1 National lanning Department

2 ublic rivate artnerships Regulatory Framework and roject ortfolio July of 2015

3 Content 1. Colombia s macroeconomic overview 2. Colombia s Infrastructure 3. Law Legal Framework 4. roductive and Social roject ortfolio ublic Initiative 5. roductive and Social roject ortfolio Unsolicited roposals

4 1. Colombia s macroeconomic overview

5 Colombian Geography and Demography Easy access point. Central location between Mexico, Caracas, Miami and Lima Colombia is a Democratic, constitutional republic comprising thirty-two departments. The Capital and largest city is Bogotá. TOTAL OULATION 48,2 million rincipal Cities: Bogotá (8,9 million) Medellin (3,4 million) Cali (3,1 million)

6 er capita GD has triple its value since (p) 2014(p) GD per capita (USD) Data Source: from IMF Banco de la República - DANE

7 Colombia has a bigger GD than its peers in the LA region GD 2014 (USD Billions) Colombia Mil Mill. USD Colombia s GD represents the 8% of the Latin American and the Caribbean GD. Colombia s GD represents: 16% of Brazil 29% of Mexico 70% of Argentina 0 Source: Data from IMF Banco de la República

8 14 In 2014 the Colombian economy reached a growth of 4,6%, very similar to the figure projected by the government ,6% 3,6% 2,4% 1,9% 0,1% Colombia Chile eru Brasil Ecuador Latin America shows a slowdown in its economic growth of 1,3% in 2014, explained by lower performance such as Brazil but offset by good results as the Colombian (4,6%) and Ecuadorian (3,6%). Source: Data from IMF Banco Mundial

9 Inflation in June 2015 is above the range (p) Inflation 5,00% 4,00% 3,00% Total Inflation Min Título del gráfico Inflation without food Máx 4,42% 3,72% 10% 9% 8% 7% 6% 8,8% 2,00% 5% 4% [VALOR] 1,00% 3% 2% 0,00% 1% 0% The increase in food prices, particularly perishable (potato) and some processed foods such as rice along with the transfer of the peso depreciation to domestic prices, explained most of the increase in overall inflation in the first quarter of the year. Data from Banco de la República - DANE Source: DANE

10 Since 2011 Colombia has attracted more FDI FDI USD Millions Colombia s main investors United States USD millions Share: 32% United Kingdom USD millions Share 20% Chile USD millions articipación 6% Spain USD millions Share 11% FDI will be kept around 3% of GD, which is consistent in the context of low petroleum prices where investments in the oil sector will be reduce. Source: BANRE

11 ositive Investment Environment Doing Business Ranking Variation Easy of Doing Business Rank Colombia 45 Colombia 34 erú 30 erú 35 anamá 29 México 39 Ecuador 8 Chile 41 México 4 anamá 52 Brasil 1 Ecuador 115 Chile -13 Argentina Brasil Argentina *ositive Values show ranking improvements in business environment. Colombia is ranked 34 reflecting significant protection to investors. Data source: Doing Business Reports

12 % Unemployment Rate (%GD) is in permanent decline (p) ,98 15,54 14,10 13,64 Unemployment rate ended June 2015 in 8,9% ,81 12,03 11,20 11,27 12,03 11,78 10,84 10, ,65 9,11 8,90 8 * Rate of unoccupied people of the economic active population Data source: Banco de la República, DANE

13 US Million Colombia s trade balance * (pr) , , , , , , , , ,00 Exports Imports , , ,00 0,00 *rojected value of 2015 was made considering the Medium Term Fiscal Framework Data Source: Banco de la República, Ministerio de Hacienda

14 % IB Gross Fixed Capital Formation (%GD) , ,22 22,40 23,03 23,49 22,44 23,88 22,13 23,85 24,17 19, , , ,03 Data Source: World Bank

15 GD growth has been marked mainly by the construction sector ,00% 12,00% 10,00% Good performance of this sector is mainly explained by an increase of 12,1% in civil Works. 11,60% 9,90% 8,00% 6,00% 4,00% Buildings Civil Works GD Growth Construction 2,00% 0,00% -2,00% In 2014 the construction sector continued being one of the main driving forces of the economy to contribute 0,7 pp to overall GD growth, with a variation of 9,9% Data Source: Ministerio de Hacienda, DANE

16 Colombia obtained investment grade issued by main credit rating agencies BBB Standard & oor's Ratings Services maintained its long-term sovereign credit ratings on Colombia s foreign currency in 'BBB' Baa2 All main Rating agencies reviews highlighted the good economic and financial period that Colombia is experiencing nowadays, specially: Their ability to manage external shocks Their excellent credit record BBB An improvement in their Macroeconomic credibility A significant improvement in their security conditions Data Source: Bancoldex

17 2. Colombia s Infrastructure

18 The development of infrastructure The development of road infrastructure in Colombia linking private participation began in the mid 90s with the first generation of road concessions. Since then, private participation in road infrastructure has remained through programs of second and third generation of road concessions which sought to improve the execution of contracts. First Generation road concession contracts, primarily focused on road rehabilitation and expansion of road corridors (1,649 km).

19 The development of infrastructure Second Generation Improve issues related to financial aspects, responsibility and risks schemes. The second generation of road concessions involved 470 km of roads (construction and rehabilitation of new roads, seconds driveways entrances to major cities). Third Generation olicy adjustments: extensions and additions to the concession contracts legislation was improved. 3,557 km included, highlighting the Ruta del Sol project which incorporated changes on risk allocation between the public and private counterparts and a new scheme of contract award criteria.

20 The development of infrastructure Main roblems Road concession contracts (first, second and third generation) had significant delays/problems regarding: Work schedules Additions in contracts (in time and amount) Additional works executed without specific requirements roperty taxes and environmental overruns Financial imbalance in contracts roblems during the bidding process and contract award

21 The development of infrastructure Suggestions to improve the concessions scheme 1 Strengthen prioritization and structuring of projects, including cost-benefit and Value for money analysis. 2 To Improve the institutional framework related to infrastructure, including a model of longterm planning the approval process and analysis stages of structuring projects. 3 To Increase institutional capacity to ensure proper risk transfer and reduce contracts renegotiation. 4 - erform rigorous analysis of the socio-environmental impacts before implementation of the project. 5 Assuring independent monitoring practice to measure the quality of services provided.

22 Access to modern infrastructure and equal opportunities remain a challenge for Colombia Global Competitiveness - Infrastructure (3.5) Chile Mexico Ecuador Uruguay eru Argentina Brazil Colombia Venezuela Quality of roads 2, Quality of air transport infrastructure Chile Mexico Ecuador Uruguay eru Colombia Argentina Brazil Venezuela Quality of railroad infrastructure Quality of port infrastructure Ecuador Mexico Chile Brazil eru Argentina Venezuela Colombia Uruguay 1,5 Chile Uruguay Mexico Ecuador Argentina eru Colombia Brazil Venezuela 3, = extremely underdeveloped; 7 = extensive and efficient by international standards Source: World Economic Forum. Global Competitiveness Report

23 Infrastructure ublic Investment vs. rivate Investment 4,5% 4,0% 4,1% 3,5% 3,0% 3,2% 3,5% 3,6% 3,1% 3,6% 3,3% 3,3% 2,9% 2,5% 2,3% 2,0% (e) 2011 (e) Inversion rivate Investment/ rivada / IB GD Inversión rivate Investment/ ública / IB GD Source: DN

24 Colombia s capacity Latin-American ranking SCORE , Infrascope overall score Law 1508 Decree 1467 Decree 063: water and basic sanitation YEAR untaje Score Strenghts Regulatory Framework(68.8) Investment Climate (78.0) Weaknesses Institutional Framework (50.0) Operational Maturity(53,1) Subnational Adjustment (50.0) Financial Facilities (61.1) Infrascope is a benchmarking index that evaluates 19 LAC government s capacity to implement sustainable and efficient infrastructure s. Sectors: Transport, Water and Electricity Infrascope Index. Economist Intelligence Unit

25 3. Law Legal Framework

26 Basic scheme State Agency Disbursement of public funds Long-term contract based on service delivery Banking Capital Markets Creditors Shareholders Debt Stock rivate Investor SV Resource Management Services operating revenue Users Operating Agreement ayments O&M Construction payments Construction contract Operator Coordination Constructor

27 Main Characteristics All Sectors Capacity & Commitment s Legal and Regulatory Framework - Law 1508 / 2012 The law applies to all sectors in which the provision of infrastructure and its related services are needed. Seeks to attract long term investors with enough financial capacity, who will not only construct the infrastructure but also operate and maintain it. Service ayment Introduces the concept of payment for availability and level of service. Incentives for rivate Initiatives roper structuring Budgetary Treatment Institutional Organization Information Temporary Contracts The law includes a regulatory regime applicable to unsolicited proposals, involving correct incentives for their development. The law reinforces the proper structuring of projects with regard to studies, risk analysis and includes the concept of value for money. The law contains changes in the budgetary treatment regarding: future reserves for national and territorial projects. The law clarifies the roles and functions of the entities participating in the project cycle. A data base to register the rojects is created. (Managed by the ND). The infrastructure reverts to the public sector at the end of the concession period. (30 years max)

28 Key Issues BEFORE- LAWS 80/93 and 1150/07 NOW- LAW 1508/12 Advances were granted in concessions There are no advanced payments ublic Contrib. Construction Operation and Maintenance 30 Years ublic Contrib. Construction Operation and Maintenance 30 Years The payment is made irrespective of compliance with the service No maximum term Law 80/1993: Additions of maximum 50% Law 1150/2007: Maximum term additions of 60% The payment was made for construction works The award process started with the opening of the bidding process There were no requirements to analyze the best way to implement the project. No difference was made between who financed and who constructed. The projects were not designed for financial and institutional investors. ublic initiative projects only ayment is made according to the performance of the service Maximum term : 30 years Additions are limited to 20% (CAEX and OEX) The payments are for the services provided by the infrastructure A stage for prequalification is allowed previous to the bidding process The law requires to analyze and justify the way to implement the project ( or Traditional rocurement) The requirements are oriented to enabling: legal capacity, ability and experience in financial investment or project structuring and development It encourages the attraction of institutional and financial investors They allow and encourage unsolicited bids (unsolicited proposals)

