(Text with EEA relevance) (2014/687/EU)
|
|
- Elfrieda Glenn
- 8 years ago
- Views:
Transcription
1 L 284/76 COMMISSION IMPLEMTING DECISION of 26 Septemer 2014 estlishing the est ville tehniques (BAT) onlusions, under Diretive 2010/75/EU of the Europen Prliment nd of the Counil, for the prodution of pulp, pper nd ord (notified under doument C(2014) 6750) (Text with EEA relevne) (2014/687/EU) THE EUROPEAN COMMISSION, Hving regrd to the Trety on the Funtioning of the Europen Union, Hving regrd to Diretive 2010/75/EU of the Europen Prliment nd of the Counil of 24 Novemer 2010 on industril emissions (integrted pollution prevention nd ontrol) ( 1 ), nd in prtiulr Artile 13(5) thereof, Wheres: (1) Artile 13(1) of Diretive 2010/75/EU requires the Commission to orgnise n exhnge of informtion on industril emissions etween it nd Memer Sttes, the industries onerned nd non-governmentl orgnistions promoting environmentl protetion in order to filitte the drwing up of est ville tehniques (BAT) referene douments s defined in Artile 3(11) of tht Diretive. (2) In ordne with Artile 13(2) of Diretive 2010/75/EU, the exhnge of informtion is to ddress the performne of instlltions nd tehniques in terms of emissions, expressed s short- nd long-term verges, where pproprite, nd the ssoited referene onditions, onsumption nd nture of rw mterils, wter onsumption, use of energy nd genertion of wste nd the tehniques used, ssoited monitoring, ross-medi effets, eonomi nd tehnil viility nd developments therein nd est ville tehniques nd emerging tehniques identified fter onsidering the issues mentioned in points () nd () of Artile 13(2) of tht Diretive. (3) BAT onlusions s defined in Artile 3(12) of Diretive 2010/75/EU re the key element of BAT referene douments nd ly down the onlusions on est ville tehniques, their desription, informtion to ssess their ppliility, the emission levels ssoited with the est ville tehniques, ssoited monitoring, ssoited onsumption levels nd, where pproprite, relevnt site remedition mesures. (4) In ordne with Artile 14(3) of Diretive 2010/75/EU, BAT onlusions re to e the referene for setting permit onditions for instlltions overed y Chpter II of tht Diretive. (5) Artile 15(3) of Diretive 2010/75/EU requires the ompetent uthority to set emission limit vlues tht ensure tht, under norml operting onditions, emissions do not exeed the emission levels ssoited with the est ville tehniques s lid down in the deisions on BAT onlusions referred to in Artile 13(5) of Diretive 2010/75/EU. (6) Artile 15(4) of Diretive 2010/75/EU provides for derogtions from the requirement lid down in Artile 15(3) only where the osts ssoited with the hievement of the emission levels ssoited with the BAT disproportiontely outweigh the environmentl enefits due to the geogrphil lotion, the lol environmentl onditions or the tehnil hrteristis of the instlltion onerned. (7) Artile 16(1) of Diretive 2010/75/EU provides tht the monitoring requirements in the permit referred to in point () of Artile 14(1) of the Diretive re to e sed on the onlusions on monitoring s desried in the BAT onlusions. (8) In ordne with Artile 21(3) of Diretive 2010/75/EU, within 4 yers of pulition of deisions on BAT onlusions, the ompetent uthority is to reonsider nd, if neessry, updte ll the permit onditions nd ensure tht the instlltion omplies with those permit onditions. ( 1 ) OJ L 334, , p. 17.
2 L 284/77 (9) Commission Deision of 16 My 2011 ( 1 ) estlishes forum, for the exhnge of informtion pursunt to Artile 13 of Diretive 2010/75/EU on industril emissions, whih is omposed of representtives of Memer Sttes, the industries onerned nd non-governmentl orgnistions promoting environmentl protetion. (10) In ordne with Artile 13(4) of Diretive 2010/75/EU, the Commission otined the opinion of tht forum on the proposed ontent of the BAT referene doument for the prodution of pulp, pper nd ord on 20 Septemer 2013 nd mde it pulily ville ( 2 ). (11) The mesures provided for in this Deision re in ordne with the opinion of the Committee estlished y Artile 75(1) of Diretive 2010/75/EU, HAS ADOPTED THIS DECISION: Artile 1 The BAT onlusions for the prodution of pulp, pper nd ord re set out in the Annex to this Deision. This Deision is ddressed to the Memer Sttes. Artile 2 Done t Brussels, 26 Septemer For the Commission Jnez POTOČNIK Memer of the Commission ( 1 ) OJ C 146, , p. 3. ( 2 )
3 L 284/78 ANNEX BAT CONCLUSIONS FOR THE PRODUCTION OF PULP, PAPER AND BOARD SCOPE GERAL CONSIDERATIONS EMISSION LEVELS ASSOCIATED WITH BAT AVERAGING PERIODS FOR EMISSIONS TO WATER REFERCE CONDITIONS FOR EMISSIONS TO AIR AVERAGING PERIODS FOR EMISSIONS TO AIR DEFINITIONS Generl BAT onlusions for the pulp nd pper industry Environmentl mngement system Mterils mngement nd good housekeeping Wter nd wste wter mngement Energy onsumption nd effiieny Emissions of odour Monitoring of key proess prmeters nd of emissions to wter nd ir Wste mngement Emissions to wter Emissions of noise Deommissioning BAT onlusions for krft pulping proess Wste wter nd emissions to wter Emissions to ir Wste genertion Energy onsumption nd effiieny BAT onlusions for the sulphite pulping proess Wste wter nd emissions to wter Emissions to ir Energy onsumption nd effiieny BAT onlusions for mehnil pulping nd hemimehnil pulping Wste wter nd emissions to wter Energy onsumption nd effiieny BAT onlusions for proessing pper for reyling Mterils mngement
4 L 284/ Wste wter nd emissions to wter Energy onsumption nd effiieny BAT onlusions for ppermking nd relted proesses Wste wter nd emissions to wter Emissions to ir Wste genertion Energy onsumption nd effiieny Desription of tehniques Desription of tehniques for the prevention nd ontrol of emissions to ir Desription of tehniques to redue fresh wter use/wste wter flow nd the pollution lod in wste wter Desription of tehniques for wste genertion prevention nd wste mngement SCOPE These BAT onlusions onern the tivities speified in Setions 6.1.() nd 6.1.() of Annex I to Diretive 2010/75/EU, i.e. the integrted nd non-integrted prodution in industril instlltions of: () pulp from timer or other firous mterils; () pper or rdord with prodution pity exeeding 20 tonnes per dy. In prtiulr, these BAT onlusions over the following proesses nd tivities: (i) hemil pulping: () krft (sulphte) pulping proess () sulphite pulping proess (ii) mehnil nd hemimehnil pulping (iii) proessing pper for reyling with nd without deinking (iv) ppermking nd relted proesses (v) ll reovery oilers nd lime kilns operted in pulp nd pper mills These BAT onlusions do not ddress the following tivities: (i) prodution of pulp from non-wood firous rw mteril (e.g. yerly plnt pulp); (ii) sttionry internl omustion engines; (iii) omustion plnts for stem nd power genertion other thn reovery oilers; (iv) dryers with internl urners for pper mhines nd oters. Other referene douments whih re relevnt for the tivities overed y these BAT onlusions re the following: Referene douments Industril Cooling Systems (ICS) Eonomis nd Cross-Medi Effets (ECM) Ativity Industril ooling systems, e.g. ooling towers, plte het exhngers Eonomis nd ross-medi effets of tehniques
5 L 284/80 Emissions from Storge (EFS) Referene douments Ativity Emissions from tnks, pipework nd stored hemils Energy Effiieny (E) Generl energy effiieny Lrge Comustion Plnts (LCP) Genertion of stem nd eletriity in pulp nd pper mills y omustion plnts Generl Priniples of Monitoring (MON) Emissions monitoring Wste Ininertion (WI) On-site ininertion nd o-ininertion of wste Wste Tretments Industries (WT) Preprtion of wste s fuels GERAL CONSIDERATIONS The tehniques listed nd desried in these BAT onlusions re neither presriptive nor exhustive. Other tehniques my e used tht ensure t lest n equivlent level of environmentl protetion. Unless otherwise stted, the BAT onlusions re generlly pplile. EMISSION LEVELS ASSOCIATED WITH BAT Where emission levels ssoited with the est ville tehniques (BAT-AELs) re given for the sme verging period in different units (e.g. s onentrtion nd speifi lod vlues (tht is per tonne of net prodution)), those different wys of expressing BAT-AELs re to e seen s equivlent lterntives. For integrted nd multi-produt pulp nd pper mills, the BAT-AELs defined for the individul proesses (pulping, ppermking) nd/or produts need to e omined ording to mixing rule sed on their dditive shres of dishrge. AVERAGING PERIODS FOR EMISSIONS TO WATER Unless stted otherwise, the verging periods ssoited with the BAT-AELs for emissions to wter re defined s follows. Dily verge Averge over smpling period of 24 hours tken s flow-proportionl omposite smple ( 1 ) or, provided tht suffiient flow stility is demonstrted, from time-proportionl smple ( 1 ) Yerly verge Averge of ll dily verges tken within yer, weighted ording to the dily prodution, nd expressed s mss of emitted sustnes per unit of mss of produts/mterils generted or proessed ( 1 ) In speil ses, there my e need to pply different smpling proedure (e.g. gr smpling) REFERCE CONDITIONS FOR EMISSIONS TO AIR The BAT-AELs for emissions to ir refer to stndrd onditions: dry gs, temperture of 273,15 K, nd pressure of 101,3 kp. Where BAT-AELs re given s onentrtion vlues, the referene O 2 level ( % y volume) is indited.
6 L 284/81 Conversion to referene oxygen onentrtion The formul for lulting the emissions onentrtion t referene oxygen level is shown elow. E R ¼ 21 O R 21 O M E M where: E R (mg/nm 3 ): O R (vol %): E M (mg/nm 3 ): O M (vol %): emissions onentrtion referred to the referene oxygen level O R referene oxygen level mesured emissions onentrtion referred to the mesured oxygen level O M mesured oxygen level. AVERAGING PERIODS FOR EMISSIONS TO AIR Unless stted otherwise, the verging periods ssoited with the BAT-AELs for emissions to ir re defined s follows. Dily verge Averge over the smpling period Yerly verge Averge over period of 24 hours sed on vlid hourly verges from ontinuous mesurement Averge vlue of three onseutive mesurements of t lest 30 minutes eh In the se of ontinuous mesurement: verge of ll vlid hourly verges. In the se of periodi mesurements: verge of ll verges over the smpling period otined during one yer. DEFINITIONS For the purpose of these BAT onlusions, the following definitions pply: Term used Definition New plnt Existing plnt Mjor refurishment New dust tement system Existing dust tement system Non-ondensle odorous gses (NCG) Conentrted non-ondensle odorous gses (CNCG) A plnt first permitted on the site of the instlltion following the pulition of these BAT onlusions or omplete replement of plnt on the existing foundtions of the instlltion following the pulition of these BAT onlusions. A plnt whih is not new plnt. A mjor hnge in design or tehnology of plnt/tement system nd with mjor djustments or replements of the proess units nd ssoited equipment. A dust tement system first operted on the site of the instlltion following the pulition of these BAT onlusions. A dust tement system whih is not new dust tement system. Non-ondensle odorous gses, referring to mlodorous gses of krft pulping. Conentrted non-ondensle odorous gses (or strong odorous gses ): TRS-ontining gses from ooking, evportion nd from stripping of ondenstes.
