1 Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hansmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. Hansmukhbhai Shambhubhai Khunt Opp. Survey No. 46, 48 On Tapi River, Vill: Kakrapar, Tal: Mandvi, Dist: Surat. 3. Applicability of the CRZ Notification, 2011 The Project is not fall in CRZ notified area. 4. Lease Area (Hectares) Sand Lease Area: Hectors 5. Co-ordinates of the lease area Latitude Longitude A 21 16'27.58"N 73 23'20.08"E B 21 16'31.27"N 73 23'31.56"E C 21 16'35.64"N 73 23'30.17"E D 21 16'31.82"N 73 23'19.00"E 6. Ownership of Land (Govt. / Private Land) The lease area is river bed of Tapi owned by Govt. 7. Status of Operation (New project OR Existing project operating since ) 8. Status of Lease (Lease no., date of issue, lease period, date of application for lease renewal, etc.) New Project. New Lease Lease No.-GS/QL/6828/05/RETI/L.O.I/1857 Area: Ha. (Opp. Survey No. 46,48, On Tapi River, Vill: Kakrapar, Tal: Mandvi, Dist: Surat.) Lease application date 21/09/ Sand Reserve (MT) Rate of Mining of Sand (MT/Month) 3,00,000 MT/year (Approx.), 25,000 MT/month ENVIRONMENT SETTINGS 11. If located within 15 Km, aerial distance of the Name Distance (Km) lease area from the nearest: i. National Park / Wildlife Sanctuary / Biosphere Reserve: Purna Wild Life Sanctuary Shoolpaneshwar Wild life Sanctuary ii. Reserve Forest / Protected Forest: None km in SE km in NE direction iii. Human Habitation : 0.53 km in N direction. iv. Railway Line : Surat Nandurbar Railway Line Bardoli Railway Station v. Road : Village Road SH-88 vi. Notified / Protected Archaeological sites : None --- vii. Social infrastructures, e.g. school, hospital, historic / cultural / religious places, defence establishments, etc. : Mandvi High School Primary Health Care Dadhwada Ramji Mandir 12. Width of riverbed (Meters) km in S 32 km in SW 0.50 km in NW 2.47 km in N 8.40 km in SWW 2.80 km in NNE 7.5 km in SWW direction 1

2 Sr. No. Details Particulars 13. Average depth of water at lease area (Meters) Max.: 8m 12 m, Min : 5m 7m 14. Average thickness of sand deposit at lease 5 meter. area (Meters) 15. Details on Riparian vegetation, including endemic and endangered species of fauna, if any 16. Geo-hydrology of the river, flow (perennial, seasonal, etc.), sediment transport characteristics / replenishment potential, etc. The floral diversity of the study area includes variety of trees & shrubs. Plants that offer rich timber such as Teak, Babul etc., and plants with medicinal values such as Neem, Nilgiri, Tulsi, etc., and plants that offers fruits and vegetables are observed. The faunal diversity includes a wide range of birds, mammals, reptiles & insects. There is no national park/sanctuary; Elephant/Tiger reserve area within 25 km from the project site. The No endemic or endangered species of flora and fauna species have been available within 5 km area. Please refer Environmental Study Report 17. Width and condition of access road (kutcha / pucca) to the lease area. Status of Access road Type Width of road (Meter) Village Road Kachha Road 4.5 Village Road to SH-88 Pakka road 6.5 DETAILS ON MINING / EXCAVATION ACTIVITIES 18. Type of mining (Manual/ Semi-mechanized / Mechanised). Semi-mechanized. (By excavating the mineral) 19. Equipments to be used (bulldozers, hydraulic excavators, JCB, scrapers, loaders, Diesel Pump, etc.) 20. Minimum setback distance from river bank (Meters) 21. Minimum buffer distance from bridge piers / water intake wells / irrigation structures 22. Minimum distance of stockpiles / vehicle loading place from the river bank 23. Maximum depth of sand removal (3 m or water depth whichever is less) Sand excavator with suction-pump, Truck. 40 meters Bridge piers: 9.50 km in W direction 30 meters 3 meters (from top of the of the sand deposition) 24. Man power requirement 15 workers 25. No. of working days in a year 200 days 26. Time of working hours in a day 8.00 am to 6 pm ENVIRONMENTAL MANAGEMENT PLAN 27. Measures proposed for protection of environmental attributes like riverbed, riparian vegetation, water, air, human health, etc. Please refer Environmental Study Report. 28. Details on transportation route & measures proposed for control of fugitive emission during transportation Status of Access road Type Width of road (Meter) Village Road Kachha Road 4.5 Village Road to Pakka road 6.5 2