29 Legal and Regulatory Framework - Contents of the Law I. General rovisions 1. The law applies to all sectors minimum project investment: USD 1.7 million. 2. Maximum term including extensions 30 years* 3. Limit to additions and extensions of contracts with public budget 20% 4. Nation payments subject to service availability II. ublic initiative III. Unsolicited roposals ublic Idea: Resources: rivate and/or ublic rivate idea: Only for new projects Resources: rivate + max. 20% ublic Resources: 100% rivate Selection rocess: ublic Bidding Selection rocess: ublic Bidding Selection rocess: Abbreviated selection IV. roject`s common provisions 1. roject funds are managed through SV. 2. Creation of a new database of projects. 3. roper budget management to guarantee future payments. 4. The infrastructure reverts to the public sector * This term can be extended only if there is a previous favorable concept from CONES

30 ublic Initiative project - Flowchart Conceptual Idea of the roject rioritization Feasibility Studies + ositive Assessment of social and economic issues + ositive revious Concept - VBA * With ublic Resourses Technical, Financial and Legal Structuring Financial reviewed by ublic development Banks Art 27 / Risk analysis Ministry of Finance 2. Assessment of option - ND 3. Financial and contractual clauses - Ministry of Finance Central government investment Without Central Government Investment First review Ministry of Finance then ND First is reviewed by Ministry of Finance then the respective planning department Subnational ublic Entities * According a new presidential regulation, a previous concept has to be issued by Virgilio s Barco Urban Renewal Agency in the case of projects for administrative offices and public buildings. ublic Contract Opening of the bidding process Requires ublic $ Does not require ublic $ Request of fiscal endorsement and approval of annual budget commitments Opening of the bidding process

31 resentation of the initiative (refeasibility stage) Competent entity must register the initiative in the RUA ( 5 days after receiving the proposal) Unsolicited roposals project - Flowchart Concept (Max. 3 months) * This requirement is the responsibility of public entity Initiative rejected Favorable Acceptance of re-feasibility and acceptance conditions. roject preparation, feasibility stage (Max. 24 months) roposal Assessment (6 months) (The agency in charge may need complementary studies and must analyze them in an additional term of 3 months) MHC and ND review and issue concept ( with Cofinancing of the Nation ) or the planning unit of the territorial entity ( without Cofinancing of the Nation) Causes of rejected Not enough public interest it needs more public resources (>20%) There are a current public work or a concessions in place. Favorable roject rejected There is no commitment of any kind with the private investor must have a public hearing to third parties and authorities within one month of the delivery of Feasibility studies. Negotiation arrangements (2 months) Relevant ublic entity roposal`s originator

32 Unsolicited roposals project - Flowchart They must have the approval of future appropriation, before the bidding process Favorable Max. 20% $ ublic ublic Bidding (4 a 6 months) Negotiation arrangements (2 months) Source of funds Additional oints 3% - 10% (according to the amount of inversion) 100% $ rivate Direct selection No third party concerned Agreement ublication (Appendix included) (1-6 months) Third party concerned Abbreviated Selection rocess (2-3 months) First Right refusal (10 working days) Relevant ublic entity roposal`s originator

33 4. roductive and Social roject ortfolio ublic Initiative

34 NAME 13 rojects of ublic Initiative registered in RUA (1/2) OBJECT CONTRACTING AUTHORITY CURRENT STATUS roject for the concession of Airport of Barranquilla and South West Airports (Armenia- Neiva-opayán) Upgrade, management, commercial operation, maintenance and reversion of Airport of Barranquilla and South West Airports (Armenia-Neiva-opayán) National Infrastructure Agency-ANI In bidding process Implementation and operation of the System of ublic Bicicles in Bogotá. Endue Bogota with a system of public bicycles reachable to the citizens and that eases the integration of the people with the public transportation system (SIT). Bogota s town hall re-feasibility Upgrade of the ublic Lighting System in almira into LED technology. Optimization of the energy consumption, material supply, design, enlargement, setting up, upgrade, operation and management of the public lighting system in almira. almira s town hall Feasibility Center for the management of traffic, photo fines and traffic lights in iedecuesta Implementation of a center for the management of traffic, photo fines and traffic lights in iedecuesta. iedecuesta s town hall re-feasibility Universal Access to Television DTHSOCIAL rovision of satelite television service for municipalities located in non coverage areas. National Authority of Television- ANTV re-feasibility Regional and Urban Light Rail west section Light rail transport system at a regional level (West section) from Sabana Station to Facatativa Station in the municipality with that same name. Empresa Férrea Regional S.A.S re-feasibility Source: RUA

35 13 rojects of ublic Initiative registered in RUA (2/2) NAME OBJECT CONTRACTING AUTHORITY STATE Road project - Circuito de los Embalses in Antioquia Improvement and enlargement of the regional road network in Antioquia. Government of Antioquia Feasibility for the program of national court houses Construction of the new building for the Superintendency of notary and registration in Bogota. Overcome the deficiency in the access of the people to justice services. Construction of the building with its associate services, spaces needed and requirements of earthquake resistance. Minister of Justice re-feasibility Superintendency of notary and registration Feasibility Upgrade of Matecaña International Airport. Construction, upgrade, and adequacy of the land side and administration, operation, commercial operation and reversion of the air side of Matecaña International Airport in the city of ereira. Matecaña International Airport Feasibility ublic lighting service for Armenia, Quindío. Concession for the administration, upgrade, operation and enlargement of the public lighting service in Armenia in a term of 20 years. Armenia s town hall roceso de Selección (Ver SECO) Slaughterhouse for Arjona. Concession for the maintenance, operation and administration of the slaughterhouse in Arjona Bolivar. Arjona s town hall Feasibility Road network for Cordoba. lan for an enlargement and improvement of the road network in Cordoba. Córdoba s town hall re-feasibility Source: RUA

36 Leading rojects : Almost 1,100 km out to tender before 2014 CARTAGENA BARRANQUILLA Cruz del Viso SANTA MARTA onedera VALLEDUAR Carreto RIOHACHA La az Cuestecitas Buenavista San Juan ARAGUACHON Group 1 Group 2 Group 3 Total km , st tranche km 31,8 156,6 Tender date 1st tranche ALO DE LETRAS NECOCLÍ SAN ELAYO Toluviejo MONTERIA laneta Rica CARMEN DE BOLIVAR SINCELEJO La Yé San Marcos CAUCASIA Achí Aguachica Aguaclara SAN ROQUE Ocaña Group 4 Roads to prosperity East Range , El Tigre Simití CUCUTA BARRANCAB. REMEDIOS B/MANGA amplona ARAUCA Santa fé de Ant. Camilo C Bolombolo Tunel de Occidente MEDELLIN to. Berrío Barbosa SOGAMOSO TAME BUENAVENTURA CALI STDER. QUILICHAO MANIZALES EREIRA ARMENIA LA AILA BUGA La Manuela TO. SALGAR ZIAQUIRA TUNJA VILLETA Sopó Sisga EL SECRETO CALERA BOGOTA GIRARDOT Cáqueza IBAGUE ESINAL VILLAVICENCIO CARTAGO Granada NEIVA YOAL UERTO GAITAN to. Arimena Estimated Kilometers Total Investment estimated (billions of dollars) 24,4 OAYAN RUMICHACA CHACHAGÛÍ ASTO MOCOA Current Concessions News Early victories Source: ANI- National Infrastructure Agency

37 Center South Group 1 Honda Mariquita La Dorada to Salgar to Bogotá BOGOTA MAIN FEATURES Ibagué Girardot Kilometers: 846,6 Km Actual Tolls: 6 New Tolls: 7-9 TOTAL CAEX (Billions USD): 1,3 Neiva ROAD CORRIDORS: uerto Salgar Girardot ( 212,6 km) Girardot - Neiva (190 km) Neiva Mocoa- Santana (444 km) Mocoa Tolls Santana Early Victory Source: ANI- ANI- National Infrastructure Agency

38 South West Group 2 Ibagué La aila Loboguerrero MAIN FEATURES B/ventura Dagua Buga Mulalo Kilometers: 724,8 km Actual Road Tolls: 8 New Road Tolls: 3 TOTAL CAEX (Billions USD): 2,75 Cali Stder Quilichao ROAD CORRIDORS: Ibagué La aila (135km) Buga Buenaventura ( 118km) Mulaló Loboguerrero (31,82km) Santander de Quilichao Chachagüí (360 km) asto Rumichaca (80km) Chachagüi asto Tolls Rumichaca Early Victory Source: ANI- ANI- National Infrastructure Agency

39 Center East Group 3 MAIN FEATURES ARAUCA Kilometers: 1.391,6 Km Actual Road Tolls: 14 New Road Tolls: 5 TOTAL CAEX (Billions USD): 3,93 Hato Corozal Tame to Carreño ore Guasca Sisga Briceño Caqueza El Tablón Chirajara La Calera Choachí Villaviecio YOAL Aguaclara to Gaitán to López te Arimena ROAD CORRIDORS: Villavicencio Arauca (823km) Corredor erimetral del Oriente (156,6km) Doble calzada Bogotá Villavicencio (72km) Malla Vial del Meta (340km) Granada Tolls Early Victory Source: ANI- ANI- National Infrastructure Agency

40 Caribbean Region Group 4 Cartage na Arjona Cruz del Viso B/quilla Sta Marta Malambo onedera Carreto San Juan Nepomuceno uerta De Hierro Ye de Ciénaga Valledupar La Florida Distracció n La az araguachón Cuestecit as San Juan Del Cesar MAIN FEATURES Kilometers: 1.481,7 Km Actual Road Tolls: 11 New Road Tolls: 6 TOTAL CAEX (Billions USD): 2,91 ROAD CORRIDORS: Cartagena Barranquilla (146,7 km) Barranquilla Santa Marta (93km) San Roque - araguachón (474 km) Caucasia Cruz del Viso (434 km) Corozal Sincelejo Yatí El Burro San Roque Cereté - onedera (334 km) Cereté Sahagún Ciénaga De Oro El Viajando San Marcos Tamalameque Caucasia Tolls Early Victory Source: ANI- National Infrastructure Agency