7 L 284/82 Term used Definition Strong odorous gses Conentrted non-ondensle odorous gses (CNCG). Wek odorous gses Diluted non-ondensle odorous gses: TRS-ontining gses whih re not strong odorous gses (e.g. gses oming from tnks, wshing filters, hip ins, lime mud filters, drying mhines). Residul wek gses Wek gses tht re emitted in wys other thn through reovery oiler, lime kiln or TRS-urner. Continuous mesurement Mesurements using n utomted mesuring system (AMS) permnently instlled on site. Periodi mesurement Determintion of mesurnd (prtiulr quntity sujet to mesurement) t speified time intervls using mnul or utomted methods. Diffuse emissions Emissions rising from diret (non-hnnelled) ontt of voltile sustnes or dust with the environment under norml operting onditions. Integrted prodution Both pulp nd pper/ord re produed t the sme site. The pulp is normlly not dried efore pper/ord mnufture. Non-integrted prodution Either () prodution of mrket pulp (for sle) in mills tht do not operte pper mhines, or () prodution of pper/ord using only pulp produed in other plnts (mrket pulp). Net prodution (i) For pper mills: the unpked, slele prodution fter the lst slitter winder, i.e. efore onverting. (ii) For off-line oters: prodution fter oting. (iii) For tissue mills: slele prodution fter the tissue mhine efore ny rewinding proesses nd exluding ny ore. (iv) For mrket pulp mills: prodution fter pking (ADt). (v) For integrted mills: Net pulp, prodution refers to the prodution fter pking (ADt) plus the pulp trnsferred to the pper mill (pulp lulted t 90 % dryness, i.e. ir dry). Net pper prodution: sme s (i) Speility pper mill A mill produing numerous pper nd ord grdes for speil purposes (industril nd/or non-industril) tht re hrterised y prtiulr properties, reltively smll end use mrket or nihe pplitions tht re often espeilly designed for prtiulr ustomer or end-user group. Exmples of speility ppers inlude igrette ppers, filter ppers, metllised pper, therml pper, self-opy pper, stiking lels, st oted pper, s well s gypsum liners nd speil ppers for wxing, insulting, roofing, sphlting, nd other speifi pplitions or tretments. All of these grdes fll outside of the stndrd pper tegories. Hrdwood Group of wood speies inluding e.g. spen, eeh, irh nd eulyptus. The term hrdwood is used s opposite to softwood. Softwood Wood from onifers inluding e.g. pine nd sprue. The term softwood is used s opposite to hrdwood. Custiising Proess in the lime yle in whih hydroxide (white liquor) is regenerted y the retion C(OH) 2 + CO 3 2 CCO 3 (s) + 2 OH
8 L 284/83 ACRONYMS Term used Definition ADt Air Dry tonnes (of pulp) expressed s 90 % dryness. AOX Adsorle orgni hlides mesured ording to the ISO: 9562 stndrd method for wste wters. BOD Biohemil oxygen demnd. The quntity of dissolved oxygen required y miroorgnisms to deompose orgni mtter in wste wter. CMP Chemimehnil pulp. CTMP Chemithermomehnil pulp. COD Chemil oxygen demnd; the mount of hemilly oxidisle orgni mtter in wste wter (normlly referring to nlysis with dihromte oxidtion). DS Dry solids, expressed s weight %. DTPA Diethlyene trimine penteti id (omplexing/helting gent used in peroxide lehing). ECF Elementl Chlorine Free. EDTA Ethylene dimine tetreti id (omplexing/helting gent). H 2 S Hydrogen sulphide. LWC Light weight oted pper. NO X The sum of nitrogen oxide (NO) nd nitrogen dioxide (NO 2 ), expressed s NO 2. NSSC Neutrl sulphite semi hemil. RCF Reyled fires. SO 2 Sulphur dioxide. TCF Totlly Chlorine Free. Totl nitrogen (Tot-N) Totl nitrogen (Tot-N) given s N, inludes orgni nitrogen, free mmoni nd mmonium (NH 4+ -N), nitrites (NO 2- -N) nd nitrtes (NO 3- -N). Totl phosphorus (Tot-P) Totl phosphorus (Tot-P) given s P, inludes dissolved phosphorus plus ny insolule phosphorus rried over into the effluent in the form of preipittes or within miroes. TMP Thermomehnil pulp. TOC Totl orgni ron.
9 L 284/84 Term used Definition TRS Totl redued sulphur. The sum of the following redued mlodorous sulphur ompounds generted in the pulping proess: hydrogen sulphide, methyl merptn, dimethylsulphide nd dimethyldisulphide, expressed s sulphur. TSS Totl suspended solids (in wste wter). Suspended solids onsist of smll fire frgments, fillers, fines, non-settled iomss (gglomertion of miroorgnisms) nd other smll prtiles. VOC Voltile orgni ompounds s defined in Artile 3(45) of Diretive 2010/75/EU GERAL BAT CONCLUSIONS FOR THE PULP AND PAPER INDUSTRY The proess speifi BAT onlusions inluded in Setions 1.2 to 1.6 pply, in ddition to the generl BAT onlusions mentioned in this setion Environmentl mngement system BAT 1. In order to improve the overll environmentl performne of plnts for the prodution of pulp, pper nd ord, BAT is to implement nd dhere to n environmentl mngement system (EMS) tht inorportes ll of the following fetures: () ommitment of the mngement, inluding senior mngement; () definition of n environmentl poliy tht inludes the ontinuous improvement of the instlltion y the mngement; () plnning nd estlishing the neessry proedures, ojetives nd trgets, in onjuntion with finnil plnning nd investment; (d) implementtion of proedures pying prtiulr ttention to: (i) (ii) (iii) (iv) (v) (vi) struture nd responsiility trining, wreness nd ompetene ommunition employee involvement doumenttion effiient proess ontrol (vii) mintenne progrmmes (viii) emergeny prepredness nd response (ix) sfegurding ompline with environmentl legisltion; (e) heking performne nd tking orretive tion, pying prtiulr ttention to: (i) monitoring nd mesurement (see lso the Referene Doument on the Generl Priniples of Monitoring) (ii) orretive nd preventive tion (iii) mintenne of reords (iv) independent (where prtile) internl nd externl uditing in order to determine whether or not the EMS onforms to plnned rrngements nd hs een properly implemented nd mintined;
10 L 284/85 (f) review of the EMS nd its ontinuing suitility, dequy nd effetiveness y senior mngement; (g) following the development of lener tehnologies; (h) onsidertion for the environmentl impts from the eventul deommissioning of the instlltion t the stge of designing new plnt, nd throughout its operting life; (i) pplition of setorl enhmrking on regulr sis. Appliility The sope (e.g. level of detils) nd nture of the EMS (e.g. stndrdised or non-stndrdised) will generlly e relted to the nture, sle nd omplexity of the instlltion, nd the rnge of environmentl impts it my hve Mterils mngement nd good housekeeping BAT 2. BAT is to pply the priniples of good housekeeping for minimising the environmentl impt of the prodution proess y using omintion of the tehniques given elow. d e f g Creful seletion nd ontrol of hemils nd dditives Input-output nlysis with hemil inventory, inluding quntities nd toxiologil properties Minimise the use of hemils to the minimum level required y the qulity speifitions of the finl produt Avoid the use of hrmful sustnes (e.g. nonylphenol ethoxylte-ontining dispersion or lening gents or surftnts) nd sustitution y less hrmful lterntives Minimise the input of sustnes into the soil y lekge, eril deposition nd the inpproprite storge of rw mterils, produts or residues Estlish spill mngement progrmme nd extend the ontinment of relevnt soures, thus preventing the ontmintion of soil nd groundwter Proper design of the piping nd storge systems to keep the surfes len nd to redue the need for wshing nd lening BAT 3. In order to redue the relese of not redily iodegrdle orgni helting gents suh s EDTA or DTPA from peroxide lehing, BAT is to use omintion of the tehniques given elow. Determintion of quntity of helting gents relesed to the environment through periodi mesurements Appliility Not pplile for mills tht do not use helting gents Proess optimistion to redue onsumption nd emission of not redily iodegrdle helting gents Preferentil use of iodegrdle or eliminle helting gents, grdully phsing out nondegrdle produts Not pplile for plnts tht eliminte 70 % or more of EDTA/DTPA in their wste wter tretment plnt or proess Appliility depends on the vilility of pproprite sustitutes (iodegrdle gents meeting e.g. rightness requirements of pulp)
11 L 284/ Wter nd wste wter mngement BAT 4. In order to redue the genertion nd the pollution lod of wste wter from wood storge nd preprtion, BAT is to use omintion of the tehniques given elow. Dry derking (desription see Setion ) Appliility Restrited ppliility when high purity nd rightness is required with TCF lehing Hndling of wood logs in suh wy s to void the ontmintion of rk nd wood with snd nd stones Generlly pplile Pving of the wood yrd re nd prtiulrly the surfes used for the storge of hips Appliility my e restrited due to the size of the wood yrd nd storge re d Controlling the flow of sprinkling wter nd minimising surfe run-off wter from the wood yrd Generlly pplile e Colleting of ontminted run-off wter from the wood yrd nd seprting out suspended solids effluent efore iologil tretment Appliility my e restrited y the degree of ontmintion of run-off wter (low onentrtion) nd/or the size of the wste wter tretment plnt (lrge volumes) The BAT-ssoited effluent flow from dry derking is 0,5 2,5 m 3 /ADt. BAT 5. In order to redue fresh wter use nd genertion of wste wter, BAT is to lose the wter system to the degree tehnilly fesile in line with the pulp nd pper grde mnuftured y using omintion of the tehniques given elow. Appliility Monitoring nd optimising wter usge Evlution of wter reirultion options d e f Blning the degree of losure of wter iruits nd potentil drwks; dding dditionl equipment if neessry Seprtion of less ontminted seling wter from pumps for vuum genertion nd reuse Seprtion of len ooling wter from ontminted proess wter nd reuse Reusing proess wter to sustitute for fresh wter (wter reirultion nd losing of wter loops) Generlly pplile Applile to new plnts nd mjor refurishments. Appliility my e limited due to wter qulity nd/or produt qulity requirements or due to tehnil onstrints (suh s preipittion/inrusttion in wter system) or inrese odour nuisne g In-line tretment of (prts of) proess wter to improve wter qulity to llow for reirultion or reuse Generlly pplile
