1 PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM TPA TO TPA OF Limited JASIDIH Dist.: Deoghar (Jharkhand)

2 INDEX Contents Page Nos. 1. Executive Summary Introduction of the Project / Background Information Project Description Site Analysis Planning Brief Proposed Infrastructure Rehabilitation and Resettlement (R & R) Plan Project Schedule & Cost Estimates Analysis of Proposal 18

3 1. EXECUTIVE SUMMARY : HIL Limited (formerly Hyderabad Industries Limited) is one of India s most respected names in the building material solutions industry. HIL is a pioneer of green building materials, producing roofing solutions, panels, walling blocks, high-quality pipes and fittings, and industrial insulation. As per EIA Notification 2006 and amendments thereof, the proposed expansion project is A category project and listed in Schedule of EIA Notification 2006 at Sl. No. 4(c). The present proposal of HIL is for expansion of production capacity from existing TPA to TPA within existing premises. No additional land is being acquired for the proposed expansion project. The project site is well connected with road and railway, nearest city Deoghar is located at distance of 5 km and Mayurakshi River (seasonal) passing in east direction at distance of 3.5 km. There is no forest, national park, wild life sanctuary, eco sensitive areas in surrounding 10 km radius. Interstate border of Bihar-Jharkhand is 7 km. in North direction of the project zone. 2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION : (i) Identification of Project & Project Proponent Project ; M/s. HIL Ltd. is situated in Industrial Area, Jasidih, Dist. Deoghar in Jharkhand State. M/s HIL is engaged in the manufacturing of Asbestos Cement Sheets & Accessories since The existing rate of production is MT/Annum and proposed to increase production by MT/Annum i.e. total MT/Annum. The manufacturing process involves unit operations and processes. The HIL has on site storage facilities for various raw materials such as White Chrysotile Asbestos, cement and fly ash. Manufacturing facilities areas are spread over about sq. meters of land in safe & hygienic environment. HIL is the largest manufacturer of Asbestos Cement Sheets & Accessories in Jharkhand. 1

4 Project Proponent ; Pitabas Behera General Manager HIL Ltd. Industrial Area Jasidih Mob.: (ii) Brief description of nature of project : M/s HIL is engaged in the manufacturing of Asbestos Cement Sheets & Accessories since 1980 at the existing project location. The existing capacity MT/Annum and proposed increase capacity MT/Annum i.e. total MT/Annum. (iii) Need for the project and its importance to the country and or region The asbestos cement sheeting industry is growing at a healthy 7-8 percent a year. Even as the real estate sector has taken a hit due to the slowdown and subsequent reduction in demand, the asbestos cement (AC) sheet industry, which provides roofing material for about 50 per cent of the rural population, is relatively untouched. Driven by steady demand from the rural markets, the industry is growing at a steady. There are some 18 big players in the industry catering to the domestic market. The industry employs about 300,000 people and its annual turnover is around Rs 4,000 crore, about 12 percent of which goes to the states as direct and indirect tax. There is a huge housing deficit in rural India as many houses currently fall into the category of kaccha houses, thereby leaving tremendous opportunity of sustained growth of new age construction practices and products. The demand for asbestos cement sheets will not come down anytime soon. Few products can compete with asbestos cement roofing sheets due to its longevity and lower cost. Majority of rural population of our country is still living under asbestos roofed buildings due to economic conditions. M/s HIL Ltd. is in the business of Asbestos Cement Sheets since last 69 years with Head Quarters located at Hyderabad. The demand for asbestos cement sheets is increasing in the region & entire country. After proposed expansion M/s HIL will cater to the demand of various products locally. The Project will create direct & indirect employment opportunities in the nearby areas. HIL will employ local people from the nearby villages 2