41 Roads for rosperity Región Caribe Caucasia MAIN FEATURES El Tigre Remedios Kilometers: 1.446,5 Km Actual Road Tolls: 10 New Road Tolls: TOTAL CAEX (Billions USD): 7,25 ROAD CORRIDORS: Sta. De Antioquia ortal Occidental T. de Occidente MEDELLIN orcesit o Ancón Sur S.J Nus T. Dolores to. Berrio Ruta del Sol Group 1 (584,48 Km) Group 2 (503 Km) Group 3 (359 Km) Bolombolo Camilo C La intada La Virginia Irra La Manuela Tolls Zona Cafetera Early Victory Source: ANI- National Infrastructure Agency

42 East Mountain Range Adaptation Fund Ocaña to Santander MAIN FEATURES MANIZALES to Boyacá Honda Villeta Aguaclara to Araujo BOGOTA B/MAGA TUNJA CUCUTA amplona Duitama Kilometers: Km Actual Road Tolls: 11 TOTAL CAEX (Billions USD): 5,43 ROAD CORRIDORS: Manizales Honda Villeta (220km) Bogotá Bucaramanga amplona (543 km) Tunja Chiquinquirá uerto Boyacá (315 km) uerto Gaitán uerto Araujo (571 km) Duitama amplona Cúcuta (373 km) Duitama amplona Cúcuta (373 km) Cúcuta Aguaclara- uerto Capulco (257 km) Cúcuta uerto Santander (51km) Early Victory Total Km 630 Total CAEX US 1509 mm to Gaitán Type of investment: Manteinance and restoration of the existent roads. Construction of a second lane (70 Km) Tolls Early Victory Source: ANI- National Infrastructure Agency

43 Other roads La Mata Tibu Convención MAIN FEATURES Kilometers: 485Km Existing tolls: 2 TOTAL CAEX (Billons USD): 0,87 ROAD CORRIDORS: Cúcuta Tibú La Mata (331 Km) CÚCUTA Bucaramanga Barrancabermeja Yondó (154Km) B/Bermeja Tolls Early Victory Source: ANI- National Infrastructure Agency

44 Awarded projects Loboguerrero Buga 55,42 km 55,42 km: rehabilitation, operation and maintenance of the existing road $29,95 millions USD Winning Bidder : CSS Constructores S.A. Zipaquirá - alenque 370 Km: rehabilitation, operation and maintenance $183,4 millions USD Winning Bidder : Consorcio Hidalgo e Hidalgo Colombia S.A.S. Source: ANI- National Infrastructure Agency

45 First Group 4G Capex* Opex* Km Current Status FIRST GROU OF ROJECTS (USD Millon) IONEERS Girardot - Honda - uerto Salgar ,13 Awarded Mulaló Loboguerrero 596,5 220,5 31,82 Awarded erimetral de Oriente de Cundinamarca ,5 153,8 Awarded Cartagena - Barranquilla, Circunvalar de la rosperidad 479, ,09 Awarded SECOND GROU OF ROJECTS (USD Millon) GROU I Autopista Conexión Norte 491, Awarded Autopista al Río Magdalena 2 686,5 306,5 144 Awarded Autopista Conexión acífico ,8 Awarded Autopista Conexión acífico ,78 Awarded Autopista Conexión acífico ,5 146,2 Awarded TOTAL

46 rojects awarded 4G Girardot - uerto Salgar Girardot uerto Salgar Construction of new second lanes (55km), operation and maintenance (157km). 190,13 km 25 years. $ 1,200 Millions USD Winning Bidder : Mario Alberto Huertas Cotes (75%), Constructora MECO SA Sucursal Colombia (25%). Source: ANI- National Infrastructure Agency

47 rojects awarded 4G Mulaló - Loboguerrero Mulaló- Loboguerrero Length : Section Km, Section Km, Section Km, Section Km Y Section Km for a Total of km eriod : 25 years Capex: USD 500 million Opex: USD 250 million Winning bidder: Estudios y royectos del Sol (Episol) 60%, (Colombia) and Iridium Colombia Concesiones Viarias 40%, (España) reliminary Source: ANI- National Infrastructure Agency

48 erimetral de Oriente de Cundinamarca rojects awarded 4G erimetral de Oriente de Cundinamarca Rehabilitation and Construction (95,33km), and improvement (57,66km). 152,99 km 25 years $ 750 Millions USD Winning Bidder : Shikun & Binui AG Israel (37.05%); C.I. Grodcos. en C.A. Ingenieros Civiles Colombia (25%); Colombiana de Inversiones (37.05)%. Source: ANI- National Infrastructure Agency

49 rojects awarded 4G Cartagena - Barranquilla Cartagena-Barranquilla Length : Section 1, 117 km y Section 2, 36.7 km, for a total approx. de km. eriod : 25 years. Capex : USD 500 million Opex: USD 350 million Winning bidder: Mario Alberto Huertas Cotes y Constructora MECO Sociedad Anónima Sucursal Colombia. reliminary Source: ANI- National Infrastructure Agency

50 rojects awarded- Conexión Norte Conexión Norte Length : Section 1, 58 Km y Section 2, 87 Km, for a Total of 145 km. eriod : 25 years Capex : USD 500 million Opex: USD 300 million Winning bidder: Autopistas del Nordeste SV reliminary Source: ANI- National Infrastructure Agency

51 rojects awarded- Rio Magdalena 2 Rio Magdalena 2 Length : Approx. 144 Km. eriod : 25 years Capex: USD 700 million Opex : USD 400 million Winning bidder: E OHL Concesiones compuesta por OHL Concesiones Colombia S.A.S 60% y OHL Concesiones Chile S.A. 40%. reliminary Source: ANI- National Infrastructure Agency

52 rojects awarded 4G acifico 1 acifico 1 Rehabilitation, construction, operation and maintenance 49,7 Km 25 years. $945 Millions USD Winning Bidder : Estudios y proyectos del Sol S.A. Episol S.A.S (60%), Iridium Colombia Concesiones Viales S.A.S. (40%). Source: ANI- National Infrastructure Agency

53 rojects awarded 4G acifico 2 acifico 2 98 Km: 44 km(construction of new second lanes) 54km (operation and maintenance) 25 years. $480 Millions USD Winning Bidder :.S.F Concesión La intada (Odinsa and Colombian partners) Source: ANI- National Infrastructure Agency

54 rojects awarded 4G acifico 3 acifico 3 Rehabilitation or construction of new second lanes operation and maintenance. 142 km 25 years $935 Millions USD Winning Bidder : Mario Huertas Cotes (Colombia) Constructora MECO S.A. (Costa Rica). Source: ANI- National Infrastructure Agency

55 Rio Magdalena 1 MAIN FEATURES Length : Approx. 161 Km eriod : 25 years Capex: USD 1050 million Opex : USD 80 million Status: Suspended reliminary Source: ANI- National Infrastructure Agency

56 Second Group 4G Capex* Opex* Km Current Status ROADS FOR ROSERITY (USD Million) GROU II Autopista al Mar 1 728, Awarded Autopista al Mar 2 767, In bidding process NEWS (USD Million) Neiva- Girardot 673, ,85 Approved by MHC and DN Santana - Neiva 751,5 733,5 447 Awarded Rumichaca asto 816,5 341,5 79,67 In bidding process opayán - S/der de Quilichao 595, ,83 Awarded Transversal del Sisga ,17 Awarded Villavicencio Yopal 942,5 527,5 264,13 Awarded /ta de Hierro - almar 224, ,56 Awarded B/manga- B/meja - Yondó ,02 In bidding process TOTAL 6.632, ,23

57 rojects awarded 4G - Mar 1 MAIN FEATURES Study, final design, financing, environmental, property tax and social management, construction, improvement, rehabilitation, operation, maintenance and transfer of Sea Grant Highway 1. Approx. 180 Km 25 years $1.603 Million USD Winning Bidder: SAC 4G integrated by SACYR Concesiones Colombia S.A.S 37.5%, Strabag S.A.S 37.5% and COBCAY S.A 25%. Source: ANI- National Infrastructure Agency

58 rojects 4G - Mar 2 MAIN FEATURES Length: 245 Km. eriod : 16 years. ( ) Capex: USD 767,5 million Opex : USD 319 million Status: In bidding process Calzada Nueva reliminary Source: ANI- National Infrastructure Agency

59 rojects 4G - Neiva-Girardot MAIN FEATURES Length: 190,85 Km. eriod : 25 years Capex: USD 673,5 millions Opex : USD 532 millions Source: CONES

60 rojects awarded 4G - Santana-Neiva MAIN FEATURES Financing, construction, rehabilitation, improvement, operation, maintenance and transfer of the Neiva-Mocoa-Santana Corridor 447 Km 25 years $1.368,70 Million USD Winning Bidder: Controladora de Operaciones de Infraestructura S.A de CV (35%), Cass Constructores y Cia (20%), Carlos Alberto Solarte Solarte (20%), Estyma (10%) and ALCA Ingeniería (5%). Fuente: CONES

61 rojects 4G - Rumichaca-asto MAIN FEATURES Length: 79,67 Km. eriod : 25 years Capex: USD 816,5 million Opex : USD 341,5 million Fuente: CONES

62 rojects awarded 4G opayán-santander de Quilichao MAIN FEATURES Financing, construction, rehabilitation, improvement, operation, maintenance and transfer of the opayan-santander de Quilichao Corridor 75,83 Km. 25 years $1.165,35 Million USD Winning Bidder: Hidalgo E Hidalgo S.A. Sucursal Colombia 25%, Hidalgo E Hidalgo Colombia S.A.A 5%, CASS Constructores & CIA S.C.A 35% and Carlos Alberto Solarte 35%. Fuente: CONES

63 rojects 4G - Transversal del Sisga MAIN FEATURES Financing, construction, rehabilitation, improvement, operation and maintenance of the Transversal del Sisga Corridor. 137,17 Km. 25 years $540,98 Million USD Winning Bidder: Centro Oriente SV integrated by KMA Construcciones S.A 40%, Ortiz Construcciones u royectos 40% and Obresca 20% Fuente: CONES

