Grounding of Electrical Systems NEW CODE: Grounding and Bonding
|
|
|
- Kristina Arnold
- 9 years ago
- Views:
Transcription
1 Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE
2 Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately Derive System Grounding Electrode Bonding Ground Fault Protection Ground Reference or Signal Reference Grounding for Lightning Protection
3 Definitions Review definition as we encounter them. Grounded vs Grounding Isolated Ground Floating Ground Ground Loop Net Current
4 Why am I grounding or Not? Safety Grounding for Fault Current Paths Grounding for Touch Potential (static) Grounding for Lightning Protection Surge Arresters, TVSS (SPD) Grounding for Signal Reference (RF, Data, static,etc.) Not Grounding Continuous operation
5 Three reasons for grounding Fault Protection Lightning Protection Signal Reference
6 Grounded vs Grounding Grounded vs. grounding in an electrical system. Grounded system refers to a system where a conductor is grounded and is intended to or may carry current in the normal operation. The neutral on a wye system is a prime example of a grounded conductor. The grounding conductor system is not intended to carry operational current in its design. This path is intended to carry unwanted and fault currents for protection.
7 Types of AC Grounded Systems Ungrounded system Solidly Grounded System Resistance Grounded Reactance Grounded Ground Fault Neutralizer
8 Which System to Use?? Safety - Who is Operating the System Ground Fault Detection Signal Reference Touch Potential (also static) Available Fault Currents? Operation Stability System Response
9 Ungrounded System Type of system typically used on is a Delta service. Some time used on a floating Wye Detection System in Place Ground Detection by Lighting Zigzag Grounding Transformer Ground Relay Ground Fault???
10 Detection Devices
11 Solidly Grounded System Usually use in Wye systems Return Fault current to trip overcurrent protection device quickly Usually better reference and safer system Much better for lightning protection Can be used in Corner Grounded Delta Problems with phase grounded re-grounded Not good on lightning protection equipment
12 Resistive grounded Low Resistance Limit Fault Current Minimizes the damage at the fault Used usually with multiple sources i.e. transformers, and or generators High Resistance Enables system operation with one phase grounded Enables current to flow for detection networks Current is low enough so that no damage occurs
13 Reactance Grounding Reactor connected between system neutral and ground Reduces the ground fault current between phase and ground Usually higher fault current than low resistance grounding Better coordination with fault currents on multi-grounded system. Mostly used on system above 5kV.
14 Ground-Fault Neutalizer Reactor with relatively high value of reactance. Usually on system above 15kV phase to ground air exposed. (overhead Transmission and Distribution) May provide insulator flashover with selfextinguishing characteristics.
15 Separately Derived System The system grounding conductor for a separately derived system shall be grounded at only one point. Main system Disconnecting means for a main utility feed, or a step down or step up transformer, or a generator could all be separately derived systems. When grounded it will be grounded at the nearest grounding electrode.
16 Grounding Electrode System and Grounding Electrode Conductor Part III NEC (Grounding Electrode System) Electrodes Water Pipe if 10 ft. or more of metal water pipe is in contact with the earth. Metal Frame of the Building or Structure where the following methods are used to make an earth connection: (1,2,3,4) Concrete-Encased Electrode in at least 2 of concrete located within and near the bottom of a concrete foundation or footing that is in indirect contact with the earth. Ground Ring encircling the building or structure in direct contact with the earth Rod or Pipe electrode not less than 8 ft in length Plate Electrode not less than 2 square ft. Other Local underground systems such as piping, underground tanks and underground metal well casing NOT Permitted Metal underground gas piping Aluminum electrode
17
18 Grounding Electrode System Installation NEC This requirement clarifies that the supplemental electrode system must be installed as if it were the sole grounding electrode Bonding NEC C This requirement is for bonding of multiple electrodes.
19 Bonding Bonding for Main Bonding Jumper System Bonding Jumper Electrode Bonding Part V Bonding Where necessary to ensure electrical continuity and the capacity to conduct safely and fault current likely imposed.
