1 Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System Cory David Smith, Project Manager, ECOM Engineering Inc., and David Lawrence Smith, Principal, ECOM Engineering Inc. Abstract A comparison of a High Resistance Grounding System and a Solidly Grounding system in a Data Center application. This document provides the pros and cons of using a high resistance ground system in a data center. It also looks at the common elements of a Data Center s power distribution system and explains the different setup between a High Resistance Grounded system and a Solidly Grounded System. I. NOMENCLATURE HRG: High Resistance Ground, PDU: Power Distribution Unit, UPS: Uninterruptible Power Supply, NRK: Neutral Reference Kit, Transient Voltage Surge Suppressor (TVSS)/Surge Protection Device (SPD), IT: Information Technology, NEC: National Electric Code T II. INTRODUCTION HIS document looks at the advantages and disadvantages of using a High Resistance Grounding system in a data center. The data center is an 12 Megawatt facility in Oregon built and operated by Fortune Data Centers. In this document a solidly grounded system and a high resistance grounding system fault current will be compared for the same system, the verified phase to ground fault for the high resistance ground will be measured and the charging current of the system will be verified for the grounding system. With the mitigation of damage during a single phase to ground fault and continuity of service during a single phase to ground fault, high resistance grounding is an ideal application for protecting critical loads in a data center. III. HIGH RESISTANCE GROUNDING IN A DATA CENTER The use of High Resistance Grounding or HRG at Fortune Oregon Data Center for critical loads allows for a more robust distribution system. The distribution system becomes more robust with the use of HRG by being able to continue service without interruption through a single phase to ground fault, location of the ground fault and then isolation and clearing of Fortune Oregon Data Center. Dave Smith, ECOM Engineering, Owners Representative, Jesse Smith, Nova Partners, Construction Manager, Travis Schumacher, DPR/FORTIS Mission Critical, MEP Coordinator. Fortune Oregon Data Center Engineer of Record Steve Emert PE, Rosedin Electric. Eaton PowerWare, Rosedin Electric. the ground fault with minimal damage to equipment and no interruption of critical power distributions systems. A HRG system has several advantages to implementation in a data center. The application of HRG eliminates the need for complex and expensive zone interlock ground fault breaker schemes. With the HRG system having a low phase to ground fault current, a restrained transient overvoltage and ability to continuously serve the critical load during a phase to ground fault condition, makes the HRG system an attractive solution to the data center community. The HRG system insures high availability and concurrent maintainability as demanded by IT managers served by data centers. By using a HRG system single phase to ground fault available energy is greatly reduced. The concern for groundfault protection is based on four factors: 1. The majority of electric faults involve ground. Even faults that are initially phase to phase spread quickly to any adjacent metallic housing, conduit, or tray that provides a return path to the system grounding point. Ungrounded systems are also subject to ground faults and require careful attention to ground detection and fault protection. 2. The ground-fault protective sensitivity can be relatively independent of continuous-load current values and therefore, have lower pickup settings than phase protective devices. 3. Because ground-fault currents are not transferred through system power transformers that are connected delta-wye or delta-delta, the ground-fault protection for each system voltage level is independent of the protection at other voltage levels. This configuration permits much faster relaying than can be afforded by phase-protective devices that require coordination using pickup values and time delays that extend from the load to the source generators and often result in considerable time delay at some points in the system. 4. Arcing ground faults that are not promptly detected and cleared can be destructive. [1] A. Types of Grounding in a Data Center Per the NEC only two types of grounding can be used in a low voltage system in the United States. A solidly grounded system and for three phase loads High Resistance Grounding can be implemented [2]. Both systems offer advantages and disadvantages based on application.