64 rojects 4G Villavicencio-Yopal MAIN FEATURES Study, final design, financing, environmental, property tax and social management, construction, improvement, rehabilitation, operation, maintenance and transfer of Villavicencio-Yopal corridor. 261 Km. 25 years $1.295,98 Millions USD Winning Bidder: SAC 4G integrated by SACYR Concesiones Colombia S.A.S 37.5%, Strabag S.A.S 37.5% and COBCAY S.A 25%. Fuente: CONES

65 rojects 4G uerta de Hierro-almar de Varela MAIN FEATURES Study, final design, financing, environmental, property tax and social management, construction, improvement, rehabilitation, operation and maintenance of uerta de Hierro-almar de Varela corridor. 202,56 Km. 25 years $370,94 Million USD Winning Bidder: E SAC 4G integrated by SACYR CONCESIONES COLOMBIA S.A.S Fuente: CONES

66 rojects 4G Bucaramanga-Barrancamermeja- Yondó Length: 154 Km. eriod : 25 years Capex: USD 887 million Opex : USD 516 million MAIN FEATURES Fuente: CONES

67 Third Group 4G Capex* Opex* Km Current Status ADATATION FUND Bucaramanga amplona 411,68 315,18 133,1 amplona - Cúcuta 647,83 269,73 112,7 Approved by MHC and DN Approved by MHC and DN Ocaña - Cúcuta 767,68 347,36 195,5 In structuring Zipaquirá - Barbosa 995,82 670,24 145,7 In structuring Barbosa - Bucaramanga 598,59 458,70 215,5 In structuring Duitama - amplona 367,54 428,88 307,5 Approved by MHC and DN Sogamoso Aguazul - Mani 418,35 308,68 182,5 In structuring Chinchiná Mariquita 359,17 404, In structuring TOTAL 4.566, , ,5

68 National Benefits Fiscal Future Commitments (USD Billion) N Departments Total 4G $24,61 24 N Municipalities National Impactl (3) Stimate oblation Annual Growth GD Reducing Travel Time Total National opulation (2) 1,5% 30% Generated Jobs ioneers $3, ` ,58% (1) 30% Autopistas rosperidad Grupo I $4, ' ,5% (1) 35% Autopistas rosperidad Grupo II $4, Without Data (4) 39% Without Data (4) (1) Regional Average (2) Total National opulation Data Source: DANE (3) rojects are physically developed in 24 municipalities but the impact of the National rogramme is because increases the competitiveness of the economy improving connectivity between different regions of the country and generate a boost to employment in almost all regions. (4) No information available: The estructuring of the four projects have not completated.

69 ND Challenges in structuring Road rojects Structuring technical, legal and financial under the mechanism the San Gil-Charalá- Duitama Corridor, which includes the rehabilitation of approximately 20 kms and the operation and maintenance of the corridor. Structuring financed by the Support rivate articipation rogramme- S- ND. Status: In structuring

70 Airports in 4 cities BARRANQUILLA S AIRORT 2015 BARRANQUILLA Awarded : December 31st of 2014 OAYÁN ARMENIA NEIVA ARMENIA, NEIVA AND OAYÁN AIRORTS 2015 Submissions scheduled for April 10th of Source: ANI- National Infrastructure Agency

71 Mantecaña s Airport National rojects Object Construction, modernization of the land side and the management, operation, maintenance, commercial, exploitation and transfer of the land and airside of the Matecaña s Airport in ereira City Current State In prequalification process ublication of the invitation document in SECO: September 23rd Deadline for sumissions of interest expressions: November 18th The resolution of the list of prequalified (12) was published: February 2nd, 2015 Fuente: Aeromate - SECO

72 Fluvial rojects Magdalena s River navigation recovery Object Recovery of Magdalena s River navigation using schemes Description Between uerto Salgar / La Dorada - Bocas de Ceniza. Term: 10 years Works for river canalization OyM activities to guarantee : 4,5 foots on uerto Salgar/uerto Berrío stage; 6,0 foots on uerto Berrío/Barrancabermeja stage; 7 foots on Barrancabermeja/uente Laureano Gómez stage; and 37,5 foots until Bocas de Ceniza. roject will demand a total investment of (USD1,2 billion). Awarded (August 15 th ) Current State Source: Cormagdalena

73 ublic Buildings Fiscalía General de la Nación - Cali Object Design, construction, management, operation and maintenance of the Fiscalía General de la Nación Offices Cali and the provision of associated services through model Generalities Construction of the FGN Cali, La construcción de la FGN Cali, it s framed in the draft Urban Renewal "aradise City" that aims to improve the public space of the city center. Net area (office) + health + Batteries + communal areas Circulation and fixed points + Technical areas: 42,015,32 m2. Basement Area 1 and 2: 14,530,22 m2. TOTAL ROJECT AREA: m2 Commercial operation area: 754 m2 Estimated Investment: USD 80 MM Concession period: 15 years years (construction) In requalification Current Status Data Source: Estudio Diseñar, Estructurar e Implementar la Estrategia de articipación rivada para el Diseño, Construcción, Dotación, Operación y Mantenimiento de Sede para la Seccional Cali de la Fiscalía General de la Nación. Estructuración Valfinanzas S.A.

74 Justice sector / ublic buildings projects Superintendence of Notaries and Registry Bogotá D.C. Objective Design, construction, administration, operation and maintenance of the infrastructure and related services for the Superintendence of Notaries and Registry Offices (SNR) through a public-private partnership scheme. Basic Concepts Estimated area: m2 plus m2 of underground parking lots distributed this way: SNR: m2. Commercial infrastructure: m2. Estimated infrastructure investment: US$ 75 Million otential complementary services to be provided by the private sector: arking lots rivate offices Food court Bogotá D.C. Source: Study Design of the private capital entailment strategy for infrastructure solutions of judicial offices and the Superintendence of Notaries and Registry offices - Valfinanzas Structured Current Status Estimated Opening Bid rocess in 2015

75 Leading rojects in social economy Subnational Court Houses Ministry of Justice and Law Objective roperty management, design, construction, maintenance and operation of the physical infrastructure of 50 Subnational cout houses. Basic Concepts Estimated area: m2 (1.213 m2 for house): Estimated infrastructure investment: USD 62 MM Deadline:16.5 years 1.5 years (design and construction) 15 years (operation and maintenance) Current Status Structuring process completed Estimated Opening Bid rocess in 2015

76 Urban Renovation CAN roject Object Construction of a three-building complex where officials from ministries and various government agencies will be located in 16 floors. First construction of Ciudad CAN, an urban development plan that entails the renewal of an area of 213 acres. ublic initiative proposed by the National Company for Renewal and Urban Development Virgilio Barco Current Status Area: m² Start of works: Second quarter Construction term: 30 months roject at studies and designs stage. Fuente: Aeromate - SECO

77 Justice sector / ublic buildings projects Colombia s attorney general Cali Offices Objective Design, construction, administration, operation and maintenance of the offices for the Colombia s attorney general Cali offices and the provision of connected services, through a public-private partnership scheme. Basic Concepts OFFICES Location: Areas of urban renovation raised by the zoning plan, located in the zone known as the Global Centre of the city of Cali. Total project area: 56,545 sq mt rojected land area: Sq mt Institutional estimated area : Sq mt plus parking lots. Estimated infrastructure investment : US$ 75 Millions Cali. In pre-qualification Current Status Source: Colombia s General Attorney Offices

78 El Dorado 2 Airport Object Increase the operating capacity, competitiveness and development of the country's main airport. erform structuring a project that integrates the existing El Dorado Airport with the new airport El Dorado II. The project should consider how it would be the integrated Cundinamarca light rail or Regiotram with the new airport that will be built between the municipalities of Madrid and Facatativá. The airport will be consolidated as the main 'hub' of South America, not only of cargo but also of passengers. The project is in structuring.

79 Santa Marta s water delivery system Object ermanently provide drinking water and to increase the coverage and quality of this service in the city of Santa Marta, as well as improving the coverage and quality of wastewater management that occur in the city. In structuring. Current Status ublic Initiative roject

80 ND Challenges in structuring Social rojects Structuring technical, legal and financially a project that includes the restoration, construction, manning, operation and maintenance of the infrastructure of museums owned by the Ministry of Culture. Structuring financed by the rogramme to Support rivate articipation S ND. Status: In Structuring Structuring technical, legal and financially a project that includes the construction, manning, operation and maintenance of the infrastructure of a group of libraries (municipal, district or departmental), located in different municipalities or districts. Structuring financed by the rogramme to Support rivate articipation S ND. Status: In Structuring ND: National lanning Department

81 5. roductive and Social roject ortfolio Unsolicited roposals

82 Data Source: Vicepresidencia de Estructuración Agencia Nacional de Infraestructura / SECO Name I Ibagué Cajamarca I Malla vial del Meta Status Awarded 15/01/2015 Awarded 09/04/2015 CAEX (USD Million) rocesses Developed OEX (USD Million) VFM* (USD Million) 509,76 675,35 99,40 342,12 241,52 201,15 I Chirajará Fundadores / Bogotá Villavicencio I Departamentos del Cesar y la Guajira Awarded 23/04/2015 Awarded 19/05/ ,54 819,61 263,73 152,15 562,75 109,88 I Cambao Manizales Awarded 19/05/ ,72 310,51 101,10 VFM*: Value for Money

83 Awarded Road Transport I Ibagué - Cajamarca Contract value: 1,860,649 million pesos Awarded: January 15, 2015 (direct contracting) Financing: 100% private Studies, design, construction, operation, maintenance, social management, property and environmental of the second carriageway of the road Ibagué - Cajamarca, and operation and maintenance of Highway System, Chicoral variant, Gualanday variant, Gualanday -Ibagué, Gualanday - Espinal, icaleña Variant, North Branch and existing path Ibagué-Cajamarca. roponent: Originator romise of Future Society GICA SA comprised of Constructora Colpatria S.A. 29%, Mincivil S.A 29%, HB Estructuras Metálicas S.A 14%, Termotécnica Coindustrial S.A 15% and Latinoamérica de construcciones S.A Latinco S.A with a 13%. Data Source: SECO

