1 Index S.No DESCRIPTION PAGE NO. 01 General information about lessee Details of mining lease No.of existing mining pits, their dimensions and locations, plan & section of the pits, brief geology of the area 04 Details of Production & Dispatches of last 5 year Physical & Geological characteristics of deposit Details of mining machinery deployed deployed or 12 to be deployed and their detailed specifications. 07 Method of mining Year wise annual programme of mining for next 18 five years 09 Details of the employment Measures taken and to be taken for land restoration, reclamation and plantation in/or nearby lease area 11 Measures taken and to be taken for protection of environment in and around mining lease area 12 Measures taken and to be taken for dumping overburden, stacking of top soil and utilization of top soil 13 Measures taken and to be taken for the control of water, noise and air pollution 14 Contribution regarding and social development of the nearby residents 15 Details regarding checkup and it insurance of all employed person BHOORAJ SINGH, M.L. No 262/2006 Page 1

2 LIST OF PLATES S.NO. PARTICULARS PLATE NO. 1. LEASE AREA MAP 1 2. KEY PLAN 2 3. SURFACE PLAN 3 4. SURFACE GEOLOGICAL PLAN & SECTION 4 5. YEARWISE WORKING PLAN & SECTION 5 6. ENVIRONMENT PLAN 6 7. CONCEPTUAL PLAN 7 List of Annexure 1. Copy of RQP Certificate. 2. Copy of Demarcation letter 3. Copy of Jamabandi & Khasra Map. 4. Copy of Sanction letter. 5. Copy of office order 6. Copy of lease deed 7. Copy of consent to operate BHOORAJ SINGH, M.L. No 262/2006 Page 2

3 CERTIFICATE I hereby authorize Kapil Kumar Gupta, RQP to prepare simplified mining scheme in respect of masonary stone N/V Gangora, Tehsil- Pahari, District Bharatpur State Rajasthan, over an area of 1.00 hectare. The above simplified mining scheme has been prepared on my consent & approval and that I will abide by all the commitments made under. In case of default, approval of simplified mining scheme may be withdrawn. Date: Place: Signature of the applicant DECLARATION The simplified mining scheme has been prepared in full consultation with me & I understood its contents & agree implement the same in accordance with the law. Date: Place: Signature of the applicant BHOORAJ SINGH, M.L. No 262/2006 Page 3

4 CERTIFICATE (1) This is to certify that the provision of mineral conservation and development rules, Under rule 37 (G(2)) of MMCR 1986 IInd amendment 2012 for existing simplified mining scheme area have been observed in the preparation of simplified mining scheme for mineral Masonary stone for an area of 1.00 hectare. Near village Gangora Tehsil- Pahari District Bharatpur State Rajasthan by Sh. Tej Singh S/o Sh. Vijay Singh (M.L.NO. 262/2006). Wherever specific permission is required, the applicant will approach the concerned Authorities for granting the permission. (2) Certified that the provision of mines Act. Rules & Regulations made there under have been observed in preparing this simplified mining scheme and wherever specific permission is required, the applicant will approach the D.G.M.S. (3) It is also certified that the information furnished in the above simplified mining scheme true and correct to the best my knowledge. Date: Place: (KAPIL KUMAR GUPTA) RQP/AJM/350/2014/A BHOORAJ SINGH, M.L. No 262/2006 Page 4

