PRE-FEASIBILITY REPORT
|
|
|
- Roland Ramsey
- 10 years ago
- Views:
Transcription
1
2 PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 4 (iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY 4 /REGION (iv) DEMAND-SUPPLY GAP 4 (v) IMPORTS VS. INDIGENOUS PRODUCTION 4 (vi) EXPORT POSSIBILITY 4 (vii) DOMESTIC/EXPORT MARKETS 4 (viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO 5 THE PROJECT 3.0 PROJECT DESCRIPTION 5 (i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT 5 PROJECTS, IF ANY (ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC 5 LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES (iii) DETAILS OF ALTERNATIVE SITE CONSIDERED 7 (iv) SIZE OR MAGNITUDE OF OPERATION 7 (v) PROJECT DESCRIPTION WITH PROCESS DETAILS 8 (vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED 9 QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT (vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED 9 IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED (viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER 9 REQUIREMENT AND SOURCE (ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) 9 AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL 4.0 SITE ANALYSIS 9 (i) CONNECTIVITY 9 (ii) LAND FORM, LAND USE AND LAND OWNERSHIP 10 (iii) TOPOGRAPHY ALONG WITH MAP 10 (iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON- AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF 10 i
3 S. NO. CONTENTS PAGE NO. NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION (v) EXISTING INFRASTRUCTURE 14 (vi) SOIL CLASSIFICATION 14 (vii) CLIMATIC DATA FROM SECONDARY SOURCES 14 (viii) SOCIAL INFRASTRUCTURE AVAILABLE PLANNING BRIEF 14 (i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND 14 TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION (ii) POPULATION PROJECTION 15 (iii) LAND USE PLANNING 15 (iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & 15 SOCIAL) (v) AMENITIES/FACILITIES PROPOSED INFRASTRUCTURE 15 (i) INDUSTRIAL AREA (PROCESSING AREA) 15 (ii) RESIDENTIAL AREA (NON PROCESSING AREA) 15 (iii) GREEN BELT DEVELOPMENT 15 (iv) SOCIAL INFRASTRUCTURE 15 (v) CONNECTIVITY 15 (vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF 16 WATER) (vii) SEWERAGE SYSTEM 16 (viii) INDUSTRIAL WASTE MANAGEMENT 16 (ix) SOLID WASTE MANAGEMENT 16 (x) POWER REQUIREMENT & SUPPLY/SOURCE REHABILITATION AND RESETTLEMENT (R& R) PLAN 16 (i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE 16 PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 8.0 PROJECT SCHEDULE & COST ESTIMATES 16 (i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE 16 OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN) (ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF 16 ECONOMIC VIABILITY OF THE PROJECT 9.0 ANALYSIS OF PROPOSAL 16 (i) FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION IF ANY 16 ii
4 LIST OF TABLES TABLE NO. NAME OF TABLE PAGE NO. 1. BRIEF OF THE PROJECT 1 2. LOCATION AND AREA OF THE PROJECT 7 3. YEAWISE PRODUCTION DETAILS 8 4. ENVIRONMENTAL SETTINGS 10 i
5 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report 1.0 EXECUTIVE SUMMARY PRE-FEASIBILITY REPORT Table 1 Brief of the Project S. No. Particulars Details A. Location Details 1. Village(s) Ahirbas, Indragarh, Ulahedi, Kairwara, Kairwari, Kairwa Jat, Kairwawal, Kesarpur, Khedli Saiyad, Khedli Pichnaut, Kharkhara, Gujuki, Gajika, Ghegholi, Ghatla, Chomu, Chhajurampura, Jatoli, Dhhakpuri, Dadar, Nangla Charan, Nangla Jogi, Nangli Sandh, Naithala, Nangal Jhida, Nangal Todiyar, Naharpura Kalan, Piladhaba, Bandipura, Barkhera, Burja, Bahadurpur Pattikatla, Badh Vilandi, Bichpuri, Modiya, Moreda, Mohabbatpur, Ratangarh, Roopbas, Haldina, Satana, Sumel, Salpur, Salpuri, Shanpur, Mahuwa Kala, Mahuwa Khurd, Dholaplash, Achalpuri, Roopbas, Bhandodi. 2. Tehsil Alwar 3. District Alwar 4. State Rajasthan 5. Latitude/Longitude 27 19'17.84"N to 27 39'13.10"N 76 31'42.26"E to 76 46'28.40"E 6. Toposheet No 54A/6, 54A/7, 54A/10, 54A/11, 54A/12, 54A/14 & 54A/15 B. Lease Area Details 7. Lease area ha 8. Type of land Govt. Land (Gair Mumkin Nadi & Nallah) C. Cost Details 9. Total Project Cost Rs 1 Crores/- 10. Cost for Environmental Protection Measures D. Requirements of The Project Capital cost Rs. 4 Lacs/- Recurring Cost per annum : Rs. 2.5 Lacs per annum/- 11. Water Requirement 30 KLD which will be required for (spraying, plantation and drinking) sourced from nearby villages. 12. Power Requirement Electric power is not required as mine will be operated in 13. Man Power Requirement 340 (Direct Employment) day hours only. The machinery will be diesel operated. M/s Mateshwari Mintech Pvt.Ltd 1