12 L 284/87 The BAT-ssoited wste wter flow t the point of dishrge fter wste wter tretment s yerly verges re: Setor BAT-ssoited wste wter flow Blehed krft m 3 /ADt Unlehed krft m 3 /ADt Blehed sulphite pper grde pulp m 3 /ADt Mgnefite pulp m 3 /ADt Dissolving pulp m 3 /ADt NSSC pulp m 3 /ADt Mehnil pulp 9 16 m 3 /t CTMP nd CMP 9 16 m 3 /ADt RCF pper mills without deinking 1,5 10 m 3 /t (the higher end of the rnge is minly ssoited with folding oxord prodution) RCF pper mills with deinking 8 15 m 3 /t RCF-sed tissue pper mills with deinking m 3 /t Non-integrted pper mills 3,5 20 m 3 /t Energy onsumption nd effiieny BAT 6. In order to redue fuel nd energy onsumption in pulp nd pper mills, BAT is to use tehnique () nd omintion of the other tehniques given elow. Use n energy mngement system tht inludes ll of the following fetures: (i) Assessment of the mill's overll energy onsumption nd prodution (ii) Loting, quntifying nd optimising the potentils for energy reovery (iii) Monitoring nd sfegurding the optimised sitution for energy onsumption Generlly pplile Appliility Reover energy y ininerting those wstes nd residues from the prodution of pulp nd pper tht hve high orgni ontent nd lorifi vlue, tking into ount BAT 12 Only pplile if the reyling or reuse of wstes nd residues from the prodution of pulp nd pper with high orgni ontent nd high lorifi vlue is not possile
13 L 284/88 d Cover the stem nd power demnd of the prodution proesses s fr s possile y the ogenertion of het nd power (CHP) Use exess het for the drying of iomss nd sludge, to het oiler feedwter nd proess wter, to het uildings, et. Appliility Applile for ll new plnts nd for mjor refurishments of the energy plnt. Appliility in existing plnts my e limited due to the mill lyout nd ville spe Appliility of this tehnique my e limited in ses where the het soures nd lotions re fr prt e Use thermo ompressors Applile to oth new nd existing plnts for ll grdes of pper nd for oting mhines, s long s medium pressure stem is ville f g h i j Insulte stem nd ondenste pipe fittings Use energy effiient vuum systems for dewtering Use high effiieny eletril motors, pumps nd gittors Use frequeny inverters for fns, ompressors nd pumps Mth stem pressure levels with tul pressure needs Generlly pplile Desription (): Simultneous genertion of het nd eletril nd/or mehnil energy in single proess, referred to s omined het nd power plnt (CHP). CHP plnts in the pulp nd pper industry normlly pply stem turines nd/or gs turines. The eonomi viility (hievle svings nd pyk time) will depend minly on the ost of eletriity nd fuels Emissions of odour With regrd to the emissions of mlodorous sulphur-ontining gses from krft nd sulphite pulp mills, see the proess-speifi BAT given in Setions nd BAT 7. In order to prevent nd redue the emission of odorous ompounds originting from the wste wter system, BAT is to use omintion of the tehniques given elow. I. Applile for odours relted to wter systems losure Design pper mill proesses, stok nd wter storge tnks, pipes nd hests in suh wy s to void prolonged retention times, ded zones or res with poor mixing in wter iruits nd relted units, in order to void unontrolled deposits nd the dey nd deomposition of orgni nd iologil mtter. Use ioides, dispersnts or of oxidising gents (e.g. tlyti disinfetion with hydrogen peroxide) to ontrol odour nd deying teri growth.
14 L 284/89 Instll internl tretment proesses ( kidneys ) to redue the onentrtions of orgni mtter nd onsequently possile odour prolems in the white wter system. II. Applile for odours relted to wste wter tretment nd sludge hndling, in order to void onditions where wste wter or sludge eomes neroi d e f g h Implement losed sewer systems with ontrolled vents, using hemils in some ses to redue the formtion of nd to oxidise hydrogen sulphide in sewer systems. Avoid over-ertion in equlistion sins ut mintin suffiient mixing. Ensure suffiient ertion pity nd mixing properties in ertion tnks; revise the ertion system regulrly. Gurntee proper opertion of seondry lrifier sludge olletion nd return sludge pumping Limit the retention time of sludge in sludge storges y sending the sludge ontinuously to the dewtering units. Avoid the storge of wste wter in the spill sin longer thn is neessry; keep the spill sin empty. If sludge dryers re used, tretment of therml sludge dryer vent gses y sruing nd/or io filtrtion (suh s ompost filters). Avoid ir ooling towers for untreted wter effluent y pplying plte het exhngers Monitoring of key proess prmeters nd of emissions to wter nd ir BAT 8. BAT is to monitor the key proess prmeters ording to the tle given elow. I. Monitoring key proess prmeters relevnt for emissions to ir Prmeter Pressure, temperture, oxygen, CO nd wter vpour ontent in flue-gs for omustion proesses Monitoring frequeny Continuous II. Monitoring key proess prmeters relevnt for emissions to wter Wter flow, temperture nd ph Prmeter P nd N ontent in iomss, sludge volume index, exess mmoni nd ortho-phosphte in the effluent, nd mirosopy heks of the iomss Volume flow nd CH 4 ontent of iogs produed in neroi wste wter tretment Monitoring frequeny Continuous Periodi Continuous H 2 S nd CO 2 tretment ontents of iogs produed in neroi wste wter Periodi
15 L 284/90 BAT 9. BAT is to rry out the monitoring nd mesurement of emissions to ir, s indited elow, on regulr sis with the frequeny indited nd ording to stndrds. If stndrds re not ville, BAT is to use ISO, ntionl or other interntionl stndrds whih ensure the provision of dt of n equivlent sientifi qulity. Prmeter Monitoring frequeny Emission soure Monitoring ssoited with Continuous Reovery oiler BAT 21 BAT 22 BAT 36 BAT 37 NO x nd SO 2 Periodi or ontinuous Lime kiln BAT 24 BAT 26 Periodi or ontinuous Dedited TRS urner BAT 28 BAT 29 Dust Periodi or ontinuous Reovery oiler (krft) nd lime kiln BAT 23 BAT 27 Periodi Reovery oiler (sulphite) BAT 37 Continuous Reovery oiler BAT 21 TRS (inluding H 2 S) Periodi or ontinuous Lime kiln nd dedited TRS urner BAT 24 BAT 25 BAT 28 Periodi Diffuse emissions from different soures (e.g. the fire line, tnks, hip ins, et.) nd residul wek gses BAT 11 BAT 20 d NH 3 Periodi Reovery oiler equipped with SNCR BAT 36 BAT 10. BAT is to rry out the monitoring of emissions to wter, s indited elow, with the indited frequeny nd ording to stndrds. If stndrds re not ville, BAT is to use ISO, ntionl or other interntionl stndrds tht ensure the provision of dt of n equivlent sientifi qulity. Prmeter Monitoring frequeny Monitoring ssoited with Chemil oxygen demnd (COD) or Totl orgni ron (TOC) ( 1 ) Dily ( 2 ) ( 3 ) BOD 5 or BOD 7 Weekly (one week) Totl suspended solids (TSS) Dily ( 2 ) ( 3 ) d Totl nitrogen Weekly (one week) ( 2 ) BAT 19 BAT 33 BAT 40 BAT 45 BAT 50 e Totl phosphorus Weekly (one week) ( 2 ) f EDTA, DTPA ( 4 ) Monthly (one month)
16 L 284/91 Prmeter Monitoring frequeny Monitoring ssoited with Monthly (one month) BAT 19: lehed krft g AOX (ording to ISO 9562:2004) ( 5 ) One every two months BAT 33: exept TCF nd NSSC mills BAT 40: exept CTMP nd CMP mills BAT 45 BAT 50 h Relevnt metls (e.g. Zn, Cu, Cd, P, Ni) One yer ( 1 ) There is trend to reple COD y TOC for eonomi nd environmentl resons. If TOC is lredy mesured s key proess prmeter, there is no need to mesure COD; however, orreltion etween the two prmeters should e estlished for the speifi emission soure nd wste wter tretment step. ( 2 ) Rpid test methods n lso e used. The results of rpid tests should e heked regulrly (e.g. monthly) ginst stndrds or, if stndrds re not ville, ginst ISO, ntionl or other interntionl stndrds whih ensure the provision of dt of n equivlent sientifi qulity. ( 3 ) For mills operting less thn seven dys week, the monitoring frequeny for COD nd TSS my e redued to over the dys the mill is in opertion or to extend the smpling period to 48 or 72 hours. ( 4 ) Applile where EDTA or DTPA (helting gents) re used in the proess. ( 5 ) Not pplile to plnts tht provide evidene tht no AOX is generted or dded vi hemil dditives nd rw mterils. BAT 11. BAT is to regulrly monitor nd ssess diffuse totl redued sulphur emissions from relevnt soures. Desription The ssessment of diffuse totl redued sulphur emissions n e done y periodi mesurement nd ssessment of diffuse emissions tht re emitted from different soures (e.g. the fire line, tnks, hip ins et.) y diret mesurements Wste mngement BAT 12. In order to redue the quntities of wstes sent for disposl, BAT is to implement wste ssessment (inluding wste inventories) nd mngement system, so s to filitte wste reuse, or filing tht, wste reyling, or filing tht, other reovery, inluding omintion of the tehniques given elow. Desription Appliility Seprte olletion of different wste frtions (inluding seprtion nd lssifition of hzrdous wste) Generlly pplile Merging of suitle frtions of residues to otin mixtures tht n e etter utilised Generlly pplile Pretretment of proess residues efore reuse or reyling See Setion Generlly pplile d Mteril reovery nd reyling of proess residues on site Generlly pplile e Energy reovery on- or off-site from wstes with high orgni ontent For off-site utilistion, the ppliility depends on the vilility of third prty