5 1.0 GENERAL INFORMATION ABOUT LESSEE (1). NAME & ADDRESS OF THE LESSEE The lease holder Sh. Tej Singh S/o Sh. Vijay Singh Village Bajeka Tehsil &District Sirasa (Haryana). Thus the lease holder having a mining lease of 1.00 hectare (M.L.262/2006) for Masonary Stone, Near village Gangora, Tehsil- Nagar, Distt.- Bharatpur. As per recent amendments in Rajasthan Miner Mineral Concession Rules 1986, rule 37G (2) the lease holder has to submit the approved Simplified Mining Scheme for the existing lease area. As per notification dated July 24, 2012 the Simplified Mining Scheme of 1.00 hectare area will be approved by the Superintending Mining Engineer, Bharatpur Circle, Bharatpur. The lease holder approached the RQP for preparation of Simplified Mining Scheme. The lease holder authorized the RQP for preparation, submission, modification, withdrawn and to collect the approved copies of the Simplified Mining Scheme (refer certificate-1). (2). STATUS OF THE LESSEE Lease holder is private individual having a good experience in mining industry. (3). NAME & ADDRESS OF THE AUTHORIZED PERSON, WHO PREPARED THE SIMPLIFIED MINING SCHEME Kapil Kumar Gupta RQP/AJM/350/2014/A Chhimpo Ka Mohalla, G.S. Road, Bikaner. MOB BHOORAJ SINGH, M.L. No 262/2006 Page 5

6 2.0 DETAILS OF THE MINING LEASE (1). ML NO/DETAIL OF MINING LEASE Lease holder having a mining lease of 1.00 hectare (M.L.262/2006) for Masonary Stone, Near village Gangora, Tehsil- Pahari, Distt.- Bharatpur. The approach for the lease area is as follows: Bharatpur is situated on the National Highway 11 Jaipur to Agra. Bharatpur to lease area is about 70 kilometres. Jaipur to Bharatpur is 200 kilometre via Dausa. (2). NAME OF MINERAL Masonary Stone (Quartzite) (3). DESCRIPTION REPORT OF THE MINING LEASE WITH PLAN (COPY ENCLOSED ):Details of area (with location map): FROM TO BEARING DISTANCE FRP A MT A B MT B C MT C D MT D A MT FRP-Anjani mata ka mandir KEY PLAN OF THE AREA Toposheet No.: The area for mining lease falls in Survey of India Toposheet No. 54E/02. (4). LOCATION MAP OF THE MINING LEASE SHOWING THE DETAILS OF THE APPROACH ROADS UPTO THE MINE Location map of the mining lease, showing the details of the approach roads upto the mine is enclosed as Plate No.2 (5). details of the mining lease Near Village Tehsil District & State Gangora Pahari BHARATPUR Rajasthan Status of land Area Period Khasra no Govt. land Hect. Years BHOORAJ SINGH, M.L. No 262/2006 Page 6

7 (6). SUPERIMPOSED MAP OF SANCTIONED AREA ON REVENUE MAP Superimposed map of sanctioned area on revenue map as Annexure-3. (7). INFRASTRUCTURE FACILITIES (A). NEAREST RAILWAY STATION Nearest railway station is Pahari city R.S. around 6.5 E kilometers from the mine site. It is located on broad gauge line of northwestern railway. Many up and down trains are running on this track. (B). POLICE STATION Nearest Police Station is situated at Pahari which is about 6.5 km away from the mine site. Station is approachable by the link road. (C). POST OFFICE Nearest Post Office is situated at Pahari which is 6.5 km away from the mine site. Post office is approachable by the link road. (D). MEDICAL FACILITIES PHC is situated in Pahari which is 6.5 km away from the mine site. General medical facilities available at Pahari. (E). WATER & ELECTRICITY Water & Electricity is available at nearby villages. All nearby villages connected with electric lines and water demand is fulfilled by wells, tube wells. (F). EDUCATION FACILITIES A secondary school and higher education facilities available at Pahari. (G). MODE OF TRANSPORTATION OF MINERAL The mineral will be transported by tractor trolley from the mine through link road. (H). RIVER/CANAL/PORT, IF ANY, ETC. There is no river or canal near the mine site. Further, no wet or dry port is available near by the mine site. BHOORAJ SINGH, M.L. No 262/2006 Page 7