6 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report ENVIRONMENTAL MANAGEMENT PLAN Guidelines for sustainable mining of minor mineral which lays down the parameters of riverbed mining, evolved by MoEF, New Delhi vide their letter no. Z-1102/3/2009-IA.II (M) dated June 1 st, 2010 will be followed. Also, the State Govt. Policy Notification GSR 27 dated 21 st June, 2012 (Annexure-III) will be followed. Geological Survey of India, GSI have also issued guidelines relating to river bed guidelines S. No. PARTICULARS DETAILS Water sprinkling will be done during loading, transportation over approach roads Regular maintenance of machinery will be carried out. Overloading will be prevented Air Quality Management Water Quality Management Noise Quality Management Trucks will be covered by tarpaulin covers It will be ensured that all transportation vehicles carry a valid PUC certificate. Plantation will be carried out at the approach road, river bank and vicinity area. Periodic air quality monitoring will be done and adequate measures will be taken. Waste water will not be generated during mining operations as it involves only collection of bajri. Ground Water will not be intersected during mining activities. Mining will be done well above the water table, 1 m above sub terranean water table; therefore, no adverse impact on surface water regime will be there. No waste water will be generated from the mining activities. Toilets will be made available near mine s office away from the river. Septic tanks and soak pits will be provided for the disposal of domestic/toilet waste Sources of noise will be during operation of excavators and transport vehicles. For this proper maintenance will be done at regular intervals. Oiling and greasing at regular interval will be done. Adequate silencers will be provided in all the diesel engines of M/s Mateshwari Mintech Pvt.Ltd 2
7 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report S. No. PARTICULARS DETAILS vehicles. Minimum use of horns and speed limit of 10 km/hr in the village area. Plantation will be carried out at the sides of approach road, river bank and vicinity area 4 Solid Waste Management Waste will not be generated in the mining activities as the project involves collection of Bajri. There is no toxic element present in the mineral. Plantation will be carried out along the approach road, river banks and at all strategic points in the vicinity area. Trees of adequate height will be planted. Plantation will also be done outside the lease area in consultation with Gram Panchayats. It is proposed that the plantation development will be carried out in the vicinity of river banks, along the approach roads, around Govt. 5 Plantation buildings, schools. About 1500 trees will be planted per year. Trees of adequate height will be planted. Species proposed for greenbelt development are Aam (Magnifera Indica), Jamun (Syzygium cumini), Arjun (Terminalia arjuna), Shahtoot (Morus Alba), Neem (Azadiracta indica), Pipal (Ficus religiosa), Babool (Acacia nilotica), Ber (Ziziphus mauritiana), etc. will be planted. Other Fruit bearing species, native species and plants useful for local etc. will also be planted in consultation with Forest department. 6 Socio Economics Measures The laboures will be from nearby villages that are purely dependent upon such mining activities because they are not skilled in any other trade and vocation and are engaged in this same trade since long time. 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT M/s Mateshwari Mintech Pvt. Ltd has proposed River Bed Mining Project of Bajri, Area ha with Production Capacity MTPA from Gair Mumkin Nadi & Nallah at Tehsil & District Alwar, Rajasthan. Letter of Intent (LOI) for grant of mining lease for Bajri over an area of ha has been issued by the Joint Secretary, Department of Mines, M/s Mateshwari Mintech Pvt.Ltd 3