17 L 284/92 Desription Appliility f Externl mteril utilistion Depending on the vilility of third prty g Pretretment of wste efore disposl Generlly pplile Emissions to wter Further informtion on wste wter tretment in pulp nd pper mills nd proess-speifi BAT-AELs re given in Setions 1.2 to 1.6. BAT 13. In order to redue nutrient (nitrogen nd phosphorus) emissions into reeiving wters, BAT is to sustitute hemil dditives with high nitrogen nd phosphorus ontents y dditives ontining low nitrogen nd phosphorus ontents. Appliility Applile if the nitrogen in the hemil dditives is not ioville (i.e. it nnot serve s nutrient in iologil tretment) or if the nutrient lne is in surplus. BAT 14. In order to redue emissions of pollutnts into reeiving wters, BAT is to use ll of the tehniques given elow. Primry (physio-hemil) tretment Seondry (iologil) tretment ( 1 ) See Setion Desription ( 1 ) Not pplile to plnts where the iologil lod of wste wter fter the primry tretment is very low, e.g. some pper mills produing speility pper. BAT 15. When further removl of orgni sustnes, nitrogen or phosphorus is needed, BAT is to use tertiry tretment s desried in Setion BAT 16. In order to redue emissions of pollutnts into reeiving wters from iologil wste wter tretment plnts, BAT is to use ll of the tehniques given elow. Proper design nd opertion of the iologil tretment plnt Regulrly ontrolling the tive iomss Adjustment of nutrition supply (nitrogen nd phosphorus) to the tul need of the tive iomss
18 L 284/ Emissions of noise BAT 17. In order to redue the emissions of noise from pulp nd pper mnufturing, BAT is to use omintion of the tehniques given elow. Desription Appliility Noise-redution progrmme A noise-redution progrmme inludes identifition of soures nd ffeted res, lultions nd mesurements of noise levels in order to rnk soures ording to noise levels, nd identifition of the most ost effetive omintion of tehniques, their implementtion nd monitoring. Generlly pplile. Strtegi plnning of the lotion of equipment, units nd uildings Noise levels n e redued y inresing the distne etween the emitter nd the reeiver nd y using uildings s noise sreens. Generlly pplile to new plnts. In the se of existing plnts, the relotion of equipment nd prodution units my e restrited y the lk of spe or y exessive osts. Opertionl nd mngement tehniques in uildings ontining noisy equipment This inludes: improved inspetion nd mintenne of equipment to prevent filures losing of doors nd windows of overed res equipment opertion y experiened stff voidne of noisy tivities during night-time provisions for noise ontrol during mintenne tivities d Enlosing noisy equipment nd units Enlosure of noisy equipment, suh s wood hndling, hydruli units, nd ompressors in seprte strutures, suh s uildings or soundproofed inets, where internl-externl lining is mde of impt-sorent mteril. Generlly pplile. e Use of low-noise equipment nd noise-reduers on equipment nd duts. f Virtion insultion Virtion insultion of mhinery nd deoupled rrngement of noise soures nd potentilly resonnt omponents. g Soundproofing of uildings This potentilly inludes use of: sound-soring mterils in wlls nd eilings sound-isolting doors doule-glzed windows
19 L 284/94 Desription Appliility h Noise tement Noise propgtion n e redued y inserting rriers etween emitters nd reeivers. Approprite rriers inlude protetion wlls, emnkments nd uildings. Suitle noise tement tehniques inlude fitting sileners nd ttenutors to noisy equipment suh s stem releses nd dryer vents. Generlly pplile to new plnts. In the se of existing plnts, the insertion of ostles my e restrited y the lk of spe. i j Use of lrger wood-hndling mhines to redue lifting nd trnsport times nd noise from logs flling onto log piles or the feed tle. Improved wys of working, e.g. relesing logs from lower height onto the log piles or the feed tle; immedite feedk of the level of noise for the workers. Generlly pplile Deommissioning BAT 18. In order to prevent pollution risks when deommissioning plnt, BAT is to use the generl tehniques given elow. Ensure tht underground tnks nd piping re either voided in the design phse or tht their lotion is well known nd doumented. Estlish instrutions for emptying proess equipment, vessels nd piping. Ensure len losure when the fility is shut down, e.g. to len up nd rehilitte the site. Nturl soil funtions should e sfegurded, if fesile. d Use monitoring progrmme, espeilly reltive to groundwter, in order to detet possile future impts on site or in neighouring res. e Develop nd mintin site losure or esstion sheme, sed on risk nlysis, tht inludes trnsprent orgnistion of the shutdown work, tking into ount relevnt lol speifi onditions BAT CONCLUSIONS FOR KRAFT PULPING PROCESS For integrted krft pulp nd pper mills, the proess-speifi BAT onlusions for ppermking given in Setion 1.6 pply, in ddition to the BAT onlusions in this setion Wste wter nd emissions to wter BAT 19. In order to redue emissions of pollutnts into reeiving wters from the whole mill, BAT is to use TCF or modern ECF lehing (see desription in Setion ), nd suitle omintion of the tehniques speified in BAT 13, BAT 14, BAT 15 nd BAT 16 nd of the tehniques given elow.
20 L 284/95 Desription Appliility Modified ooking efore lehing Oxygen delignifition efore lehing Generlly pplile Closed rown stok sreening nd effiient rown stok wshing d Prtil proess wter reyling in the leh plnt Wter reyling my e limited due to inrusttion in lehing e Effetive spill monitoring nd ontinment with suitle reovery system See Setion Generlly pplile f g Mintining suffiient lk liquor evportion nd reovery oiler pity to ope with pek lods Stripping the ontminted (foul) ondenstes nd reusing the ondenstes in the proess Generlly pplile BAT-ssoited emission levels See Tle 1 nd Tle 2. These BAT-ssoited emission levels re not pplile to dissolving krft pulp mills. The referene wste wter flow for krft mills is set out in BAT 5. Tle 1 BAT-ssoited emission levels for the diret wste wter dishrge to reeiving wters from lehed krft pulp mill Prmeter Yerly verge kg/adt ( 1 ) Chemil oxygen demnd (COD) 7 20 Totl suspended solids (TSS) 0,3 1,5 Totl nitrogen 0,05 0,25 ( 2 ) Totl phosphorus 0,01 0,03 ( 2 ) Eulyptus: 0,02 0,11 kg/adt ( 3 ) Adsorle orgnilly ound hlogens (AOX) ( 4 ) ( 5 ) 0 0,2 ( 1 ) The BAT-AEL rnges refer to mrket pulp prodution nd the pulp prodution prt of integrted mills (emissions from ppermking re not inluded). ( 2 ) A ompt iologil wste wter tretment plnt n result in slightly higher emission levels. ( 3 ) The upper end of the rnge refers to mills using eulyptus from regions with higher levels of phosphorus (e.g. Ierin eulyptus). ( 4 ) Applile for mills using hlorine ontining lehing hemils. ( 5 ) For mills produing pulp with high strength, stiffness nd high purity properties (e.g. for liquid pkging ord nd LWC), emissions level of AOX up to 0,25 kg/adt my our.
21 L 284/96 Tle 2 BAT-ssoited emission levels for the diret wste wter dishrge to reeiving wters from n unlehed krft pulp mill Prmeter Yerly verge kg/adt ( 1 ) Chemil oxygen demnd (COD) 2,5 8 Totl suspended solids (TSS) 0,3 1,0 Totl nitrogen 0,1 0,2 ( 2 ) Totl phosphorus 0,01 0,02 ( 2 ) ( 1 ) The BAT-AEL rnges refer to mrket pulp prodution nd the pulp prodution prt of integrted mills (emissions from ppermking re not inluded). ( 2 ) A ompt iologil wste wter tretment plnt n result in slightly higher emission levels. The BOD onentrtion in the treted effluents is expeted to e low (round 25 mg/l s 24-hour omposite smple) Emissions to ir Redution of emissions in strong nd wek odorous gses BAT 20. In order to redue odour emissions nd totl redued sulphur emissions due to strong nd wek odorous gses, BAT is to prevent diffuse emissions y pturing ll proess-sed sulphur ontining off-gses, inluding ll vents with sulphur-ontining emissions, y pplying ll of the tehniques given elow. Desription Colletion systems for strong nd wek odorous gses, omprising the following fetures: overs, sution hoods, duts, nd extrtion system with suffiient pity; ontinuous lek detetion system; sfety mesures nd equipment. Ininertion of strong nd wek non-ondensle gses Ininertion n e rried out using: reovery oiler lime kiln ( 1 ) dedited TRS urner equipped with wet sruers for SO x removl; or power oiler ( 2 ) To ensure the onstnt vilility of ininertion for odorous strong gses, k-up systems re instlled. Lime kilns n serve s k-up for reovery oilers; further k-up equipment re flres nd pkge oiler Reording unvilility of the ininertion system nd ny resulting emissions ( 3 ) ( 1 ) The SO x emission levels of the lime kiln inrese signifintly when strong non-ondensle gses (NCG) re fed to the kiln nd no lkline sruer is used. ( 2 ) Applile for the tretment of wek odorous gses. ( 3 ) Applile for the tretment of strong odorous gses.
22 L 284/97 Appliility Generlly pplile for new plnts nd for mjor refurishments of existing plnts. The instlltion of neessry equipment my e diffiult for existing plnts due to lyout nd spe restritions. The ppliility of ininertion might e limited for sfety resons, nd in this se wet sruers ould e used. BAT-ssoited emission level of totl redued sulphur (TRS) in residul wek gses emitted is 0,05 0,2 kg S/ADt Redution of emissions from reovery oiler SO 2 nd TRS emissions BAT 21. In order to redue SO 2 nd TRS emissions from reovery oiler, BAT is to use omintion of the tehniques given elow. Inresing the dry solids (DS) ontent of lk liquor Desription The lk liquor n e onentrted y n evportion proess efore urning Optimised firing Firing onditions n e improved e.g. y good mixing of ir nd fuel, ontrol of furne lod et. Wet sruer See Setion BAT-ssoited emission levels See Tle 3. Tle 3 BAT-ssoited emission levels for SO 2 nd TRS emissions from reovery oiler Prmeter Dily verge ( 1 ) ( 2 ) Yerly verge ( 1 ) Yerly verge ( 1 ) mg/nm 3 t 6 % O 2 mg/nm 3 t 6 % O 2 kg S/ADt SO 2 DS < 75 % DS % ( 3 ) Totl redued sulphur (TRS) 1 10 ( 4 ) 1 5 Gseous S (TRS- S + SO 2 -S) DS < 75 % 0,03 0,17 DS % ( 3 ) 0,03 0,13 ( 1 ) Inresing the DS ontent of the lk liquor results in lower SO 2 emissions nd higher NO x emissions. Due to this, reovery oiler with low emission levels for SO 2, my e on the higher end of the rnge for NO x nd vie vers. ( 2 ) BAT-AELs do not over periods during whih the reovery oiler is run on DS ontent muh lower thn the norml DS ontent due to shut down or mintenne of the lk liquor onentrtion plnt. ( 3 ) If reovery oiler were to urn lk liquor with DS > 83 %, then SO 2 nd gseous S emission levels should e reonsidered on se-y-se sis. ( 4 ) The rnge is pplile without the ininertion of odorous strong gses. DS = dry solid ontent of the lk liquor.