84 306 unsolicited projects, 241 of them without public resources Invitation Notice Feasibility Feasibility in studies re-feasibility in studies Selection rocesss Awarded Rejected Total Roads Urban Transport ublic arking Street Lighting Urban renewal Traffic control Water and Sanitation Solid waste Trains and subway Airports Healed Diagnóstico ublic buildings Commercial retail Transport 6 6 Solicite información sobre su libreta militar. Obtenga información sobre la oferta educativa. Urban logistics risons 5 5 ublic arks 4 4 Sporting facilities Education 2 2 Airport logistics Urban Dam construction 1 1 ort logistics 1 1 Television 1 1 Housing 1 1 Document 1 1 Information systems 1 1 TOTAL Source: RUA

85 Road s rojects I Ibagué - Cajamarca Does not require public resources Studies, design, construction, operation, maintenance, social management and environmental in the second carriageway of the road Ibagué Cajamarca and operation and maintenance of the road system. Contract value: US$ 930 Million Status: Awarded I Cesar - Guajira Does not require public resources Construction, rehabilitation, operation and maintenance of road system to connect the departments of Cesar and La Guajira Status: Study Feasibility I La aila - Calarcá Does not require public resources Construction, Management, Operation and Maintenance of Road Corridors Second road La aila - The Wire; Double road El Alambrado - Barcelona - Calarcá and Administration, Operation and Maintenance Calarcá Cajamarca road. Status: Study Feasibility Source: RUA

86 Airports Airport Rafael Núñez - Cartagena. Does not require public resources Design and construction of a taxi driveway, the expansion of the aircraft parking area, Improvement of the passenger terminal area and installation of boarding bridges. Status: re-feasibility study Airport El dorado Does not require public resources Design, construction and maintenance for the adequacy of the outdoor infrastructure of the "El Dorado" airport in Bogotá. Status: re-feasibility study Source: RUA

87 Urban Transport Ligth Rail Transit in Bogotá Corredor Occidente Requires public resources Construction, operation and maintenance for a tram. Status: Feasibility study Ligth Rail Transit in Bogotá Corredor Sur Requires public resources Mass public transit system over the old rail located in the south of the city. Status: Feasibility study Source: RUA Source: RUA

88 Railroad s Concessions Total System Operational System km 996 km Current Concessions (Fenoco, acífico, Cerrejón) 3 Medium and long term Of the11 railroad`s concessions, 2 in Feasibility Study Stage. Railway Bogotá (La Caro) Belencito Santa Marta, El Doctor and Mamatoco. rivate Initiative 3 in re- feasibility Study Stage: Oceanic red railway Megaproject acífico Orinoco Corredor ferroviario Tumaco uerto Carreño roject Ferropista Armenia Cajamarca Source: Vicepresidencia de Estructuración Agencia Nacional de Infraestructura

89 Logistics Airports Las Américas Logistic ort (ANI) The project doesn t require public resources On private land adjacent to the north runway from El Dorado Airport. Expand storage capacity, processing, handling and moving cargo. Status: re-feasibility in study Logistic Airport Center(ANI) The project doesn t require public resources Cargo logistics center in public lands of Ernesto Cortissoz International Airport. Status: re-feasibility in study Source: RUA

90 Urban Renewal - Sports Sporting Scenarios: 3 initiatives in pre-feasibility study and 1 feasibility study. Architectural renovation, actualization, operation and maintenance of El Campin Coliseum. rivate initiative without public funds Estatus: Feasibility in study. Urban renewal: 12 initiatives in prefeasibility study and 1 feasibility study. Data Source: Registro Único de Asociaciones úblico rivadas RUA

91 Contact ublic rivate artnership rogram Fabio Villalba Diego Mauricio Ávila Angélica Velasco Coordinator Legal Advisor Advisor (571 ) (571 ) (571 ) Ext Ext Ext Shirley Mardonez Luis Fernando Castro Carlos Garay Advisor Advisor Advisor smardonez@dnp.gov.co lcastro@dnp.gov.co cgaray@dnp.gov.co (571 ) (571 ) (571 ) Ext Ext Ext Valentina Bonilla Advisor Laura Tarazona Advisor vbonilla@dnp.gov.co ltarazona@dnp.gov.co (571 ) (571 ) Ext Ext. 1322

92 National lanning Department

National Planning Department. www.dnp.gov.co

National Planning Department. www.dnp.gov.co National Planning Department www.dnp.gov.co Public Private Partnerships Regulatory Framework and Project Portfolio June of 2015 Content 1. Projects on Financial closure process - Awarded 2. Structured

More information

National Planning Department. www.dnp.gov.co

National Planning Department. www.dnp.gov.co National lanning Department www.dnp.gov.co ublic rivate artnerships Regulatory Framework and roject ortfolio July 2014 Content 1. Colombia s macroeconomic overview 2. Colombia s Infrastructure 3. Law Legal

More information

#PPP PROJECTS. Dimitri Zaninovich. Director of Infrastructure and Sustainable Energy National Planning Department

#PPP PROJECTS. Dimitri Zaninovich. Director of Infrastructure and Sustainable Energy National Planning Department #PPP PROJECTS Dimitri Zaninovich Director of Infrastructure and Sustainable Energy National Planning Department February, 2014 1. Starting Point Colombia s Macroeconomic Overview Upcoming Opportunities

More information

INFRASTRUCTURE PROJECTS

INFRASTRUCTURE PROJECTS INFRASTRUCTURE PROJECTS NATIONAL INFRASTRUCTURE AGENCY Luis Fernando Andrade Moreno President - National Infrastructure Agency LOCATION OF COLOMBIA OUTLINE 1. Institutional framework for PPP in transport

More information

We take each step of your project with you. Grupo Bancolombia has all its resources and support at your disposal at each stage of your infrastructure

We take each step of your project with you. Grupo Bancolombia has all its resources and support at your disposal at each stage of your infrastructure We take each step of your project with you. Grupo Bancolombia has all its resources and support at your disposal at each stage of your infrastructure project. Introduction For Grupo Bancolombia, the commitment

More information

What You Need To Know About Real Estate - Atlanivas

What You Need To Know About Real Estate - Atlanivas New Era In The State Of Atlantico 2014 Afiliados Afiliados New Era in the State of Atlantico Generalidades Economic Integration o 17 Free Trade Agreement o 10 Investment o 9 Double Taxation 1.400 million

More information

Infrastructure Opportunities in Colombia

Infrastructure Opportunities in Colombia KPMG ADVISORY SERVICES LTDA Infrastructure Opportunities in Colombia GLOBAL INFRASTRUCTURE October 2013 kpmg.com.co 1 1 1 Contents 1. KPMG Services 2. Colombia as an investment destination 3. PPPs in Colombia

More information

Financial Institution for Development WE SUPPORT SUSTAINABLE PROJECTS

Financial Institution for Development WE SUPPORT SUSTAINABLE PROJECTS Financial Institution for Development WE SUPPORT SUSTAINABLE PROJECTS SUSTAINABLE DEVELOPMENT BANK MisiOn vision VALUE PROMISE CORPORATE VALUES Teamwork Respect Integrity Service Vocation Innovation Commitment

More information

Business Process Outsourcing & Off shoring (BPO&O) Vice-presidency of Foreign Investment August 2011

Business Process Outsourcing & Off shoring (BPO&O) Vice-presidency of Foreign Investment August 2011 Business Process Outsourcing & Off shoring (BPO&O) Vice-presidency of Foreign Investment August 2011 In 2009, eight sectors formulated and started implementing their Industry business plans leading to

More information

Management report and results 2013 Medellín, March 28, 2014. Todos los derechos reservados por Interconexión Eléctrica S.A. E.S.P.

Management report and results 2013 Medellín, March 28, 2014. Todos los derechos reservados por Interconexión Eléctrica S.A. E.S.P. Management report and results 2013 Medellín, March 28, 2014 Corporate Strategy Definitions: Big choices The Group's profitability and the generation of value are the main strategic aspirations The mix

More information

Empresas Públicas de Medellín

Empresas Públicas de Medellín 1 Empresas Públicas de Medellín Emerging Markets Corporate Conference Miami, March of 2010 Disclaimer 2 This document was prepared by EPM with the purpose of providing interested parties certain financial

More information

INVEST IN COLOMBIA. 1. Colombia. Great destination for business and investment. 2. World recognizesour work. 3. Reasons to invest

INVEST IN COLOMBIA. 1. Colombia. Great destination for business and investment. 2. World recognizesour work. 3. Reasons to invest TOURISM SECTOR Colombia is becoming one of the most important destinations for tourism in Latin America. According to the World Travel & Tourism Council (WTTC), real demand for trips and tourism in Colombia

More information

Mining Sector. May 2009

Mining Sector. May 2009 Mining Sector May 2009 Contribution of Mining Sector to Colombian economy 2006 2007 2008* Total GDP Growth Mines and hydrocarbons GDP Growth Mining share as % of total GDP 6,8% 0,1% 2,58% 7,5% 4,6% 2,6%

More information

Summary of Empresas ICA, S.A.B. de C.V. ( ICA ) s Business Plan

Summary of Empresas ICA, S.A.B. de C.V. ( ICA ) s Business Plan Basis of Preparation The business plan was developed to be consistent with the expected ongoing businesses of the Construction and Concessions segments, while most of the other parts of the business are

More information

Barranquilla: Strategic Platform. Services. for BPO & IT

Barranquilla: Strategic Platform. Services. for BPO & IT Barranquilla: Strategic Platform for BPO & IT Services Contents 1. Barranquilla s Potential at a Glance 01 2. BPO& IT Industry in Colombia 04 3. BPO& IT Industry in Barranquilla 06 4. Student Population

More information

Colombia in the world

Colombia in the world Colombia in the world Proexport around the world Process of attracting Foreign Direct Investment Proexport offers detailed and professional assistance for investors that find interesting business opportunities

More information

Motorcycle as a new massive mode of urban transportation: a challenge for many LA countries, cities and citizens

Motorcycle as a new massive mode of urban transportation: a challenge for many LA countries, cities and citizens Motorcycle as a new massive mode of urban transportation: a challenge for many LA countries, cities and citizens Ricardo Montezuma Msc, Ph.D. Director Fundación Ciudad Humana Profesor Titular Universidad

More information

Infrastructure in Colombia Key investment considerations. June 18, 2014

Infrastructure in Colombia Key investment considerations. June 18, 2014 Infrastructure in Colombia Key investment considerations June 18, 2014 With you today Stephen Best Stephane Villeneuve Senior Manager Global Infrastructure KPMG General Manager New Markets and Strategy

