1 Arc Resistant Switchgear n Insulated and isolated bus n Separation barriers and top venting n Breaker shutters 12 SWITCHGEAR Arc resistant metal-enclosed low voltage switchgear is an optional product offering that contains and channels internal arcing fault energy. This new switchgear construction provides an additional degree of protection to the personnel performing normal operating duties in close proximity to the equipment while the equipment is operating under normal conditions. In each of the descriptions below, additional design features are indicated, all of which aid in directing faults upward away from personnel or reduce the chances of a fault by insulating and isolating live parts. Front view Door gaskets and sealing trims Type 2B accessibility rating allows auxiliary/control compartment door to be open and still maintain arc resistant rating Extra hinges Thumb screw latches added One piece breaker door Enhanced sill channel with internal plenum for arc venting Breaker sealing frame maintains arc resistant rating with breaker in Connect, Test or Disconnect position. Rear view Pressure release vent in rear top cover Extra bolts and pressure dams in rear covers/doors Rear vent covers extended for vent flaps Extra bolts on end trim sheets Siemens Canada Limited Power Product Catalogue
2 1 DLA: 1600 Man.: SIEMENS Type: WLL Size: WLL 800A Trip: ETU 776 LSIG Max A/Plug/Setting: 800 / 800 DLA: 1600 Man.: SIEMENS Type: WLL Size: WLL 1600A Trip: ETU 776 LSIG Max A/Plug/Setting: 1600 / 1600 Low Voltage Switchgear GRID GRID BUS 1 Dynamic Arc Sentry One of the trip units available for the Siemens WL Family of GEN 1 breakers is the ETU 776. It offers dual parameter BUS 2 sets that BUS 3 Vs:480 V enable the trip unit to automatically lower the instantaneous setting and thereby lower the available energy in a fault condition. Commonly referred to as maintenance mode, making a breaker trip faster while engaged in any form of mainte- Example 1 TX-4 PPE: 3 AHE: 10.6 cal/cm^2(100%) AFB: in WD: 24 in BUS WL 1600 TX-4 GEN 1 nance or just by being in proximity to energized equipment is BUS 2 BUS 3 Vs:480 V an effective way to minimize arc flash dangers. If one is concerned about the effects of temporarily inhibiting selectivity, then rest assured that with the ETU 776 single step changes are possible giving engineers the ability to clear faults faster with minimum effect on coordination. In the example below the effects of the DAS system may be seen. PPE: 0 AHE: 0.74 cal/cm^2(100%) AFB: in WD: 24 in 1600 WL Switchgear WL WL WL WL WL WL 1000 PANEL 2 PANEL 3 POWER POWER PANEL 2 POWER PANEL WL WL WL WL WL WL PANEL 2 PANEL 3 POWER POWER PANEL 2 POWER PANEL Time in Seconds Current in Amperes X Volt Phase Time-Current Characteristic Curves TCC 2 13:48:48 Parameter Set B Parameter set "A" Parameter set "B" C:\EDSA2005\Projects\DAS SWGR whitepaper.pdc WL Breaker with ETU 776 Dual Parameter sets enable maintenance mode - can be set remotely via software or automatically via digital input. Siemens Canada Limited Power Product Catalogue 12-15
3 12 SWITCHGEAR Under normal conditions, the switchgear s calculated arc flash energy will require PPE level 3 protection for anyone within the arc flash boundary. Incorporating the features built into the DAS system, and using the ETU776 trip unit, the system changes to parameter set B. In the second figure the instantaneous has been changed to a lower setting and the calculation shows a reduction of arc flash energy. The Example 2 resultant PPE level has been reduced to 0. Below is another example of the benefit of the DAS, or even manual switching, of breaker parameter set. The reduced settings set available in the ETU 776 can also be used to reduce the arc flash energy at downstream equipment. In the first figure on the left with normal settings the arc energy at panel 1 requires PPE level 2. After switching to the parameter B settings, the PPE level at Panel 1 is reduced to 0. WL WL PPE: 2 AHE: 5.9 cal/cm^2(85%) AFB: in WD: 17.9 in Arc Flash in parameter A Arc Flash in parameter A Arc Flash in parameter B Siemens Canada Limited Power Product Catalogue