23 L 284/98 NO x emissions BAT 22. In order to redue NO x emissions from reovery oiler, BAT is to use n optimised firing system inluding ll of the fetures given elow. Computerised omustion ontrol Good mixing of fuel nd ir Stged ir feed systems, e.g. y using different ir registers nd ir inlet ports Appliility ()is pplile to new reovery oilers nd in the se of mjor refurishment of reovery oilers, s this tehnique requires onsiderle hnges to the ir feed systems nd the furne. BAT-ssoited emission levels See Tle 4. Tle 4 BAT-ssoited emission levels for NO x emissions from reovery oiler Prmeter Yerly verge ( 1 ) Yerly verge ( 1 ) mg/nm 3 t 6 % O 2 kg NO x /ADt NO x Softwood ( 2 ) Hrdwood ( 2 ) DS < 75 %: 0,8 1,4 DS % ( 3 ): 1,0 1,6 DS < 75 %: 0,8 1,4 DS % ( 3 ): 1,0 1,7 ( 1 ) Inresing the DS ontent of the lk liquor results in lower SO 2 emissions nd higher NO x emissions. Due to this, reovery oiler with low emission levels for SO 2, my e on the higher end of the rnge for NO x nd vie vers. ( 2 ) The tul NO x emission level of reovery oiler depends on the DS ontent nd the nitrogen ontent of the lk liquor, nd the mount nd omintion of NCG nd other nitrogen ontining flows (e.g. dissolving tnk vent gs, methnol seprted from the ondenste, iosludge) urnt. The higher the DS ontent, the nitrogen ontent in the lk liquor, nd the mount of NCG nd other nitrogen ontining flows urnt, the loser the emissions will e to the upper end of the BAT-AEL rnge. ( 3 ) If reovery oiler were to urn lk liquor with DS > 83 %, then NO x emission levels should e reonsidered on se-y-se sis. DS = dry solid ontent of lk liquor. Dust emissions BAT 23. In order to redue dust emissions from reovery oiler, BAT is to use n eletrostti preipittor (ESP) or omintion of ESP nd wet sruer.
24 L 284/99 Desription SeeSetion BAT-ssoited emission levels See Tle 5. Tle 5 BAT-ssoited emission levels for dust emissions from reovery oiler Prmeter Dust tement system Yerly verge mg/nm 3 t 6 % O 2 Yerly verge kg dust/adt Dust New or mjor refurishment ,02 0,20 Existing ( 1 ) 0,02 0,3 ( 1 ) ( 1 ) For n existing reovery oiler equipped with n ESP pprohing the end of its opertionl life, emission levels my inrese over time up to 50 mg/nm 3 (orresponding to 0,4 kg/adt) Redution of emissions from lime kiln SO 2 emissions BAT 24. In order to redue SO 2 emissions from lime kiln, BAT is to pply one or omintion of the tehniques given elow. Desription Fuel seletion/low sulphur fuel Limit ininertion of sulphur-ontining odorous strong gses in the lime kiln Control of N 2 S ontent in lime mud feed See Setion d Alkline sruer BAT-ssoited emission levels See Tle 6. Tle 6 BAT-ssoited emission levels for SO 2 nd sulphur emissions from lime kiln Prmeter ( 1 ) Yerly verge mg SO 2 /Nm 3 t 6 % O 2 Yerly verge kg S/ADt SO 2 when strong gses re not urnt in the lime kiln 5 70
25 L 284/100 Prmeter ( 1 ) Yerly verge mg SO 2 /Nm 3 t 6 % O 2 Yerly verge kg S/ADt SO 2 when strong gses re urnt in the lime kiln Gseous S (TRS-S + SO 2 -S) when strong gses re not urnt in the lime kiln Gseous S (TRS-S + SO 2 -S) when strong gses re urnt in the lime kiln 0,005 0,07 0,055 0,12 ( 1 ) strong gses inludes methnol nd turpentine TRS emissions BAT 25. In order to redue TRS emissions from lime kiln, BAT is to pply one or omintion of the tehniques given elow. Control of the exess oxygen Control of N 2 S ontent in lime mud feed See Setion Desription Comintion of ESP nd lkline sruer See Setion BAT-ssoited emission levels See Tle 7. Tle 7 BAT-ssoited emission levels for TRS emissions from lime kiln Prmeter Yerly verge mg S/Nm 3 t 6 % O 2 Totl redued sulphur (TRS) < 1 10 ( 1 ) ( 1 ) For lime kilns urning strong gses (inluding methnol nd turpentine), the upper end of the AEL rnge my e up to 40 mg/nm 3. NO x emissions BAT 26. In order to redue NO x emissions from lime kiln, BAT is to pply omintion of the tehniques given elow. Desription d Optimised omustion nd omustion ontrol Good mixing of fuel nd ir Low-NO x urner Fuel seletion/low-n fuel See Setion
26 L 284/101 BAT-ssoited emission levels See Tle 8. Tle 8 BAT-ssoited emission levels for NO x emissions from lime kiln Prmeter Yerly verge mg/nm 3 t 6 % O 2 Yerly verge kg NO x /ADt Liquid fuels ( 1 ) 0,1 0,2 ( 1 ) Gseous fuels ( 2 ) 0,1 0,3 ( 2 ) ( 1 ) When using liquid fuels originting from vegetle mtter (e.g. turpentine, methnol, tll-oil), inluding those otined s y-produts of the pulping proess, emission levels up to 350 mg/nm 3 (orresponding to 0,35 kg NO x /ADt) my our. ( 2 ) When using gseous fuels originting from vegetle mtter (e.g. non-ondensle gses), inluding those otined s y-produts of the pulping proess, emission levels up to 450 mg/nm 3 (orresponding to 0,45 kg NO x /ADt) my our. Dust emissions BAT 27. In order to redue dust emissions from lime kiln, BAT is to use n eletrostti preipittor (ESP) or omintion of ESP nd wet sruer. Desription See Setion BAT-ssoited emission levels See Tle 9. Tle 9 BAT-ssoited emission levels for dust emissions from lime kiln Prmeter Dust tement system Yerly verge mg/nm 3 t 6 % O 2 Yerly verge kg dust/adt Dust New or mjor refurishments ,005 0,02 Existing ( 1 ) 0,005 0,03 ( 1 ) ( 1 ) For n existing lime kiln equipped with n ESP pprohing the end of its opertionl life, emission levels my inrese over time up to 50 mg/nm 3 (orresponding to 0,05 kg/adt) Redution of emissions from urner for strong odorous gses (dedited TRS urner) BAT 28. In order to redue SO 2 emissions from the ininertion of strong odorous gses in dedited TRS urner, BAT is to use n lkline SO 2 sruer.
27 L 284/102 BAT-ssoited emission levels See Tle 10. Tle 10 BAT-ssoited emission levels for SO 2 nd TRS emissions from the ininertion of strong gses in dedited TRS urner Prmeter Yerly verge mg/nm 3 t 9 % O 2 Yerly verge kg S/ADt SO TRS 1 5 Gseous S (TRS-S + SO 2 -S) 0,002 0,05 ( 1 ) ( 1 ) This BAT-AEL is sed on gs flow in the rnge of Nm 3 /ADt. BAT 29. In order to redue NO x emissions from the ininertion of strong odorous gses in dedited TRS urner, BAT is to use one or omintion of the tehniques given elow. Desription Appliility Burner/firing optimistion See Setion Generlly pplile Stged ininertion See Setion Generlly pplile for new plnts nd for mjor refurishments. For existing mills, pplile only if spe llows for the insertion of equipment BAT-ssoited emission levels See Tle 11. Tle 11 BAT-ssoited emission levels for NO x emissions from the ininertion of strong gses in dedited TRS urner Prmeter Yerly verge mg/nm 3 t 9 % O 2 Yerly verge kg NO x /ADt NO x ( 1 ) 0,01 0,1 ( 1 ) ( 1 ) Where t existing plnts swith to stged ininertion is not fesile, emissions levels up to mg/nm 3 (orresponding to 0,2 kg/adt) my our Wste genertion BAT 30. In order to prevent wste genertion nd minimise the mount of solid wste to e disposed of, BAT is to reyle dust from lk liquor reovery oiler ESPs to the proess.