8 3.0 NO. OF EXISTING MINING PITS, THEIR DIMENSIONS AND LOCATIONS, PLAN & SECTIONS OF THE PITS, BRIEF GEOLOGY OF THE AREA: All above information are given in plates of surface plan, location plan and year wise working plan. 3.1 Physiography & Drainage The lease area is hill, terrain. The lease area is part of slope of a mound range trending roughly north- south N15 0 E- S15 0 W. the lease area located towards eastern side of the mound range. No habitation observed in the lease area. Nearest village Chhapra located towards eastern side of lease area. No forest land in the lease area. Quartzite rocks are observed in the lease area. The lease area is showing almost undulated topography. The highest contour RL is 300 mts. in the lease area while lowest contour is 290 mts. in the lease area. This provides an elevation difference of 5.0 mts. the general slope of the area is towards north east direction. There is no seasonal nalla flowing through mining lease area. The spot RL and other features are marked in the surface plan and surface geological plan plate no. 3 & plate no.4 respectively. These plans are prepared on a scale of 1:1000. REGIONAL GEOLOGY OF THE AREA- The regional geological settings of Bharatpur district show a wide variety of rock type belonging to the Delhi super group of middle proterozoic age.the rock formations which outcrop in Bharatpur district are mainly Calc Gniess,Quartzite,amphibolites,Mylonite,dolomite,Migmatite,gneiss,Calc schist,marble,micaschist etc. The regional geological sequence of the region as described by geological survey of india,miscellaneous publication no.30,part 12,2 nd revised edition is as follows. BHOORAJ SINGH, M.L. No 262/2006 Page 8

9 Regional Geology: - The general geological succession of the district is as follows : Super group Recent Group age Lithology Soil, Sand Dunes Post Delhi Pegmatite, Granite Delhi Ajabgarh/ Lower- Muscovite-Biotite Super Kumbalgarh Middle Group,Qurtzite,amphibolites,mylonites, Group group Proterozoic dolomite,migmatite,gniesses,calc Gniess,calc schist,marble,mica schist,calcite, Alwer- Gogunda Boitite schist,calc Biotite Group Schist,Quartzite Local Geology: The area under consideration falls under Delhi super group. Mining lease area is covered by the rock exposure is seen on the surface. Geologically, the massive quartzite in the mining lease area belongs to Delhi super group. The stratigarphic sequence of the litho unit present in the area is as follows:- Recent & sub recent - Alluvium & Blown sand Delhi Super group Ajabgarh Group massive quartzite Surface geological mapping has been done on a scale 1:1000 and geological cross section and long section is prepared accordingly. BHOORAJ SINGH, M.L. No 262/2006 Page 9

10 3.2 METHOD OF ESTIMATION OF RESERVES The mineral masonary stone is exposed in the entire lease area from the general surface level, accordingly reserves calculated as Proved, Probable and Possible category. Besides, following points have been considered for reserves calculation. (i) Proved category of mineral reserves has taken from 300mRL to 180mRL. (ii) Average 5m depth of masonary stone below proved category has been considered for probable category reserves. (iii) (iv) (v) 2.5 tonne/m 3 have been considered as bulk density of masnory stone. Recovery of masonry stone is 95% of total reserves. Recovery of masonry stone is 95%, whereas 5% is mining loss of total reserves. f- Geological Reserves And Grades the reserves for mineral masonary stone have been calculated based on cross sectional area method. Geological and Mineable reserves 1. Proved reserves: Geological reserves =Cross sectional area (m 2 ) x influence length (m) x bulk density(t/m 3 ) =11547x100x2.5 = MT Mineable reserves= Cross sectional area (m 2 ) x influence length (m) x bulk density(t/m 3 ) =9818x100x2.5 = MT 2 Probable reseves Geological reserves =Cross sectional area (m 2 ) x influence length (m) x bulk density(t/m 3 ) =500x100x2.5 = MT Mineable reserves= Cross sectional area (m 2 ) x influence length (m) x bulk density(t/m 3 ) =425x100x2.5 BHOORAJ SINGH, M.L. No 262/2006 Page 10