4 Remote operation and monitoring n Remote Monitoring for temperature, metering and maintenance data. n Remote Control via communications with or without interposing relays. n Remote Racking feature. n Remote Operation for opening and closing via local hand held pendant station. Remote Monitoring is an effective way to maintain separation between personnel and energized electrical equipment. With the latest equipment from Siemens, this is now easier and more cost effective than ever. Maintenance personnel and engineers can now view real-time electrical parameters, operating conditions (like temperature in the breaker and number of operations), and open and close breakers remotely. The WinPM.Net software with its Web Enabled interface allows multiple users to access only the information they are interested in from the convenience of their desks. Accountants can access cost allocation and utility billing information to enforce accountability for electrical resources and verify utility bills. Trip settings and other parameters for the LV power breakers can be modified and monitored remotely as well. In addition, WL breakers with appropriate electrical controls and communication components, can be opened and closed through communications directly or with the use of interposing relays. 12 Switchgear Unit sub #5 elevation Real-time data from WL breakers with remote open/close capability Siemens Canada Limited Power Product Catalogue 12-17
5 12 SWITCHGEAR Remote Racking Device Although it is always preferable to work on equipment that has been de-energized, in some cases it may not be practical. Siemens now offers the Remote Breaker Racking Device. This product uses an integral torque overload sensing mechanism and allows users to safely rack our WL breakers into the Connect, Test and Disconnect position from up to 30 feet away. This allows the operator to be outside the arc flash boundary thereby providing additional personnel protection and reducing the PPE requirements. This system can be retrofitted to existing Siemens WL switchgear lineups. Remote Racking Device Remote Operator Pendant This hand held pendant allows a user to remotely operate (open/close) a WL breaker without being in front of the switchgear. Standard cable lengths are 30 feet with other lengths available. This pendant, along with the Remote Racking device, can be used to improve personnel safety by putting operators outside the arc flash boundary. Maintenance personnel can remotely open breakers and close breakers, without being in front of the equipment. The Remote Operator Pendant can be used in combination with the Remote Racking Device for added personnel safety. Remote Operator Pendant Control port on WL Switchgear Siemens Canada Limited Power Product Catalogue
6 Other protection options n Infrared Viewing ports n Zone Selective Interlocking n High Resistance Grounding Infrared Viewing Ports Infrared viewing ports allow maintenance personnel to monitor temperatures of the cable and bus connection points in the rear of the gear while it is energized and under load. Excessive temperatures can be an indication of a problem with a connection. Infrared viewing ports 12 Switchgear Zone Selective Interlocking Zone Selective Interlocking eliminates any intentional time delay in the event a fault occurs between two breakers in adjacent zones. In the schematic to the right, representative time delay values are shown for the breakers in each zone. If a fault occurs on the load side of the downstream breaker, the ZSI system enables the upstream breaker s delay and allows the downstream device more time to independently clear the fault. If the fault occurs on the line side of the downstream breaker (between two zones), the delay in the upstream breaker will not occur. This allows the fastest tripping time for faults and will reduce the amount of arc energy which may be released. The ZSI function is available for short time delays and ground fault delays. High Resistance Grounding Research has shown that a high percentage of arc faults start as a phase to ground fault. High resistance grounding systems minimize the available phase to ground arcing current. A high resistance grounding system reduces the magnitude of phase to ground faults. This will reduce the mechanical stress on equipment for the most common of faults and will reduce the magnitude of energy released. Zone Selective Interlocking PH1 PH2 PH3 PH1 PH2 NEUT 3-CLF 2-CLF ROD ISTOR METER SYSTEM SWITCH SYSTEM SWITCH AM W NORMAL ISTOR METER W NORMAL WIRE LOOP FOR PORTABLE DETECTOR R FAULT AM R FAULT G WIRE LOOP FOR PORTABLE DETECTOR G CONTROL CIRCUIT SW CONTROL CIRCUIT SW Siemens Canada Limited Power Product Catalogue 12-19
Contents. Low Voltage Metal-Enclosed Switchgear 12-2 Secondary Unit Substations 12-20. 12 Switchgear
12 POWER PRODUCT Switchgear Contents Low Voltage Metal-Enclosed Switchgear 12-2 Secondary Unit Substations 12-20 12 Switchgear 12 SWITCHGEAR Type WL Low Voltage Metal-Enclosed Switchgear 2 Siemens WL breakers
The following components are common to most cubicles; this example is an ABB HK cubicle.