28 L 284/103 Appliility Reirultion of dust my e limited due to non-proess elements in the dust Energy onsumption nd effiieny BAT 31. In order to redue therml energy onsumption (stem), mximise the enefit of energy rriers used, nd to redue the onsumption of eletriity, BAT is to pply omintion of the tehniques given elow. d e f g h i j k l m n o p q High dry solid ontent of rk, y use of effiient presses or drying High effiieny stem oilers, e.g. low flue-gs tempertures Effetive seondry heting systems Closing wter systems, inluding leh plnt High pulp onentrtion (middle or high onsisteny tehnique) High effiieny evportion plnt Reovery of het from dissolving tnks e.g. y vent sruers Reovery nd use of the low temperture strems from effluents nd other wste het soures to het uildings, oiler feedwter nd proess wter Approprite use of seondry het nd seondry ondenste Monitoring nd ontrol of proesses, using dvned ontrol systems Optimise integrted het exhnger network Het reovery from the flue-gs from the reovery oiler etween the ESP nd the fn Ensuring s high pulp onsisteny s possile in sreening nd lening Use of speed ontrol of vrious lrge motors Use of effiient vuum pumps Proper sizing of pipes, pumps nd fns Optimised tnk levels BAT 32. In order to inrese the effiieny of power genertion, BAT is to pply omintion of the tehniques given elow. High lk liquor dry solid ontent (inreses oiler effiieny, stem genertion nd thus eletriity genertion) High reovery oiler pressure nd temperture; in new reovery oilers the pressure n e t lest 100 rs nd the temperture 510 C
INSTALLATION, OPERATION & MAINTENANCE
DIESEL PROTECTION SYSTEMS Exhust Temperture Vlves (Mehnil) INSTALLATION, OPERATION & MAINTENANCE Vlve Numer TSZ-135 TSZ-150 TSZ-200 TSZ-275 TSZ-392 DESCRIPTION Non-eletril temperture vlves mnuftured in
More informationOUTLINE SYSTEM-ON-CHIP DESIGN. GETTING STARTED WITH VHDL August 31, 2015 GAJSKI S Y-CHART (1983) TOP-DOWN DESIGN (1)
August 31, 2015 GETTING STARTED WITH VHDL 2 Top-down design VHDL history Min elements of VHDL Entities nd rhitetures Signls nd proesses Dt types Configurtions Simultor sis The testenh onept OUTLINE 3 GAJSKI
More information7 mm Diameter Miniature Cermet Trimmer
7 mm Dimeter Miniture Cermet Trimmer A dust seled plsti se proteting qulity ermet trk gurntees high performne nd proven reliility. Adjustments re mde esier y the ler sle redings. is idelly suited to ll
More informationEuropean Convention on Products Liability in regard to Personal Injury and Death
Europen Trety Series - No. 91 Europen Convention on Produts Liility in regrd to Personl Injury nd Deth Strsourg, 27.I.1977 The memer Sttes of the Counil of Europe, signtory hereto, Considering tht the
More informationEuropean Convention on Social and Medical Assistance
Europen Convention on Soil nd Medil Assistne Pris, 11.XII.1953 Europen Trety Series - No. 14 The governments signtory hereto, eing memers of the Counil of Europe, Considering tht the im of the Counil of
More informationELECTROVALUE: a LCA Approach
A Network of Tehnology n Qulity NASA/C3P 2009 Interntionl Workshop on Environment n Alterntive ti Energy Globl Collbortion in Environmentl n Alterntive Energy Strtegies Assessment of WEEE Reuse in ELECTROVALUE:
More informationEnd-to-end development solutions
TECHNICAL SERVICES Endtoend development solutions Mnged y TFE HOTELS TFE Hotels re the only Austrlin Hotel group with inhouse end to end development solutions. We hve expertise in Arhiteturl nd Interior
More information- DAY 1 - Website Design and Project Planning
Wesite Design nd Projet Plnning Ojetive This module provides n overview of the onepts of wesite design nd liner workflow for produing wesite. Prtiipnts will outline the sope of wesite projet, inluding
More informationWould your business survive a crisis? A guide to business continuity planning. www.staffordbc.gov.uk
Would your usiness survive risis? A guide to usiness ontinuity plnning www.stfford.gov.uk 2 A guide to Business Continuity Plnning A guide to usiness ontinuity plnning Contents The Lw Wht type of inidents
More informationMcAfee Network Security Platform
XC-240 Lod Blner Appline Quik Strt Guide Revision D MAfee Network Seurity Pltform This quik strt guide explins how to quikly set up nd tivte your MAfee Network Seurity Pltform XC-240 Lod Blner. The SFP+
More informationActive Directory Service
In order to lern whih questions hve een nswered orretly: 1. Print these pges. 2. Answer the questions. 3. Send this ssessment with the nswers vi:. FAX to (212) 967-3498. Or. Mil the nswers to the following
More informationQualmark Licence Agreement
Terms nd Conditions Qulmrk Liene Agreement Terms nd Conditions Terms nd Conditions 1. Liene Holder Applint 2. Confirmed Sttus 3. Term nd Renewl 4. Use of the Intelletul Property 5. Qulmrk Progrmme Rtings
More informationStudent Access to Virtual Desktops from personally owned Windows computers
Student Aess to Virtul Desktops from personlly owned Windows omputers Mdison College is plesed to nnoune the ility for students to ess nd use virtul desktops, vi Mdison College wireless, from personlly
More informationUNIVERSITY AND WORK-STUDY EMPLOYERS WEBSITE USER S GUIDE
UNIVERSITY AND WORK-STUDY EMPLOYERS WEBSITE USER S GUIDE Tble of Contents 1 Home Pge 1 2 Pge 2 3 Your Control Pnel 3 4 Add New Job (Three-Step Form) 4-6 5 Mnging Job Postings (Mnge Job Pge) 7-8 6 Additionl
More informationInter-domain Routing
COMP 631: COMPUTER NETWORKS Inter-domin Routing Jsleen Kur Fll 2014 1 Internet-sle Routing: Approhes DV nd link-stte protools do not sle to glol Internet How to mke routing slle? Exploit the notion of
More informationKEY SKILLS INFORMATION TECHNOLOGY Level 3. Question Paper. 29 January 9 February 2001
KEY SKILLS INFORMATION TECHNOLOGY Level 3 Question Pper 29 Jnury 9 Ferury 2001 WHAT YOU NEED This Question Pper An Answer Booklet Aess to omputer, softwre nd printer You my use ilingul ditionry Do NOT
More informationRadial blowers with AC motor
Rdil lowers with AC motor Generl informtion Desription 32 Rdil lowers, motor diretly mounted RL, RLF, RLD, RLA, RLE, RLS 33 Rdil lowers with doule housing 37 Rdil lowers, motor deoupled mounted, high temperture
More informationp-q Theory Power Components Calculations
ISIE 23 - IEEE Interntionl Symposium on Industril Eletronis Rio de Jneiro, Brsil, 9-11 Junho de 23, ISBN: -783-7912-8 p-q Theory Power Components Clultions João L. Afonso, Memer, IEEE, M. J. Sepúlved Freits,
More informationTOA RANGATIRA TRUST. Deed of Trust 3714386.2
TOA RANGATIRA TRUST Deed of Trust 1 Deed dted 2011 Prties 1 Te Runng o To Rngtir Inorported n inorported soiety hving its registered offie t Poriru (the Runng ) Bkground A B C D The Runng is n inorported
More informationEnterprise Digital Signage Create a New Sign
Enterprise Digitl Signge Crete New Sign Intended Audiene: Content dministrtors of Enterprise Digitl Signge inluding stff with remote ess to sign.pitt.edu nd the Content Mnger softwre pplition for their
More informationInnovation in Software Development Process by Introducing Toyota Production System
Innovtion in Softwre Development Proess y Introduing Toyot Prodution System V Koihi Furugki V Tooru Tkgi V Akinori Skt V Disuke Okym (Mnusript reeived June 1, 2006) Fujitsu Softwre Tehnologies (formerly
More informationEquivalence Checking. Sean Weaver
Equivlene Cheking Sen Wever Equivlene Cheking Given two Boolen funtions, prove whether or not two they re funtionlly equivlent This tlk fouses speifilly on the mehnis of heking the equivlene of pirs of
More information1. Definition, Basic concepts, Types 2. Addition and Subtraction of Matrices 3. Scalar Multiplication 4. Assignment and answer key 5.
. Definition, Bsi onepts, Types. Addition nd Sutrtion of Mtries. Slr Multiplition. Assignment nd nswer key. Mtrix Multiplition. Assignment nd nswer key. Determinnt x x (digonl, minors, properties) summry
More informationInstaller reference guide
Instller referene guide Dikin Altherm hyrid het pump + EVLQ05+08CA EHYHBH05AA EHYHBH/X08AA Instller referene guide Dikin Altherm hyrid het pump English Tle of ontents Tle of ontents 1 Aout the produt 3
More informationModule 5. Three-phase AC Circuits. Version 2 EE IIT, Kharagpur
Module 5 Three-hse A iruits Version EE IIT, Khrgur esson 8 Three-hse Blned Suly Version EE IIT, Khrgur In the module, ontining six lessons (-7), the study of iruits, onsisting of the liner elements resistne,
More informationENERGY STORAGE ROUND TABLE
NTIONL RENEWLE ENERGY ENTRE ENERGY STORGE ROUND TLE RENEWLE ENERGIES GRID INTEGRTION D Mdrid, 12 pril 2012 INDEX 00 Energy Storge 01 enefits nd opportunities 02 hllenges 03 ener tivities 2 00 Energy Storge
More informationCalculating Principal Strains using a Rectangular Strain Gage Rosette
Clulting Prinipl Strins using Retngulr Strin Gge Rosette Strin gge rosettes re used often in engineering prtie to determine strin sttes t speifi points on struture. Figure illustrtes three ommonly used
More informationc b 5.00 10 5 N/m 2 (0.120 m 3 0.200 m 3 ), = 4.00 10 4 J. W total = W a b + W b c 2.00
Chter 19, exmle rolems: (19.06) A gs undergoes two roesses. First: onstnt volume @ 0.200 m 3, isohori. Pressure inreses from 2.00 10 5 P to 5.00 10 5 P. Seond: Constnt ressure @ 5.00 10 5 P, isori. olume
More informationHow To Balance Power In A Distribution System
NTERNATONA JOURNA OF ENERG, ssue 3, ol., 7 A dynmilly S bsed ompt ontrol lgorithm for lod blning in distribution systems A. Kzemi, A. Mordi Koohi nd R. Rezeipour Abstrt An lgorithm for pplying fixed pitor-thyristorontrolled
More informationGENERAL OPERATING PRINCIPLES
KEYSECUREPC USER MANUAL N.B.: PRIOR TO READING THIS MANUAL, YOU ARE ADVISED TO READ THE FOLLOWING MANUAL: GENERAL OPERATING PRINCIPLES Der Customer, KeySeurePC is n innovtive prout tht uses ptente tehnology:
More informationVMware Horizon FLEX Administration Guide
VMwre Horizon FLEX Administrtion Guide Horizon FLEX 1.1 This doument supports the version of eh produt listed nd supports ll susequent versions until the doument is repled y new edition. To hek for more
More informationAssessor s guidelines for the: SVQ 2 in Pharmacy Services at SCQF level 5 SVQ 3 in Pharmacy Services at SCQF level 6
Assessor s guidelines for the: SVQ 2 in Phrmy Servies t SCQF level 5 SVQ 3 in Phrmy Servies t SCQF level 6 Pulition dte: My 2011 Pulition ode: DB5818 The informtion in this pulition my e reprodued in support
More informationSouthern Midlands. Tasmanian Municipal Emergency Management Plan. Plan Details. Approval
Tsmnin Muniipl Emergeny Mngement Pln Southern Midlnds Pln Detils Pln Title: Southern Midlnds Emergeny Mngement Pln Issue Detils: Issue 5, 2011 Review Authority: Southern Midlnds Muniipl Emergeny Mngement
More informationVMware Horizon FLEX Administration Guide
VMwre Horizon FLEX Administrtion Guide Horizon FLEX 1.0 This doument supports the version of eh produt listed nd supports ll susequent versions until the doument is repled y new edition. To hek for more
More informationComplete Property Owner
Allinz Insurne pl Complete Property Owner Poliy Wording Complete Property Owner Poliy Wording Contents Introdution 1 How to Mke Clim 2 Complints Proedure 4 Thnk you for hoosing Allinz Insurne pl. We re
More informationCopyright 2009 by Maggioli S.p.A.