More information

A Regional Leader in the Energy Sector

A Regional Leader in the Energy Sector Empresa de Energía de Bogotá - EEB A Regional Leader in the Energy Sector EEB Overview Wide energy Portfolio: Network and Services Shareholders: Bogotá D.C. 76.28%, Ecopetrol 6.87%, Corficolombiana 3.56%,

More information

Latin America. The New Frontier for Outsourcing. Atlanta Chapter IAOP Esteban Reyes, CEO, VSI Nearshore Outsourcing June 27, 2011

Latin America. The New Frontier for Outsourcing. Atlanta Chapter IAOP Esteban Reyes, CEO, VSI Nearshore Outsourcing June 27, 2011 Latin America The New Frontier for Outsourcing Atlanta Chapter IAOP Esteban Reyes, CEO, VSI Nearshore Outsourcing June 27, 2011 Agenda 1. Economic Trends in Latin America 2. Outsourcing in Latin America

More information

Fleet in operation as of April 2015 Avianca. Avianca Cargo. Avianca in numbers

Fleet in operation as of April 2015 Avianca. Avianca Cargo. Avianca in numbers Fact Sheet 2015 Fleet in operation as of April 2015 Avianca 04 Boeing 787 Dreamliner 10 Airbus A330-200 57 Airbus A320-200 09 Airbus A321 32 Airbus A319-100 10 Airbus A318-100 12 Aviones jet Embraer E190

More information

Agribusiness. Sector

Agribusiness. Sector Agribusiness Sector Introduction Specialized interest and knowledge of your business is the best guarantee of a broad array of financial solutions that Grupo Bancolombia* places at your disposal. The backing

More information

Grupo Éxito Corporate Presentation

Grupo Éxito Corporate Presentation Grupo Éxito Corporate Presentation Note on Forward-Looking Statements This presentation may contain forward-looking statements regarding expected developments and expectations about future events. These

More information

HIGHER EDUCATION IN PERU

HIGHER EDUCATION IN PERU HIGHER EDUCATION IN PERU THE ROLE OF GOVERNMENT IN QUALITY ASSURANCE RAFAEL YAYA QUIJANDRÍA HIGHER EDUCATION IN PERU ROLE OF GOVERNMENT IN QUALITY ASSURANCE 1 Higher Education in Peru 2 Main Problems and

More information

Corredores de Comercio del NAFTA Laredo, Texas: Puente Comercial de las Américas

Corredores de Comercio del NAFTA Laredo, Texas: Puente Comercial de las Américas Corredores de Comercio del NAFTA Laredo, Texas: Puente Comercial de las Américas The Objective of recent trade missions to Central and South America: To position Laredo, Texas as a logistics hub, to promote

More information

Manufacturing. Sector

Manufacturing. Sector Manufacturing Sector Introduction Taking into account its interest in and knowledge of your business, Grupo Bancolombia*, through its subsidiaries, offers different financial solutions to industry. We

More information

04 de diciembre de 2009 No. 121

04 de diciembre de 2009 No. 121 WEEKLY EMANA NEWS QUE PASÓ MAY 2010 04 de diciembre de 2009 No. 121 Bolivia S&P Raises Bolivia s Rating to B with Positive Outlook 7/05/2010 The rating agency Standard & Poor s (S&P) raised Bolivia s foreign-currency

More information

2Q15 Consolidated Earnings Results

2Q15 Consolidated Earnings Results 2Q15 Consolidated Earnings Results IFRS September 2015 Disclaimer Grupo Aval Acciones y Valores S.A. ( Grupo Aval ) is an issuer of securities in Colombia and in the United States, registered with Colombia

More information

Aena Internacional is a shareholder in Grupo Aeroportuario del Pacífico (GAP), which operates 12 airports in Mexico.

Aena Internacional is a shareholder in Grupo Aeroportuario del Pacífico (GAP), which operates 12 airports in Mexico. Aena Internacional is a shareholder in Grupo Aeroportuario del Pacífico (GAP), which operates 12 airports in Mexico. General Information International Development 72 Annual Report 2006 Aena Internacional

More information

102 Management Report Second Half 2013. Chapter 8 Our Commitment to Stakeholders

102 Management Report Second Half 2013. Chapter 8 Our Commitment to Stakeholders 102 Management Report Second Half 2013 Chapter 8 Our Commitment to Stakeholders 103 Sharing the knowledge from what we know to do is part of our commitment Through the Financial Education For Life program,

More information

An overview of current tax reforms in Colombia. A TMF Group briefing. Juan Carlos Alvarez Regional Managing Director

An overview of current tax reforms in Colombia. A TMF Group briefing. Juan Carlos Alvarez Regional Managing Director An overview of current tax reforms in Colombia A TMF Group briefing Juan Carlos Alvarez Regional Managing Director Since January 2015 companies operating in Colombia have been challenged to a new tax reform.

More information

Juan José Echavarría Co-Director, Central Bank of Colombia October, 2008

Juan José Echavarría Co-Director, Central Bank of Colombia October, 2008 Colombian Economic Prospects Juan José Echavarría Co-Director, Central Bank of Colombia October, 2008 Topics Growth Inflation Exports, Foreign Direct Investment and Remittances The Financial Sector Central

More information

VETTED UNITS OF THE COLOMBIAN SECURITY FORCES ELIGIBLE FOR POSSIBLE US ASSISTANCE AND TRAINING 2008

VETTED UNITS OF THE COLOMBIAN SECURITY FORCES ELIGIBLE FOR POSSIBLE US ASSISTANCE AND TRAINING 2008 ARMY VETTED UNITS OF THE COLOMBIAN SECURITY FORCES ELIGIBLE FOR POSSIBLE US ASSISTANCE AND TRAINING 2008 ARMY SPECIAL OPERATIONS COMMAND COMANDO BATTALION AMBROSIO ALMEIDA LANCERO GROUP 4TH REGIONAL INTELLIGENCE

More information

Cluster to Promote Competitiveness through Public Private Partnerships

Cluster to Promote Competitiveness through Public Private Partnerships Cluster to Promote Competitiveness through Public Private Partnerships Multilateral Investment Fund FOMIN Tercer Encuentro Técnico de Capacitación en materia de Estructuración de Proyectos de Asociación

More information

Passenger Rail System: Spain s experience

Passenger Rail System: Spain s experience Passenger Rail System: Spain s experience Chicago, March 2012 Jesús Planchuelo Martínez de Haro SENER. Civil Engineering & Architecture Department Director Member of Tecniberia Index I. The Spanish Engineering

More information

GOVERNMENT POLICIES FOR BUS RAPID TRANSIT DELIVERY

GOVERNMENT POLICIES FOR BUS RAPID TRANSIT DELIVERY GOVERNMENT POLICIES FOR BUS RAPID TRANSIT DELIVERY Daniel García Deputy Minister of Transport Republic of Colombia January 2007 Colombian Federal Transit Policy THE PROBLEMATIC OF TRANSIT IN COLOMBIA Structural

More information

Inter-American Development Bank. Financing Private Infrastructure with the IDB: EXR Business Seminar April 2006 Washington, DC

Inter-American Development Bank. Financing Private Infrastructure with the IDB: EXR Business Seminar April 2006 Washington, DC Inter-American Development Bank Financing Private Infrastructure with the IDB: EXR Business Seminar April 2006 Washington, DC Agenda IDB and the Private Sector Department IDB Benchmark Transportation Deals

More information

Colombia Insurance day

Colombia Insurance day < Picture to go here > Colombia Insurance day 6 June 2013 Lloyd s 2012 agenda 08.30 Welcome & opening remarks John Nelson 08.45 The Critical role of insurance in Colombia Roberto Junguito 09.00 Panel -

More information

PROMOTING COMPETITIVE AND RESPONSIBLE MINING IN COLOMBIA. Prospectors and Developers Association of Canada Convention Toronto, March 2014

PROMOTING COMPETITIVE AND RESPONSIBLE MINING IN COLOMBIA. Prospectors and Developers Association of Canada Convention Toronto, March 2014 PROMOTING COMPETITIVE AND RESPONSIBLE MINING IN COLOMBIA Prospectors and Developers Association of Canada Convention Toronto, March 2014 PROGRESS ANM MILESTONES ANM * * RUCOM: Unique Register of Mineral

More information

1Q15 Consolidated Earnings Results

1Q15 Consolidated Earnings Results 1Q15 Consolidated Earnings Results Colombian Banking GAAP and IFRS June 2015 Disclaimer Grupo Aval Acciones y Valores S.A. ( Grupo Aval ) is an issuer of securities in Colombia and in the United States,

More information

COMPARING REGULATION IN 21 CITIES AND 183 ECONOMIES

COMPARING REGULATION IN 21 CITIES AND 183 ECONOMIES COMPARING REGULATION IN 21 CITIES AND 183 ECONOMIES A PUBLICATION OF THE WORLD BANK AND THE INTERNATIONAL FINANCE CORPORATION COMPARING REGULATION IN 21 CITIES AND 183 ECONOMIES 2010 The International

More information

Hotel, Tourism and Leisure. Global leader in hospitality consulting. Latin America/Caribbean

Hotel, Tourism and Leisure. Global leader in hospitality consulting. Latin America/Caribbean TM Hotel, Tourism and Leisure Global leader in hospitality consulting Latin America/Caribbean TM Hotel, Tourism and Leisure Welcome to, the world s number one hospitality consulting network. We are the

More information

International Development

International Development AENA INTERNACIONAL DESARROLLO S,A Aena Internacional conducts its activity as a leading Spanish company in the management of aeronautical facilities for a total of 28 airports, located throughout Latin

More information

Results of Tourism Activity

Results of Tourism Activity Reporting Date: May 15, 2015 Results of Tourism Activity Mexico, March 2015 Costa, Oaxaca. San Blas, Nayarit. Centro de Convenciones Acapulco, Guerrero Loreto, Baja California Sur. Undersecretariat of

More information

BTG Pactual& CelfinSouthern Cone Andean Conference 2013. Santiago, June 5 and 6, 2013