3 Sr. No. Details Particulars SH-88 For measures proposed for control of fugitive emission during transportation. Please refer Environmental Study Report. 29. Plan for tree plantation in riparian area / road sides in at least 20% of lease area, numbers & types of species and budgetary outlay for the same Types of plants No. of plants I II Year Year III Year Nilgiri, Neem, Tamarind, Banyan, etc. local species Total Plan for restoration / reclamation None 3

4 ENVIRONMENT STUDY REPORT (RIVERBED SAND MINING PROJECT) PROPOSAL I, Mr. Hansmukhbhai Shambhubhai Khunt have been applied for extracting the sand (minor mineral) In front of Sr. No.: 46, 48 at Vill: Kakrapar, Tal: Mandvi, Dist: Surat on river bed of Tapi. We are applying to regularize the new Sand mining activity. The mining area of the unit is ha that is less than 25 ha. Our sand lease area is not falling under CRZ area. Therefore, Project falls under category B (B2) of schedule 1(a), as per the EIA Notification, September Therefore, it requires prior Environment Clearance. Status of operation & Status of Lease are summarized as under. New project Area: Ha. (Opp. Survey No. 46, 48, On Tapi River, Vill: Kakrapar, Tal: Mandvi, Dist: Surat.) Lease Application date 21/09/2005 Co-ordinates of the corners of lease area(latitude and Longitude) Latitude Longitude A 21 16'27.58"N 73 23'20.08"E B 21 16'31.27"N 73 23'31.56"E C 21 16'35.64"N 73 23'30.17"E D 21 16'31.82"N 73 23'19.00"E 4

5 There is no forest, Wild life sanctuary, eco sensitive area present within 10 km area from the project site. Unit does not require electricity during the mining activity. In sand mining activity, water required for domestic, dust suppression & tree plantation only. The requirement is met by surface water & bore well water (nearby village). No hazardous waste is generated during mining activity. Municipal Solid Waste generation during activity is of minor quantity. One dustbin has been provided at the identified place to store all domestic waste & disposed to nearby Gram Panchayat site. Size/ Magnitude Of Operation Production capacity (Mining area/mining Rate) Extraction of the sand will 3,00,000 MT/YEAR (Approx.) from an area of ha (In front of Survey No. 46, 48 On Tapi River, Vill: Kakrapar, Tal: Mandvi, Dist: Surat.) Mining Details Sr. No. Details Explanation 1. Lease Area ha 2. Rate of Production 3,00,000 MT/Yr 3. Method of mining Semi Mechanized (By excavating the mineral) 4. Extent of mechanization Suction pump, Extractor, Truck and Tractors Trolley DETAIL OF ENVIRONMENT SETTING The lease is on riverbed of Tapi. There is no forest, Wild life sanctuary, eco sensitive area within 10 km from the project site. The details of water bodies and nearest park are mentioned below: Sr. No. If located within 15 km, aerial distance of the lease area from the nearest: Name Distance(Km) i. National park/wildlife Sanctuary/Biosphere Reserve: Purna Wild km in SE direction Sanctuary Shoolpaneshwar km in NE direction life Sanctuary None --- ii. Reserve Forest/Projected Forest: iii. Human Habitation: 0.53 km in N direction. iv. Railway Line Surat km in S direction 5