Copyright 29 y Mggioli S.p.A. Mggioli Editore è un mrhio di Mggioli S.p.A. Aziend on sistem qulità ertifito ISO 91: 2 47822 Sntrngelo di Romgn (RN) Vi del Crpino, 8 Tel. 541/628111 Fx 541/6222 www.mggioli.it/serviziolienti
More information2006 IPCC Software for National Greenhouse Gas Inventories: Application and use for India
2006 IPCC Softwre for Ntionl Greenhouse Gs Inventories: Appliction nd use for Indi Presenttion for NGGIP Side Event Bonn, June 8, 2013 Prof. Amit Grg (mitgrg@iimhd.ernet.in), INDIA GHG Inventory Softwre
More informationSimulation of a large electric distribution system having intensive harmonics in the industrial zone of Konya
Turkish Journl of Eletril Engineering & omputer Sienes http:// journls. tuitk. gov. tr/ elektrik/ Reserh rtile Turk J Ele Eng & omp Si (2013) 21: 934 944 TÜİTK doi:10.3906/elk-1201-55 Simultion of lrge
More informationTrowel Notch Sizes for Installation of Floor Coverings, Wood Flooring and Tiles
TKB-Tehnil Briefing Note 6 Trowel Noth s for Instlltion of Floor Coverings, Wood Flooring nd Tiles Version: My 2007 Prepred y the Tehnishe Kommission Buklestoffe (TKB) (Tehnil Commission on Constrution
More informationAbbott RealTime 2N40 HBV 51-608234/R1. Customer Service: 1-800-553-7042. Key to symbols used
Aott RelTime 2N40 51-608234/R1 HBV Customer Servie: 1-800-553-7042 This pkge insert must e red refully prior to use. Pkge insert instrutions must e followed ordingly. Reliility of ssy results nnot e gurnteed
More information2008-2011 Project Report
2008-2011 Projet Report Projet Nme: Emmetsurg Soil Study: Evlution of orn o nd stover removl levels on rop prodution, soil qulity nd nutrient levels. Priniple Investigtors: Dr. Sturt Birrell, Assoite Professor
More informationJaERM Software-as-a-Solution Package
JERM Softwre-s--Solution Pckge Enterprise Risk Mngement ( ERM ) Public listed compnies nd orgnistions providing finncil services re required by Monetry Authority of Singpore ( MAS ) nd/or Singpore Stock
More informationMERSEY-LEVEN. Tasmanian Municipal Emergency Management Plan. Plan Details: Approval: Issue 2, December 2014 Page 1 of 53.
Tsmnin Muniipl Mngement Pln MERSEY-LEVEN Pln Detils: Pln Title: Mersey-Leven Mngement Pln Issue Detils: Issue 2, Deemer 2014 Review Authority: Mersey-Leven Mngement Committee Sumission Authority: North-West
More informationFUEL SYSTEMS ROCHESTER 4 BARREL CARBURETOR 5 C
FUEL SYSTEMS 72085 ROCHESTER 4 BARREL CARBURETOR 5 C Tle of Contents Pge Rohester 4 Brrel Cruretor............. 5C-1 Torque Speifitions.................. 5C-1 Tools................................. 5C-1
More informationArchitecture and Data Flows Reference Guide
Arhiteture nd Dt Flows Referene Guide BES12 Version 12.3 Pulished: 2015-10-14 SWD-20151014125318579 Contents Aout this guide... 5 Arhiteture: BES12 EMM solution... 6 Components used to mnge BlkBerry 10,
More informationDlNBVRGH + Sickness Absence Monitoring Report. Executive of the Council. Purpose of report
DlNBVRGH + + THE CITY OF EDINBURGH COUNCIL Sickness Absence Monitoring Report Executive of the Council 8fh My 4 I.I...3 Purpose of report This report quntifies the mount of working time lost s result of
More informationNational Firefighter Ability Tests And the National Firefighter Questionnaire
Ntionl Firefighter Aility Tests An the Ntionl Firefighter Questionnire PREPARATION AND PRACTICE BOOKLET Setion One: Introution There re three tests n questionnire tht mke up the NFA Tests session, these
More informationcontrol policies to be declared over by associating security
Seure XML Querying with Seurity Views Wenfei Fn University of Edinurgh & Bell Lortories wenfei@infeduk Chee-Yong Chn Ntionl University of Singpore hny@ompnusedusg Minos Groflkis Bell Lortories minos@reserhell-lsom
More informationTHE LONGITUDINAL FIELD IN THE GTEM 1750 AND THE NATURE OF THE TERMINATION.
THE LONGITUDINAL FIELD IN THE GTEM 175 AND THE NATURE OF THE TERMINATION. Benjmin Guy Loder Ntionl Physil Lbortory, Queens Rod, Teddington, Middlesex, Englnd. TW11 LW Mrtin Alexnder Ntionl Physil Lbortory,
More informationGuidance Document: Selecting a Commercial Records Storage Provider
G C P R e o r s M n g e r s A s s o i t i o n Guine Doument: Seleting Commeril Reors Storge Provier 1 Seleting Commeril Reors Storge Provier 1.1 Generl Remrks 1.1.1 The following is heklist to ssist in
More information*These academic programs have no specific Academic Program Rules and therefore are bound entirely by the General Academic Program Rules
Msters Degrees by Reserh (exluding Mster of Philosophy) These progrms re only vilble to Interntionl Students in 2012. Interntionl students seeking to enrol in Msters Degree in Eonomis or Publi Helth must
More informationLondon Charterers Clauses 2015/2016
London Chrterers Cluses 2015/2016 STEAMSHIP MUTUAL UNDERWRITING ASSOCIATION LIMITED Authorised y the Prudentil Regultion Authority nd regulted y the Finnil Condut Authority nd Prudentil Regultion Authority
More informationREMO: Resource-Aware Application State Monitoring for Large-Scale Distributed Systems
: Resoure-Awre Applition Stte Monitoring for Lrge-Sle Distriuted Systems Shiong Meng Srinivs R. Kshyp Chitr Venktrmni Ling Liu College of Computing, Georgi Institute of Tehnology, Atlnt, GA 332, USA {smeng,
More informationPsychological health and safety in the workplace Prevention, CAN/CSA-Z1003-13/BNQ 9700-803/2013
Psychologicl helth nd sfety in the workplce Prevention, CAN/CSA-Z1003-13/BNQ 9700-803/2013 promotion, nd guidnce to stged implementtion This smple udit tool is n nnex of the Ntionl Stndrd of Cnd on Psychologicl
More informationEuropean Treaty Series - No. 141 CONVENTION ON LAUNDERING, SEARCH, SEIZURE AND CONFISCATION OF THE PROCEEDS FROM CRIME
Europen Trety Series - No. 141 CONVENTION ON LAUNDERING, SEARCH, SEIZURE AND CONFISCATION OF THE PROCEEDS FROM CRIME Strsourg, 8.XI.1990 2 ETS 141 Lundering of the Proeeds from Crime, 8.XI.1990 Premle
More informationPUBLIC DISCLOSURE COPY 05481017 793760 2127 2011.04030 JAMES A. MICHENER ART MUSEU 2127 1
Cution: Forms printed from within Adoe Arot produts my not meet IRS or stte txing geny speifitions. When using Arot.x produts, unhek the "Shrink oversized pges to pper size" nd unhek the "Expnd smll pges
More informationthe machine and check the components
Quik Setup Guide Strt Here MFC-7360N MFC-7460DN Plese red the Sfety nd Legl ooklet first efore you set up your mhine. Then, plese red this Quik Setup Guide for the orret setup nd instlltion. To view the
More informationSECTION 7-2 Law of Cosines
516 7 Additionl Topis in Trigonometry h d sin s () tn h h d 50. Surveying. The lyout in the figure t right is used to determine n inessile height h when seline d in plne perpendiulr to h n e estlished
More informationAllianz Insurance plc. Motor Trade Select. Policy Wording
Allinz Insurne pl Motor Trde Selet Poliy Wording Contents Poliy Definitions 2 The Cover Provided Setion 1 Mteril Dmge 4 Setion 2 Motor Vehile Rod Risks 17 Setion 3 Self Drive Vehile Hire 26 Setion 4 MOT
More informationStart Here. Quick Setup Guide. the machine and check the components. NOTE Not all models are available in all countries.
Quik Setup Guide Strt Here HL-3140CW / HL-3150CDN HL-3150CDW / HL-3170CDW Thnk you for hoosing Brother, your support is importnt to us nd we vlue your usiness. Your Brother produt is engineered nd mnuftured
More informationBEC TESTS Gli ascolti sono disponibili all indirizzo www.loescher.it/business
Gli solti sono disponiili ll indirizzo www.loesher.it/usiness SURNAME AND NAME CLASS DATE BEC TEST Prt one Questions 1-8 For questions 1-8 you will her eight short reordings. For eh question, hoose one
More informationCombined Liability Insurance. Information and Communication Technology Proposal form
Comined Liility Insurnce Informtion nd Communiction Technology Proposl form Comined Liility Insurnce Informtion nd Communiction Technology - Proposl form This proposl form must e completed nd signed y
More informationSmall Businesses Decisions to Offer Health Insurance to Employees
Smll Businesses Decisions to Offer Helth Insurnce to Employees Ctherine McLughlin nd Adm Swinurn, June 2014 Employer-sponsored helth insurnce (ESI) is the dominnt source of coverge for nonelderly dults
More informationQuick Guide to Lisp Implementation
isp Implementtion Hndout Pge 1 o 10 Quik Guide to isp Implementtion Representtion o si dt strutures isp dt strutures re lled S-epressions. The representtion o n S-epression n e roken into two piees, the
More informationAllianz Insurance plc. Motor Trade Select. Policy Wording
Allinz Insurne pl Motor Trde Selet Poliy Wording Contents Poliy Definitions 2 The Cover Provided Setion 1 Mteril Dmge 4 Setion 2 Motor Vehile Rod Risks 17 Setion 3 Self Drive Vehile Hire 26 Setion 4 MOT
More informationthe machine and check the components Black Yellow Cyan Magenta Starter Ink Cartridges Product Registration Sheet (USA only)
Quik Setup Guide Strt Here DCP-J140W Thnk you for hoosing Brother, your support is importnt to us nd we vlue your usiness. Your Brother produt is engineered nd mnuftured to the highest stndrds to deliver
More informationthe machine and check the components Starter Ink Cartridges Basic User s Guide Product Safety Guide Telephone Line Cord
Quik Setup Guide Strt Here MFC-J450DW MFC-J470DW Thnk you for hoosing Brother, your support is importnt to us nd we vlue your usiness. Your Brother produt is engineered nd mnuftured to the highest stndrds
More informationRatio and Proportion
Rtio nd Proportion Rtio: The onept of rtio ours frequently nd in wide vriety of wys For exmple: A newspper reports tht the rtio of Repulins to Demorts on ertin Congressionl ommittee is 3 to The student/fulty
More informationReturn of Organization Exempt From Income Tax
PUBLIC DISCLOSURE COPY Form 99 Return of Orgniztion Exempt From Inome Tx Uner setion 51, 527, or 4947(1) of the Internl Revenue Coe (exept privte fountions) OMB 1545-47 Do not enter Soil Seurity numers
More informationIntroductory Information. Setup Guide. Introduction. Space Required for Installation. Overview of Setup. The Manuals Supplied with This Printer ENG
Introdutory Informtion Introdution Setup Guide ENG Red this mnul efore ttempting to operte the printer. Keep this mnul in hndy lotion for future referene. Overview of Setup These re the steps in printer
More information1 GSW IPv4 Addressing
1 For s long s I ve een working with the Internet protools, people hve een sying tht IPv6 will e repling IPv4 in ouple of yers time. While this remins true, it s worth knowing out IPv4 ddresses. Even when
More informationAgricultural Economics Working Paper Series Hohenheimer Agrarökonomische Arbeitsberichte
Agriulturl Eonomis Working Pper Series Hohenheimer Agrrökonomishe Arbeitsberihte der Generl Arbeit Equilibrium STAGE_W: An Titel Applied zweizeilig Model With Multiple Types of Wter Autor 1 nd Jons Lukmnn
More informationCHAPTER 31 CAPACITOR
. Given tht Numer of eletron HPTER PITOR Net hrge Q.6 9.6 7 The net potentil ifferene L..6 pitne v 7.6 8 F.. r 5 m. m 8.854 5.4 6.95 5 F... Let the rius of the is R re R D mm m 8.85 r r 8.85 4. 5 m.5 m
More informationOr more simply put, when adding or subtracting quantities, their uncertainties add.
