1 6 Kaririya Khasra Details

25 729 Total 6 7 Keshavnagar Total 4 8 Kesroli Total 7 9 Kanor Total 6 10 Kala Ghata Total 5 11 Khuteta Kalan Total 9 12 Khunteta Khurd Khasra Details

26 Total Kharkhada 80 Total 1 14 Khushpuri Total Khalsa Nagar 1116 Total 1 16 Khojaka Total 5 17 Khodakarmali Total 5 18 Khohar Total 3 19 Googdod Total 4 Khasra Details

27 20 Gujarbas Total 2 21 Gadi Total 3 22 Govindpura Total 8 23 Chaprada Total 8 24 Chidwai Total 9 25 Choroti Pahar / Khasra Details

28 890 Total 9 26 Choroti Ishtmurar Total Jugrawar Total 4 28 Jatpur / Total 4 29 Todali Total 6 30 Dhodholi Total 3 31 Nangla Chirawada Khasra Details

29 / / / Khasra Details

30 / / Khasra Details

31 / / / Khasra Details

32 999 Total Nangla Bajeerka Total 6 33 Naiwara Nakachpur Total 2 35 Nakhnaul Total 3 36 Naharpur Khurd Total 2 37 Naugawa Khasra Details

33 Total Poothi Total Parawada Total 2 40 Pata Total 8 41 Piproli Total 4 42 Podipur Khasra Details

34 Bagarrajput Total Bujaka / Khasra Details

35 Total Barwara Total 5 46 Baira Total 4 47 Bairawas Total Bahala Total 5 49 Baangholi Total 2 50 Bamni Khera 655 Total 1 Khasra Details

36 51 Bamboli Total 4 52 Bas Thokdar Total Bilaspur Khasra Details

37 Total Beejwa Total 4 55 Mrangleshpur Total 5 56 Mandapur Total 3 57 Manduka Bas 560 Total 1 58 Moonpur 778 Total 1 59 Moonpur Karmala / Total Mubarikpur / Khasra Details

38 Total Mewkhera Total 9 62 Mastabad 111 Khasra Details

39 Total 9 63 Mandla Khurd Total 2 64 Malpur Total Milakpur Khasra Details

40 Total Raghunathgarh Khasra Details

41 Total Roopbas 2/525 Total 1 68 Rasgan Total Ladpur 704 Total 1 70 Lalpuri 681 Total 1 Khasra Details

42 71 Loharwadi Total 6 72 Saithali Total 4 73 Sadhan Ka Bas Khasra Details

43 RAJASTIIAN GAZBT:TE ExtraordinarY Q6 31, 31, {s-{r. sns 1934-q4 21, Jilne21,2012 ; qr.r 4 (rr) sc_sg-s (I) 1If,r rrrdn iprr sral {rq-srbfirfuit gpr urft ffi Tn Flqrq.Trtdt, sc-fred fffr af {fufrm uoi S$ srlaw o,r{fr frqql MINES (Gr.II) DEPARTMENT NOTIF'ICATION, JaiPu4 June 21,2012 G.S.R 27.- In exercise of powers conferred by rule 654 of The Rajasthan Minor Mineral Concession Rules, 1986, hereinafter,eferr"d to as the said ruies, the State Govemment in the interest of mineral development hereby notiff following procedure for grant ofconcession of mineratr bajri, namely - ' -1. Mining leases for mineral bajri will be granted as provided in naj asthan -Minor Mineral Concession (Amendment) Rules, 2012 notifi-ed vide this Department Notification No' F'14(1) Mines,'GI.IL2C1 I Cated , Till such time that mining leases of bajri comes into force as oer above amended rules, Mining Engineer / Asstt' Mining bngirre", may recover royalty aiongwith permit fees at.the rates ore"scribed in-the said rules by establishing departmental check post i, Uy *uy of royalty cqllection contract for such period as decided by the Director. 3.