BTG Pactual& CelfinSouthern Cone Andean Conference 2013. Santiago, June 5 and 6, 2013 BTG Pactual& CelfinSouthern Cone Andean Conference 2013 Santiago, June 5 and 6, 2013 COMPANY STRUCTURE Affiliates that consolidate 60% 68% 50% 100% Besalco Construcciones Besalco MD Montajes Kipreos Hospital

More information

ARGENTINA MISSIONLINE LOGISTICS SA EXCLUSIVE MEMBER. Name: SALTA 3503 LA LUCILA B1637BXG BUENOS AIRES - ARGENTINA. Phone: +54-11-4711-6586

ARGENTINA MISSIONLINE LOGISTICS SA EXCLUSIVE MEMBER. Name: SALTA 3503 LA LUCILA B1637BXG BUENOS AIRES - ARGENTINA. Phone: +54-11-4711-6586 ARGENTINA Address: MISSIONLINE LOGISTICS SA SALTA 3503 LA LUCILA B1637BXG BUES AIRES - ARGENTINA Phone : +54-11-4711-6586 Fax : +54-11-4711-6586 C.E.O. or General Manager: RICHARD KRAAYENBRINK Phone: +54-11-4711-6586

More information

COLOMBIA MINING OUTLOOK. Bogotá, mayo de 2011

COLOMBIA MINING OUTLOOK. Bogotá, mayo de 2011 COLOMBIA MINING OUTLOOK Bogotá, mayo de 2011 Colombia Basic Figures Location: North Corner of South America. Only SA Country with access to Atlantic & Pacific Oceans. Surface Area: 1,141,748 Km2. 15% of

More information

The Healthcare and Health Tourism. Sector

The Healthcare and Health Tourism. Sector The Healthcare and Health Tourism Sector Introduction For Bancolombia being an ally of healthcare institutions means to accompany, advise, and offer alternatives to make your projects become a reality.

More information

APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru

APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru 2008/SOM1/ECSG/SEM/018 APEC Information Privacy Principles in the Development of Outsourcing Business: Contact Center in Peru Submitted by: Peru Technical Assistance Seminar on International Implementation

More information

LAN AIRLINES Corporate Update. May, 2011

LAN AIRLINES Corporate Update. May, 2011 LAN AIRLINES Corporate Update May, 2011 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating results. These expectations

More information

Characteristics of Public Budgets in 5 Latin American Countries

Characteristics of Public Budgets in 5 Latin American Countries Characteristics of Public Budgets in 5 Latin American Countries The Latin American Network for Legislative Transparency is a network of civil society organizations in Latin America that promote transparency,

More information

Dealer. Línea Integral Autos Car Line Program. Autos (LIA): Línea Integral. The Wholesale Plan: The Retail Plan: Inventory 0 % Inventory Sales

Dealer. Línea Integral Autos Car Line Program. Autos (LIA): Línea Integral. The Wholesale Plan: The Retail Plan: Inventory 0 % Inventory Sales Automotive Sector Introduction Grupo Bancolombia is the financial partner for the Automotive Sector in Colombia and has a comprehensive portfolio designed according to your needs and those of agents that

More information

TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap

TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap 1. Launched in 2008, the government s Afghanistan National Strategy (ANDS) is a Millennium Goals (MDGs) based action plan and road map for

More information

arrangements typified by joint working between the public and private sectors covering all types of collaboration across the private-public sector

arrangements typified by joint working between the public and private sectors covering all types of collaboration across the private-public sector 20//204 PUBLIC PARTNERSHIP PRIVATE on Institutional Arrangement and Policy Implications Case Studies from the Republic of Korea November 8, 204 Seung-Jin Baek Economic Development Division UN ECLAC What

More information

Tito Yepes. Calle 78 No. 9 91 Tel: +57 1 325 9777 Skype: tyepes Email: tyepes@fedesarrollo.org.co

Tito Yepes. Calle 78 No. 9 91 Tel: +57 1 325 9777 Skype: tyepes Email: tyepes@fedesarrollo.org.co Tito Yepes Calle 78 No. 9 91 Tel: +57 1 325 9777 Skype: tyepes Email: tyepes@fedesarrollo.org.co Associated researcher at Fedesarrollo and international consultant in infrastructure, urban and regional

More information

Universidad de los Andes School of Engineering

Universidad de los Andes School of Engineering Universidad de los Andes School of Engineering Outline» The country and the city» Universidad de los Andes» The School of Engineering: - Structure and resources - Academic programs - Research-Industry

More information

The Mexican Economy: Facts and Opportunities

The Mexican Economy: Facts and Opportunities Manuel Sánchez Santander Global Fixed Income Summit London, England, September 20, 2012 Contents 1 Structural features 2 Recent developments and outlook 3 Inflation and monetary policy 4 Economic challenges

More information

The Brazilian Economy and Investment Opportunities

The Brazilian Economy and Investment Opportunities The Brazilian Economy and Investment Guido Mantega Minister of Finance Brazilian Infrastructure Concession Program US$ 235 billion in the coming years Largest concession program in recent decades Investment:

More information

SECURING FLORIDA S FUTURE WWW.FLORIDACHAMBER.COM. Securing Florida s

SECURING FLORIDA S FUTURE WWW.FLORIDACHAMBER.COM. Securing Florida s Securing Florida s Florida A State of Change Florida Trade and Logistics Study Phase I (2010) Document existing and project future trade flows Recommend strategies for Florida to compete globally Phase

More information

NATURAL GAS IN COLOMBIA

NATURAL GAS IN COLOMBIA NATURAL GAS IN COLOMBIA Diana Alejandra Franco Díaz 317816 January 30, 2009 30.01.2009 Natural Gas 1 15 years since the Natural Gas Mass Consumption Plan started Colombia is the 7th country in the world

More information

Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network

Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Mrs. Christy García Godos Naveda Head of Project December 2013 Diagnosis of the current situation Urban transport Buses Lack of

More information

Empresas Publicas de Medellin ESP August 11, 2015

Empresas Publicas de Medellin ESP August 11, 2015 Empresas Publicas de Medellin ESP August 11, 2015 Corporate Speakers Jorge Andres Tabares; EPM Group; Executive Vice President of Corporate Finance and Investment Management PRESENTATION Operator: Welcome

More information

MANUAL Arrival. Mobility THINK UPB! EN// International Relations Office THINK GLOBALLY... Formación integral para la transformación social y humana 1

MANUAL Arrival. Mobility THINK UPB! EN// International Relations Office THINK GLOBALLY... Formación integral para la transformación social y humana 1 THINK GLOBALLY... THINK UPB! International Relations Office Mobility MANUAL Arrival www.upb.edu.co Formación integral para la transformación social y humana 1 Contents General information.... 3 Information

More information

3Aena Aeropuertos. Aena Internacional. 2011 Annual report. Aena Internacional

3Aena Aeropuertos. Aena Internacional. 2011 Annual report. Aena Internacional Since beginning operations in 1998, has been managing airport infrastructures abroad. Today we are present in eight countries in Europe, America and Africa, strengthening Aena Aeropuertos position as the

More information

Colombia: Policy strategy for public financial management of natural disaster risk

Colombia: Policy strategy for public financial management of natural disaster risk Colombia: Policy strategy for public financial management of natural disaster risk Acronyms ANI Cat DDO CCE CEPAL CONPES FNGRD GDP GFDRR GoC IADB MHCP PND PPP SECO SGC UNGRD National Infrastructure Agency

More information

STRATEGIC PUBLIC TRANSPORTATION SYSTEMS PROGRAM

STRATEGIC PUBLIC TRANSPORTATION SYSTEMS PROGRAM DOCUMENT OF THE INTER-AMERICAN DEVELOPMENT BANK COLOMBIA STRATEGIC PUBLIC TRANSPORTATION SYSTEMS PROGRAM (CO-L1091) This document was prepared by the program team consisting of: Miroslava de Nevo, Program

More information

Public/Private Partnerships and the Public Procurement Process

Public/Private Partnerships and the Public Procurement Process ELEVATING OUR PROFESSIONALISM 48 TH ANNUAL CONFERENCE MAY 17-20, 2015 ORLANDO, FLORIDA Public/Private Partnerships and the Public Procurement Process By Roman Martinez, MPA, CPPO, CPPB DEFINITION OF P3S

More information

Options for South-South cooperation on transport NAMA s Large Commercial Vehicles Renovation Experiences in Colombia and México

Options for South-South cooperation on transport NAMA s Large Commercial Vehicles Renovation Experiences in Colombia and México Options for South-South cooperation on transport NAMA s Large Commercial Vehicles Renovation Experiences in Colombia and México Holger Dalkmann and Dario Hidalgo EMBARQ Hilda Martínez, Sayel Cortés, Gabriela

More information

10th ANIVERSARY SULAMERICA INVESTIMENTOS

10th ANIVERSARY SULAMERICA INVESTIMENTOS 10th ANIVERSARY SULAMERICA INVESTIMENTOS AGENDA 1. Perú Macro Environment 2. The need for a Pension System Reform 3. The Private Pension System 4. AFP Integra 5. Multifondos 6. The Future 1 1. Peru - Macro

More information

GABRIEL GONZALEZ-RUIZ A. Partner

GABRIEL GONZALEZ-RUIZ A. Partner GABRIEL GONZALEZ-RUIZ A. Partner Date of Birth: November 14 th, 1955 Nationality: Panamanian Academic Instruction: Bachelor of Law and Political Science, University of Panama, (1978). Thesis: "The Autonomy

More information

Chilean Insurance Market Overview

Chilean Insurance Market Overview Chilean Insurance Market Overview London, October 14 th, 2014 Jorge Claude Executive Vice President Asociación de Aseguradores de Chile Agenda 1. Chilean Economy & Insurance Market at a glance 2. Non-Life

More information

Policy for the Handling of Personal Data. Grupo Nutresa S.A.