6 Railway 32 km in SW direction Bardoli Railway Station v. Road: Village Road 0.50 km in NW 2.47 km in N direction vi. Notified/Protected None --- Archaeological sites: vii Social infrastructures, e.g. school, hospital, historic/ Mandvi High School Primary Health Care Dadhwada Ramji 8.40 km in SWW 2.80 km in NNE 7.5 km in SWW direction Width of Riverbed Width of Riverbed:445 meter Geo-hydrological Detail of River Tapi The river Tapi originates near Multal in Betul district in Madhya Paradesh at an elevation of 752m above msl. The Total Length of this West flowing river from its origin to its out fall into the sea is 724 km. For the first 282km the river flows in Madhya Pradesh, Out of which 54km forms the common boundary with Maharashtra state. It flows for 228 km in Maharashtra before entering Gujarat. Traversing a length of 214 km in Gujarat, the Tapi River joins Arabian Sea in the Gulf of Cambay after flowing past the Tapi city. The river receives tidal influence for a length of about 25 km upstream from the mouth. 6

7 Lower Tapi Zone Brief description: Lower Tapi Basin consist main Tapi stream from Ukai Reservoir to its mouth in the Gulf of Cambay. The Lower Tapi Basin extends over an area of 2920 sq.km. The length of the Tapi River in Lower Tapi Basin is 129 km. There are a series of rapids for a distance of about 32 km. between Kakrapar and aamalpur. Through the Kakrapar rapids, the river falls by nearly 4.6 mtr. In the last reach, the river passes through the Gujarat plains and after flowing past Tapi city, empties into the Gulf of Cambay. The tidal influence is felt up to 25 km from its mouth in the Gulf of Cambay {after completion of a Weir cum Causeway at Singanpur near Tapi city.} Sediment transport characteristics A baseline study of the Tapti River was conducted to determine the basic physical and chemical characteristics of the sediment. Tapi station was selected along the study area sediment characteristics revealed sandy to loamy(muddy) sand soils with ph of Values of organic carbon 0.380%, Electric conductivity 3.99 dsm-1, Available Nitrogen kg/ha, Phosphorous kg/ha. Available Potassium estimated 367 kg/ha. The exchangeable Ca and Mg present in Tapti river sediment collected from Tapi stations is & me/100 mg respectively. Width and condition of access road (kutcha/pucca) to the lease area. Mode of Transportation of mineral and Transportation route. Mode of Transportation of material: Trucks (10 Mt & 16 MT) Transportation route: as below 7

8 Access road status Status of Access road Type Width of road(meter) Village Road Kachha Road 4.5 Village Road to SH-88 Pakka road 6.5 DETAILS ON MINING/EXCAVATION ACTIVITIES Method of Mining Mining of the minerals is done by excavating the mineral from active channel or Floodplain or terrace. Mining of the minerals is done by excavating the mineral in ½ meter strip. Then the mining is restricted up to 2 m depth only. We are doing the mining of the minerals (sand) by excavating (by using suction excavator) the minerals through the floating pipeline from in-stream active channel i.e. riverbed of Tapi at Kakrapar, Tal: Mandvi, Dist: Surat from an area of ha. Average depth of Water at lease area is: Max: 8.0 m to 10.0 m Min: 5.0 m to 07.0 m The Average thickness of sand lease area is : 4.0 m Type of mining is: Semi Mechanized ( By excavating the mineral) Equipments used are: Sand excavator with pump & truck. Minimum setback distance from river bank is: 40 meter Minimum Buffer distance from Bridge: Bridge is 9.5 km away in west direction from project site Minimum distance of Stockpiles/Vehicle loading place from the river bank is: 30 meter Man Power requirement: people Average No. of Working days in a year:200 days(approx) Time of Working hours in a day is: 8.00 am to 6.00 pm ANTICIPATED ENVIRONMENTAL IMPACTS 8