4.0 CIRCUIT BREAKER CUBICLE Learning Objectives The circuit breaker cubicle is the component of the switchgear that holds the circuit breaker, and the controls and cabling for the distribution system.
Part 1 System Modeling & Studies for Existing Systems
Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures
Enhancing Personnel Safety with Arc Resistant Equipment
Enhancing Personnel Safety with Arc Resistant Equipment Carl Christian Power LV Offer Marketing Nashville, TN Sponsored by the Water Wastewater Competency Center 1 Enhancing Personnel Safety 5-10 Five
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation
Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers
Power-Zone 4 Arc Resistant Low Voltage Switchgear
Power-Zone 4 Arc Resistant Low Voltage Switchgear with ArcBlok Technology Make the most of your energy SM Workplace safety 2 I Power-Zone 4 Arc Resistant Low Voltage Switchgear Five to ten arc flash explosions
FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
UL Validated Testing of Arc-Resistant Motor Control Centers
UL Validated Testing of Arc-Resistant Motor Control Centers Ensure Protective Features Perform as Designed Larry Sifers Account Manager Littleton, CO Siemens Industry June 1st - 3rd, 2011 Western Mining
Arc Flash Energy Mitigation Techniques
Arc Flash Energy Mitigation Techniques When short circuits occur on an electrical distribution system, an arc flash event usually forms. These arc flash events can cause dangerous and potentially fatal
Product Guide. Low voltage grounding system. Answers for industry.
Product Guide Low voltage grounding system Answers for industry. Advanced switchgear solutions for process industries In today s high-tech manufacturing world, profitability can be greatly impacted by
How to reduce exposure to arc flash hazards
GE Energy Industrial Solutions How to reduce exposure to arc flash hazards Multiple solutions for new and existing facilities imagination at work Multiple Issues Today s power system engineer must not
Safety By Design. Strategies for Electrical Contractors
Safety By Design Strategies for Electrical Contractors Introduction Engineering and system design significantly impact worker safety System design provides opportunity to eliminate/minimize workers exposure
2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY
2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY Thomas P. McNamara, P.E. Manager, Development Engineering ABB Inc. Power Technologies Medium
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY
Siemens tiastar TM Motor Control Center (MCC) Siemens 2011. All rights reserved.
Siemens tiastar TM Motor Control Center (MCC) Siemens 2011. All rights reserved. tiastar Arc Resistant MCCs UL Validated Testing of Arc-Resistant Motor Control Centers page 2 tiastar Arc Resistant MCCs
Arc Flash Mitigation & Selective Co-ordination
Arc Flash Mitigation & Selective Co-ordination Michael Hodder March 2015 Overview This seminar will provide information on: Mitigating arc flash hazards Selective Coordination What can we do to make these
Sample - No Commercial Use
COMPLETE REVISION October 2010 Electrical PIP ELSSG01 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort
RISK MITIGATION for ELECTRICAL WORK. Feb 2013 San Diego CA
RISK MITIGATION for ELECTRICAL WORK Feb 2013 San Diego CA Agenda I. RISK Define the Risks Arc Flash Review II. MITIGATION 3 Easy Steps New Designs Vs. Existing Systems III. DUKE UNIVERSITY EXAMPLE I. Risk