8 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Government of Rajasthan, vide letter no. P. 6 (4)/ Mine/ Group- 2/ 2014 dated for the period of five years. (ii) BRIEF DESCRIPTION OF THE NATURE OF PROJECT As per EIA Notification dated 14 th September, 2006 amended as on date, the project falls under S. No 1 (Mining of Minerals), Project or Activity 1(a) - (3), Category A. General condition is applicable as Sariska National Park is about 1.5 km in West direction from Lease area. (iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY AND OR REGION The Bajri (Sand) is the main material required for construction activities. The mining activities will increase better employment opportunities. Average income level which is the indicator of socio-economic status of house hold is expected to increase and in turn it will uplift the economic standard. The Bajri is deposited in the river bed during rainy season. To avoid risk of spreading the river and channelize the flow of river, the excavation of Bajri from river bed is necessary or we can say unavoidable as assessed and estimated by State Govt. Therefore the project will contribute in development of infrastructure and construction activities in the region as the Bajri is main raw material for the construction activities. (iv) DEMAND SUPPLY GAP Considering the demand of Bajri and sufficient availability of the mineral in the area, it is necessary to have the mining project to sustain the uninterrupted supply of raw material for construction activities in the region & also to provide employment opportunities to nearby habitants. (v) IMPORTS VS. INDIGENOUS PRODUCTION The Bajri is a cheap raw material and available in abundance on river bed, therefore its import is not required. (vi) EXPORT POSSIBILITY There is no export possibility as these minerals are quite cheap and locally available in abundance. Also, export will entail huge logistics cost. (vii) DOMESTIC/EXPORT MARKETS Bajri has only domestic market and there is no possibility of export. M/s Mateshwari Mintech Pvt.Ltd 4
9 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report (viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT The proposed production from this mining project in the area is about.34 million tonnes per year. The daily production will be about 1428 tonnes. Direct Employment to 340 persons will be required to meet the said production capacity and many persons will get indirect employment in transportation. Due to movement of the men and transport vehicles, the satellite occupation in the form of small hotels, shops etc will boost economic activity in the area and many persons will get indirect employment in and around the area. 3.0 PROJECT DESCRIPTION (i) Type of Project Including Interlinked And Independent Projects, If Any: No Interlinked Project(s) is there. This is a site specific single mining project. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates- Incorporated as Fig no. 1 M/s Mateshwari Mintech Pvt.Ltd 5
10 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Figure No. 1: Map showing general & specific location of the proposed mine site (Mine Area ha) M/s Mateshwari Mintech Pvt.Ltd 6
11 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report TABLE 2 Location and Area of the Project S. No. Particulars Details A. Location Details 1. Village(s) Ahirbas, Indragarh, Ulahedi, Kairwara, Kairwari, Kairwa Jat, Kairwawal, Kesarpur, Khedli Saiyad, Khedli Pichnaut, Kharkhara, Gujuki, Gajika, Ghegholi, Ghatla, Chomu, Chhajurampura, Jatoli, Dhhakpuri, Dadar, Nangla Charan, Nangla Jogi, Nangli Sandh, Naithala, Nangal Jhida, Nangal Todiyar, Naharpura Kalan, Piladhaba, Bandipura, Barkhera, Burja, Bahadurpur Pattikatla, Badh Vilandi, Bichpuri, Modiya, Moreda, Mohabbatpur, Ratangarh, Roopbas, Haldina, Satana, Sumel, Salpur, Salpuri, Shanpur, Mahuwa Kala, Mahuwa Khurd, Dholaplash, Achalpuri, Roopbas, Bhandodi. 2. Tehsil Alwar 3. District Alwar 4. State Rajasthan 5. Latitude/Longitude 27 19'17.84"N to 27 39'13.10"N 76 31'42.26"E to 76 46'28.40"E 6. Toposheet No 54A/6, 54A/7, 54A/10, 54A/11, 54A/12, 54A/14 & 54A/15 (iii) Details of Alternate Sites Considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. This is a site specific mining project. Adequate quantity of Bajri reserves is available. Therefore, no Alternative Sites are examined. (iv) Size or Magnitude of Operation This is a Bajri mining project for collection of Bajri from Gair Mumkin Nadi & Nallah bed. The lease area is ha and proposed production capacity is million tonnes per annum. The collection will be done manually as well with excavators of low bucket capacity. No other operation is required. M/s Mateshwari Mintech Pvt.Ltd 7