2 B. Advantages and Disadvantages of Solidly Grounded Systems in Data Centers A solidly grounded system offers several advantages: 1. During a phase to ground fault the system does not suffer from overvoltages. 2. The solidly grounded system has low step potentials between ground and the electrical system in normal operation. 3. Single phase to ground loads can be applied to the electrical system without the need for isolation transformers between the critical equipment and single phase loads for lighting and equipment. 4. Paralleling UPS units in a Solidly Grounded system is not as complicated as in a HRG system. Disadvantages of a solidly grounded system in a data center include: 1. High ground fault current and a voltage dip on the phase that has the ground fault. 2. Interruption of service during a phase to ground fault. 3. High ground fault current is available during arcing faults. 4. Phase to ground faults cause mechanical stresses in circuits and equipment caring the fault current. 5. Damage to electrical equipment caused by high phase to ground fault currents. 6. Complicated protection schemes to provide ground fault protection. A lack of selectivity is inherent in ground fault protection schemes. Per NEC, Section (A) the maximum ground fault sensor trip setting is restricted to 1200 amps. a. Thus data center critical power distribution systems larger than 1200 amps must rely on zone interlock schemes to coordinate ground fault protection. These schemes rely on breaker to breaker communication which is inherently a single point of failure for the critical power distribution system during a single phase to ground fault. b. Ground fault selectivity can also be achieved through a limited amount of time delay between breakers however, this allows a larger magnitude of fault current during a single phase to ground fault. c. The ground fault time delay available for coordination limits the number of breakers that can realistically be coordinated in series. C. Advantages and Disadvantages of High Resistance Grounding in Data Centers Advantages to high resistance grounding in a data center: 1. Reduces burning and melting effects in faulted electric equipment, such as switchgear, transformers, cables and rotating machines. 2. Reduces mechanical stresses in circuits and apparatus carrying fault currents. 3. Reduces electric-shock hazards to personnel caused by stray ground-fault currents in the ground return path. 4. Reduces the arc blast or flash hazard to personnel who may have accidentally caused or who happen to be in close proximity to the ground fault. 5. Reduces the momentary line-voltage dip occasioned by the occurrence and clearing of a ground fault. 6. To secure control of transient overvoltages while at the same time avoiding the shutdown of a faulty circuit on the occurrence of the first ground fault (high-resistance grounding).[1] 7. The load is maintained during a single phase to ground fault. 8. Allows time to respond, isolate and repair the single phase to ground fault event while maintaining the critical load. 9. HRG s reduces the available phase to ground arcing fault because the phase to ground fault current is limited to a maximum of 10 Amps by the HRG resistor. However there is still the danger of a three phase arcing fault which must be used to calculate the protection required to protect the technician working on the equipment. The limited phase to ground available current reduces the chance of a phase to ground arcing fault creating a three phase arcing fault. 10. During a Ground Fault Condition the ground fault can be left until an ideal time to clear the fault as long as the insulation of the cable is rated at 173% [3]. For a 480V system the conductors insulation is rated at 600V thus a 173% voltage of the phase to ground voltage brings the two un-faulted phase voltages in respect to ground to 480V. This does not exceed the insulation of the conductors. See Figures 1.A and 1.B for the normal operating characteristics and fault operating characteristics of the voltage with a HRG. Disadvantages of using a HRG system must be considered before implementing the system in the design of any building but especially a non-industrial application. Some of the following disadvantages must be addressed: 1. Transient overvoltages up to 250% of nominal system voltage can occur in the system. 2. Single phase loads cannot be connected to the HRG system. Life Safety loads must be separated by a transformer with a solidly grounded neutral. 3. Power Electronic equipment such as the UPS and TVSS must be selected so that they are able to operate with a HRG typically connected in a Delta configuration. 4. Switchgear control transformers cannot connected be phase to neutral and must be connected phase to phase. 5. Paralleling UPS modules with an HRG increases the complexity of the system. 6. During a ground fault event qualified personnel must go into energized equipment to meter feeders to find the location of the ground fault. With the Personal Protection Equipment (PPE) for Arc Flash based on the three phase arc flash energy. This condition can be mitigated by the installation of permanent amp meters on feeder circuits.

3 D. Data on the HRG System at Fortune Data Center Table 1: Unit Substation USG-1-4 Ground Fault Data Electrical Ground Fault Element Solid Name Ground Unit Substation USG , Amps UPS , Amps UPS-DP , Amps Input of 37, PDU Amps Ground Fault Resistance Ground Maximum Allowed Current Ground Fault Resistance Ground Measured Fig. 1.A: Voltage Characteristics of an HRG System Under Normal Operating Conditions. By utilizing a HRG system the phase to ground fault current of the system decreases by a factor of ten thousand or four orders of magnitude. The dramatic reduction of phase to ground fault current mitigates damage to the system during a phase to ground fault event. Based on IEEE Research Bus Duct ground faults are 2.3 times more likely to occur compared to phase to phase faults. Cable ground faults are 73 times more likely to occur compared to phase to phase faults and Cable Joints ground faults are 7.8 times more likely to occur compared to phase to phase faults [5]. Using this research as a guide the ability the HRG system has the ability to limit the amount of energy delivered by the most common type of fault. Fig. 1.B: Voltage Characteristics of an HRG System Under A Single Phase to Ground Operating Conditions. E. Challenges for the HRG System Charging current of the system must be less than the total ground fault current. For most 480V HRG systems the charging current is under 2A which can be measured or calculated [3]. While the overvoltage can be a problem to the insulation of the cable in a medium voltage system, in a low voltage 480V system where the phase to neutral voltage is 277V a 173% overvoltage brings the two un-faulted phases to a voltage of 480 Volts. The cable insulation is rated at 600 Volts which mitigates the danger of insulation break down avoiding a double phase to ground fault. Ground Faults should still be cleared as soon as possible as a second fault will create a phase to phase condition tripping upstream breakers. Intermittent ground faults may also cause transient overvoltages of 250% that damage the insulation of the cables and can overtime lead to a double phase to ground fault condition. PPE is based on the three phase arc flash condition in electrical panels. In an HRG system if any panel has been found in the Arc Flash study to be a non approach panel while energized. Design coordination measures such as permanently installed amp meters on feeders and or breaker trip units with a maintenance setting that reduce arc flash energy should be installed so the location of the fault can be found while keeping the operators safe.