2008 Eaton Corporation. All rights reserved.
FlashGard TM Motor Control Center Electrical Safety Hazards Design Philosophy The Product 2008 Eaton Corporation. All rights reserved. Research studies say. Five to 10 arc flash explosions occur in electrical
ZONE SELECTIVE INTERLOCKING (ZSI) APPLICATION AND TESTING GUIDE SIEMENS WL UL489 AND UL1066 AIR CIRCUIT BREAKERS
Definition: Zone Selective Interlocking (ZSI) - A method which allows two or more ground fault breakers to communicate with each other so that a short circuit or ground fault will be cleared by the breaker
Understanding Arc Flash
Understanding Arc Flash Presented by Eddie F. Jones, PE 1 2 3 4 5 Five to 10 arc flash explosions occur in electric equipment every day in the United States. This number does not include cases in which
METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.
METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV tgood.com Energy. Fast. TGOOD produces over 5000 switchgear units annually for projects around the globe PRODUCT OVERVIEW Integral substation component
BRANDON AND CLARK INC. // SCOTT W. CLARK, P.E. ELECTRICAL CONTINUING EDUCATION ARC FLASH - NFPA 70E
BRANDON AND CLARK INC. // SCOTT W. CLARK, P.E. ELECTRICAL CONTINUING EDUCATION ARC FLASH - NFPA 70E Training is not a substitute for following corporate safety guidelines. Always refer to the latest safety
HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE
Appendix B-2 - Electrical Safety In Design Final Report TECHNOLOGIES THAT REDUCE LIKELIHOOD OF INJURY FROM ELECTRICAL HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE The following are technologies that reduce
4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS
4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE
Submit shop drawings for equipment provided under this section Shop drawings shall indicate:
Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,
Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear.
Arc Flash Mitigation Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear. Distance is Safety We will discuss through examples of actual occurrences and possible
MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED
MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED CCG Facilities Integration Incorporated
Choosing the Best Solution for Reducing Arc Energy
CONVENTION SESSION HANDOUT Choosing the Best Solution for Reducing Arc Energy Terry L. Schiazza, Business Development Manager Square D / Schneider Electric SESSION #11 Independent Electrical Contractors
Technical Guide. SKM Arc Flash Line Side vs. Load Side
SKM Arc Flash Line vs. Load The option of choosing the line-side or the load-side arc flash incident energy for arc flash labels is an important decision when performing an arc flash hazard analysis. When
ARC FLASH HAZARD MITIGATION. Industrial Tests, Inc. [indtests.com]
ARC FLASH HAZARD MITIGATION ARC FLASH HAZARD MITIGATION NWHA TECHNICAL SEMINAR May 17, 2012 Richard D Reese Power Systems Manager Industrial Tests, Inc. Rocklin, California [[email protected]; 916-660-2837]
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services
Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination
Primary and Secondary Electrical Distribution Systems
Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility
Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer [email protected]. Electrical Hazards 2/18/2015. Shock.
Arc Flash Hazards Dan Neeser Field Application Engineer [email protected] Electrical Hazards Electrical Hazards Shock Arc Flash Arc Blast 2 1 Arcing Fault Basics 35,000 F Radiant Heat & UV Speed of
A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software
A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software Abstract: The nature of explosive equipment failures, and the rate of serious burn injuries in the electrical industry
Fusible Disconnect Switch
Circuit Breakers Circuit breakers are used in panelboards and switchboards to provide circuit protection and provide a means of energizing and de-energizing a circuit. Siemens Sentron molded case circuit
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service
ARC FLASH CALCULATIONS & LABELING REQUIREMENTS
ARC FLASH CALCULATIONS & LABELING REQUIREMENTS Presented by: Edmund Elizalde EYP Mission Critical Facilities, Inc. Slides by: Lonnie Lindell SKM Systems Analysis, Inc. 1 Agenda NEC 110.16 NFPA 70E IEEE
Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000
Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000 Description Firetrol FTA1000 Full Voltage Fire Pump Controllers are intended for use with electric motor driven fi re pumps
misconceptions about arc-flash hazard assessments
misconceptions about arc-flash hazard assessments There are some common misconceptions about Arc-Flash Hazard Assessments which reduce the effectiveness of the Assessments and can increase electrical hazards.