5 depending upon the availability of skilled & un-skilled man-power surrounding the project site. In operation phase, the proposed project would require significant workforce of non-technical and technical persons. Migration of highly educated and skilled experience will result in increase of literacy in the surrounding villages. (iv) Demand Supply Gap: The demand supply gap of Asbestos Cement sheets etc. are increasing over the years. The consumption of asbestos products in was about tonnes and requirement is increasing year by year. At present the industry s total production capacity is about 4.5 million tonnes and a small part of the output is exported to other countries. The growing demand and supply gap in the region has compelled HIL to expand its existing production capacity. (v) Imports vs. Indigenous Production: The industry is thriving on the import of about 350,000 tonnes of Chrysotile Asbestos every year from Canada, Brazil, Russia, Zimbabwe and Kazakhstan for production of AC Sheets and Pipes. Asbestos is also mined in India, particularly Rajasthan, but the quantity and quality are of no relevance to AC Sheet production. HIL will import Chrysotile Asbestos from Canada, Brazil, Russia and other countries through seaport and then by roads through closed containers. (vi) Domestic/Export Market: The asbestos industries total production capacity is about 4.5 million tonnes and a small part of the output is exported. (vii) Employment Generation (Direct & Indirect) At present HIL has 95 nos. direct staff and 80 Nos. indirect manpower. No additional manpower is required after proposed expansion project. However, proposed expansion of HIL will generate employment opportunities in indirect mode. In indirect mode people will be appointed as company authorized dealers & sellers and approx. 50 nos. of indirect manpower will be required for cement feeding and loading. 3

6 3. Project Description: (i) Type of project including interlinked and inter dependent project: M/s HIL is engaged in the manufacturing of Asbestos Cement Sheets & Accessories since 1980 at the existing project location. The existing capacity is MT/Annum and proposed to increase capacity by MT/Annum i.e. total MT/Annum. There are no interlinked and inter dependent project with the proposed expansion project of HIL. (ii) Location: Village : Jasidih Block : Deoghar District : Deoghar State : Jharkhand Refer Project Location Map of HIL Ltd. on next page. (iii) Details of alternate sites Considered and the basis of selecting the proposed site, particularly the environment consideration gone into should be highlighted. No alternate sites have been considered for the proposed expansion project as all the expansion activities will be carried out within existing premises and no additional land will be required for the proposed expansion project. (iv) Size or magnitude of operation: HIL existing rate of production is MT/Annum and proposed to increase production by MT/Annum i.e total MT/Annum. All the expansion activities will be carried out within existing premises of acres. No additional land is required for the proposed expansion. 4

7 HIL PROJECT LOCATION MAP Howrah Delhi Main Line Deogarh Town Project Location :- HIL LTD. INDUSTRIAL AREA JASIDIH DEOGHAR (JHARKHAND) LONGITUDE: 86 38'24.61"E LATITUDE : 24 30'57.47"N MSL : 264 M. Triveni Smelters Pvt. Ltd., Raipura, Fatuha, Patna, Bihar 5

8 (v) Project description with process details: (a schematic diagram/flowchart layout, components of the project) Refer Manufacturing Process Flow Chart on next page (vi) Raw Material required along with estimated Quantity, likely source, marketing area of final products, mode of Transport of raw material & finished product. Raw material Existing MT per Annum Proposed MT per Annum Cement Fiber Slag Source Nearby Cement Plants Maiher, M.P Imported (Russia) Giridih & Ramgarh, Jharkhand Mode of Transport By Rail / Road By Ship up to the port then by Road (Closed containers) By Road (Trucks) DWR Plant Generation Internal MMF Patalganga, Maharashtra By Road (Trucks) Pulp Chennai By Road (Trucks) Flyash Nearby Power Plant Bikeswar Termal Power Station, W.B By Road (Trucks) FR Rajasthan By Road (Trucks) (vii) Resources optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined. In the proposed expansion project no fuel will be used for heating purposes. Moreover, water is being conserved by recycling and reuse in process. 6