4 F. UPS Grounding There are three choices for UPS grounding: four-wire source and four-wire load solidly grounded, three-wire source and three wire load solidly grounded and three wire source and three wire load high resistance grounded. See Figures 1, 2 and 3. Fig. 1: Four Wire Input/ Four Wire Output Solid Ground of a UPS [6]. In this configuration during a phase to ground fault the UPS will go to static bypass during the fault to be able to deliver enough current to clear the fault. Fig. 2: Three Wire Input/Three Wire Output Solid Ground of a UPS [6] In this configuration during a phase to ground fault the UPS will go to static bypass during the fault to be able to deliver enough current to clear the fault. Using a high resistance ground for the UPS that limits the phase to ground current to a maximum of 10 amps allows the UPS manufacture to disable the function on the UPS that when the UPS detects a ground fault to go to static bypass and instead have an alarm only. This is allowable because the UPS is able to supply the current to the system in the phase to ground fault condition. Thus the UPS stays online protecting the critical load. G. HRG System and Equations Type of High Resistance Grounding, there are two types of high resistance grounding. The first type of high resistance grounding is used with a relay or ground fault breaker that allows a certain amount of current through the resistor for up to 10 seconds and then trips the protection and continuity of service is broken. 1. The advantage to this is that the system is cheaper to install and gives the fault time to clear itself. This allows for more coordination with the ground fault protective scheme and makes coordinating the system easier. 2. The disadvantage of this system is that the resistor is only rated for a limited duration and the expensive breakers and relaying is still required and your system still loses continuity of service. Resulting in loss of critical load. The other type of High Resistance Grounding has a continuous duty rated resistor and can have a ground fault on the system for any amount of time. 1. With this configuration all advantages of High Resistance Grounding apply. For the HRG system to have stable operation some of the following conditions must be met. The ground fault current must be at least three times the charging current of the capacitance of the electrical system. Because of system reliability and the capacity to continue serving critical load a fully rated continuous duty resistor is the logical choice for a Data Center application. R NGR V LL Ohms (1) I G N X C R GR Ohms I G 3I CO Amperes (3) (2) P NGR I G R NRG Watts (4) Total Ground Current I G I R I C (5) Fig. 3: Three Wire Input/Three Wire Output High Resistance Ground of a UPS [6]. Capacitive Reactance X C ohms/phase (6) C Zero Sequence Capacitance C micro Farads ux /phase (7) Charging Current

5 3I C C E Amperes (8) Charging Current Where: f = Frequency in hertz 3I C. LE Amperes C 0 = Capacitance to Ground in µf Where: (11) E = Line to Line System Voltage E = Line to Line System Voltage Cable Capacitance Three-conductor Cable L = Line length in ft./1000 C. µf (9) Motors LOG D F 3I C 0.05 HP Amperes (12) RPM Measuri ng System Charging Current Where: C 0 = Capacitance to Ground in mf per 1000 feet. R MAX V LL = specific inductance of insulation Ohms (13) I C D 1 = d + 3c +b for three-conductor cable. d = diameter of conductor Where: c = thickness of insulation of conductor. 3I C0 = the estimated charging current b = thickness of belt insulation. V LL = the system line to line voltage [7] Charging Current Estimates Transformers C µF (10) Fig. 4: One Line Diagram for location of Phase to Ground Fault Measurement and Test at Fortune Oregon Data Center during commissioning

6 Fig. 5: Sample One-line Diagram for location of Ground Fault Location Circuitry Figure 4 shows the location for where the phase to ground faults where tested on site at Fortune Oregon Data Center during commissioning. In Figure 5 the location of phase to ground fault location circuitry is shown. In Figures 6 and 7 the circuit for measuring the fault current is shown. Fig. 7: UPS Output Switchboard Ground Fault Sensing Circuit. Fig. 6: Unit Substation Switchboard Ground Fault Sensing Circuit. IV. EQUIPMENT COORDINATION FOR SUCCESSFUL HIGH RESISTANCE GROUND OPERATION To insure a successful commissioning and operation of an HRG system on a highly reliable UPS critical power distribution system. The following items must be coordinated through the design, specification, submittal review and equipment start up. Starting with Electrical Switchboards components of the switchboards must be configured in to work with a HRG.