Bypass transfer switch mechanisms
Power topic #6013 Technical information from Cummins Power Generation transfer switch mechanisms > White paper By Gary Olson, Director, Power Systems Development This paper describes the configuration
Alternate Methods to Short Circuit Breaker Coordination
Alternate Methods to Short Circuit Breaker Coordination Nguyen Perez, PE Senior Electrical Engineer 2600 Douglas Road, Suite 301 Coral Gables, Florida 305.529.1515 (p) www.brplusa.com Importance in Healthcare
IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS
IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS Paul A Zoubek, CSP, CIH Occupational Services, Inc. San Diego, CA 619-861 861-0612 [email protected] OCCUPATIONAL SERVICES, INC. BACKGROUND Update Update
A USERS GUIDE TO ARC RESISTANT LOW VOLTAGE SWITCHGEAR & MOTOR CONTROL ANALYTICAL COMPARISON VS ARC FLASH TEST RESULTS
A USERS GUIDE TO ARC RESISTANT LOW VOLTAGE SWITCHGEAR & MOTOR CONTROL ANALYTICAL COMPARISON VS ARC FLASH TEST RESULTS By: Gabriel Arce, ABB, San Luis Potosi, Mexico Casey McCollum, ABB, Houston, TX John
SECTION 16426C ARC RESISTANT DRAWOUT SWITCHGEAR (MAGNUM DS) LOW VOLTAGE
ARC RESISTANT DRAWOUT SWITCHGEAR (MAGNUM DS) LOW VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 SCOPE The Contractor shall furnish and install, where indicated on the drawings, a deadfront type, arc resistant
What s up with Arc Flash?
What s up with Arc Flash? Presented by Mark Haskins, CSP Practical Safety Solutions, LLC CONN OSHA Breakfast Roundtable February 18, 2014 2014 Practical Safety Solutions, LLC What is Arc Flash? Definition
ELECTRICAL SAFETY RISK ASSESSMENT
ELECTRICAL SAFETY RISK ASSESSMENT The intent of this procedure is to perform a risk assessment, which includes a review of the electrical hazards, the associated foreseeable tasks, and the protective measures
! WARNING Arc Flash and Shock Hazard Appropriate PPE Required
Arc Flash Hazard Labeling Do s and Don ts! WARNING Arc Flash and Shock Hazard Appropriate PPE Required 11' - 3" Flash Hazard Boundary 9 cal/cm2 Flash Hazard at 18 inches #3 PPE Level Cotton underwear plus
01.4IB.51200B PowlVac-AR Arc Resistant Switchgear. 5kV & 15kV 1200A, 2000A, 3000A, & 4000A Forced Cooled. Powered by Safety
PowlVac-AR Arc Resistant Switchgear 1200A, 2000A, 3000A, & 4000A Forced Cooled Powered by Safety PowlVac-AR Arc Resistant Switchgear 01.4IB.51200B Contact Information Powell Electrical Systems, Inc. www.powellind.com
Mitigation of Arc-Flash Hazards and Reduction of Costs by Selective Arc-Flash Protection
Mitigation of Arc-Flash Hazards and Reduction of Costs by Selective Arc-Flash Protection L. Kumpulainen, S. Dahl J. Ma Vamp Ltd, Finland Vamp Ltd, China 1 ABSTRACT This paper describes causes and characteristics
SENTRON Switching and Protection Devices Air Circuit Breakers
Siemens AG 9 SENTRON Switching and rotection Devices Air Circuit reakers 5 5/ Introduction 3WL Air Circuit reakers 3WL Air Circuit reakers/ Non-Automatic Air Circuit reakers up to 63 A (AC) 5/6 General
MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE
DESCRIPTION MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE DESCRIPTION The SST Model 5010 Two Channel Smoke/Fire Detection Module provides two independent detection input channels for the NOVA-5000
New standardized approach to arc flash protection
New standardized approach to arc flash protection Samuel Dahl Juha Arvola Tero Virtala Arcteq Relays Ltd Arcteq Relays Ltd Arcteq Relays Ltd Wolffintie 36 F 11 Wolffintie 36 F 11 Wolffintie 36 F11 65200
Extend the Life of Existing Switchgear
Extend the Life of Existing Switchgear January 2011/1910DB1002 by Hal Theobald, Product Manager Schneider Electric USA, Inc. Make the most of your energy SM Summary Introduction... p 3 Maintenance Requirements...