11 = MT Total Geological reserves = (Proved+Probable) reserves = = MT Total Mineable reserves = = MT The mineral reserves are computed as per UNFC. The reserves are as follows: Reserves of Masonary Stone Particulars Code Reserves Total Mineral resources(a+b) 1 Mineral reserves Proved mineral reserves Probable mineral reserves & MT Remaining Mineral Feasibility mineral Prefeasibility mineral resources Measured Mineral resources Indicated mineral resources Inferred mineral resources Reconnaissance mineral resources & Detail of UNFC classification UNFC is a three digit code based system, the economic viability axis representing the first digit, the feasibility axis the second digit and the geological axis the third digit. Each digit provided. Codes 1, 2 and 3 in decreasing order. The highest category of resources under UNFC system has code (111) and for lowest category the code is (334). Code (111): this code is provided for the economically mineable part of the measured mineral resources(proved category reserves). Code (121): This code is provided for the economically mineable part of the indicated mineral resources (Probable category resreves). BHOORAJ SINGH, M.L. No 262/2006 Page 11

12 Code (211): The part of the measured mineral resources(proved category) which as per feasibility study has not found economically mineable. The reserves blocked in 7.5mt buffer zone and 45 meters from permanent structure. Code (222): The part of the indicated mineral resources (probable category) which as per feasibility study has not found economically mineable. The reserves blocked in 7.5mt buffer zone and 45mt from permanent structure. Code (333): Tonnage Grade and mineral content can be estimated with low level of confidence and resources are also inferred from geological reserves. Life of mine: The proposal annual production is of MT of masonary stone per annum masonary stone from this mine. So, life of mine= total mineable reserves/annual production = /120,000 = years 4.0 Details of production and dispatches of last 5 years: the details of production and dispatched of last five years are as follows:- Year Production (MT) Dispatches (MT) Nil Nil Nil Nil Nil Nil Nil 5.0 Physical & geological characteristics of the deposit Physical Properties: Occurrence - Quartz Texture Colour Form Luster/glose Transparency Hardness - Fine to medium grained - Light Blue - Massive - Dull - Quartz grains opaque to 7 on Mohr hardness Bulk density BHOORAJ SINGH, M.L. No 262/2006 Page 12

13 6.0 Details of mining machinery deployed or to be deployed and their detailed specifications Detail of the mining machinery deployed or to be deployed and their detailed specification :- the following mining machinery deployed at mines. The mine currently workings, Mining machinery deployed at mines are follows as:- S. no Machine No s Company 1 Excavator 1 L&T 2 Compressor 1 Atlas Copco 3 Drill Machine 1 Atlas copco 4 Tractor 1 Ford 5 Dumper 1 Ashoka leyland The machinery to be deployed and their specification are as follows S. no Machine No s Company 1 Excavator 1 L&T 2 Compressor 1 Atlas Copco 3 Drill Machine 1 Atlas copco 4 Tractor 1 Ford 5 Dumper 1 Ashoka leyland 7.0 Method of mining The Masonary Stone is overlain by weathered quartzite so for the exploitation of mineral there is requirement of removal of the over burden and stack separately at the appropriate location. Semi mechanized mining is the suitable method for mining. The mining will be made during the mining as per requirement. The height of the benches will be kept 5.0 mt in mineral. The mineral will be excavated by help of earth movers. The overburden is weathered quartzite. The mineralized Masonary Stone bed is basically brittle and mining will be done by blasting. In view the above drilling and blasting of rock would be required. Blasting may be carried out in rare time following proper safety rules. BHOORAJ SINGH, M.L. No 262/2006 Page 13