9 MANUFACTURING PROCESS FLOW CHART Dust Free Air Water Raw Asbestos Cement & Fly Ash Binders Dust collector with automatic Bag Shaking Device Bag Opening Device Cone Tanks Edge Runner Mill Clarifier Fibre Silo Weigh Hopper Slurry Mixer Collected Materials Storage Mixer Dilution Water Back Water 6 VAT Sheet Machine Water from Cone Tank Green Asbestos Cement Sheets on Conveyor Green Sheets Trimming Waste Dissolver Corrugation Stripping Heating Chamber Atmospheric Curing Finished Products for Dispatch 7

10 (viii) Availability of Water its source, Energy/Power requirement and source should be given At present & after expansion in future also, water requirement is fulfilled through bore wells & open wells inside premises. Water requirement will be approx. 189 KLD (Kilo Liters per Day) after proposed expansion. Water requirement details are as under; Requirement Existing Proposed Make up water for process 77 KLD 186 KLD Domestic & other Gardening purpose 3 KLD 3 KLD Total 80 KLD 189 KLD (ix) Quantity of waste to be generated (Liquid and solid) and scheme for their management. WASTE WATER GENERATION & TREATMENT ; The HIL project will not generate any industrial effluent and will achieve Zero Discharge Concept. Entire water will be reused back in to the process. Only 1.8 m 3 /day of domestic waste water will be generated. This waste water will be diverted into a septic tank followed by soak pit inside the existing premises. Air Pollution: Fiber Bag Opening and Milling The fiber bags shall be slit open in closed automatic Bag Opening Device (BOD). The empty bags shall be lifted by a hooking device attached within the bag opening device and carried to the attached bag shredder unit and the fiber after passing through the lump breaker shall be collected in the attached blender where some water shall be added to maintain the process in wet condition. When all the bags in one batch are emptied in to the blender, the fiber in wet form shall be taken to the Edge Runner Mill (ERM) with a screw conveyor and elevator which is also joined by the shredded bag pieces from the shredder unit. Here at ERM some more water is further added to the fibre for milling operation. The bag opening device & the edge runner mill shall be kept under negative pressure by means of a Bag Filter Type Dust Collector with reverse pulse jet cleaning which is connected to a blower. The delivery point of the blower is connected to a stack of 7.5Mtr. height. 8

11 Cement and Fly ash Feeding o The cement feeding point will be connected to a bag filter type dust collector with reverse pulse jet cleaning and with a blower driven by an electric motor. Stack height would be maintained upto 30Mtr. o The Fly ash feeding point shall be connected to the same above bag filter type dust collector with reverse pulse jet cleaning and with a blower driven by an electric motor. The outlet is connected to the stack of 5Mtr. height. Details of Existing & Proposed Air Pollution Control Devices ; ID NO. NAME OF PCE ATTACHED TO DE 1 Strategic Dust collector BOD DE 2 Strategic Dust collector DRY WASTE DE 3 Strategic Dust collector CEMENT FEEDING DE 4 SILO TOP FLYASH SILO No.1 DE 5 SILO TOP FLYASH SILO No.2 DE 6 SILO TOP FLYASH SILO No.3 DE 7 SILO TOP CEMENT SILO DE 8 WEIGH HOPPER CEMENT WEIGH HOPPER DE 9 SILO TOP FR2 SILO DE 10 Strategic Dust collector FR2 FEEDING DE 11 SILO TOP SLAG DE 12 Strategic Dust collector CEMENT & SLAG MIXING TANK Solid Waste Management: All solid waste generated during the process are recyclable in nature. The details are as under ; Nature of Solid Waste Quantity Management Broken Sheets Sediments from Cone Tank 1750 TPA 17.5 TPA These sheets will be pulverized and recycled in the close circuit manufacturing process These waste will be processed through ball mill and recycled in the close circuit manufacturing process The HDPE Fibre bags are shredded in the Shredder unit attached to the Bag Opening Device and sent along with the fibre into the fibre mill through the screw conveyor. 9

12 The wet waste accumulated during the scheduled cleanings are continuously recycled though the Wet Ball Mill in slurry form. Periodically recycled after the containers placed beneath the rotary valve of the respective Dust Collectors are adequately filled in. The settling solids in slurry form from the recuperating tank are collected in a clarifier (where it is kept under suspension) and reused in the process. 4. Site Analysis: (i) Connectivity: HIL is situated in Industrial Area, Jasidih, Dist. Deoghar in the state of Jharkhand. Jasidih is situated on Howrah Delhi Main Line of ECR. NH 333 is approx. 1km. away from the project site which connects district headquarters and rest of country from project site. Project site can be assessed by road and rail from all over the India. Nearest Airport is located at Ranchi. Jasidih Junction is approx 0.5 Km. from the project site. ii) Land Form, Land use & Land ownership: Land Form :- Land Use :- Land use of the project area and surrounding is industrial in nature. Project site is located within industrial area. Proposed expansion will be carried out within existing premises of HIL. No additional land is being acquired for the proposed expansion project. Land Ownership :- HIL project land of 21.5 Acres was allotted by Industrial Area Development Authority, Patna, Govt. of Bihar on leasehold basis in the year 1979 for establishment of asbestos cement roofing sheets project. iii) Topography (along with map): The region contains several clusters of rocky hills covered with forest, but series of long ridges with intervening depressions. Most of the rolling uplands are cultivated by highland crops. The average elevation of the district is 247Mtr. above MSL, However hill ranges like Phuljari (750Mtr.), Teror (670Mtr.) and Degaria (575Mtr.) break the monotony of the landscape. The general slope of the district is from north west to south 10

13 east. Geologically the district is mainly covered by chhotanagpur granite gneiss of Archean age with paches of alluvium, sandstone and shale of Gondawana formations. Important rivers flowing in the district are the Ajay, the Paltro etc. These rivers gather a large number of tributaries which form the land scape full of Tanrs and Dons. 5 KM. RADIUS LOCATION MAP iv) Existing land use pattern (Agriculture, non agriculture, forest, water bodies including CRZ), shortest distance from the periphery of the project forest, national park, wild life sanctuary, eco- sensitivity area, water bodies Distance from HFL line, CRZ notification for notified industrial area. There is no reserved forest, national park, wild life sanctuary, eco sensitive zones in surrounding 10 Km of the plant boundary. CRZ is not applicable to the project. 11

14 v) Existing Infrastructure ; All the required infrastructures are available within existing premises of HIL at Jasidih, Deoghar, Jharkhand. In addition to existing infrastructure, for proposed expansion, new infrastructure will be developed or existing will be upgraded. vi) Soil Classification: The district is characterized by a wide variety of soils, which can be classified as clayey, loamy, sandy loam and lateritic. Sandy loams to loamy sands are common in uplands whereas loam to sandy loam is common in lowlands. The soils occurring in different landforms have been characterised during soil resource mapping of the state on 1:250,000 scale (Haldar et al. 1996) and three soil orders namely Entisols, Inceptisols and Alfisols were observed in Deoghar district (Fig.1 and table 1). Alfisols were the dominant soils covering 50.0 percent of TGA followed by Inceptisols (42.0 %) and Entisols (6.3 %). vii) Climatic Data ; The temperature variations in different three seasons are given in table below: Period Min m. Temperature Max m. Temperature Mar. June 12 0 C 22 0 C 35 0 C 44 0 C Jul. Oct C 20 0 C 31 0 C 38 0 C Nov.- Feb. 8 0 C 11 0 C 15 0 C 30 0 C Rainfall in Study Area : Period Rainfall in mm. (Source : IMD Report)

15 viii) Social Infrastructure available ; All the social infrastructure, as mentioned below, are available within 1-5 Km. of HIL Project Site. Schools (Primary as well as secondary) Colleges (Science, commerce, Arts, engineering, medical, pharmacy, education) Health centers, dispensaries, hospitals Electricity Drinking water supply Banks (Cooperative as well as nationalized) and credit societies 5. Planning Brief: i) Planning concept (type of Industries, facilities, transportation etc) Town and country planning/development authority classification. Type of Industry : HIL Limited (formerly Hyderabad Industries Limited) is one of India s most respected names in the building material solutions industry. HIL is a pioneer of green building materials, producing roofing solutions, panels, walling blocks, high-quality pipes and fittings, and industrial insulation. As per EIA Notification 2006 and amendments thereof, the proposed expansion project is A category project and listed in Schedule of EIA Notification 2006 at Sl. No. 4(c). The present proposal of HIL is for expansion of production capacity from existing TPA by TPA i.e. total TPA within existing premises. No additional land is being acquired for the proposed expansion project. ii) Population Projection: No major population influx is anticipated due to the proposed expansion project. iii) Land Use Planning Site Layout Plan showing existing & proposed facilities along with green belt area is shown herewith on next page. 13

16 HIL SITE LAYOUT PLAN 14

17 iv) Assessment of Infrastructure demand (physical & social) : The basic infrastructure such as roads, electricity, transportation, drinking water supply, health centers and hospitals, school, colleges, sanitation facilities are available in the vicinity. The proposed project is not going to exert any unbearable load on any of these resources. v) Amenities/Facilities: Canteen, Laboratory, rest room, medical facilities, drinking water, etc. are available within existing project premises. 6. Proposed Infrastructure: No new infrastructure is planned for the proposed expansion project. i) Residential Area (Non-Processing Area): No residential area is envisaged in the proposed project. ii) Green Belt Area : 7.15 Acres of area is being utilized as green belt are and will be developed more precisely and maintained after proposed expansion. iii) Social Infrastructure: All infrastructure facilities are existing in the vicinity of the HIL. iv) Connectivity HIL is situated in Industrial Area, Jasidih, Dist. Deoghar in the state of Jharkhand. Jasidih is situated on Howrah Delhi Main Line of ECR. NH 333 is approx. 1km. away from the project site which connects district headquarters and rest of country from project site. Project site can be assessed by road and rail from all over the India. Nearest Airport is located at Ranchi. Jasidih Junction is approx 0.5 Km. from the project site. v) Drinking Water Management : After proposed expansion existing borewell & open wells will be used as drinking water source. 15

18 vi) Sewerage System: No industrial waste water will be generated from the proposed project. All the domestic waste water will be disposed off through septic tank followed by soak pit inside premises. vii) Industrial Waste Management: Waste Water Generation & Treatment ; No industrial waste water will be generated from the proposed expansion project. Only domestic waste water will be generated which will be disposed off through septic tank followed by soak pits inside the premises. Air Pollution: For proposed expansion project air pollution control system (pulse jet bag filters) will be installed at all strategic locations. viii) Solid Waste Management: After proposed expansion all the generated solid waste will be managed as per existing prevailing practices inside the premises as explained above. ix) Power Requirement & Supply/Source: 1070 KVA of power is being utilized at present for the HIL Project. After proposed expansion no additional power will be required for project operations. Existing 1 No KVA & 1 No. 625 KVA DG Set will be utilized for power back-up after proposed expansion. 7) Rehabilitation & Resettlement (R & R) Plan: As there is no requirement of additional land for the proposed expansion project & HIL is already a running project which is under operation for last 35 years, so there is no need of any new Rehabilitation and Resettlement (R&R) Plan. 8) Project Schedule & Cost Estimates: i) Likely date of start of construction & likely date of completion. 16

19 Expansion activities will be started immediately after obtaining Environmental Clearance from MoEF & CC, Govt. of India. Expansion activities will be completed within 4-6 months time after start. ii) Estimated Project cost along with analysis in terms of economic validity: Total Estimated Cost of proposed expansion project is Rs Crores. Detail break-up is as under ; Particulars Cost (Rs. Lakh) Land (Existing on Lease) Existing Building & Civil Works Plant & machinery Pollution Control Equipment Existing Green Belt Maintenance Existing TOTAL COST OF EXPANSION PROJECT RECURRING COST FOR ENVIRONMENTAL MANAGEMENT Existing 9) Analysis of Proposal (Final Recommendation): (Financial & Social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.) After proposed expansion of HIL approx. 50 nos. of indirect manpower will be required for cement feeding and loading operation which will be preferably hired from local villages surrounding the project area. As the project area is located in Santhal Pargana province of Jharkhand state where majority of population are schedule tribes and local tribal people will be benefitted in direct and indirect way. Moreover, State Govt. will get more revenue from HIL after proposed expansion.. * * * * * 17