Secondary Unit Substations
14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically
Arc Flash Mitigation. Executive summary. by Antony Parsons, Ph.D., P.E.
by Antony Parsons, Ph.D., P.E. Executive summary Arc flash events can result in significant injury to workers, including severe burn injuries. The most effective arc flash safety programs are not those
Arc Flash Safety in 400V Data Centers
Arc Flash Safety in 400V Data Centers Strategies for protecting employees from underappreciated yet potentially deadly hazards By Dave G. Loucks PCM Solution Manager Eaton Corporation Executive summary
Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC
Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC Project name: Customer: Address, location of the system: Serial number
MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4
CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,
Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers
Specification Guide for RVAC Direct Replacement AC Medium Voltage Circuit Breakers Table of Contents 1.0 General Work Scope...3 2.0 Standards...3 3.0 Supplier Qualifications...4 4.0 Circuit Breaker Element
A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009
A Comparison of Contemporary Electrical Distribution Equipment Standards San Francisco IEEE Industry Applications Society May 26, 2009 What are Standards? Clearly defined performance characteristics Based
Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves
Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves White Paper July 2010 Integrating surge protective devices (SPD) into distribution equipment (i.e. switchgear, switchboards,
Masterclad Medium Voltage Passive Arc-Resistant Switchgear
Masterclad Medium Voltage Passive Arc-Resistant Switchgear Square D Masterclad medium voltage passive arc-resistant (AR) switchgear is designed with utilities and industrial customers in mind who demand
3053 Electrical Safety Training Program Course Outline
3053 Electrical Safety Training Program Course Outline The following outline summarizes the major points of information presented in the program. The outline can be used to review the program before conducting
QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room
QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings
Implementation of arc flash mitigating solutions at industrial manufacturing facilities
Thought leadership White paper Implementation of arc flash mitigating solutions at industrial manufacturing facilities David B. Durocher Senior Member, IEEE Global Industry Manager Eaton 26850 SW Kinsman
Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)
Common Electrical Hazards in the Workplace Including Arc Flash Presented by Ken Cohen, PhD, PE & CIH (Ret.) 1 What s New In February 1972, OSHA incorporated the 1971 edition of the National Fire Protection
Arc Terminator Active Arc-Resistant Switchgear
Arc Terminator Active Arc-Resistant Switchgear Increasing safety and productivity by extinguishing internal arcing faults within the switchgear. The Square D Arc Terminator from Schneider Electric offers
MCC Ratings. Voltage Rating
MCC Ratings In addition to the various ratings of individual components used in motor control centers, the overall ratings of the motor control center must also be considered. Voltage Rating Motor control
Low Voltage Circuit Breakers. Arc flash hazards
Low Voltage Circuit Breakers Arc flash hazards Index Low voltage selectivity with ABB circuit breakers Introduction... 2 Definitions, acronyms and terms used... 3 Electrical arcs and their dangerous effects
Electronic Trip Circuit Breaker Basics Circuit Breaker Application Guide Class 0600
Electronic Trip Circuit Breaker Basics Circuit Breaker Application Guide Class 0600 Data Bulletin 0600DB1104 03/2012 Retain for future use. Electronic Trip Circuit Breaker Basics 0600DB1104 Table of Contents
Medium Voltage Motor Control Assemblies
Medium Voltage Motor Control Assemblies Arc Resistant AMPGARD.1 Product............................................. 2 Application........................................... 2 Features, Benefits and Functions...................................