44 b0. Trf,relrq {rq-rr,. qq 21, 2012 lfirl 4 (rr) 4. This no$floation shall come in effect w'e'f fhe date of p"ufi*,i"g of tnil deparftnent notification of even no' dated 23-05' 2012 in official gazette. [No. F-14(1) Mines /Gr.IIl2011t Bv Order of the Governor' " frro Eqrc ai-ffsrf,, Deputy Secretary to Government' Government Central Press, Jaipur'.

45 r No. : F.l4(t)Mines/Gr.Il20t i Goyerument of Ra.iasthan Mines (Gr. tr) Department Jaipur, dated :? J,4ii?gB,o, r r#flffj.i,1di*,r1?* H#f tlis depanmenr refter ro. F.r4(r)Mines/Gr.rrl il*'jf*ffi?itrflilffit::yi::f* inoo rorce as per above amended rues. O"rat"s prlcriuea';;';;#;*."'gu?eer mav recover rovaltv alongr,rdrh ;;#;;; royarty corection ",il*, il, s.,ff'#f; ::,ffi:fiiffiti"hj- o}#ff ;",; ;; 4. This aotification shall come i noria"*ion or","o ffi;ff 5r".r;,1 ;:L* :i:tr pubrishing of rhis deparrmear By &d". offlcor".onr, it * T i :! ;) :!...l Copy forwarded to the followiag for inform^,,." -, ::;;;::'.jffi' i ) * i=::, lp *"-, Govemor of Rajas*_. *,0*, lii",ru;l*r**##il" **iffi$il; "'o* secretary, i f Rajasrhan. Jaipur, :. r.s.fo ""..,1-"nief pr. Secretary. Finr Deptt' Raiasthan' 1 P's-,. Jaioui i"tri*,,"'ilurance -&ffi#'';i"f$;n," 3 *::':;:;;"!,lil:;:fffl li,1rff.**" Depu" Raiasthan, raipur '. ^ --:ffi1,:;'l.. rnreuigence (sdrd, vitt Bhawan, : i#::tj:fm[::f;"?*1:g1o"**a* udaipur with requesito circurate in.a, the $B*rg*r.. Asstt Seeretary to Govt- i t l

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA Delhi Jaipur Expressway (Green field) PRE-FEASIBILITY REPORT June - 2016 Table of Contents Sr. No. Particulars Page No. 1 Executive Summary 2 2 Introduction of the

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR MARBLE MINE(MINOR MINERAL) NEAR VILLAGE KHO(PALPUR), TEHSIL: RAJGARH, DISTRICT: ALWAR, RAJASTHAN NON- FOREST LAND PRE-FEASIBILITY REPORT CATEGORY A (Sariska Wild life Sanctuary is located in 5.0 km

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM 72000 TPA TO 175000 TPA OF Limited JASIDIH Dist.: Deoghar 814 142 (Jharkhand) INDEX Contents

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

LORE SILICA SAND MIINE

LORE SILICA SAND MIINE PRE FEASIBILITY REPORT OF Submitted to MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE GOVT. OF INDIA Paryavaran Bhawan, CGO Complex Jor Bagh Road, New Delhi-110 003 LORE SILICA SAND MIINE Village: Lore,

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

LOI Ref. No.: N/2015/IN000263/HR./000008/1103/00008 Date : 12.12.2015

LOI Ref. No.: N/2015/IN000263/HR./000008/1103/00008 Date : 12.12.2015 LOI Ref. No.: N/2015/IN000263/HR./000008/1103/00008 Date : 12.12.2015 To, The District Forest Office Mewat (Haryana) Subject: NOC for for use of forest land for installation of proposed Indian Oil Corporation

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Project Details - Riverbed Sand Mining Project

Project Details - Riverbed Sand Mining Project Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hansmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. Hansmukhbhai Shambhubhai

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

MINING PLAN WITH BAJRI (MINOR MINERAL) MINE

MINING PLAN WITH BAJRI (MINOR MINERAL) MINE MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN (Submitted Under Rule(s) 37B, 37 E(6), 37G of Rajasthan Minor Mineral Concession (2 nd Amendment) Rules 2012) OF BAJRI (MINOR MINERAL) MINE Mr. MANJEET CHAWLA

More information