12 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report TABLE 3 Year wise Production details Year Bajri (in million tonnes) 1 st nd rd th th Total Source: Mining plan & progressive Mine Closure Plan (v) Project Description with Process Detail (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given) In respect of river bed mining, State Govt. Policy Notification GSR 27 was issued on 21 st June, The MoEF, New Delhi has also issued a report of working group in 2010 which also lays down the parameters of riverbed mining. Geological Survey of India, GSI have also issued guidelines relating to river bed guidelines. Mining will be done following all of the above mentioned guidelines. Mining will be done for 3 metre thick strip at a time in the direction of river, to avoid ponding effect and maintaining the uniform surface. No Mining will be done below water level and 45 m from any bridge, culvert, or any water works setup, if any etc. No mining will be done within 10 m from the either side of river banks to maintain its river banks and for their protection. Mining will proceed along the river in the direction from downstream to upstream in each block. No mining will be done across the river-nalla. In order to make adequate replenishment, blocks will be mined in alternate year, so that one block is kept idle/ non working while the other block is being worked. Every mining block will have clearly identified approach road/ entry points into the rivers-nalla and similarly the exit points. No mining will be done on curves of the rivers-nalla to avoid the meandering effect. No mining will be carried out during monsoon season. M/s Mateshwari Mintech Pvt.Ltd 8
13 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report (vi) Raw Material required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product This is a mining project with proposed production capacity of bajri million TPA. No raw material will be required for proposed mining. The collected bajri will directly be sold in the open market. The Bajri produced from the area will be transported by trucks/dumpers to different destinations around the area. (vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be briefly Outlined. No waste water will be generated from the mining operations. There will no other product from the area, therefore reuse and recycling of the same is not envisaged. (viii) Availability of Water Its Source, Energy /Power Requirement and Source A. Water Requirement Total Water requirement for the mining project is estimated 30 KLD which will be required for (dust suppression, plantation and drinking) sourced from nearby villages. B. Power Requirement Electric Power will not be required in the mining operations as mining activities will be carried out during day time only. (ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their Management/Disposal: Waste will not be generated in the mining activities as the project involves collection of Bajri. There is no toxic element present in the mineral. 4.0 SITE ANALYSIS (i) Connectivity Nearest Railway station is Malakhera at an aerial distance of about 3.0 km in North direction. State Highway-25 and 44 passing through lease area. Nearest Airport is Jaipur International Airport at an aerial distance of about 93 km in SW direction. District headquarter Alwar is about 4.0 km in West direction. M/s Mateshwari Mintech Pvt.Ltd 9
14 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Post and Telegraph, Hospital, Bank, Education and all market facilities are available at these places. (ii) Land Form, Land Use and Land Ownership Total mine area of ha for the proposed project is Gair Mumkin Nadi & Nallah as available in revenue records. It is not expected to have permanent change in land use but the same will be changed temporarily during the period when mining operations of Bajri will be undertaken. Natural replenishment of bajri during rainy season will be there. Plantation will be done on the Gair Mumkin Nadi & Nallah banks & approach road of the nearby villages. (iii) Topography along with Map The proposed mine area comprises of part of Gair Mumkin Nadi & Nallah. There is neither road nor habitation in the area. (iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies (Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified Industrial Area, A Copy Of The Gazette Notification. The proposed mine area is ha. There is neither agriculture land nor forest land in the area. TABLE - 4 ENVIRONMENTAL SETTING S. No. Particulars Details 1 Nearest National Highway/ State Highway- 25 (Passing through lease area) State Highway State Highway-44 (Passing through lease area) State Highway- 14 (~1.0 km in NW direction) State Highway-13 (~3.0 km in NW direction) State Highway-25(A) (~8 km in South direction) 2 Nearest Railway Station Malakhera Railway Station (~3.0 km in North direction). 3 Nearest Airport Jaipur international Airport, (~93 km in SW direction). 4 National Park, Wildlife Sariska National Park (~1.5 km in West Sanctuary, Biosphere Reserve, direction) M/s Mateshwari Mintech Pvt.Ltd 10