20 Ground? Hot Neutral Ground
21 Review Ohms Law Voltage = Current X Resistance (Potential) (amps) (ohms) BONDING Ground Rod Develop VOLTAGE Develop VOLTAGE Ground Rod Current Source Lightning Average current 30,000 amps
22 Grounding and Bonding Voltage Difference Transient voltages and currents at data port or cable connections
23 Isolated Ground NEC (D) Isolated ground receptacle (orange triangle) NEC 406.2(D) NEC (B) Isolated Grounding Circuits NEC 647 Section Sensitive Electronic Equipment. NEC Grounding. Technical Equipment Ground
24 Isolated Ground Isolated grounded receptacle has an isolated terminal from the yoke to the ground Lug. These receptacle are usually marked with an orange triangle or all orange. Sub Panel Neutral Bus Ground Bus
25 Floating Ground The neutral on a wye system is not intentionally grounded Signal conductor shielding is not intentionally grounded Problem is high transient voltage or overvoltages may exist causing damage. Not a good way for lightning protection
26 Ground Loop Grounds from two different derived system are connected Open ground loops. Grounds are not bonded properly and cause damage. Ground loops cause circulating current between systems and cause transformer coupling (CT s) Signal reference can be compromised causing data errors.
27 Grounding for Signal Reference Don t Burst the Bubble. Ground on one end Ground on both ends Ground on neither end Fiber Optic Best Answer Optical Coupler
28 Don t Burst the Bubble
29 Ground Fault Interrupter Function
30 Net Current Currents that are not apart of the normal operation of a derive electrical system. All positive, negative, and zero sequence currents added and the resultant current are net currents.
31 Books On Grounding NEC IEEE Green Book Recommended Practice for Grounding of Industrial and Commercial Power Systems Emerald Book Recommended Practice for Powering and Grounding Sensitive Electronic Equipment Industrial and Commercial Power system Handbook
Grounding & Bonding Why it is done And How to Install Properly
Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.
Services. Three Phase Service
Services Primary Service vs Secondary Service Overhead vs Underground Common Service Types Three Phase Wye Closed Open Delta Corner Grounded Center Tapped Open Single Phase Three Phase Service Wye Delta
CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
Electrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
Video Camera Installation Guide
Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide
270526-TC Grounding and Bonding for Telecommunications Systems
270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer
Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers
9229 Waterford Centre Dr. Bldg C, Suite 110 Austin, Tx 78758 Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers Current Version: 13 AC Modules are a new product
STREETLIGHT SYSTEM GROUNDING AND BONDING
Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial
ELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current
The following table shows approximate percentage wise the
SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are
Chapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS
PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS Monograph by: John Grizzy Grzywacz, Professor OSHA National Training Institute Arlington Heights, Illinois Contributing: Michael Kovacic, President
1. Franklin Rod Performance 2. LEC/DAS Performance
THREE ESSENTIALS OF LIGHTNING PROTECTION: BONDING, GROUNDING AND SURGE PROTECTION by Richard Kithil, President and Orlando Alzamora, Vice-President National Lightning Safety Institute (NLSI) 1.0 Summary.
GROUNDING AND BONDING ELECTRICAL SYSTEMS
GROUNDING AND BONDING ELECTRICAL SYSTEMS Produced and Distributed By Engineer Educators, Inc. 857 East Park Avenue Tallahassee, FL 32301 2007-2008 EngineerEducators.com / Tallahassee, FL GROUNDING AND
Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance
WHITE PAPER Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance Overview Enphase has developed a new microinverter family that includes the M250 and new
Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.
Grounding Practice at Data and Communications Centers David Brender, P.E., CPQ National Program Manager Copper Development Association Inc. Overview of This Presentation Elements of building wiring and
David Brender Copper Development Association Inc. [email protected]. Miramar, March 8, 2013
Grounding and Bonding in Communications Systems David Brender Copper Development Association Inc. [email protected] Ennes Workshop Miramar, March 8, 2013 MMXIII This talk concentrates on:
White Paper: Electrical Ground Rules
Acromag, Incorporated 30765 S Wixom Rd, Wixom, MI 48393 USA Tel: 248-295-0880 Fax: 248-624-9234 www.acromag.com White Paper: Electrical Ground Rules Best Practices for Grounding Your Electrical Equipment
Customer Substation Manual 08/05/02
Customer Substation Manual Table of Contents Section Page 2 of 85 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
SAES-P-111 28 January, 2004 Grounding. Electrical Systems Designs & Automation Standards Committee Members
Engineering Standard 28 January, 2004 Electrical Systems Designs & Automation Standards Committee Members Ishwait, Basel A., Chairman Al-Hamrani, Majed M., Vice Chairman Almadi, Soliman M. Badrani, Hamed
Corner-Grounded Delta (Grounded B Phase) Systems
Data Bulletin 2700DB0202R03/12 09/2012 Replaces 2700DB0202R2/09 dated 02/2009 Corner-Grounded Delta (Grounded B Phase) Systems Class 2700 Retain for future use. Introduction Corner-grounded delta systems
PROTECTION AGAINST ELECTRIC SHOCK by John Ware
16 become live under fault conditions. The potential of the metal enclosure is higher than that of the main earthing terminal of the installation (and that of Earth) because of a potential difference created
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education
Significant Changes in the 2011 NEC Prepared by Bryan Holland City of North Port
Significant Changes in the 2011 NEC Prepared by Bryan Holland City of North Port Code-Wide Code Change Section 90.5(C). Fine Print Notes are now referred to as "Informational Notes." The purpose, intent,
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd
100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center Introduction Roger Hedding Steven Schoenherr, P.E. ABB Inc. Minnesota Power 598 N. Buth Rd 3215 Arrowhead Rd Dousman,
4.5 Transformer Connections
ELECTRIC POWER SYSTEMS IN COMMERCIAL BUILDINGS IEEE Std 241-1990 5) Flat Billing Ñ Certain applications involve service to the load of a Þxed characteristic. For such loads, the supplying utility may offer
Earth Ground Resistance
Principles, testing methods and applications Diagnose intermittent electrical problems Avoid unnecessary downtime Learn earth ground safety principles Earth Ground Resistance Why Ground, Why Test? Why
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System Cory David Smith, Project Manager, ECOM Engineering Inc., and David Lawrence Smith, Principal, ECOM Engineering
Rule 5.500 Fast Track Analysis for National Life Insurance Co.
Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION
Substation Grounding Study Specification
Substation Grounding Study Specification Introduction A grounding study is required for name of station, a / / kv substation located in name of location and connected to the following circuits: number
Lightning Arresters P30027 18 KVA P30038 10 KVA. Description & Installation
Lightning Arresters P30027 18 KVA P30038 10 KVA Description & Installation Printed in USA 09/11 TO330 Rev. B Table of Contents Page 1.0 SCOPE 2 2.0 PRODUCT OVERVIEW 2 2.1 Intended Uses 2 2.2 Lightning
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
What are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC
TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23
INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23 GUIDELINES FOR WORKING WITH PORTABLE POWER DISTRIBUTION SYSTEMS AND OTHER ELECTRICAL EQUIPMENT "ADDENDUM C" WORKING WITH 480 VOLT SYSTEMS
SECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
Tips for connecting 24-volt power
Digital Designer s Guide Application NoteAN0604D Revision B Tips for connecting 24-volt power This application note covers choosing a transformer and connecting 24 volt AC power to a KMC Controls DDC controller.
Digital Energy ITI. Instrument Transformer Basic Technical Information and Application
g Digital Energy ITI Instrument Transformer Basic Technical Information and Application Table of Contents DEFINITIONS AND FUNCTIONS CONSTRUCTION FEATURES MAGNETIC CIRCUITS RATING AND RATIO CURRENT TRANSFORMER
Product Guide. Low voltage grounding system. Answers for industry.
Product Guide Low voltage grounding system Answers for industry. Advanced switchgear solutions for process industries In today s high-tech manufacturing world, profitability can be greatly impacted by
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS
SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS Claudio S. Mardegan [email protected] www.engepower.com Phone: 55 3579-8777
System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems
System Grounding and Ground-Fault Protection Methods for -Supplied Power Systems Bill Brown, P.E., Square D Critical Power Competency Center 1. INTRODUCTION The use of solid grounding for -supplied power
GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS Customer Handout Date Aug 2, 2010 Version 1.0 File Name Customer Requirements At Power Substations Document Id Outside Plant Engineering 1 Table Of Contents 1.0
Grounding of AC generators and switching the neutral in emergency and standby power systems
Power topic #6006 Part 2 of 2 Technical information from Cummins Power eneration rounding of AC generators and switching the neutral in emergency and standby power systems > White paper By Lawrence A.
Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392
1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of
IP PHONE SYSTEM. CooVox Series-U60 For Small and Medium Business. Quick Installation Guide. www.zycoo.com
SYS WAN LAN IP PHONE SYSTEM Series-U60 For Small and Medium Business Quick Installation Guide www.zycoo.com Table of Contents 1 Package Contents 2 Hardware Installation 2.1 Safety Precautions 2.2 Installation
CHECKING AND TESTING ELECTRICAL INSTALLING WORK
CHECKING AND TESTING ELECTRICAL INSTALLING WORK Department of Consumer and Employment Protection Energy Safety Preface It is a requirement of the Electricity (Licensing) Regulations 1991 that all electrical
Lightning Protection Introduction
Lightning Protection Introduction Structural lightning protection design considerations BS 6651 (Protection of structures against lightning) clearly advises strict adherence to the provision of a conventional
Power Quality for Information Technology System
Power Quality for Information Technology System ITS OBVIOUS THE TOLERANCE IS DIFFRENT But What isn t Tobvious? HOW MANY OF YOU HAVE : A COMPUTER AT HOME? = Computers are not screens and Keyboards COMPUTERS
Atlanta Chapter IEEE Industry Applications Society
Atlanta Chapter IEEE Industry Applications Society Electrical Equipment Room Design Considerations presented at the Sheraton Buckhead Hotel Atlanta, Georgia November 20, 2006 Outline 1. Definitions 2.
Section B: Electricity
Section B: Electricity We use mains electricity, supplied by power stations, for all kinds of appliances in our homes, so it is very important to know how to use it safely. In this chapter you will learn
101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer
101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION Cutler-Hammer WELCOME Welcome to Module 3, Fundamentals of Electrical Distribution. If you have successfully completed Module
Application Guidelines for Transformer Connection and Grounding for Distributed Generation: An Update
Application Guidelines for Transformer Connection and Grounding for Distributed Generation: An Update Copyright Material IEEE Paper No. ESW2013-14 Eric Weisgerber P.K. Sen, P.E. Keith Malmedal, P.E. Student
Three-Phase Electric Power Distribution for Computer Data Centers
Three-hase Electric ower Distribution for Computer Data Centers WHITE AER E901 Geist January 008 Summary This paper will describe the characteristics of three-phase power and outline the advantages of
PXL-250: Network Wiring
This document provides the network wiring requirements for a PXL-250 access control network. Network Requirements The PXL-250 uses a half-duplex, RS-485 communication bus. Per the RS-485 specification,
Chapter 2. Grounding & Shielding. 2.1 Grounding generalities
Chapter 2 Grounding & Shielding Safety, system protection and performance are the three main reasons to earth a system. Not all electronic equipment needs to be connected to earth to work, satellites are
PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS
PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values a) For 33/11 KV Power Transformer 2500 V megger is to be need. b) Power Transformer neutral Earthing is
How Much Voltage Drop Is Acceptable?
How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed
Earthing Guidance Notes
Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head
GroundRod AC Substation Earthing Tutorial
1 GroundRod AC Substation Earthing Tutorial 1. Functions of an earthing system The two primary functions of a safe earthing system are: To ensure that a person who is in the vicinity of earthed facilities
Model 1756 Test Lead Kit
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-888-KEITHLEY http://www.keithley.com Model 1756 Test Lead Kit Gerneral Purpose Test Lead Information Description These test leads allow you
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13
Interfacing electrification and system reliability Roger White Professional Head of Electrification and Plant Rail Abstract Integration is the term given to ensuring that the different elements of an electrified
DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS
MIOSHA-STD-1313 (10/15) 6 Pages For further information Ph: 517-284-7740 www.michigan.gov/mioshastandards DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS
Earth Fault Detection Basics in Theory
Earth Fault Detection Basics in Theory Author: Dipl.-Ing. Ingo Kühnen Woodward Power Solutions Krefelder Weg 47 47906 Kempen, Germany Kempen, 16.04.2010 Earth_Fault_Detection_20100416.doc page 1 1. Star
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
Arc Fault Circuit Interrupters Frequently Asked Questions
Contents My AFCI is tripping! What do I do? What is the difference between branch feeder and combination type Arc Fault Circuit Interrupters? What is new with the 2008 NEC versus the 2005 NEC with respect
Assessment of Soil Resistivity on Grounding of Electrical Systems: A Case Study of North-East Zone, Nigeria
Assessment of Soil Resistivity on Grounding of Electrical Systems: A Case Study of North-East Zone, Nigeria Abstract Gabriel A. Adegboyega and Kehinde O. Odeyemi Department of Electrical and Electronic
Electrical safety requirements in DC distribution systems
Electrical safety requirements in DC distribution systems PAUL J.L.AN TICHELEN, DOMINIQUE WEYEN ITO Boeretang 200, 2400 Mol BELGIUM Abstract: This paper focuses on the safety requirements for the DC bus
How to design SMPS to Pass Common Mode Lightning Surge Test
Application Note, V1.0, September 2006 How to design SMPS to Pass Common Mode Lightning Surge Test Power Management & Supply N e v e r s t o p t h i n k i n g. Edition 2006-09-06 Published by Infineon
The Service Entrance. Technical Terms Drip loop Insulator Meter Meter enclosure
This sample chapter is for review purposes only. Copyright The Goodheart-Willcox Co., Inc. All rights reserved. 10 The Entrance Objectives Information in this chapter will enable you to: List the components
Applications. Remote Display Mounting Kits
June 200 Sheet 105 Surge Protection Products TVSS General Description Clipper Power System Visor Series.1-5 Clipper Power System Visor Series General Description Eaton s Cutler-Hammer leading-edge surge
ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST
Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist
Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation
Medium Voltage (MV) & High Voltage (HV) Training Module 6 Date of the presentation Electrical System Basics MV vs. HV - Definitions Differences between USA and the rest of the world IEC define a high voltage
Fundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At
Switchgear Application Issues for Mission Critical Power Systems, Part One
Switchgear pplication Issues for Mission Critical Power Systems, Part One BSTRCT With the advent of high reliability data centers and telecommunication facilities, designers of commercial power face new
Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
CSA Z32 TESTING GUIDELINE AND PROCEDURES
PO Box 20020 Red Deer, AB T4N 6X5 Phone: 403.986.2939 Web: www.908eng.com July 9, 2012 CSA Z32 TESTING GUIDELINE AND PROCEDURES This document is intended to outline the various tests, procedures and preparations
RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:
RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,
Requirements for the Attachment of Communication Cable Facilities on PPL Poles
Page 99 of 137 Requirements for the Attachment of Communication Cable Facilities on Replaces: URS-3002 URS-3004 URS-101C-304 A-157649 Page 100 of 137 Reference Notes for Drawings: General 1. The term communication
Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers
Technical Note Freedom/Fleet Power 512-0084-01-01 Rev 1 Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers Overview This document is a guide for troubleshooting inverters, battery chargers,
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
Grounding and Electrical Safety of Shore Power Supply and DC Stinger System Design
Grounding and Electrical Safety of Shore Power Supply and DC Stinger System Design Dev Paul AECOM 2101 Webster Street, Suite 1900, Oakland, Ca 94612 [email protected]; (510) 419 6448 Abstract: To enhance
HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
Installation instructions for mains wire-in protectors ESP D1, D1R, D1/LCD and D1R/LCD variants
Installation instructions for mains wire-in protectors ESP D1, D1R, D1/LCD and D1R/LCD variants Introduction This document explains how to install Furse Electronic Systems s for mains power supplies: Single
AC and DC Drive System Installation Information
Purpose This document contains the Parker SSD Drives recommendations for installing drive systems. These instructions must be followed for safe and reliable operation. Instructions CODES AND REGULATIONS
Short Circuit Current Calculations
Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that
National Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL ELECTRICIAN V4 ELEC26_O4 Released September 2013 Focus Statement An Industrial Electrician must be able to interpret