14 7.1. Proposed year wise development for five years First year Development & Production: In the first year of mining will be done by extending the working pit in east and west direction. There is no requirement to develop benches in over burden. Two benches will be developed in the Masonary Stone bed at the RL 300mRL to 295mRL, 295mRL to 200mRL advancing towards east and west directions. Total tonnes ROM Masonary Stone and tonnes Marketable Masonary Stone will be produced in the first year of mining plan. The calculations are tabulated in table no. VI (Refer plate no. 5 proposed year wise development plan). Second year Development & Production: In the Second year of mining will be done by extending the working pit in east and west direction. There is no requirement to develop benches in over burden. Two benches will be developed in the Masonary Stone bed at the RL 290mRL to 285mRL 285mRL to 280mRL advancing towards East and West directions. Total tonnes ROM Masonary Stone and tonnes Marketable Masonary Stone will be produced in the second year of mining plan. The calculations are tabulated in table no. VI (Refer plate no. 5 proposed year wise development plan). Third year Development & Production: In the third year of mining will be done by extending the working pit in all direction. There is no bench will be developed in OB. Two bench will be developed in the Masonary Stone bed at the RL 285mRL. to 280mRL and 280mRL to 275mRL advancing towards East and West directions. Total tonnes ROM Masonary Stone and tonnes Marketable Masonary Stone will be produced in the third year of mining plan. The calculations are tabulated in table no. VI (Refer plate no. 5 proposed year wise development plan). Fourth year Development & Production: In the fourth year of mining will be done by extending the working pit in east and west direction. There is no requirement to develop benches in over burden. Two benches will be developed in the Masonary Stone bed at the RL 275mRL to 270mRL, 270mRL to 265mRL advancing towards East and West directions. Total tonnes ROM Masonary Stone and tonnes Marketable Masonary BHOORAJ SINGH, M.L. No 262/2006 Page 14

15 Stone will be produced in the fourth year of mining plan. The calculations are tabulated in table no. VI (Refer plate no. 5 proposed year wise development plan). Fifth year Development & Production: In the fifth year of mining will be done by extending the working pit in all direction. There is no requirement to develop benches in over burden. Two benches will be developed in the Masonary Stone bed at the RL 265mRL to 260mRL and RL 260mRL to 255mRL. Total tonnes ROM Masonary Stone and tonnes Marketable Masonary Stone will be produced in the fifth year of mining plan. The calculations are tabulated in table no. VI (Refer plate no. 5 proposed year wise development plan). Year wise production of mineral and waste (Refer plate no.5) Year BENCH R.L. AREA AVG. VOLUME Market Able (mts.) THICKNE (Cum.) Masonary Stone SS (Mts.) (100%) (Ton) from To I. I II Total III. I Total IV. I Total V. I Total Total Marketable Masonary stone will be excavated in five years= tonnes PROPOSED RATE OF PRODUCTION WHEN THE MINE IS FULLY DEVELOPED The production is tonnes in first year and tones in fifth year. BHOORAJ SINGH, M.L. No 262/2006 Page 15

16 7.3 MINEABLE RESERVES AND ANTICIPATED LIFE OF THE MINE The proposal annual production is of MT of masonary stone per annum masonary stone from this mine. So, life of mine= total mineable reserves/annual production = /120,000 = years 7.4 Proposed Mining Method:- As per chapter no CONCEPTUAL MINING PLAN Conceptual Simplified Mining Scheme is necessary to know the ultimate limit of the pit crust at surface at the end of lease period. It is also necessary to select the sites for waste dump, site service, plantation etc. in such a place that these sites should not get any disturbance during the life of the mine. Considering the aforesaid aspects the Conceptual Ultimate pit limit The surface limit of the working at the end of lease period is illustrated on Plate No. 5. The section has been prepared and ultimate slope is drawn over the section BLASTING The overburden is weathered quartzite. The mineralized Masonary Stone bed is basically brittle and mining will be done by blasting. The mining is running by skilled labours. There may be limited blasting may be carried out in rare time following proper safety rules MINE DRAINAGE A. Likely depth of water table The lease area showing almost undulate topography. There is no nalla in lease area so there is no effect on surface water. The proposed mining in the next five years is only up to 255mRL depth from the surface level. In the rainy season almost all the water will flow on the surrounding agriculture land and government land and no water will be accumulated in the working area. Ground water table is 50 to 60 mt deep from the surface level so the ground water will not hinder the working. BHOORAJ SINGH, M.L. No 262/2006 Page 16