DATA CENTER UNIQUE CHARACTERISTICS AND THE ROLE OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS
DATA CENTER UNIQUE CHARACTERISTICS AND THE ROLE OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS ABSTRACT Data Centers are a critical part of the world economic systems. Billions of electronic transactions happen
Switchgear and Metal-Enclosed Bus
Section 18 Switchgear and Metal-Enclosed Bus 180. SWITCHGEAR ASSEMBLIES 180A. General Requirements for All Switchgear. This rule covers general requirements for all switchgear. Examples of switchgear found
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
Spending too much to maintain aging switchgear? Circuit breaker solutions from Square D Services.
Spending too much to maintain aging switchgear? Circuit breaker solutions from Square D Services. Spending too much time and money on equipment maintenance? Square D Services: Your source for circuit breaker
Fault Characteristics in Electrical Equipment
1. Introduction Proper design and installation of electrical equipment minimizes the chance of electrical faults. Faults occur when the insulation system is compromised and current is allowed to flow through
PIP ELSSG02 Design and Fabrication of Medium Voltage Metal-Clad Switchgear from 4.76 kv to 38 kv
Electrical Design and Fabrication of Medium Voltage Metal-Clad Switchgear from 4.76 kv to 38 kv Table of Contents 1. Introduction...2 1.1 Purpose... 2 1.2 Scope... 2 2. References...2 2.1... 2 2.2 Industry
ARC FLASH HAZARD OVERVIEW. Presented August 13, 2015 WWOA Lake Michigan District by Mead & Hunt, Inc.
ARC FLASH HAZARD OVERVIEW Presented August 13, 2015 WWOA Lake Michigan District by Mead & Hunt, Inc. ARC FLASH EXPERIENCE Christopher J. DeWaal, MS, MEM, PE, LEED AP, HACCP How did I get involved? A client
Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity
Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more
NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers
NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers A market position paper from the experts in Business-Critical Continuity TM Executive Summary Electrocutions are the fourth
3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to
Roadmap to Compliance with NFPA 70E Arc Flash Requirements
Roadmap to Compliance with NFPA 70E Arc Flash Requirements TAHFM Interlink 2015 March 30, 2015 Antony Parsons, Ph.D., P.E. Schneider Electric Engineering Services 1 2 How do we get to Reliable Power? >
Medium voltage VCP-W MR2 (integral racking)
Supersedes March 2013 Contents Description Page Notices and warnings...................... 2 Introduction.............................. 3 Breaker pan configurations.................. 3 Inspection/maintenance.....................
NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements
NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems Safe energy distribution that meets the highest industrial requirements NATUS switchgear systems your advantages minimal use of insulant
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System Cory David Smith, Project Manager, ECOM Engineering Inc., and David Lawrence Smith, Principal, ECOM Engineering
ATS - Automatic Changeover
ATS - Automatic Changeover Manufacturers of Electrical Switchgear Choosing an Automatic Transfer System Switchgear Systems offer a variety of solutions for multiple supply switching needs. As well as our
OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS
OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it
Paralleling Switchgear
Paralleling Switchgear By Maurice D Mello, P.Eng. Systems Engineer, GE Consumer & Industrial, Canada What is Paralleling? Paralleling is the operation in which multiple power sources, usually two or more
21 st Century Facilities
Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer
Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems
Suitable for Emergency, Peak and Prime Power System Applications Low Voltage Automatic Transfer Switch Systems THE POWER AUTHORITY THE POWER AUTHORITY ASCO s experience and commitment to excellence in
Best Practice Catalog Generator Switchgear
Best Practice Catalog Generator Switchgear Revision 2.0, 8/23/2012 Prepared by MESA ASSOCIATES, INC. Chattanooga, TN 37402 and OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6283 managed by UT-BATTELLE,
Eaton Automatic Transfer Switches
This is a photographic template your photograph should fit precisely within this rectangle. Eaton Automatic Transfer Switches Jody Grabowski Eaton ATS Product Line Sales Engineer February 1st, 2011 2008
Electrical Distribution Services for Mining and Metals Industries
Electrical Distribution Services for Mining and Metals Industries Solutions to help maximize plant reliability and ensure personnel safety Make the most of your energy SM Electrical Systems are Serious