15 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report etc. within 10 km radius 6 Reserved / Protected Forests within 10 km radius Reserved Forests Shyamaka RF (~ 5.0 km in NE direction). Kalakhora RF (~ 7.5 km in NE direction). Reserved Forest (~2.0 km in North direction). Duninath RF (~4.5 km in North direction). Reserved Forest (~8.5 km in East direction). Manjupur RF (~7.0 km in SE direction). Khunteta Kalan RF (~2.0 km in East direction). Macheri RF (~8.0 km in South direction). Nandu RF (~7.5 km in SW direction). Umri RF (~5.5 km in SW direction). Dangarwara RF (~6.0 km in SW direction). Baleta RF (~3.0 km in SW direction). Silberi RF (~2.5 km in West direction). Dholidhup RF (~2.0 km in West direction). Alwar RF (~3.5 km in West direction). Bhurasid RF (~6.0 km in NW direction). Shahpur RF (~6.5 km in WNW direction). Saidawas Block RF (~7.5 km in WNW direction). Baraliwari RF (~4.0 km in NW direction). Dabla RF (~8.0 km in West direction). Umran RF (~4.5 km in WNW direction). Jhir RF (~6.0 km in NW direction). Paintpur RF (~9.0 km in NW direction). Kalikhol Block RF (~6.5 km in NW direction). Gainpura RF (~3.5 km in West direction). Gopalpura RF (~4.5 km in NW direction). Protected Forests Rajgarh PF (~8.0 km in South direction). Madogarh PF (~4.0 km in West direction). Prithipura PF (~3.5 km in West direction). M/s Mateshwari Mintech Pvt.Ltd 11
16 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Chanduli PF (~6.5 km in NW direction). Protected Forest (~3.0 km in West direction). Protected Forest (~4.0 km in WNW direction). Kalikhor PF (~8.0 km in NW direction). Madhogarh PF (~7.0 km in NW direction). Chandol PF (~8.5 km in WNW direction) 7 Water Bodies (within 10 km radius) Ruparel Nadi (Part of Lease Area) Sukhri Nadi (Part of lease area) Silberi Nala (~3.5 km in West direction) Siliser Lake (~7.0 km in NW Direction) Jaisamand Lake (~1.5 km in West direction) Kaduki Lake (~1.5 km in West direction) 8 Seismic Zone Zone II as per IS: 1893 (Part-I) : 2002 M/s Mateshwari Mintech Pvt.Ltd 12
17 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Figure -2: Map Showing 10 km radius study area M/s Mateshwari Mintech Pvt.Ltd 13
18 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report (v) Existing Infrastructure Nearest Railway station is Malakhera at an aerial distance of about 3.0 km in North direction. State Highway-25 and 44 passing through lease area. Nearest Airport is Jaipur International Airport at an aerial distance of about 93 km in SW direction. District headquarter Alwar is about 4.0 km in West direction. Post and Telegraph, Hospital, Bank, Education and all market facilities are available at these places. (vi) Soil Classification The soils in general are clay loam to clay in texture and moderately to less permeable and developing cracks in dry season. (vii) Climatic Data from Secondary Sources The area has semi arid zone type climate. Average rainfall remains between 300mm to 350mm per year. The maximum, minimum and mean temperatures of the area are 45 0 C, 3 0 C and 24 0 C respectively. (viii) Social Infrastructure Available The site is well connected with social infrastructure facilities like medical, post office, schools, police stations etc. and as such no constraints are envisaged in this aspect. 5.0 PLANNING BRIEF (i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town and Country Planning/Development Authority Classification Proposed mining area falls in Govt. land (Gair Mumkin Nadi & Nallah). The mining lease will be granted after grant of Environmental Clearance by MoEF&CC, New Delhi. State Highway-25 and 44 passing through lease area. Transportation of Bajri from river bed face to consumers will be done by trucks/ tractor trolleys to consumer sites. The approach roads will be provided up to the river bed face of Bajri. The terrain of the river is almost flat. The temporary ramps will be made upto working sites. The ramps will be broken before monsoon and will be made good after every monsoon season. (ii) Population Projection Manpower required will be engaged from nearby areas. No significant influx of people is anticipated in the area. M/s Mateshwari Mintech Pvt.Ltd 14