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA VISAKA INDUSTRIES LIMITED TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA Proposed Capacity : 200000 TPA Phase 1 : 40000 TPA

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Pre-Feasibility Report for ITC Mixed Use Development, Rajarhat, Kolkata

Pre-Feasibility Report for ITC Mixed Use Development, Rajarhat, Kolkata Pre-Feasibility Report for ITC Mixed Use Development, Rajarhat, Kolkata 1 Introduction of the Project About ITC ITC is one of India's foremost multi-business enterprise with a market capitalization of

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by

Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) 1 2 3 4 5 I. Tamil Nadu Districts Municipalities (Hill Stations) Building Rules 1993. Rules Required Available

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Solid Waste Treatment Facility Solid Waste Permit Application

Solid Waste Treatment Facility Solid Waste Permit Application Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.

More information

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Introduction Objective: to estimate the CO2 emissions produced by road surface construction

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

PROJECT PROFILE. RICE MILL (Capacity 4 TPH)

PROJECT PROFILE. RICE MILL (Capacity 4 TPH) PROJECT PROFILE ON RICE MILL (Capacity 4 TPH) PREPARED BY 8 th Floor, Parishrama Bhavan, Basheerbagh, Hyderabad 1. Introduction: The Rice milling is the process that helps in removal of hulls and bran

More information

TAMIL NADU POLLUTION CONTROL BOARD FORM I

TAMIL NADU POLLUTION CONTROL BOARD FORM I TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi- 110 003 To The Managing Director

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery

More information

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management A. AIR POLLUTION: Air Pollution sources are Transportation, Industries and

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

M/s. D.S. Alloyd Pvt. Ltd.

M/s. D.S. Alloyd Pvt. Ltd. PRE-FEASIBILITY REPORT FOR PROPOSED MANUFACTURING OF MANGANESE OXIDE & EXPANSION OF VARIOUS FERRO ALLOYS AT C-235, MIDC BUTIBORI, DISTRICT NAGPUR, (M.S.) M/s. D.S. Alloyd Pvt. Ltd. EIA Consultant: Pollution

More information

Document No. 2015-207

Document No. 2015-207 Henan Province Environment Assessment Center Document No. 2015-207 Technical Review Report on Gushi Biomass Power Project-Environment Impact Assessment Report Henan Province Environment Protection Bureau:

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

TISSUE PAPER MANUFACTURING

TISSUE PAPER MANUFACTURING PROJECT PROFILE ON TISSUE PAPER MANUFACTURING Prepared by: Kerala State Industrial Development Corporation September 2012 1 TISSUE PAPER PROJECT SUMMARY 1 The Proposal : To set up a Tissue Paper Production

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS

PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS PRODUCT : Cement Concrete Hollow Blocks NIC CODE : 26959 (based on NIC 2004) PRODUCT CODE : 94459 (based on ASICC 2000) PRODUCTION CAPACITY : Quantity :

More information

Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015

Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015 Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE ON MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR MODERN COLD STORAGE INTRODUCTION Cold Storage is a special kind of room, the temperature

More information

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS The evolution continues in decentralised wastewater technology... The Process Decentralised wastewater treatment systems are defined

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION

PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION PRSENTATION ON DRAINAGE SYSTEM OF DELHI EAST DELHI MUNICIPAL CORPORATION 25.07.2014 MAP OF DELHI SHOWING MCD s, NDMC & DCB ABOUT DELHI DELHI MANIFESTS UNCONTROLLED URBANISATION POPULATION INDUSTRIALISATION

More information