Propgtion of Uncertint through Mthemticl Opertions Since the untit of interest in n eperiment is rrel otined mesuring tht untit directl, we must understnd how error propgtes when mthemticl opertions re
More informationChapter. Contents: A Constructing decimal numbers
Chpter 9 Deimls Contents: A Construting deiml numers B Representing deiml numers C Deiml urreny D Using numer line E Ordering deimls F Rounding deiml numers G Converting deimls to frtions H Converting
More informationPROPOSED CHANGES TO THE 2016 LEAPFROG HOSPITAL SURVEY
PROPOSED CHANGES TO THE 2016 LEAPFROG HOSPITAL SURVEY OPEN FOR PUBLIC COMMENT Eh yer, The Lepfrog Group s tem of reserhers reviews the literture nd onvenes expert pnels to review survey ontent to ensure
More informationData Security 1. 1 What is the function of the Jump instruction? 2 What are the main parts of the virus code? 3 What is the last act of the virus?
UNIT 18 Dt Seurity 1 STARTER Wht stories do you think followed these hedlines? Compre nswers within your group. 1 Love ug retes worldwide hos. 2 Hkers rk Mirosoft softwre odes. 3 We phone sm. Wht other
More informationNORTH KILLINGHOLME POWER PROJECT APPLICATION FOR A NEW BESPOKE ENVIRONMENTAL PERMIT
NORTH KILLINGHOLME POWER PROJECT APPLICATION FOR A NEW BESPOKE ENVIRONMENTAL PERMIT C.GEN Killingholme Ltd 64042C/1.1 Finl North Killingholme Power Project 64042C/1.1 Prepred for C.GEN Killingholme Ltd
More informationLaboratory support for the didactic process of engineering processes automation at the Faculty of Mechanical Engineering
of Ahievements in Mterils nd Mnufturing Engineering VOLUME 15 ISSUE 1-2 Mrh-April 2006 Lortory support for the didti proess of engineering proesses utomtion t the Fulty of Mehnil Engineering J. Świder,
More informationBUSINESS PROCESS MODEL TRANSFORMATION ISSUES The top 7 adversaries encountered at defining model transformations
USINESS PROCESS MODEL TRANSFORMATION ISSUES The top 7 dversries enountered t defining model trnsformtions Mrion Murzek Women s Postgrdute College for Internet Tehnologies (WIT), Institute of Softwre Tehnology
More informationArc-Consistency for Non-Binary Dynamic CSPs
Ar-Consisteny for Non-Binry Dynmi CSPs Christin Bessière LIRMM (UMR C 9928 CNRS / Université Montpellier II) 860, rue de Sint Priest 34090 Montpellier, Frne Emil: essiere@rim.fr Astrt. Constrint stisftion
More informationTreatment Spring Late Summer Fall 0.10 5.56 3.85 0.61 6.97 3.01 1.91 3.01 2.13 2.99 5.33 2.50 1.06 3.53 6.10 Mean = 1.33 Mean = 4.88 Mean = 3.
The nlysis of vrince (ANOVA) Although the t-test is one of the most commonly used sttisticl hypothesis tests, it hs limittions. The mjor limittion is tht the t-test cn be used to compre the mens of only
More informationHow To Organize A Meeting On Gotomeeting
NOTES ON ORGANIZING AND SCHEDULING MEETINGS Individul GoToMeeting orgnizers my hold meetings for up to 15 ttendees. GoToMeeting Corporte orgnizers my hold meetings for up to 25 ttendees. GoToMeeting orgnizers
More informationGAO POSTSECONDARY EDUCATION. Student Outcomes Vary at For-Profit, Nonprofit, and Public Schools. Report to Congressional Requesters
GAO United Sttes Government Aountbility Offie Report to Congressionl Requesters Deember 2011 POSTSECONDARY EDUCATION Outomes Vry t For-Profit, Nonprofit, nd Publi Shools GAO-12-143 Contents Letter 1 Limited
More informationVIESMANN. VITODENS AND VITOSOLAR Flue systems for gas condensing boilers 1.9 to 150.0 kw. Technical guide FLUE SYSTEMS VITODENS AND VITOSOLAR
VIESMANN VITODENS AND VITOSOLAR Flue systems f gs ondensing oilers 1.9 to 150.0 kw Tehnil guide FLUE SYSTEMS VITODENS AND VITOSOLAR 5/01 Index Index 1. Flue systems 1. 1 Flue systems... 4 Struturl unit...
More informationSOLVING EQUATIONS BY FACTORING
316 (5-60) Chpter 5 Exponents nd Polynomils 5.9 SOLVING EQUATIONS BY FACTORING In this setion The Zero Ftor Property Applitions helpful hint Note tht the zero ftor property is our seond exmple of getting
More informationGAMES OF THE XXX OLYMPIAD
GAMES OF THE XXX OLYMPIAD London (GBR) 29 July to 11 August 2012 COMPETITION REGULATIONS MEN S AND WOMEN S HOCKEY COMPETITIONS Pulished: July 2012 INTERNATIONAL HOCKEY FEDERATION First pulished Mrh 2012;
More informationPractice Test 2. a. 12 kn b. 17 kn c. 13 kn d. 5.0 kn e. 49 kn
Prtie Test 2 1. A highwy urve hs rdius of 0.14 km nd is unnked. A r weighing 12 kn goes round the urve t speed of 24 m/s without slipping. Wht is the mgnitude of the horizontl fore of the rod on the r?
More informationVIESMANN. VITODENS Flue systems for gas condensing boilers 3.8 to 105.0 kw. Technical guide VITODENS FLUE SYSTEMS
VIESMNN VITODENS Flue systems for gs ondensing oilers 3.8 to 105.0 kw Tehnil guide VITODENS FLUE SYSTEMS 5/011 Index Index 1. Flue systems 1.1... 4 Struturl unit... 4 System ertifition... 4 1. Blned flue
More informationIncluded in CMS/JCAHO Core Measures for CAP*
Inluded in S/JHO ore esures for P* TELRO illing nd oding Guide orest Lortories, In. * TELRO (eftroline fosmil) is one of the reommended -ltm ntiiotis for ommunity-quired Pneumoni in Immunoompetent Ptients
More informationRevised products from the Medicare Learning Network (MLN) ICD-10-CM/PCS Myths and Facts, Fact Sheet, ICN 902143, downloadable.
DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Meire & Meii Servies Revise prouts from the Meire Lerning Network (MLN) ICD-10-CM/PCS Myths n Fts, Ft Sheet, ICN 902143, ownlole. MLN Mtters Numer: SE1325
More informationORGANIZER QUICK REFERENCE GUIDE
NOTES ON ORGANIZING AND SCHEDULING MEETINGS Individul GoToMeeting orgnizers my hold meetings for up to 15 ttendees. GoToMeeting Corporte orgnizers my hold meetings for up to 25 ttendees. GoToMeeting orgnizers
More informationReasoning to Solve Equations and Inequalities
Lesson4 Resoning to Solve Equtions nd Inequlities In erlier work in this unit, you modeled situtions with severl vriles nd equtions. For exmple, suppose you were given usiness plns for concert showing
More informationAdditional Protocol to the Convention on Human Rights and Biomedicine concerning Genetic Testing for Health Purposes
Council of Europe Trety Series - No. 203 Additionl Protocol to the Convention on Humn Rights nd Biomedicine concerning Genetic Testing for Helth Purposes Strsourg, 27.XI.2008 2 CETS 203 Humn Rights nd
More informationCustomer Service. You can help us to maintain this position by letting us know if you consider that our service has been unsatisfactory
Customer Servie At Insurne Corportion we hve rel ommitment to ustomer re We hve uilt reputtion s n Insurer tht puts our ustomers first You n help us to mintin this position y letting us know if you onsider
More informationReturn of Organization Exempt From Income Tax
Form 990 Deprtment of the Tresury Internl Revenue Servie Return of Orgniztion Exempt From Inome Tx Uner setion 501(), 527, or 4947()(1) of the Interni Revenue Coe (exept lk lung enefit trust or privte
More informationRecognition Scheme Forensic Science Content Within Educational Programmes
Recognition Scheme Forensic Science Content Within Eductionl Progrmmes one Introduction The Chrtered Society of Forensic Sciences (CSoFS) hs been ccrediting the forensic content of full degree courses
More informationWords Symbols Diagram. abcde. a + b + c + d + e
Logi Gtes nd Properties We will e using logil opertions to uild mhines tht n do rithmeti lultions. It s useful to think of these opertions s si omponents tht n e hooked together into omplex networks. To
More informationClause Trees: a Tool for Understanding and Implementing Resolution in Automated Reasoning
Cluse Trees: Tool for Understnding nd Implementing Resolution in Automted Resoning J. D. Horton nd Brue Spener University of New Brunswik, Frederiton, New Brunswik, Cnd E3B 5A3 emil : jdh@un. nd spener@un.
More informationOrthodontic marketing through social media networks: The patient and practitioner s perspective
Originl rtile Orthodonti mrketing through soil medi networks: The ptient nd prtitioner s perspetive Kristin L. Nelson ; Bhvn Shroff ; l M. Best ; Steven J. Linduer d BSTRCT Ojetive: To (1) ssess orthodonti
More information