19 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report (iii) Land Use Planning The proposed mining lease area is ha which comprises of Government land. Plantation will be done along the river banks outside the lease area during the lease period of 5 years. Infrastructure like offices, rest shelter will be maintained outside the lease area. The approach roads will be made in the lease area as well as outside the lease area. (iv) Assessment of Infrastructure Demand (Physical& Social) The applicant will assess the demand of infrastructure (Physical & Social) in nearby area of the proposed project site and same will be developed under corporate social responsibilities programs. (v) Amenities/Facilities The applicant will develop the Amenities/Facilities in the nearby area of the proposed project site as per requirement of local people the nearby area of under corporate social responsibilities programs. 6.0 PROPOSED INFRASTRUCTURE (i) Industrial Area (Processing Area) Proposed mining lease area is ha and located in the rural area. All required infrastructure for the mining activities will be provided. (ii) Residential Area (Non Processing Area) This is not required as mine workers will come from nearby villages. (iii) Green Belt Development Plantation will be carried out at the approach road and river bank Within 5 years of lease period. (iv) Social Infrastructure The laborers will be from nearby villages that are purely dependent upon such mining activities because they are not skilled in any other trade and vocation. (v) CONNECTIVITY Nearest Railway station is Malakhera at an aerial distance of about 3.0 km in North direction. State Highway-25 and 44 passing through lease area. Nearest Airport is Jaipur International Airport at an aerial distance of about 93 km in SW direction. District headquarter Alwar is about 4.0 km in West direction. M/s Mateshwari Mintech Pvt.Ltd 15
20 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Post and Telegraph, Hospital, Bank, Education and all market facilities are available at these places. (vi) Drinking Water Management (Source& Supply of water) Water requirement for drinking purpose will be fulfilled from nearby villages (vii) Sewerage System The domestic wastewater generated from mine and utilities will be disposed in Septic tanks and soak pits. No other sewerage system is required. (viii) Industrial Waste Management No industrial waste will be generated from mining activities; therefore, its management is not required. (ix) Solid Waste Management No waste will be generated from the said mining operations. The small boulders generated during excavations will be used for constructions of haul roads. Unused material including mineral or spillage (if any) will not be stacked on the banks as it will hinder the flow of river in monsoon season. (x) Power Requirement & Supply/Source Electric power is not required as mine will be operated in day hours only. The machinery will be diesel operated. 7.0 REHABILITATION AND RESETTLEMENT (R& R) PLAN (i) Policy To Be Adopted (Central/State)In Respect Of The Project Affected Persons Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To Be Given) The entire mine Area i.e ha is Govt. land (Gair Mumkin Nadi & Nallah) and as there is no habitation, therefore, no displacement of population is involved. 8.0 PROJECT SCHEDULE & COST ESTIMATES (i) Likely Date Of Start Of Construction And Likely Date Of Completion The mine will be started after obtaining Environmental Clearance from the MoEF&CC, New Delhi. (ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the Project Total cost of the Project is : Rs 1.0 Crores/- M/s Mateshwari Mintech Pvt.Ltd 16
21 Proposed River Bed Mining Project of Bajri, Area ha with production capacity MTPA At Tehsil & District: Alwar (Rajasthan) Pre-Feasibility Report Cost for Environment Protection for the Proposed Mining Project Capital cost : Rs 4.0 Lacs/- Recurring Cost per annum : Rs. 2.5 Lacs per annum/ ANALYSIS OF PROPOSAL (i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population if any. Proposed riverbed mining project will result in growth of the surrounding areas by increased direct and indirect employment in the region. Development of social amenities will be in the form of medical facilities, education to under-privileged children and creation of self help groups. No major adverse effects on environment are envisaged in collection of Bajri from Gair Mumkin Nadi & Nallah. M/s Mateshwari Mintech Pvt.Ltd 17
