PRE- FEASIBILITY REPORT

Similar documents
Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

PRE - FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

PRE- FEASIBILITY STUDY REPORT

Pre- FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

Pre- FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PROPOSED TERMS OF REFERENCE

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PREFEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

Project Details- Minor Minerals (Other Than Sand)

PRE FEASIBILITY REPORT

Project Details- Minor Minerals (Other Than Sand)

Environmental Management Plan

ENVIRONMENT MANAGEMENT PLAN

M/s. Karshanbhai Bhagvanbhai Rabari

Environment Management Plan

Project Details-Minor Minerals (Other Than Sand)

Environment Management Plan

P.F.R. TABLE OF CONTENTS

ENVIRONMENTAL MANAGEMENT PLAN :-

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: Ha)-B2 Project

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

Pre-feasibility Report

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

ENVIRONMENT MANAGEMENT PLAN

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Form -1 Mining Plan & Pre-feasibility Report

ENVIRONMENTAL MANAGEMENT PLAN

[SIMPLIFIED MINING SCHEME] Index

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

ENVIRONMENTAL MANAGEMENT PLAN

Environment Management Plan

CHANDAM7AIL,P SAND DEPOSIT

ENVIRONMENT MANAGEMENT PLAN

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn: TPa

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Form -1 Mining Plan & Pre-feasibility Report

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

NIMAPALLI STONE QUARRY

PRE FEASIBILITY REPORT

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

Proposed Terms of Reference for EIA studies

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Mineral Granite. Lease Area Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

ENVIRONMENTAL MANAGEMENT PLAN

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

INDEX 1.0 EXECUTIVE SUMMARY... 23

How To Conduct An Environmental Impact Assessment

Proposed Terms of Reference for EIA studies

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

PRE-FEASIBILITY REPORT

LORE SILICA SAND MIINE

FORM i, pre FEasiBilitY REpORt. EnViROnMEnt ManaGEMEnt plan FOR. area= proposed production: - 36,000 tpa. project COst: - 10 lacs

Project Details-Minor Minerals ( Rajula Building Stone)

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION FOR ENVIRONMENTAL CLEARANCE

Environmental Management Plan

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

Andhra Pradesh Latitude & Longitude N E Toposheet No 56 K/6, 56 K/7, 56 K/10 & 56 K/611

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

(IV) Proposed Terms of Reference for EIA Studies

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

For Building Stone Quarry

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY


Transcription:

PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0

1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan within 5km of the study area) Project or activity 1(a) as per EIA Notifications 2006, and amended thereof. Summarized Tabular Representation: Project Name Dunga ki Nangal (M.L No.- 224/2008) Quartz, Feldspar and Silica sand Mine Applicant M/s Regaliya Minerals Pvt. Ltd. Location of mine Area Latitude Longitude Village- Dunga ki Nangal Tehsil -Neem ka Thana District - Sikar State - Rajasthan 4.9391 ha. 27 50'30.5" N to 27 50'53.5" N 75 57'3.47" E to 75 57'14.31"E Topo sheet number GT Sheet No. 45M/13 Minerals of mine Total Mineable reserves Life of mine Cost of project Proposed production of mine Method of mining No of working days Quartz, Feldspar and Silica sand 35,21,800 Tonnes 13 years 1 crore 3,03,130 TPA Opencast Semi-Mechanized 300 days Water demand and source Total water requirement is about 3.1 KLD = 1.8 KLD (Drinking & Domestic Uses) + 0.6 KLD (Plantation) + 0.7 KLD (Dust Suppression). Man power 40 Nearest railway station Nearest State highway/national highway Nearest airport Dabla Railway Station, about 6 km in North West direction SH 37-B about 6 km away in S direction from the site. Jaipur Airport about 104 km in South direction Seismic zone Zone III as per IS 1893 (Part I): 2002 2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 1