Policy for the Handling of Personal Data. Grupo Nutresa S.A. Policy for the Handling of Personal Data Grupo Nutresa S.A. Objective, Scope and Definition OBJECTIVE Define the general guidelines to comply with Law 1581 of 2012 and Decree 1377 of 2013 in Colombia,

More information

AS ELIGIBLE FOR THE APP

AS ELIGIBLE FOR THE APP INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA IIRSA PROJECTS IDENTIFIED AT THE NATIONALLEVEL LEVEL AS ELIGIBLE FOR THE APP Presentation of and debate about the results of the

More information

Colombia: sustaining reforms over time

Colombia: sustaining reforms over time 26 Colombia: sustaining reforms over time Colombia s experience shows the importance of sustaining reform efforts over time and adjusting them to the changing needs of the economy, whether at the national

More information

Goiás. 340,086.698 sq.km. State Area. Goiânia. Capital. Capital population 1,333,767. State Population 6,154,996. Economically active population 63.

Goiás. 340,086.698 sq.km. State Area. Goiânia. Capital. Capital population 1,333,767. State Population 6,154,996. Economically active population 63. State State Area Capital 340,086.698 sq.km Goiânia Capital population 1,333,767 State Population 6,154,996 Economically active population 63.3% Populational growth rate 16.8% Unemployment rate 7.6% GDP

More information

Treatment of capital gains in mining projects in Ecuador

Treatment of capital gains in mining projects in Ecuador Treatment of capital gains in mining projects in Ecuador September 2015 CAPITAL GAINS TA IN LATIN AMERICA Is the indirect disposal of shares taxed? Country Taxes Does not tax Brazil Argentina Chile Colombia

More information

Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe

Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe Consejo Mundial de Energía Foro Biregional de América del Norte y de América Latina y el Caribe JUNIO DE 2006 Disclaimer Safe harbor statement under the Private Securities Litigation Reform Act of 1995:

More information

ANNEX III Quantitative Restrictions (Chapter 11)

ANNEX III Quantitative Restrictions (Chapter 11) ANNEX III Quantitative Restrictions (Chapter 11) Annex III 1. The Schedule of a Party sets out the non-discriminatory quantitative restrictions maintained by that Party pursuant to Article 11.6. 2. Each

More information

Marine Coastal Strip (MCS): Projected investments in logistics infrastructure

Marine Coastal Strip (MCS): Projected investments in logistics infrastructure Marine Coastal Strip (MCS): Projected investments in logistics infrastructure July 2013 Maritime Coastal Strip: Projected Investments in logistics infrastructure Project Amount (US$ m) Total (US$ m) Estimated

More information

Brazil Economic Overview

Brazil Economic Overview Brazil Economic Overview Brazilian American Chamber of Commerce of Florida Alexandre Tombini Governor March 26, 2012 1 Brazil Brazil is among the largest countries in terms of territory, population and

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION INVESTOR PRESENTATION AUGUST 2014 1 2 DISCLAIMER THIS DOCUMENT HAS BEEN PREPARED BY PARQUE ARAUCO FOR THE PURPOSE OF PROVIDING GENERAL INFORMATION ABOUT THE COMPANY. The Company assumes no responsibility

More information

Routes Development in Lima

Routes Development in Lima Routes Development in Lima November, 2008 Contents Ideal location First Steps Initial Conclusions Strategy Marketing activities Results Challenges 1 PERU, A SHORT OVERVIEW Peru is ideally situated PERU

More information

Ministerio de Comercio, Industria y Turismo República de Colombia COLOMBIA. SERGIO DIAZ-GRANADOS GUIDA Ministry of Trade, Industry, and Tourism

Ministerio de Comercio, Industria y Turismo República de Colombia COLOMBIA. SERGIO DIAZ-GRANADOS GUIDA Ministry of Trade, Industry, and Tourism COLOMBIA SERGIO DIAZ-GRANADOS GUIDA Ministry of Trade, Industry, and Tourism Milano, March 2012 1 Contents Latin America, a promising region Colombia, in Latin America Colombia - Italy Relationship 2 Latin

More information

Bank Panel. Colombia 1 / 15. Sociodemographic profile Real delivery Panel IR% Total panelists: 6.022 77,8% Sex Man 3.031. Features

Bank Panel. Colombia 1 / 15. Sociodemographic profile Real delivery Panel IR% Total panelists: 6.022 77,8% Sex Man 3.031. Features 1 / 15 Bank Panel Colombia Features Panel size (ISO): 57.966 People profiled (ISO): 17.064 Estimated response rate (ISO): 45% Updated: 15/12/2014 Size (ISO): number of panelists according to ISO 26362

More information

GENERAL INFORMATION. Area (km2) 406.752. Population 6.672.631 (2012) Ciudad del Este, Encarnación y Concepción. Other important cities

GENERAL INFORMATION. Area (km2) 406.752. Population 6.672.631 (2012) Ciudad del Este, Encarnación y Concepción. Other important cities Paraguay GENERAL INFORMATION GENERAL INFORMATION Area (km2) 406.752 Oficial Languages Currency Spanish and Guarani Guaraní (Gs.) Population 6.672.631 (2012) GDP in US Millions Capital Other important cities

More information

3 rd Brazil - China Capital Markets Forum

3 rd Brazil - China Capital Markets Forum 3 rd Brazil - China Capital Markets Forum Ilan Goldfajn Chief Economist, Itaú Unibanco Partner, Itaú BBA August 30 th, 2012 In Brief World: consolidating a scenario of low growth. Slow recovery in the

More information

Brazil Economic Overview

Brazil Economic Overview Brazil Economic Overview New York Alexandre Tombini Governor February 2013 1 Macroeconomic Policy and Social Development Macroeconomic fundamentals, combined with adequate prudential policies and strong

More information

Enjoy S.A. June 2013

Enjoy S.A. June 2013 Enjoy S.A. June 2013 Executive summary Enjoy: Leader in the Chilean gaming industry, with a successful track record dating back over 37 years Comprehensive casino, hotel, restaurant, bar, event, show and

More information

Photo Credit: TURISMO MADRID. A Special Report on the REGION OF MADRID

Photo Credit: TURISMO MADRID. A Special Report on the REGION OF MADRID Photo Credit: TURISMO MADRID A Special Report on the REGION OF MADRID Key Facts Madrid is one of the world s preferred locations for foreign investment due to its position as a leading global financial

More information

Coca Cultivation survey 2012

Coca Cultivation survey 2012 Coca Cultivation survey 2012 ACKNOWLEDGEMENTS The following organizations and individuals contributed to the implementation of the 2012 coca cultivation survey in Colombia and to the preparation of this

More information

U-Sapiens Ranking Colombia 2010_2

U-Sapiens Ranking Colombia 2010_2 U-Sapiens Ranking Colombia 2010_2 By Carlos-Roberto Peña-Barrera (1977-Colombia-) editor@sapiensresearch.org Abstract The main objectives of the investigation are the following: (1) that the national and

More information

REPUBLIC OF COLOMBIA

REPUBLIC OF COLOMBIA REPUBLIC OF COLOMBIA MINISTRY OF ENVIRONMENT, HOUSING AND TERRITORIAL PLANNING GLOBAL METHANE INITIATIVE Landfill Subcommitte Meeting Venice, Italy 10th November, 2010 M2M Activities in Colombia Project

More information

REPORT TO MINISTERS Fifth Ministerial Meeting of the Pathways to Prosperity in the Americas Initiative Cali, Colombia

REPORT TO MINISTERS Fifth Ministerial Meeting of the Pathways to Prosperity in the Americas Initiative Cali, Colombia REPORT TO MINISTERS Fifth Ministerial Meeting of the Pathways to Prosperity in the Americas Initiative Cali, Colombia As the fifth Pathways to Prosperity Ministerial in Cali, Colombia, approaches, the

More information

CALL FOR APPLICATIONS For mobility starting in autumn 2014 Application deadline 20. December 2013

CALL FOR APPLICATIONS For mobility starting in autumn 2014 Application deadline 20. December 2013 CALL FOR APPLICATIONS For mobility starting in autumn 2014 Application deadline 20. December 2013 EULAlinks launches a Call for Applications on 30.October 2013 for mobility starting at the earliest in

More information

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith

Thailand focus 2014 Competencies & Growth potentials. Arkhom Termpittayapaisith Thailand Focus 2014 What s new in Thailand s Economic Development Strategy Thailand focus 2014 Competencies & Growth potentials Arkhom Termpittayapaisith Secretary-General Office of the National Economic

More information

Argentina s Economy: A death foretold again, or a surprise rescue? Claudio M. Loser Centennial- Latin America March 2014

Argentina s Economy: A death foretold again, or a surprise rescue? Claudio M. Loser Centennial- Latin America March 2014 Argentina s Economy: A death foretold again, or a surprise rescue? Claudio M. Loser Centennial- Latin America March 214 Argentine performance tended to be ahead the world and even the Emerging Economies

More information

INSTRUCTIONS FOR THE OFFICIAL PRESS DELEGATIONS AND MEDIA COMPANIES

INSTRUCTIONS FOR THE OFFICIAL PRESS DELEGATIONS AND MEDIA COMPANIES INSTRUCTIONS FOR THE OFFICIAL PRESS DELEGATIONS AND MEDIA COMPANIES TABLE OF CONTENTS 1. PRESS COORDINATION 2. ACCREDITATION 3. GRAND PRESS ROOM - CARIBBEAN NAVAL MUSEUM 4. TELECOMMUNICATION SERVICES 5.

More information

COSIPLAN PLAN DE TRABAJO 2015 PRESIDENCY PRO TEMPORE URUGUAY 2014-2015

COSIPLAN PLAN DE TRABAJO 2015 PRESIDENCY PRO TEMPORE URUGUAY 2014-2015 PRESIDENCY PRO TEMPORE URUGUAY 2014-2015 1 WORK PLAN 2015 COSIPLAN Coordinating Committee 2 ACTION 1.1: Indicative Territorial Planning Methodology and Process Follow up on: COSIPLAN Projects Planning

More information

Corporate Presentation 2014

Corporate Presentation 2014 Corporate Presentation 2014 Grupo Éxito Grupo Éxito is the leader retail Company in Colombia and Uruguay with Net Revenues of COP$10.7 billion in 2013 and 42% share of the formal market with a true nation-wide

More information

INFONAVIT. Alejandro Murat Hinojosa

INFONAVIT. Alejandro Murat Hinojosa INFONAVIT Alejandro Murat Hinojosa INSTITUTO DEL FONDO NACIONAL DE LA VIVIENDA PARA LOS TRABAJADORES This presentation may contain forward looking statements. These statements may include the plans and

More information