7 7 TVSS/SPD or Surge Protective Device must be a delta configuration. If a 4 wire solidly grounded SPD was installed the neutral wire would defeat the HRG of the system and provide the path of least resistance for the phase to ground fault. The surge arrester ratings must be specified so that neither the maximum continuous operating voltage nor the one-second temporary overvoltage capability is exceeded under system ground-fault conditions [1]. Control transformers in the electrical equipment must be phase to phase not phase to neutral as this will also defeat the HRG system. All control transformers and SPD s should be rated for line to line voltage, not line to ground. During testing the measured fault current of the system was 3.5 amps. Using the equation I G 3I CO Amperes (3) to find the charging current of the grounding system to be less than or equal to amps. See Figure 4, 5, 6 and 7 for Measurement of Charging Current diagram. The HRG itself must be configured for use in the system so there are no nuisance s alarms. In this project a PulserPlus Pro-Low Voltage High Resistance Grounding by Post Glover was used. Variables that needed adjustment for proper function included: adjustable pulse rate, adjustable time delays for fundamental and third harmonic settings to prevent nuisance s alarms. System monitoring is achieved through communications via RS232, Modbus or Ethernet protocols, this provides 7x24 monitoring via the BMS system. The HRG reduces the system ground fault current to a maximum of 10 Amps and for the installed system a measured 3.5 Amps during commissioning. Note the HRG system should be a continuous duty rated resistor. This is desired so that during a ground fault there is no interruption in service while the ground fault location is found and repaired. The Eaton 9395 UPS software must be enabled to allow the UPS to operate during a Ground Fault Condition without transferring to bypasss. On the Eaton 9395 a Neutral Reference Kit (NRK) must be installed. Battery monitoring systems should not use ground as a floating reference; they need an isolated ground reference for control circuits. For the Power Distribution Unit four items must be addressed. First the ground fault function on the primary side of the PDU must be turned off and have Annunciation only. Second Phase loss/ rotation shutdown must be turned off. The Over/Under voltage shutdown must be turned off. These three functions can be turned off during setup by the manufacture. Lastly on PDU the Auto-restart function must be enabled or the 480V main breaker will shunt trip on Undervoltage /Overvoltage phase loss/rotation and ground fault while used in conjuncture with a HRG during a single phase to ground fault condition. ground fault on the electrical system is reduced so that a single phase to ground fault is no longer a catastrophic failure of the electrical system requiring an immediate outage of service and potentially extensive repair. Finally the downstream customer does not notice the single phase to ground fault. The critical load is continuously fed thru the UPS during a single phase to ground fault. Allowing maintenance personal time to find, isolate and repair the fault while maintaining critical load. Using an HRG system in Fortune Oregon Data Center, increase the electrical system reliability for Fortune s customers through the implementation of a HRG system. VI. ACKNOWLEDGMENT The authors gratefully acknowledge the contributions of Brian Kane PE, Ed Spears and Steve Emert PE for their information and review of the paper. VII. REFERENCES [1] IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems, IEEE Standard , December [2] NFPA 70, National Electric Code [3] IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems, IEEE Standard , June [4] IEEE Recommended Practice for Electrical Power Distribution for Industrial Plants, IEEE Standard , December [5] IEEE Recommended Practice for Design of Reliable Industrial and Commercial Power Systems, IEEE Standard , February [6] Eaton Technical Brief, UPS Grounding: An Objective Overview, September 7, [7] Post Glover Application Guide, Ground Fault Protection on Ungrounded and High Resistance Grounded Systems, Copyright 2007 VIII. BIOGRAPHY Cory David Smith is a Project Manager at ECOM Engineering and is based in Sacramento, California. Cory has spent 8 years in various positions at ECOM Engineering specializing in design of Data Centers and Hospitals. Cory is a graduate of California State University Sacramento with a BSEE and a member of the IEEE. David Lawrence Smith is a Principal at ECOM Engineering and is based in Sacramento, California. Dave has 30 years of electrical design, project management, construction, and commissioning experience specializing in Data Centers, Hospitals and Critical Facilities. Dave is a member of the IEEE. V. CONCLUSION Using an HRG in a critical facility such as a data center makes sense for a number of reasons. At Fortune Oregon Data Center the single phase to ground fault current is limited to 3.5 amps at the Main Switchboard compared to the 44,500 amps of the same system with a solid ground. The reduction of the fault current by 4 orders of magnitude reduces the single phase to ground arc flash potential energy. The mechanical stress of a single phase to

OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS

OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it

More information

ASK THE EXPERTS. Resistance Grounding Q&A. with industry experts

ASK THE EXPERTS. Resistance Grounding Q&A. with industry experts ASK THE EXPERTS Resistance Grounding Q&A with industry experts system grounding system grounding system grounding system grounding system grounding System Grounding Definition and Different Types What

More information

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems System Grounding and Ground-Fault Protection Methods for -Supplied Power Systems Bill Brown, P.E., Square D Critical Power Competency Center 1. INTRODUCTION The use of solid grounding for -supplied power

More information

4.5 Transformer Connections

4.5 Transformer Connections ELECTRIC POWER SYSTEMS IN COMMERCIAL BUILDINGS IEEE Std 241-1990 5) Flat Billing Ñ Certain applications involve service to the load of a Þxed characteristic. For such loads, the supplying utility may offer

More information

Transfer Equipment Controls

Transfer Equipment Controls Control Types Manual Transfer Switches Nonautomatic Transfer Switches Automatic Transfer Switches The type of control system for the transfer switch will vary depending on the type of switching equipment

More information

Arc Flash Energy Mitigation Techniques

Arc Flash Energy Mitigation Techniques Arc Flash Energy Mitigation Techniques When short circuits occur on an electrical distribution system, an arc flash event usually forms. These arc flash events can cause dangerous and potentially fatal

More information

Fundamentals of Power

Fundamentals of Power Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At

More information

Bypass transfer switch mechanisms

Bypass transfer switch mechanisms Power topic #6013 Technical information from Cummins Power Generation transfer switch mechanisms > White paper By Gary Olson, Director, Power Systems Development This paper describes the configuration