22 LIST OF ANNEXURE S. NO. PARTICULAR 1. LETTER OF INTENT 2. KHASRA DETAILS 3. NOTIFICATION ISSUED BY RAJASTHAN GOVT. i
23
24 English Translation of Letter of Intent Government of Rajasthan Department of Mines (Group-2) Reference: - P.6(4)Mine/Group-2/2014 Dated M/s. Mateshwari Mintech Pvt Ltd Flat No 706, B Block, Athena building, Jaysingh Highway, Bani Park Jaipur (Rajasthan) Subject:-Mining lease area ha Khasra area of Gair Mumkin Nadi & Nallah falling in Revenue Villages of Tehsil-Alwar, District: Alwar (Rajasthan) in favor of M/s. Mateshwari Mintech Pvt Ltd Flat No 706, B Block, Athena building, Jaysingh Highway, Bani Park Jaipur (Rajasthan) Sir, With reference to the above subject State Government has intention for the grant of Mining Lease in your favor for ha as per Rajasthan Minor Mineral Concession Rules, So, fulfill the following condition within one year period. 1. Approved Mining Plan along with Progressive Mine Closure Plan by concerned authority. 2. Environment Clearance under notification of MoEF may be obtained. 3. Financial guarantee may be submitted as per rule 37 (J). faithfully Yours Joint Secretary, Ref.No Copy forwarded for information and necessary action to: 1. Director, Mines & Geology Deptt, Rajasthan, Udaipur Joint Secretary,
25 S.No Village Khasra 1 Ahirbas 2988/1 Total 1 2 Indragarh Total 9 3 Ulahedi Total 3 4 Kairwara Khasra Details
26 / Total 56 5 Kairwari Total 8 6 Kairwa Jat Khasra Details
27 Total 4 7 Kairwawal Total 2 8 Kesarpur Total 2 9 Khedli Saiyad Total 3 10 Khedli Pichnaut Total 5 11 Kharkhara Khasra Details
28 Total Gujuki Total 9 13 Gajika Total 6 14 Ghegholi 931/1006 Total 1 15 Ghatla Khasra Details
29 / Total Chomu 1 538/ / / Total Chhajurampura Total 4 18 Jatoli Total 4 19 Dhhakpuri Khasra Details
30 Total Dadar Total 2 21 Nangla Charan Total 3 22 Nangla Jogi Total 9 23 Nangli Sandh Total 4 24 Naithala Khasra Details
31 Total Nangal Jhida 312 Total 1 26 Nangal Todiyar 8 Total 1 27 Naharpura Kalan Total 2 28 Piladhaba / /759 Khasra Details
32 Total Bandipura 1 1/ / Total 6 30 Barkhera Khasra Details
33 / Khasra Details
34 Total Burja Total 2 32 Bahadurpur Pattikatla / Total Badh Vilandi 232 Total 1 34 Bichpuri Total 3 35 Modiya Total 5 36 Moreda / Khasra Details
35 Total 8 37 Mohabbatpur Total Ratangarh / Total 8 39 Roopbas / / Total 14 Khasra Details
36 40 Haldina Total Satana Khasra Details
37 Total 8 42 Sumel / / Khasra Details
38 Total Salpur Total 8 44 Salpuri Total 9 45 Shanpur Total 6 46 Mahuwa Kala Mahuwa Khurd 1062 Khasra Details
39 / Total Dholaplash Total 2 49 Achalpuri Total 3 50 Roopbas / / Total Bhandodi Khasra Details
40 / Total 28 Grand Total 601 Khasra Details
41 RAJASTIIAN GAZBT:TE ExtraordinarY Q6 31, 31, {s-{r. sns 1934-q4 21, Jilne21,2012 ; qr.r 4 (rr) sc_sg-s (I) 1If,r rrrdn iprr sral {rq-srbfirfuit gpr urft ffi Tn Flqrq.Trtdt, sc-fred fffr af {fufrm uoi S$ srlaw o,r{fr frqql MINES (Gr.II) DEPARTMENT NOTIF'ICATION, JaiPu4 June 21,2012 G.S.R 27.- In exercise of powers conferred by rule 654 of The Rajasthan Minor Mineral Concession Rules, 1986, hereinafter,eferr"d to as the said ruies, the State Govemment in the interest of mineral development hereby notiff following procedure for grant ofconcession of mineratr bajri, namely - ' -1. Mining leases for mineral bajri will be granted as provided in naj asthan -Minor Mineral Concession (Amendment) Rules, 2012 notifi-ed vide this Department Notification No' F'14(1) Mines,'GI.IL2C1 I Cated , Till such time that mining leases of bajri comes into force as oer above amended rules, Mining Engineer / Asstt' Mining bngirre", may recover royalty aiongwith permit fees at.the rates ore"scribed in-the said rules by establishing departmental check post i, Uy *uy of royalty cqllection contract for such period as decided by the Director. 3.
42 b0. Trf,relrq {rq-rr,. qq 21, 2012 lfirl 4 (rr) 4. This no$floation shall come in effect w'e'f fhe date of p"ufi*,i"g of tnil deparftnent notification of even no' dated 23-05' 2012 in official gazette. [No. F-14(1) Mines /Gr.IIl2011t Bv Order of the Governor' " frro Eqrc ai-ffsrf,, Deputy Secretary to Government' Government Central Press, Jaipur'.