9 Over extraction of sand can destabilize channels and banks, and/or affect the ecologic functioning of rivers. In-stream extraction of sand from below the water level of a stream generally causes more changes to the natural hydrologic processes than limiting extraction to a reference point above the water level. Extracting sand from a large river or stream will generally create less impact than extracting the same amount of material from a smaller river or stream. The potential impacts of sand extraction are as under a) Bed degradation and Consequent effects on channel and bank stability b) Increased sediment loads, decreased water clarity; c) Changes in channel morphology and disturbance of ecologically important roughness elements in the river bed; d) Ecological effects on bird nesting, fish migration, etc. e) Modification of the riparian zone(wet land) including bank erosion; f) Discharges from equipment and refuelling; g) Reduction in groundwater elevations; h) Impacts on Structures and access; i) Impacts on Coastal processes. Impact on Air Environment Sources: Fugitive emission occurs due to movement of vehicles on roads. The quantity of emissions depends on various aspects like climatic conditions, moisture in the soil, speed of the vehicle, frequency of the vehicles etc. The key air emissions from the project are dusting combustion of fuel from the transportation vehicles as well as material handling, The main air pollutants will be particular matter, nitrogen dioxide and sulpher dioxide The mined sand is transported to the sites through 10/16 MT Trucks. The loading operation is manual/ mechanical using material handling equipment. IMPACTS: Respiratory dust generation system can be damaged of Workers/people living in nearby area due to. Frequent movement of heavily loaded vehicles across the river banks not only imposes land stability problems but also pollutes the river water through Oil/gasoline spillage. IMPACT OF NOISE Transportation vehicles used for the transportation of mineral area a source of Noise Pollution at the Mine site. 9

10 IMPACT ON LAND USE PATTERN AND CHANGE OF RIVER COURSE The physical composition and Stability of substrates are altered as a result of in-stream mining and most of these physical effects may exacerbate sediment entrainment in the channel. Excess sediment is considered the greatest pollutant in water and constitutes one of the major environmental factors in the degradation of stream fisheries. If the mining is not carried out in a uniform manner then I will disturb the river flow/course in the terms of its uniformity. Unplanned mining activities can lead to river channel shifting as well as degradation of land, causing loss of properties and degradation of landscape. Some physical impacts are under. 1. The Undercutting and Collapse of river banks, 2. The loss of adjacent land and/or structures, 3. Upstream erosion as a result of an increase in channel slope and changes in flow velocity 4. Downstream erosion due to increased carrying capacity of the stream, downstream changes in patterns of Deposition and changes in channel bed and habitat type. 5. Riverbed lowering 6. Changing the course of the riverbed Impact on Water Environment Mining may cause lowering of riverbed level as well as river water level resulting in lowering of groundwater table due to excessive extraction and draining out of groundwater from the adjacent areas. This may cause shortage of water for the vegetation and human settlements in the vicinity. Indiscriminate sand mining from the rivers can lead to destruction of riparian vegetation which acts are resting and nesting grounds of many migratory birds. The in stream fish wealth of the rivers may be decreased year after year consequent to unabated sand mining and subsequent habitat loss. Extensive use of high power suction pumps for extraction of sand from the river has aggravated the salt water intrusion problems especially in the lowland river reaches. Effects directly related to extraction and to changes in geomorphology include increased sedimentation, turbidity, and bank full widths, higher stream temperatures, reduced dissolved oxygen, decreased wetted periods in riparian wetlands, and degraded riparian habitat. Impact on Topography and Drainage Pattern Unplanned mining activities and stocking of unwanted material near the river bank can affect the natural topography of the river bed. Mining pits are responsible for river channel shifting as well as degradation of land and landscape. 10

11 Impact on Soil No major impact on soil of study area is envisaged due to mining activities as the minerals are replenish able and get replenished every year. Impacts on Biological Environment Excessive sediment deposition for replenishment/refilling of pits affect turbidity, prevent the penetration of light require for photosynthesis of micro and macro flora which intern reduces food avaibility for aquatic fauna. Increase in river gradient may cause excessive erosion causing adverse effect on stream habitats. Riparian flora and fauna suffer seriously from riverbank slumping, channel incision, lowering of water table, etc., as a result of the direct removal of vegetation along the river banks, bank undercutting and channel incision. 11