More information

Application of Four-Pole Circuit Breakers within Data Centers

Application of Four-Pole Circuit Breakers within Data Centers Application of Four-Pole Circuit Breakers within Data Centers December 2013/AT324 by Frank Waterer, Fellow Engineer, Schneider Electric Engineering Services Make the most of your energy SM Revision #1

More information

The following table shows approximate percentage wise the

The following table shows approximate percentage wise the SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are

More information

Switchgear Application Issues for Mission Critical Power Systems, Part One

Switchgear Application Issues for Mission Critical Power Systems, Part One Switchgear pplication Issues for Mission Critical Power Systems, Part One BSTRCT With the advent of high reliability data centers and telecommunication facilities, designers of commercial power face new

More information

Fault Characteristics in Electrical Equipment

Fault Characteristics in Electrical Equipment 1. Introduction Proper design and installation of electrical equipment minimizes the chance of electrical faults. Faults occur when the insulation system is compromised and current is allowed to flow through

More information

Earth Fault Detection Basics in Theory

Earth Fault Detection Basics in Theory Earth Fault Detection Basics in Theory Author: Dipl.-Ing. Ingo Kühnen Woodward Power Solutions Krefelder Weg 47 47906 Kempen, Germany Kempen, 16.04.2010 Earth_Fault_Detection_20100416.doc page 1 1. Star

More information

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your

More information

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Grounding of Electrical Systems NEW CODE: Grounding and Bonding Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately

More information

Part 1 System Modeling & Studies for Existing Systems

Part 1 System Modeling & Studies for Existing Systems Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures

More information

How to reduce exposure to arc flash hazards

How to reduce exposure to arc flash hazards GE Energy Industrial Solutions How to reduce exposure to arc flash hazards Multiple solutions for new and existing facilities imagination at work Multiple Issues Today s power system engineer must not

More information

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd 100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center Introduction Roger Hedding Steven Schoenherr, P.E. ABB Inc. Minnesota Power 598 N. Buth Rd 3215 Arrowhead Rd Dousman,

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

Ground Fault Protection on Ungrounded and High Resistance Grounded Systems

Ground Fault Protection on Ungrounded and High Resistance Grounded Systems > the power to protect Ground Fault Protection on Ungrounded and High Resistance Grounded Systems Application Guide www.i-gard.com table of contents SUBJECT PAGE 1. Introduction...1 2. Ungrounded Systems...1

More information

Low Voltage Switchgear

Low Voltage Switchgear Arc Resistant Switchgear n Insulated and isolated bus n Separation barriers and top venting n Breaker shutters 12 SWITCHGEAR Arc resistant metal-enclosed low voltage switchgear is an optional product offering

More information

SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS

SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS Claudio S. Mardegan claudio.mardegan@engepower.com www.engepower.com Phone: 55 3579-8777

More information

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination

More information

How Much Voltage Drop Is Acceptable?

How Much Voltage Drop Is Acceptable? How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed

More information

2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY

2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY 2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY Thomas P. McNamara, P.E. Manager, Development Engineering ABB Inc. Power Technologies Medium

More information

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more

More information

21 st Century Facilities

21 st Century Facilities Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer

More information

Power Quality for Information Technology System

Power Quality for Information Technology System Power Quality for Information Technology System ITS OBVIOUS THE TOLERANCE IS DIFFRENT But What isn t Tobvious? HOW MANY OF YOU HAVE : A COMPUTER AT HOME? = Computers are not screens and Keyboards COMPUTERS

More information

Paralleling Switchgear

Paralleling Switchgear Paralleling Switchgear By Maurice D Mello, P.Eng. Systems Engineer, GE Consumer & Industrial, Canada What is Paralleling? Paralleling is the operation in which multiple power sources, usually two or more

More information

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.

More information

Technical Guide. SKM Arc Flash Line Side vs. Load Side

Technical Guide. SKM Arc Flash Line Side vs. Load Side SKM Arc Flash Line vs. Load The option of choosing the line-side or the load-side arc flash incident energy for arc flash labels is an important decision when performing an arc flash hazard analysis. When

More information

Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear.

Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear. Arc Flash Mitigation Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear. Distance is Safety We will discuss through examples of actual occurrences and possible

More information

ELECTRICAL SAFETY RISK ASSESSMENT

ELECTRICAL SAFETY RISK ASSESSMENT ELECTRICAL SAFETY RISK ASSESSMENT The intent of this procedure is to perform a risk assessment, which includes a review of the electrical hazards, the associated foreseeable tasks, and the protective measures

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

White Paper Mervin Savostianik P. Eng. Littelfuse, Inc.

White Paper Mervin Savostianik P. Eng. Littelfuse, Inc. Ground-Fault Protection with VFDs How to use a Sensitive Relay to Find Hard-to-Spot Ground Faults in VFDs on Resistance-Grounded Systems White Paper Mervin Savostianik P. Eng. Littelfuse, Inc. How to Use

More information

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers A market position paper from the experts in Business-Critical Continuity TM Executive Summary Electrocutions are the fourth

More information

Arc Flash Safety in 400V Data Centers

Arc Flash Safety in 400V Data Centers Arc Flash Safety in 400V Data Centers Strategies for protecting employees from underappreciated yet potentially deadly hazards By Dave G. Loucks PCM Solution Manager Eaton Corporation Executive summary

More information

New standardized approach to arc flash protection

New standardized approach to arc flash protection New standardized approach to arc flash protection Samuel Dahl Juha Arvola Tero Virtala Arcteq Relays Ltd Arcteq Relays Ltd Arcteq Relays Ltd Wolffintie 36 F 11 Wolffintie 36 F 11 Wolffintie 36 F11 65200

More information

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A SURGE PROTECTIVE DEVICES (SPDs) INTEGRATED UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective

More information

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE Appendix B-2 - Electrical Safety In Design Final Report TECHNOLOGIES THAT REDUCE LIKELIHOOD OF INJURY FROM ELECTRICAL HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE The following are technologies that reduce

More information

Arc Flash Mitigation & Selective Co-ordination

Arc Flash Mitigation & Selective Co-ordination Arc Flash Mitigation & Selective Co-ordination Michael Hodder March 2015 Overview This seminar will provide information on: Mitigating arc flash hazards Selective Coordination What can we do to make these

More information

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE Understanding Power Factor and How it Affects Your Electric Bill Presented by Scott Peele PE Understanding Power Factor Definitions kva, kvar, kw, Apparent Power vs. True Power Calculations Measurements

More information

ECE 586b Course Project Report. Auto-Reclosing

ECE 586b Course Project Report. Auto-Reclosing ECE 586b Course Project Report Auto-Reclosing Srichand Injeti May 5, 2008 Department Of Electrical and computer Engineering University Of Western Ontario, London Ontario Table of contents 1. Introduction...1

More information

Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application

Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application by Reza Tajali, P.E. Square D Company ABSTRACT In modern data centers, Uninterruptible Power Supplies (UPS)

More information

Power surges can also be generated by equipment in your facility such as:

Power surges can also be generated by equipment in your facility such as: Power Quality Surge Suppressors What is Surge Protection A surge suppressor can be the first and best defense against the instant or gradual destruction of electrical equipment. Compared to the replacement

More information

Reliability requires consulting engineers and end users to grasp design, maintenance basics. By Reza Tajali, P.E. Square D Power Systems Engineering

Reliability requires consulting engineers and end users to grasp design, maintenance basics. By Reza Tajali, P.E. Square D Power Systems Engineering LOW VOLTAGE CIRCUIT BREAKER GUIDELINES FOR DATA CENTERS Reliability requires consulting engineers and end users to grasp design, maintenance basics By Reza Tajali, P.E. Square D Power Systems Engineering

More information

ARC FLASH HAZARD MITIGATION. Industrial Tests, Inc. [indtests.com]

ARC FLASH HAZARD MITIGATION. Industrial Tests, Inc. [indtests.com] ARC FLASH HAZARD MITIGATION ARC FLASH HAZARD MITIGATION NWHA TECHNICAL SEMINAR May 17, 2012 Richard D Reese Power Systems Manager Industrial Tests, Inc. Rocklin, California [Dick@indtests.com; 916-660-2837]

More information

A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software

A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software Abstract: The nature of explosive equipment failures, and the rate of serious burn injuries in the electrical industry

More information

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems Suitable for Emergency, Peak and Prime Power System Applications Low Voltage Automatic Transfer Switch Systems THE POWER AUTHORITY THE POWER AUTHORITY ASCO s experience and commitment to excellence in

More information

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta GENERATOR SELECTION Generators must be sized to handle their load based on the continuous KW, kilowatt load, and KVA, kilovoltamp load, and the worst case starting load KW + KVA. They must be derated for

More information

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify. SECTION 263354 STATIC UPS TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. System start-up services. 2. Battery charging. 3. Load bank testing. 4. Battery load testing. 5.

More information

Grounding and Electrical Safety of Shore Power Supply and DC Stinger System Design

Grounding and Electrical Safety of Shore Power Supply and DC Stinger System Design Grounding and Electrical Safety of Shore Power Supply and DC Stinger System Design Dev Paul AECOM 2101 Webster Street, Suite 1900, Oakland, Ca 94612 dev.paul@aecom.com; (510) 419 6448 Abstract: To enhance

More information

The Application of Circuit Breakers to Reduce Downtime in Datacentres

The Application of Circuit Breakers to Reduce Downtime in Datacentres The Application of Circuit Breakers to Reduce Downtime in Datacentres Tim Campbell BEng MIET. Marketing Manager, Terasaki Electric (Europe) Ltd. Abstract Circuit breakers fulfil several functions in the

More information

Eaton s E-Series protective relay family

Eaton s E-Series protective relay family E-Series protective relays Feeder distribution relays Motor relays Transformer relays Generator relays Eaton s E-Series protective relay family Microprocessor-based design Eaton s E-Series relay family

More information

Power Quality Standards for Electric Service

Power Quality Standards for Electric Service Power Quality Standards for Electric Service Effective June 1, 2008 A transition period will exist from June 1 through December 31, 2008 in which installations may be approved and connected as long as

More information

Atlanta Chapter IEEE Industry Applications Society

Atlanta Chapter IEEE Industry Applications Society Atlanta Chapter IEEE Industry Applications Society Electrical Equipment Room Design Considerations presented at the Sheraton Buckhead Hotel Atlanta, Georgia November 20, 2006 Outline 1. Definitions 2.

More information

Mike Holt s Illustrated Guide to. Rule 220.87, Articles 445, 700, 701, and 702. Based on the 2011 NEC

Mike Holt s Illustrated Guide to. Rule 220.87, Articles 445, 700, 701, and 702. Based on the 2011 NEC Mike Holt s Illustrated Guide to NEC Requirements for Generators and Standby Power Systems Rule 220.87, Articles 445, 700, 701, and 702 Based on the 2011 NEC Extracted from Mike Holt s Illustrated Guides

More information

ARC FLASH CALCULATIONS & LABELING REQUIREMENTS

ARC FLASH CALCULATIONS & LABELING REQUIREMENTS ARC FLASH CALCULATIONS & LABELING REQUIREMENTS Presented by: Edmund Elizalde EYP Mission Critical Facilities, Inc. Slides by: Lonnie Lindell SKM Systems Analysis, Inc. 1 Agenda NEC 110.16 NFPA 70E IEEE

More information

Mission Critical Data Center Systems

Mission Critical Data Center Systems Mission Critical Systems Mission Critical/ Electrical Distribution Systems Data center electrical distribution designs are rapidly evolving, driven by needs such as increasing power densities, energy efficiency,

More information

Three phase circuits

Three phase circuits Three phase circuits THREE PHASE CIRCUITS THREE-PHASE ADVANTAGES 1. The horsepower rating of three-phase motors and the kva rating of three-phase transformers are 150% greater than single-phase motors

More information

Switchgear and Metal-Enclosed Bus

Switchgear and Metal-Enclosed Bus Section 18 Switchgear and Metal-Enclosed Bus 180. SWITCHGEAR ASSEMBLIES 180A. General Requirements for All Switchgear. This rule covers general requirements for all switchgear. Examples of switchgear found

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP PacifiCorp Original Sheet No. 476 APPENDIX 2 TO SGIP SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: Designated Contact Person: Address: Telephone Number: An Interconnection

More information

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? Comparing apples-to-apples bids Plant Services Special Report A shock hazard analysis should be included as part of an arc

More information

Product Guide. Low voltage grounding system. Answers for industry.

Product Guide. Low voltage grounding system. Answers for industry. Product Guide Low voltage grounding system Answers for industry. Advanced switchgear solutions for process industries In today s high-tech manufacturing world, profitability can be greatly impacted by

More information

Understanding Arc Flash

Understanding Arc Flash Understanding Arc Flash Presented by Eddie F. Jones, PE 1 2 3 4 5 Five to 10 arc flash explosions occur in electric equipment every day in the United States. This number does not include cases in which

More information

Reverse-feed applications for circuit breakers

Reverse-feed applications for circuit breakers Technical Publication PU01200001E Contents Description Page Intoduction.......................................................................... 2 breaker classifications..........................................................

More information

Litigation Services & Information

Litigation Services & Information Litigation Services & Information Laurence "Lo" Lehman, P.E. Lehman Engineering Company Lehman Engineering has been providing engineering, design, and consulting services for electrical power systems to

More information

IRRIGATION PUMPING Table of Contents - Section 900

IRRIGATION PUMPING Table of Contents - Section 900 IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS

More information

Engineering innovation

Engineering innovation Eaton's Electrical Engineering Services & Systems Solutions Focus Seamless Solutions for Reliable, Efficient and Safe Power Systems Engineering innovation Progressive solutions for today s power systems

More information

PRESENTED AT THE 2011 IEEE IAS PULP & PAPER INDUSTRY TECHNICAL CONFERENCE, NASHVILLE, TN: IEEE 2011 - PERSONAL USE OF THIS MATERIAL IS PERMITTED.

PRESENTED AT THE 2011 IEEE IAS PULP & PAPER INDUSTRY TECHNICAL CONFERENCE, NASHVILLE, TN: IEEE 2011 - PERSONAL USE OF THIS MATERIAL IS PERMITTED. Arc Flash Energy Reduction Techniques Zone Selective Interlocking & Energy-Reducing Maintenance Switching Christopher G. Walker Senior Member, IEEE Eaton Corporation Moon Township, PA 15108 chrisgwalker@eaton.com

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS David D. Roybal, P.E. Senior Member, IEEE Eaton Electrical 3697 Mount Diablo Boulevard Lafayette, CA 94549 Abstract Low-voltage circuit

More information

Schneider Electric Services: life-cycle solutions for electrical distribution equipment. Scopes of Work for Electrical Acceptance Testing

Schneider Electric Services: life-cycle solutions for electrical distribution equipment. Scopes of Work for Electrical Acceptance Testing Scopes of Work for Electrical Acceptance Testing Schneider Electric Services: life-cycle solutions for electrical distribution equipment Make the most of your energy SM Scopes of Work for Electrical Acceptance

More information

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392 1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of

More information

415V DISTRIBUTION FOR GREEN DATA CENTERS

415V DISTRIBUTION FOR GREEN DATA CENTERS White Paper: HMRP-WP001-A5 June 5, 2012 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2012 Mirus International

More information

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.) Common Electrical Hazards in the Workplace Including Arc Flash Presented by Ken Cohen, PhD, PE & CIH (Ret.) 1 What s New In February 1972, OSHA incorporated the 1971 edition of the National Fire Protection

More information

Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer DanRNeeser@Eaton.com. Electrical Hazards 2/18/2015. Shock.

Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer DanRNeeser@Eaton.com. Electrical Hazards 2/18/2015. Shock. Arc Flash Hazards Dan Neeser Field Application Engineer DanRNeeser@Eaton.com Electrical Hazards Electrical Hazards Shock Arc Flash Arc Blast 2 1 Arcing Fault Basics 35,000 F Radiant Heat & UV Speed of

More information

Qualitative Analysis of Power Distribution Configurations for Data Centers

Qualitative Analysis of Power Distribution Configurations for Data Centers Qualitative Analysis of Power Distribution Configurations for Data Centers White Paper #4 2007 The Green Grid. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted,

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers

More information

Simulation of Ungrounded Shipboard Power Systems in PSpice

Simulation of Ungrounded Shipboard Power Systems in PSpice Simulation of Ungrounded Shipboard Power Systems in PSpice Haibo Zhang IEEE Student Member Karen L.Butler IEEE Member Power System Automation Lab Electrical Engineering Department Texas A&M University

More information

Increased power protection with parallel UPS configurations

Increased power protection with parallel UPS configurations Increased power protection with parallel UPS configurations Making the selection between Centralized Bypass and Distributed Bypass systems Janne Paananen Application Engineer, Large Systems Group Eaton

More information

Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.

Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E. By Darrell G. Broussard, P.E. Introduction: As engineers, we are aware that electrical power systems have grown. How much have they grown? When was the last time you specified a 2400-volt system, a 4160-volt

More information

What s up with Arc Flash?

What s up with Arc Flash? What s up with Arc Flash? Presented by Mark Haskins, CSP Practical Safety Solutions, LLC CONN OSHA Breakfast Roundtable February 18, 2014 2014 Practical Safety Solutions, LLC What is Arc Flash? Definition

More information

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000 Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000 Description Firetrol FTA1000 Full Voltage Fire Pump Controllers are intended for use with electric motor driven fi re pumps

More information

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Assessing The Hazards Of High and Low Voltage Single-Phase Arc-Flash By Albert Marroquin One common question

More information

IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS

IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS Paul A Zoubek, CSP, CIH Occupational Services, Inc. San Diego, CA 619-861 861-0612 paul@occsev.com OCCUPATIONAL SERVICES, INC. BACKGROUND Update Update

More information

T-016: Paralleling Application Manual

T-016: Paralleling Application Manual Application Engineering T-016: Paralleling Application Manual English Original Instructions 6-2014 A040W370 (Issue 4) Table of Contents 1. INTRODUCTION... 1 1.1 Overview... 1 1.2 About This Manual...

More information

Effective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6

Effective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6 Public Service Board Page 1 of 6 STANDARD APPLICATION FOR INTERCONNECTION OF GENERATION RESOURCES IN PARALLEL TO THE ELECTRIC SYSTEM OF: (Interconnecting Utility) Preamble and Instructions: An owner of

More information

Primary and Secondary Electrical Distribution Systems

Primary and Secondary Electrical Distribution Systems Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

HIGH VOLTAGE SHORE CONNECTION

HIGH VOLTAGE SHORE CONNECTION Guide for High Voltage Shore Connection GUIDE FOR HIGH VOLTAGE SHORE CONNECTION NOVEMBER 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011

More information

QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room

QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings

More information

RISK MITIGATION for ELECTRICAL WORK. Feb 2013 San Diego CA

RISK MITIGATION for ELECTRICAL WORK. Feb 2013 San Diego CA RISK MITIGATION for ELECTRICAL WORK Feb 2013 San Diego CA Agenda I. RISK Define the Risks Arc Flash Review II. MITIGATION 3 Easy Steps New Designs Vs. Existing Systems III. DUKE UNIVERSITY EXAMPLE I. Risk

More information

Grounding of AC generators and switching the neutral in emergency and standby power systems

Grounding of AC generators and switching the neutral in emergency and standby power systems Power topic #6006 Part 2 of 2 Technical information from Cummins Power eneration rounding of AC generators and switching the neutral in emergency and standby power systems > White paper By Lawrence A.

More information

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B SURGE PROTECTIVE DEVICES (SPDs) EXTERNAL SIDEMOUNT UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

Rule 5.500 Fast Track Analysis for National Life Insurance Co.

Rule 5.500 Fast Track Analysis for National Life Insurance Co. Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION

More information