43 r No. : F.l4(t)Mines/Gr.Il20t i Goyerument of Ra.iasthan Mines (Gr. tr) Department Jaipur, dated :? J,4ii?gB,o, r r#flffj.i,1di*,r1?* H#f tlis depanmenr refter ro. F.r4(r)Mines/Gr.rrl il*'jf*ffi?itrflilffit::yi::f* inoo rorce as per above amended rues. O"rat"s prlcriuea';;';;#;*."'gu?eer mav recover rovaltv alongr,rdrh ;;#;;; royarty corection ",il*, il, s.,ff'#f; ::,ffi:fiiffiti"hj- o}#ff ;",; ;; 4. This aotification shall come i noria"*ion or","o ffi;ff 5r".r;,1 ;:L* :i:tr pubrishing of rhis deparrmear By &d". offlcor".onr, it * T i :! ;) :!...l Copy forwarded to the followiag for inform^,,." -, ::;;;::'.jffi' i ) * i=::, lp *"-, Govemor of Rajas*_. *,0*, lii",ru;l*r**##il" **iffi$il; "'o* secretary, i f Rajasrhan. Jaipur, :. r.s.fo ""..,1-"nief pr. Secretary. Finr Deptt' Raiasthan' 1 P's-,. Jaioui i"tri*,,"'ilurance -&ffi#'';i"f$;n," 3 *::':;:;;"!,lil:;:fffl li,1rff.**" Depu" Raiasthan, raipur '. ^ --:ffi1,:;'l.. rnreuigence (sdrd, vitt Bhawan, : i#::tj:fm[::f;"?*1:g1o"**a* udaipur with requesito circurate in.a, the $B*rg*r.. Asstt Seeretary to Govt- i t l
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
PRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING
PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
PRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:
PRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan
Pre-feasibility Report
1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT
PROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone
Environmental Management Plan
Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease
CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1
CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
INDEX 1.0 EXECUTIVE SUMMARY... 23
INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1
CHANDAM7AIL,P SAND DEPOSIT
1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub
M/s. Karshanbhai Bhagvanbhai Rabari
PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to
Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on
Environment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
Project Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
Environment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report
PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi
Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT
PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,
ENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
Pre Feasibility Report
Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,
Environment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
Form -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri
PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0
Form -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
Environment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT
Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN
Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT
PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due
PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN
PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE
ENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.
PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra
EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
Proposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT
PRE-FEASIBILITY REPORT
FOR MARBLE MINE(MINOR MINERAL) NEAR VILLAGE KHO(PALPUR), TEHSIL: RAJGARH, DISTRICT: ALWAR, RAJASTHAN NON- FOREST LAND PRE-FEASIBILITY REPORT CATEGORY A (Sariska Wild life Sanctuary is located in 5.0 km
NIMAPALLI STONE QUARRY
EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS
PROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
LORE SILICA SAND MIINE
PRE FEASIBILITY REPORT OF Submitted to MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE GOVT. OF INDIA Paryavaran Bhawan, CGO Complex Jor Bagh Road, New Delhi-110 003 LORE SILICA SAND MIINE Village: Lore,
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
ENVIRONMENT MANAGEMENT PLAN
1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of
TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
NATIONAL HIGHWAYS AUTHORITY OF INDIA
NATIONAL HIGHWAYS AUTHORITY OF INDIA Delhi Jaipur Expressway (Green field) PRE-FEASIBILITY REPORT June - 2016 Table of Contents Sr. No. Particulars Page No. 1 Executive Summary 2 2 Introduction of the
APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM 72000 TPA TO 175000 TPA OF Limited JASIDIH Dist.: Deoghar 814 142 (Jharkhand) INDEX Contents
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage
Environmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
APPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
(IV) Proposed Terms of Reference for EIA Studies
ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project
BHARAT PETROLEUM CORPORATION LIMITED
TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,
LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh
Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure
NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha
PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE
ENVIRONMENTAL MANAGEMENT PLAN
Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA
RISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning
PREFEASIBILITY REPORT
PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe ([email protected]) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
A STUDY ON OWN FUND REVENUE GENERATION THROUGH COMMON PROPERTY RESOURCE MANAGEMENT IN MADANMOHANPUR GRAM PANCHAYAT, WEST BENGAL
A STUDY ON OWN FUND REVENUE GENERATION THROUGH COMMON PROPERTY RESOURCE MANAGEMENT IN MADANMOHANPUR GRAM PANCHAYAT, WEST BENGAL INTRODUCTION:- Self-Governing Institutions are an integral part of the Indian
Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.
Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The
Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu
Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance
PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)
PROPOSED TOR FOR EIA STUDY
JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS
