VOIDSPAN Port Anchors

Similar documents
STAIRWAY Building code information for one- or twofamily dwellings and townhomes.

Chorus UFB Services Agreement Bitstream Services: Service Description for UFB Handover Connection

MSB FINANCIAL CORP. MILLINGTON BANK AUDIT COMMITTEE CHARTER

Serv-U Distributed Architecture Guide

Accident Investigation

Chabot College Design Guidelines for Office Space

Rainwater Harvesting Incentive Program

User s Guide. Moduc Elements MagiCAD plugin

WINDOW REPLACEMENT Survey

TYPICAL STERILIZATION PROCESS IN AUTOCLAVE FOR POLYPROPYLENE BAGS AND/OR POLYPROPYLEN BOTTLES

Rochester Downtown Façade Improvement Grants Program

The user authentication process varies from client to client depending on internal resource capabilities, and client processes and procedures.

December 6 th Ballot Proposition School Facilities Preservation

Exercise 5 Server Configuration, Web and FTP Instructions and preparatory questions Administration of Computer Systems, Fall 2008

Exercise 5 Server Configuration, Web and FTP Instructions and preparatory questions Administration of Computer Systems, Fall 2008

TELE GREENLAND A/S (Referred to as TELE-POST) Wholesale Data Services. Annex C6. National IP Service. Service Description

Software and Hardware Change Management Policy for CDes Computer Labs

State of Wisconsin Division of Enterprise Technology (DET) Distributed Database Hosting Service Offering Definition (SOD)

Technical Requirements Summary

Rehabilitation Psychology Minimum Degree Requirements and Satisfactory Progress Chart March 2014

June 29, 2009 Incident Review Dallas Fort Worth Data Center Review Dated: July 8, 2009

Fraser Surrey Docks Adds Compliance System to the Container Gate Reservation System (GRS)

1.3. The Mean Temperature Difference

NEW LEVERLESS TYRE CHANGERS

FHWA Compliance Assessment Program (CAP) Guidance

THE FACULTY OF LAW AND SOCIAL SCIENCES. Department of Economics and Department of Development Studies

CMS Eligibility Requirements Checklist for MSSP ACO Participation

Best Practice - Pentaho BA for High Availability

MITEL OPEN INTEGRATION GATEWAY (OIG): END- CUSTOMER DEVELOPMENT & LICENSING

Duration of job. Context and environment: (e.g. dept description, region description, organogram)

THIRD PARTY PROCUREMENT PROCEDURES

EXTENDED WARRANTY PROMOTIONAL CAMPAIGN

FundingEdge. Guide to Business Cash Advance & Bank Statement Loan Programs

Office Use Only Account # Approved By:

Contact Center. Service Description. Maria Apse Senior Product Manager 2/11/2013

GFWC Leadership Education and Development Seminar (LEADS)

Terminations Standard Terminators (Type1) allow Multi-Gard to be terminated into a standard pre-cast termination for Type C or Type 40 PVC.

Wireless Light-Level Monitoring

Oracle Social Engagement & Monitoring Professional Services Descriptions. July 23, 2015

Michigan Transfer Agreement (MTA) Frequently Asked Questions for College Personnel

Malpractice and Maladministration Policy

COUNTRY REPORT: Sweden

expertise hp services valupack consulting description security review service for Linux

Tree Permit Process Intake: (A) (B) (C) (D) (A combination of checklists may be applicable depending on the scope of work) Review:

Using PayPal Website Payments Pro UK with ProductCart

FINRA Regulation Filing Application Batch Submissions

Info folder for the certification as Junior Project Manager (IPMA Level D )

efusion Table of Contents

Oracle Social Marketing Professional Services Descriptions. July 23, 2015

BME Smart-Colo. Smart-Colo is a solution optimized for colocating trading applications, built and managed by BME.

Canby Façade Improvement Program

WHAT YOU NEED TO KNOW ABOUT. Protecting your Privacy

Proposal for Development & Implementation of. Integrated Website Solution. For. Tej Shree. By: The Web Creation Delhi, INDIA

Early Childhood Development Services. Early Childhood Education Assistance Program. Terms and Conditions

TERMS AND CONDITIONS. *Revised December 21, 2015 ROUTING INSTRUCTIONS FOR U.S. SUPPLIERS SHIPPING WITHIN THE UNITED STATES

Adductor Tendonopathy Rehabilitation Programme

Template on written coordination and cooperation arrangements of the supervisory college established for the <XY> Group/<A> Institution

REQUEST FOR QUOTATIONS [insert reference number: i.e Name of Entity/ DDMMYY (deadline date)]

Inspections & Licensing

Volume THURSTON COUNTY CLERK S OFFICE. e-file SECURE FTP Site (January 2011) User Guide

Community Support Programs N9 Organizational Internship Program

1)What hardware is available for installing/configuring MOSS 2010?

CE 566 Project Controls Planning and Scheduling

Woodstock Multimedia, INC. Software/Hardware Usage Policy

Service Desk Self Service Overview

Information Services Hosting Arrangements

PIROUETT! June 2015 GENERALITIES

Systems Support - Extended

Customer no.: enter customer no. Contract no.: enter contract no.

How To Install Fcus Service Management Software On A Pc Or Macbook

POLICY. Environmental Standards for Facility Operations and Maintenance. Board Received: January 26, 2015 Review Date: February 2019

Security in Business and Applications. Madison Hajeb Stefan Hurst Benjamin Von Slade

STEP 1: Student Application Submission

Updated PT, OT, and ST Benefit Changes for Acute Services for Texas Medicaid Effective January 1, 2014

Grants Online. Quick Reference Guide - Grantees

Maritime and Coastguard Agency LogMARINE INFORMATION NOTE. Revalidating a Certificate of Competency: New Requirements for Masters and Officers

Occupational Therapy

CS 360 Software Development Spring 2008 Tuesdays and Thursdays 3:30 p.m. 4:45 p.m.

Internet Service Definition. SD012v1.1

Case Scenarios and Sample Claim Form Entries for Outcomes Reporting for Medicare Part B Therapy Services

Point2 Property Manager Quick Setup Guide

Satisfactory Academic Progress Policy

Title IV Refund Policy (R2T4)

POSITION DESCRIPTION. Classification Higher Education Worker, Level 7. Responsible to. I.T Manager. The Position

SBA 504 Financing. Long Term Asset Financing Made Possible. Glen Heller, Relationship Manager Nancy Sheridan, Specialty Finance Officer

DATE APPROVED March Version Date Comments / Changes 1.0 March 2011 Initial policy released

Emergency Preparedness Plans. Page 1 of 19

FOCUS Service Management Software Version 8.5 for Passport Business Solutions Installation Instructions

The New Supreme Court Civil Rules 7 Major Changes

UCONS Ductless Heat Pump Sacramento Field Demonstration Draft Metering Protocol Last update:

State of Wisconsin. File Server Service Service Offering Definition

Electronic Data Interchange (EDI) Requirements

Grants Online. Quick Reference Guide Grant Recipients

CITY OF NORTH RICHLAND HILLS

edoc Lite Recruitment Guidelines

Manual. Adapter OBD v2. Software version: NEVO DiegoG Full compatibility with OBD Adapter v2 2.0B

COE: Hybrid Course Request for Proposals. The goals of the College of Education Hybrid Course Funding Program are:

Yale Shared Services. Benefits of Creating a Purchase Order: Procure to Pay Tool Kit

LeadStreet Broker Guide

GREEN MOUNTAIN ENERGY COMPANY

Transcription:

PRODUCT DESCRIPTION Descriptin/ Uses The VidSpan Prt Anchr is a patented (US, CAN, EUR) stainless steel sck type anchr that spans acrss internal vids, tying separated leafs f masnry tgether while prviding an integral prt thrugh which the vid can be inspected, cleaned, pre-wetted and then gruted. These anchrs cme in a wide variety f types and cnfiguratins t best meet the needs f the prject, in lengths accrding t rder. They are manufactured in Canada fr VidSpan under a licensing agreement by Cintec America, Inc. Unique Features All stainless steel cnstructin. Perfrated and single r duble rdded pen shank anchrs available t suit lading, gruting cnditins and injectin pressures. Cintec anchr scks are available at either r bth ends, with bearing plates available in lieu f r in additin t the scks. Remvable threaded rds scket int uter ends f anchr in rder t directly attach dunnage t cunter injectin pressures- The prt anchr dubles as the fastening system fr the dunnage, aviding the need fr external bracing. Duble ended anchrs available where dunnage needed n bth faces f masnry. Anchr shear capacity nt reliant n dwel actin but based upn shear frictin haunch thery, with the maximum tie capacity prvided at the pint f best grut cmpactin- at the anchr. N shear lag, n bending r crushing, nly direct fixatin. Hllw r pen shank allws insertin f secndary rds fr additinal shear capacity, and electric heating wands if needed fr installatin during cld weather cnditins. VidSpan CG70 Grut has been designed t wrk with Prt Anchrs. VidSpan CG70 Grut is a breathable, ultra- lw shrinkage, flwable, self cnslidating grut fr use in filling cracks and vids in lder masnry structures. Based n a pzzlanic hydraulic lime PHLc as per ASTM C1707, it is a lw-t-mderate strength adhesive, filler and mrtar replacement material. Uses Include lw pressure injectin f cracks and vids in mass masnry cnstructin using Prt Anchrs; and cavity-gruting and gravity feeding and lw pressure pump filling f vids and cracks as narrw as 1/16 in width.

VidSpan Prt Anchrs Sheet # 2 f 6 Anchr Ordering Anchr Order Frms are available and easy t use, requiring anchr type designatin and A, B and C dimensins based upn field measurements. We prvide length calculatin sheets with rder frms, alng with engineering guidelines. Cintec s wn Presstec Grut is supplied with the anchr and must be used t fill the anchr scks. Anchr Types/ Open Shank Series The VS-3 is fr use where stay-in-place surface munts are nt f aesthetic r functinal cncern, where vid cleaning is needed, and there is sufficient depth at the back layer t develp lad thrugh adhesin.

VidSpan Prt Anchrs Sheet # 3 f 6 The VS-4 is fr use where anchr frnt face must be cncealed r recessed, where vid cleaning is needed, and there is sufficient depth at the frnt and back layers t develp lad thrugh adhesin. The VS-34 is fr use where anchr frnt face must be cncealed r recessed, where vid cleaning is needed, and there is sufficient depth at nly the back layer t develp lad thrugh adhesin, meaning that supplemental plates and/r dunnage are needed at the frnt.

VidSpan Prt Anchrs Sheet # 4 f 6 The VS-34-DE is fr use where anchr frnt and/r rear face may r may nt need t be cncealed r recessed, where vid cleaning is needed, and there is nt sufficient depth in the frnt r back layer t develp lad thrugh adhesin, meaning that supplemental plates and/r dunnage are needed at bth faces. Anchr Types/ Rdded Shank Series The VS-56 is fr use where stay-in-place surface munts are nt f aesthetic r functinal cncern, where cmplete vid cleaning is nt needed, and there is sufficient depth at the back layer t develp lad thrugh adhesin.

VidSpan Prt Anchrs Sheet # 5 f 6 The VS-56-DE is fr use where stay-in-place surface munts are nt f aesthetic r functinal cncern n the frnt r back faces, where cmplete vid cleaning is nt needed, and there is nt sufficient depth in the frnt r back layer t develp lad thrugh adhesin, meaning that supplemental plates and/r dunnage are needed at bth faces. The VS-80 is fr use where nly the anchr frnt must be cncealed r recessed, where cmplete vid cleaning is nt needed, and there is nt sufficient depth in the frnt r back layer t resist gruting pressures lad thrugh adhesin alne, thus requiring supplemental dunnage n bth faces.

Installer Respnsibility and Certificatin VidSpan Prt Anchrs Sheet # 6 f 6 Because f the critical nature f their functin, installatin f all VidSpan Prt Anchrs with anchr injected grut require Installer Certificatin. There are tw tiers f certificatin: Tier 1/ Nn-Pressure Critical Requirements: Fr gruting applicatins where in the pinin f the specifier there is little risk f causing blw-ut f the injected structure if gruting pressures exceed 3.75 punds per square inch.cintec Certificatin 5 years well referenced experience with repair f histric masnry structures including the use f Cintec Anchrs and gravity-fed grut applicatins. 2 hur training sessin put n by VidSpan Limitatins n Use: Use f gravity feeding grut equipment nly with 4.5 max. feet f pressure head frm the bttm f lift, n use f mechanical pumping equipment, gruting limited f flat surfaces f nt mre than three ft hrizntal length between dunnage bracing pints r returns with external surface in restred cnditin, and nt less than 40-hurs between successive 3-ft grut lifts. There are n Tier 1 limits n VidSpan Prt Anchr installatin. Tier 2/ Pressure Critical Requirements: Fr gruting applicatins where in the pinin f the specifier there is significant risk f causing blw-ut f the injected structure if gruting pressures f 4.5 psi are exceeded. VidSpan Tier 1 Certificatin 5 years well referenced experience with pressure gruting f existing masnry structures, including pressure mnitring, gemetric measuring and use f all mechanized and nn-mechanized equipment. Additinal 2 hur training sessin put n by VidSpan plus written examinatin. Limitatins n Use: N limitatins ther than nt mre than ne 3-ft grut lift within 20-hurs unless specifically authrized by a Structural Engineer registered in the jurisdictin f use.