2.1 Identification of Project and Project Proponent Dunga ki Nangal (M.L No.- 224/2008) Quartz, Feldspar and Silica sand Mine is the proposed project for Environmental Clearance, over an area of 4.9391at Village - Dunga ki Nangal, Tehsil -Neem ka Thana, District -Sikar, State - Rajasthan. The Mine lease has been granted in favor of M/s Regaliya Minerals Pvt. Ltd., address: R/o A-28, Anita Colony, Bajaj Nagar, Jaipur, Rajasthan, dated- 25 January 2010 for a period of 30 years (Lease Deed for the same is attached as Annexure-I). Mining scheme in support of proposed project for a period of 5 years has been prepared and approved with vide order no. SME/JP/MP 129/15 dated 25-06-15, attached as Annexure II. Aravalli certificate by mining engineer showing that mine lease area does not fall in Aravali is attached as Annexure III. A composite Map showing mine leases in 500 m radius of this mine is attached as Annexure IV. 2.2 Brief description of nature of project: The project has been proposed for mining of Quartz, Feldspar and Silica sand through open cast semi mechanized method. 2.3 Need for the Project and Its Importance to the Country or Region Proposed mineral is mainly the basic raw material used in the manufacturing different types of glass, plate glass, wired, bottled glass, vacuum flasks, glass shells etc. Therefore with increasing demand mineral excavation is needed. 2.4 Demands-Supply Gap The demand for minerals is ever growing with the growth of the Glass industries in our country. The mineral is used in the manufacturing different types of glass. The requirement for the mineral is always high in the nearby cities and towns. Therefore there is always a good demand of the mineral in the domestic market. 2.5 Imports vs. Indigenous Production Development needs will be met only through indigenous produced Mineral against the high cost of imported material. Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 2

2.6 Export Possibility There is no proposal to export the proposed minerals. However, production from the mine will fulfill the needs of the region and surplus if any, will be considered for export. 2.7 Domestic/ Export Markets Domestic Market Being a shiny mineral, the principal use of this is in all type of glass ware industries and products. Export Market The proposed mining activity is for indigenous consumption only for glass products etc. 2.8 Employment Generation (Direct and indirect) The proposed mining activity will provide both direct and indirect employment to local and nearby villagers. 3 PROJECT DESCRIPTION 3.1 Type of Project Including Interlinked and Interdependent Projects, If Any. The project has been proposed for mining of Quartz, Feldspar and Silica sand through open cast semi mechanized method categorized as category A. This is an independent mining project and there are no interlinked projects involved. 3.2 Location The mining lease area is located Village - Dunga ki Nangal, Tehsil -Neem ka Thana, District -Sikar, State - Rajasthan. The mining lease area falls in G.T sheet No. 45 M/13. 10 km radius buffer map of study area is attached as Annexure V. Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 3

Latitude : 27 50'30.5" N to 27 50'53.5" N Longitude : 75 57'3.47" E to 75 57'14.31"E Fig 1: Location Map of proposed Project site Project Area Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 4

3.3 Details of Alternate Sites Mining is site specific so no alternative site is proposed. 3.4 Size or magnitude of operation The mining lease has been granted over an area of 4.9391 ha, with a peak production of 3,03,130 tonnes per annum. During five year total production of mineral shall be approximately 10,80,250 Tonnes. 3.5 Project description with process details: 1 2 3 4 Site prepration (demarcation by pillars) Excavation of mineral Loading of Mineral Transportation 3.5.1 Method of Mining Method: The proposed development will be by semi mechanized open cast method of mining Working days: Considering holidays and days of weekly rest and days of peak rains and other unexpected off days, total 300 days are considered as working days. Bench height and width: The bench height and width will remain 6 m each at end position. Development will be done in slices of 3m each. Drilling and Blasting: Blasting will be done by 3m deep holes. Drilling will be done by drifter using 45mm bit for 3m effective depth of hole. Blasting can be done using various type of explosive mainly slurry explosive. Haul Roads: Haul road with 1 in 16 gradients are proposed up to the workings for movements of laborers and vehicles. Loading: the loading of mineral and waste will be hydraulic loaders. Transportation: the waste from face to dump site will be transported by tippers/ tractor trolleys and mineral from stock to crushing unit will be Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 5

transported by trippers and trolleys. From crushing unit the mineral will be dispatched in hired trucks. Face slope and ultimate slope: the face slope is proposed 85 degree whereas ultimate slope will be 45 degree. The details of machinery, to be used Machineries Capacity Nos. Air compressor for drilling 120 CFM 1 Hydraulic Excavator Loading capacity 0.3cu.m or 1.1 cu.m 1 or 2 Jack Hammer 1.5 m deep holes 1 Tripper Tractor trolley 20 tonnes 4 tonnes 6 4 Tractor with tank 4000 lts capacity 1 Production details The Proposed year wise excavation: Years Total saleable Minerals in tonnes 1 st Year 143210 2 nd Year 167080 3 rd Year 232370 4 th Year 234460 5 th Year 303130 Total 10,80,250 3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/s, Mode of Transport of Raw Material and Finished Product No raw material will be required for production of minerals. The mine mineral shall be collected in the mineral stack yard and then sorted over their before its final dispatch to industries through trucks. The waste generated shall be carried through trippers to the dump yard. 3.7 Resource Optimization/ Recycling and Reuse Not envisaged. Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 6

3.8 Availability of Water Its Source, Energy/ Power Requirement and Source 3.8.1 Water Requirement Water for domestic, dust suppression and plantation is required to be 3.1 KLD. 3.8.2 Power The operation will be done only from sun rise to sun set hence there is no power requirement for the project at site. Only diesel equipment will be used. 3.9 Quantity of wastes to be generated (Liquid and Solid) and Scheme for their Management/Disposal 3.9.1 Solid Waste Generation& its Disposal The waste is of quartzite, schist, scree etc. The total waste to be handled in five years is as follows. Proposed Waste to be generation Year Waste generation First year 15910 Second year 18560 Third year 25810 Fourth year 26060 Fifth year 33670 Total 1,20,010 The existing dump is in 0.06 hectare. The height is 10m. in two terraces of 5m each. The waste will also be used in construction and maintenance of approach road from canal road. 3.9.2 Liquid Effluent Not applicable. 4.0 SITE ANALYSIS 4.1 Connectivity The applied lease is about 1 km South East of village Dunga ki Nangal. The village is connected by a mettalled road further connecting SH 37 B Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 7

in South direction. 4.2 Landform, Land use and Land ownership 4.2.1Landform The applied lease area comprises of Govt. land. 4.2.2 Land use The applied lease area has a undulating topography. There is no village or human settlement in the lease area. Permanent vegetation in the area is also very less prominent. 4.2.3 Land Ownership The applied lease area comprises of govt. land. 4.3 Topography The applied lease area has a undulating topography. The highest contour is of 372mRL and lowest is of 371 mrl. 4.4 Existing land Use Pattern The applied lease area is having govt. Land. In general the area has small mounds. There is no village or human settlement in the lease area. Permanent vegetation in the area is also very less prominent. Also there is no eco sensitive area present near the lease area. 4.5 Existing Infrastructure No existing infrastructure within lease area. 4.6 Soil Classification The soils of the district is predominantly light textured, weak structured, well drained alluvial and eolian in nature. These soils forms a part of alluvial plains of mendha, kantli, dohan, krishnawati and sabi rivers in the southern east and central part of the district. In general the soils are very deep, coarse textured, light yellowish brown to dark yellowish brown, non calcareous and excessively drained. Soils of south are comparatively fine textured and deep, sandy loam to clay loam. 4.7 Climate data from Secondary Sources: The district has a hot summer, scanty rainfall, a chilly winter season and a general dryness of the air, except in the brief monsoon season. The maximum and minimum temperatures are 47 to 48 and 1 to 0 degrees Celsius, respectively. The average temperature around the year is about Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 8

16 to 20 degrees Celsius. The normal rainfall, mostly received from the southwest monsoon, is 459.8 mm 4.8 Social Infrastructure available: 1) The applied mine is not facilitated with power line. 2) The state transport buses and private buses are available up to village Dunga ki Nangal and mine site. 3) The nearest telephone is available at near village Dunga ki Nangal. 4) The nearest police station applicable is at Patan. 5) Permanent offices and other buildings at mine proposed. 6) Mobile Phone connectivity is available at mine site. 7) The Post office applicable for the area is Dunga ki Nangal. 8) Medical facility is available at Patan. 9) No National Park/sanctuary falls within 10 km of the lease area. 5.0 PLANNING BRIEF 5.1 Planning Concept The proposed project is for the mining of Quartz, Feldspar and Silica sand stone. Mining is proposed to be done through semi mechanized method. Rajasthan Minor Mineral Rules & MCDR will be followed in the mining. Mining will be done in benches and will not intersect the ground water table. 5.2 Land use Planning Details of land use are given below: S.No Land Use Pattern End of 5th Year(hectare) 1 Area to be Excavated 4.20 2 Storage of Top soil 0.01 3 Overburden Dump 0.06 4 Mineral/Sub grade stack 0.00 5 Infrastructure 0.01 6 Roads 0.04 7 Green Belt 0.20 8 Reclamation 0.0 9 Total Disturbed Land 4.82 Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 9