12 ENVIRONMENT MANAGEMENT PLAN AND MITIGATION MEASURES Air Quality Management There will be emission from combustion of fuels from the transportation vehicles and material handling. Besides this, to control the emission further regular preventive maintenance of equipments will be carried out on contractual basis. It shall be ensured that all transportation vehicles should carry a valid PUC certificate. Plantation will be carried out on approach roads & nearby vicinity of river bank. Regular water sprinkling on road will be carried out to avoid dustiness due to vehicular transportation. Speed of vehicles is maintained within the prescribed limits. Trucks are not over loaded and should be maintained to the body level. Condition of all trucks will be well maintained. Old age trucks will not be utilized. Noise Management No other equipments except the transportation vehicles and excavator (As and when required) for loading will be allowed. Noise generated by these equipments shall be intermittent and does not cause any impact. All vehicles which create high noise will be avoided. Plantation will be carried out on approach roads & nearby vicinity of river bank. Proper maintenance of vehicles would be ensured. Mining activity will be restricted to day time only. Management for Land Use Pattern including Change of River Course. The sediment will accumulate /replenish every year during rainy season. The minerals will be collected in a uniform way so that the river flow/ channel shall not get disturbed. Scrapping/ dredging of minerals shall be started from the centre towards bank periphery in half meter slice so that the river course does not get affected and a barrier of at least 3 meter will be left at both side of bank side for safety of banks. Unused material including mineral or spillage (If any) will not be stocked on the bank side as it will hinder the flow of river in monsoon. Suitable mitigation measures will be adopted to avoid water logging. Water Quality Management 12

13 No waste water will be generated from the mining activity of minerals as the project only involves scraping of Sand from river bed. Mining will not intersect the Water level. Mining will be done well above the riverbed water table therefore impact on water regime is not anticipated. Solid Waste Management No solid waste will be generated from the sand mining operations. Unused material including mineral or spillage (if any) will not be stocked on the banks side in river bed as it will hinder the flow of river in monsoon season. Socio Economic Environment The deployed labourers will be from nearby villages. Occupational health & Safety Dust masks will be provided to the workers, working in the dust prone zones. Study will be conducted to identify, occupational health hazards if any. Workers will be informed and trained about occupational health hazardous if identified. Any workers health related problem will be properly addressed. Adequate PPEs are provide to the workers during mining activity such as dust mask, ear plug, life jacket, safety shoes, etc. Greenbelt Development and Plantation Programme As the lease area falls in river bed, plantation & green belt development is not possible within the lease area. Unit is proposed to carry out plantation in the vicinity of river banks, along the approach roads, around Govt. buildings, schools. The Local species will be planted as per the GPCB guidelines. Plan for tree plantation and budgetary outlay for the same: 13

14 Details of Year wise tree plantation programme No. of plants Type of plants I Year II Year III Year Nilgiri, Neam, Banyan, Tamarind etc. local Species Total 285 Budgetary Outlay The estimated cost of plantation as well as maintenance for 3 years will be as under, Sr. No. Particulars Approximate recurring cost per annum(rs. IN Lac) Approximate capital cost (Rs. IN Lac) 1. Green Belt TOTAL

Project Details - Riverbed Sand Mining Project

Project Details - Riverbed Sand Mining Project Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hasmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. HASMUKHBHAI SHAMBHUBHAI

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Addendum D. Nomination of Moody Wash ACEC

Addendum D. Nomination of Moody Wash ACEC Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

Physical flow accounts: principles and general concepts

Physical flow accounts: principles and general concepts Physical flow accounts: principles and general concepts Julian Chow United Nations Statistics Division 1 st Sub-Regional Course on SEEA 23-27 September 2013 Malaysia SEEA Conceptual Framework Outside territory

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

Appendix H Dredging and Stream Channel Restoration

Appendix H Dredging and Stream Channel Restoration Appendix H Dredging and Stream Channel Restoration Mankind s intrusion into the natural environment in West Virginia began in earnest following the Civil War when extractive industries and settlement all

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...

More information

FOUR RIVERS RESTORATION PROJECT

FOUR RIVERS RESTORATION PROJECT MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Kenneth E. Tand, P.E. Practicing Geotechnical Engineer FRIEND OR FOE Trees are our friends. They extract carbon

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

Environmental Construction Operations Plan (ECO Plan) Framework

Environmental Construction Operations Plan (ECO Plan) Framework ALBERTA INFRASTRUCTURE AND TRANSPORTATION Environmental Construction Operations Plan (ECO Plan) Framework COPYRIGHT, MAY 2005 THE CROWN IN RIGHT OF THE PROVINCE OF ALBERTA, AS REPRESENTED BY THE MINISTER

More information

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information