17 B. Depth of workings Proposed deepest working will be far above the ground water table. It will be up to 255mRL. Which is far above the level of ground water table. Thus ground water will not encounter in the workings. C. Quantity and quality of water encounter The monsoon water of direct precipitation will encounter in workings and this water has to dewater during and after the rains in case of deep cuttings. The dewatering is proposed through a sump made in the bottom of the pit for check the silt. The dewatering is proposed in nearby nala. No ground water encounter in workings. Quality of drinking water of nearby well is drinkable and potable. 8.0 YEAR WISE ANNUAL PROGRAMME OF MINING FOR NEXT 5 YEARS: according to paragraph no Details of the employment: (Management plan) technical/skilled/unskilled persons etc. Technical and Supervisory Staff Because of small-scale mining proposals, depending on the requirement of mining work and also as per statutory requirement of acts and rules sufficient supervisory, skilled and unskilled person will be employed at the mine to run systematically and safely. The employment potentials of the mine are given below:- Management and Supervisory staff S.NO. CATEGORY REQUIREMENT 1. MINING MATE ONE 2. SKILLED LABOUR TWO 3. UNSKILLED LABOUR FOUR 4. CHOWKIDAR ONE BHOORAJ SINGH, M.L. No 262/2006 Page 17

18 Labour Requirement Target production = mt per year Working days in a year = 300 day No of shift in a day = One Per day output required in mineral = 400 Tonnes O.M.S observed in near areas = 2.00 Tonnes Unskilled Labour required per day will be 04Nos. Skilled Labour required per day will be 2 Nos. For miscellaneous jobs one labour will be require 1Nos. Total labour =04+2+1=07 All labour will be of Skilled and unskilled category Measures taken and to be taken for land restoration, reclamation and plantation in/ or nearby lease area. The soil may come across is very thin layer in small patches. It is proposed to scrape the soil and stacked separately to use for plantation during each monsoon. Plants of different species will be planted around and nearby areas of the mine site. The area is 1.0 hectares hence 20 trees are proposed to plant each year. Total 100 trees are proposed to replace by fresh trees in the next monsoon. The proposed trees are Bobool, Neem Year No. Replacement Type of Location (60%) species I Babool, Neem,Khejri As shown in working plan, plate no.5 II III IV V The proposed trees are Babool, Neem, Khejri. BHOORAJ SINGH, M.L. No 262/2006 Page 18

19 11.0 MEASURES TAKEN AND TO BE TAKEN FOR PROTECTION OF ENVIRONMENT IN AND AROUND MINING LEASE AREA In continuation of eco friendly mining, plants of different species are being planted around and nearby the mine site Measures taken and to be taken for dumping overburden, stacking of top soil and utilization of top soil. This is existing mining lease area so almost lease area has been used for production of masonary stone at present there is no presence of top soil in rest area so there is no requirement storage Measures taken and to be taken for control of water, noise and air pollution Quality of Air: The proposals are proposed considering the air pollution by vehicular movement, drilling, and blasting and by dumping the waste material. The mechanization may also adopt with other processing of the mineral. The magnitude of air pollution of air pollution in a mine varies with the method of mining, type of mineral, level of mechanization and beneficiation of mineral. The gaseous pollution in this mine is due to emission from diesel engines, transport vehicles as well as during blasting. The dust pollution is due to movement of mine machineries etc. drilling blasting and vehicular movement. The dust once allowed to go into atmosphere cannot be controlled. Hence, it is necessary to suppress and minimized the dust at its generating point/source. The following measures will be taken for air pollution. The emissions from diesel engines will be minimized by proper maintenance of all mine machineries, diesel, D.G. sets and transport vehicles. It is a manually operated mines and thus generation of gaseous pollution will be very low and in permissible limit. The gaseous pollution due to blasting is for a short duration. The gases are diluted by wind in a short period in open cast mining. All the machineries like compressor, trucks should be operated by trained operators. BHOORAJ SINGH, M.L. No 262/2006 Page 19

20 Noise: As already started mining is manual. The impact of noise will be restricted in core zone only where actual mining will take place. This increase can be minimized by providing adequate control measures in mine machineries and other vehicles. The equivalent Noise level within the core zone is within the permissible limit. The noise pollution in this mining project is anticipated during running of mine machineries and transport vehicles. Measures taken for noise level is detailed below- 1 The adequate silencers will be provided in diesel operated mine machineries and trucks and tractors. 2 Compact and leveled haul road are proposed for smooth running of transport vehicles. 3 The transport of vehicles should be filled up to rated capacity of the vehicle to minimize the noise. 4 The shrubs and bushes located in the area and proposed plantation will check the propagation the noise. 5 The booms on haul road are proposed to remove time to time. 6 Plantation on collective basis proposed on haul roads from tar road. Water quality: Since there is no surface water in the area therefore is no need of assessment of quality of surface water. Underground water percolating water exists in the region as seen in the wells near about. The depth of water table in bed varies from 60 to 70 mts during the year so the ground water will not hinder the working. However, fluctuations of water table depend greatly on the strong and weak monsoon. Underground water in the region is tapped by tube wells in nearby areas. There are no toxic substances and there is no danger or recharging of water table with toxic substances. BHOORAJ SINGH, M.L. No 262/2006 Page 20

21 In wells generally good quality and quantity of water for domestic purpose is always available in summer month. Though small in quantity but water available is fresh and is potable CONTRIBUTION REGARDING THE SOCIAL DEVELOPMENT OF THE NEARBY RESIDENTS. By having an economic activity near the villages, the social and demographical profile of local habitants will get positive impact, by direct and indirect jobs. As per rule 37 J (1) and (3) the lease holder already deposit for references the financial assurance of rupees 15,000/ (fifteen thousand) in term of fixed deposit. 15 Details of health checkup and insurance of all employed person (for existing lease) The health checkup of all workers and employees is being done on regular basis. All other regulations are being complied with as per the norms of Govt. of Rajasthan Place: Dated- Lease holder Smt. Tej Singh (Kapil kumar Gupta) RQP/AJM/350/2014/A BHOORAJ SINGH, M.L. No 262/2006 Page 21

22

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles. Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

For Building Stone Quarry

For Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

MINING PLAN WITH BAJRI (MINOR MINERAL) MINE

MINING PLAN WITH BAJRI (MINOR MINERAL) MINE MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN (Submitted Under Rule(s) 37B, 37 E(6), 37G of Rajasthan Minor Mineral Concession (2 nd Amendment) Rules 2012) OF BAJRI (MINOR MINERAL) MINE Mr. MANJEET CHAWLA

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P) VILLAGE : DEVGAON TEHSIL : RITHI DISTRICT : KATNI MINERAL : SAND STONE KHASRA NO : 7 PART AREA : 2.00 HECTARE PRPOSED PRODUCTION: 800 M 3 /YEAR STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED UNDER

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY.

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY. GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY. Dr Ashutosh Roul, PhD Senior Manager(Mines),NALCO. NALCO Asia s largest integrated Aluminium Complex, Encompassing

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

PRE-FEASIBILITY. Pre-Feasibility Report

PRE-FEASIBILITY. Pre-Feasibility Report PRE-FEASIBILITY. Overview: REPORT Mica is widely distributed and occurs in igneous, metamorphic and sedimentary regimes. Mica group represents 34 phyllosilicate minerals that exhibits a layered or platy

More information

Exploration. Exploration methods

Exploration. Exploration methods Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information