5.3 Assessment of Infrastructure demand (Physical & Social) On the basis of the preliminary site visit, the infrastructure demand in the village was assessed on the basis of need and priority. The health infrastructure of the study area requires improvement. The lack of medical facilities needs improvement. 5.4 Amenities/Facilities Workshop For maintenance of machinery it is proposed to establish a workshop nearby to mine site welding, puncture etc. Power supply Electric power supply does not exist at mine site and it is proposed to take connection. Water Supply A tractor mounted tanker is proposed for supply of water to mining work, spraying, watering the plants and drinking purposes. First Aid A first aid facility is proposed at Mines office. Rest Shelter Rest shelter is proposed near mine site. Latrines and Urinals At the mine site urinal and Bath is proposed for staff and labours. 5.4.1Budget for facilities provided to Labours Sl. No. Scheme Capital Cost (in Rs) Annual Recurring Cost (in Rs) 1 Drinking water facility 15,000 2 Shelter 15,000 3 Health facility 15,000 4 Education for children 20,000 5 sanitation facility 15,000 Total 30,000 50,000 Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 10

6.0 PROPOSED INFRASTRUCTURE: 6.1Industrial Area (Processing Area) No infrastructure is proposed. 6.2 Residential Area (Non Processing Area) As local workers from nearby areas will be engaged for the mining activity, no residential area/ housing are proposed. 6.3 Green Belt Green belt will be developed around the lease area, approach roads and nearby vicinity. 6.4 Social Infrastructure No social Infrastructure is proposed. However, 2% of project cost will be utilized for the development of the exiting social infrastructure of the area, depending upon the need of the local residents. SI. No. Activity (In Rs.) 1 Health camps and free medicine 50,000 2 Educational support poor 80,000 students specially girls 3 Sports camps and products for 70,000 students in need TOTAL (Annual) 2,00,000 Budget for Corporate Social Responsibility (CSR) 6.5 Connectivity: The applied lease is about 1 km South East of village Dunga ki Nangal. The village is connected by a mettalled road further connecting SH 37 B in South direction. 6.6 Sewerage System Domestic waste water will be treated into septic tank followed by soak pit 6.7 Industrial Waste Management Not applicable Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 11

6.8 Solid Waste management The waste is of quartzite, schist, scree etc. The total waste to be handled in five years is as follows. Proposed Waste to be generation Year Waste generation First year 15910 Second year 18560 Third year 25810 Fourth year 26060 Fifth year 33670 Total 1,20,010 The existing dump is in 0.06 hectare. The height is 10m. in two terraces of 5m each. The waste will also be used in construction and maintenance of approach road from canal road. Apart from the above waste, a small amount of municipal waste will be generated which will be disposed of by proper methods. 6.9 Power Requirement & Supply/Source The operation will be done only from sun rise to sun set hence there is no power requirement for the project at site. The electricity line passes out side near the M.L area. The electricity facility is not available at mining lease area. Only diesel equipment will be used. 7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN As no personnel are expected to be migrated due to mining in the lease area and the adjoining region is also having a good mineral potential, the rehabilitation of the employees is not going to be a problem. The workers and other staff can get job in the neighboring areas after the end of life of mine. The applicant shall also try for employment of the workers. 8.0 PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely Date of Start of Construction and Likely Date of Completion No construction activities are proposed. The mining activity will commence only after receiving environmental clearance and other statutory clearance. Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 12

8.2 Estimated Project Cost along with analysis in Terms of Economic Viability of the Project Estimated project cost is Rs. 1 crore. The lessee has all the mining equipments used for the scientific mining. The mine is Eco-Friendly. Economically the ore is mineable as compared to overburden thickness. The entire mineable reserve as estimated is categorized as 121. Environmental Management Plan The environmental management plan consists of the set of mitigation, management, monitoring and institutional measures to be taken during the implementation and operation of the project, to eliminate adverse environmental impacts or reduce them to acceptable levels. The present environmental management plan addresses the components of environment, which are likely to be affected by the different operations in the mine area. SI. No. 1 2 Budget Allotted for the EMP Measures Pollution Control i) Dust Suppression ii) Garland drain & ground dump Pollution Monitoring i) Air pollution ii) Water pollution Capital cost (in Rs.) Annual recurring cost (in Rs.) -- 50,000 /- 50,000 /- -- 40,000 /- 40,000 /- 3 Green Belt 100,000 /- 70,000 /- Total 1,00,000 /- 2,50,000 /- 9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The proposed mine will bring economical benefits to the state by the way of Royalty for mineral and to the local people by way of direct and secondary employment opportunities. Minerals will be used for a variety Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 13

of structural and decorative purposes. The material is in high demand at the local market for glass industry. The project will bring about socio-economic improvement of the area and will prove beneficial to the area. **************** Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 14