QUESTIONS and ANSWERS RFB , Metal Clad Switchgear and Power Control Room

Size: px
Start display at page:

Download "QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room"

Transcription

1 QUESTIONS and ANSWERS RFB , Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings available? There is only one drawing. It s a layout. The final design and final drawings need to be done by the manufacturer. 2) When you click on the Specifications the site takes you to the same E-1 drawing no other. Will there be any other specifications? Fixed. 3) UTHSCSA_Specs_May2013, Specification Article B.1 notes that the Primary Distribution is to be 4.16KV, but drawing E1 Project Description mentions 15KV Metalclad, Need clarification. There are no other references to Metalclad Switchgear under UTHSCSA_Specs_May2013, Specification Section ? Not sure where this is referenced in my spec. The primary is 13.8kV. 4) Drawing E1 Drawing References Drawing E101, E102, E103, E104 and E105 that are not on the bid site. Advise if these will be added? E10X are not drawings; they are details. 5) Since Final design and final drawings need to be done by the manufacturer, there are no specifications detailing Relaying requirements. Should the manufacturer provide his standard relaying or does UTHSCSA have a preference? Provide standard relays. 6) 4.16KV is shown in the following portion of the spec, but drawing E1 has it as 15KV. UTHSCSA_Specs_May2013, Specification Disregard. Not used for this project. 7) Saw a spec Titles "15KV Metal-Clad Switchgear and Power Control Room Specification" was added and these questions are in reference to this plus Drawing E1: Paragraph States to provide 36 Breakers with tie breakers. Drawing E-1 shows the existing with a total of 36 Breakers, and what appears to be a Bus Duct Tie between the two switchgear lineups along with two (2) Incoming Utility Feeds. Does the existing have Two Main Breakers, plus Two Tie Breakers along with 36 Feeders Breakers? Will the tie between both lineup be a Bus Duct Tie or will cable suffice with Cable Tray overhead? Either. It total we ll need 36 breakers for campus buildings, 2 main breakers for the CPSE primary and 1 or 2 breakers for the tie(s). 8) Paragraph 12.0 Ferroresonance Study: Should the price for equipment to attenuate Ferroresonance be included in the bid price of the Switchgear since it will not be known if this will be required until a study is performed. Correct. 9) Paragraph Calls for Indicating Lights as shown on the control schemes. No controls schemes are provided should the manufacturer provide his standard indicating lights. Yes.

2 10) Drawing E-1 shows that a Emergency Eye-Wash Station is to be provided. Typically and Emergency Eye-Wash Station is provided when a Battery System is to be provided for DC Control Power to the Breaker/Relay Control Circuits. Should the control power for the Breakers/Relays be provided via a DC Battery system, which in turn mean a DC Panelboard is to be provided? Eye wash can be just bottle type no power required. 11) Since Final design and final drawings need to be done by the manufacturer, there are no specifications detailing Relaying requirements. Should the manufacturer provide his standard relaying or does UTHSCSA have a preference? Yes provide standard relaying. 12) 4.16KV is shown in the following portion of the spec, but drawing E1 has it as 15KV. 15kV is correct. 13) Advise on the following: The inquiry is for 15KV Class Metalclad Switchgear. What is the Voltage Incoming Service to this existing: 3 Phase, 3 Wire Delta; 3 Phase 3 Wire Wye with the Neutral grounded at the transformer; 3 Phase 4 Wire Wye with the Neutral brought into the switchgear and terminated on the switchgear ground bus. Requesting info from CPSE. See attachment. 14) Only answered partially, will a DC Battery system be required for Breaker Control Power or will all breaker control Power Circuits to be fed from CPT's internal to the SWGR? The controls need to work when no utility power is available. 15) Drawing E-1 shows that a Emergency Eye-Wash Station is to be provided. Typically and Emergency Eye-Wash Station is provided when a Battery System is to be provided for DC Control Power to the Breaker/Relay Control Circuits. Should the control power for the Breakers/Relays be provided via a DC Battery system, which in turn mean a DC Panelboard is to be provided? Yes. 16) Will there be an Addendum forth coming? Questions and answers. 17) I would also like to request for elevation and single lined drawings. A one-line is attached. Elevation of project site (feet) is in the spec. 18) Spec article 6.2 has various interrupting ratings. At 63KA we require at least a 30 foot X 30 foot perimeter to vent arc gases. Will the SWGR have a 30' x 30' Perimeter? Yes and during the pre-bid the intent is to walk over to the site. 19) Spec calls for manufacturer to provide and install, but there is not mention on who is responsible for the removal and deposition of the existing? The existing will remain. The new switchgear will go in a different location and being done by campus. 20) Should a new Pad be provided for the new lineup? The pad will be done by campus once a design is in progress. 21) What loads are being fed by the existing breakers? Will be presented at the pre-bid when we walk over to the existing gear. A one-line is included. No existing breaker exceeds 150A at 13.8kV). 22) Will new cables need to be provided and re-pulled to the existing loads or just terminate the existing cables? No. Campus is doing that. 23) What Size and number of Cables are currently pulled to the incoming services, and Feeder Loads? Getting info from CPS Energy. See attached pdf from CPS Energy. 24) What are the KVA sizes of the CPS Energy Transformers feeding the existing and will they remain at the same KVA? See attached pdf from CPS Energy. 25) If the existing cables are to remain, and the cables do not reach the lugs of the new Switchgear will splicing of cables be allowed, or should a new cable run be provided? Yes and this is being done by CPS Energy.

3 26) Request for bid RFB No.: article 2.4 does allow for Alternate Proposals, but specification 15kV Metal-Clad Switchgear and Power Control Room Specification does not will Alternate Proposals be allowed? Alternates ARE allowed. 27) We are only showing a drawing for the power house, we would need a complete set of drawings including the drawings for the switchgear. Is this available? No. The drawing is a typical layout. The bidders design, provide drawings, test it, build it and deliver it. 28) Response from CPS: We have paralleled 15KV 4/0 CU to your switchgear. The transformer secondary voltage is 13.2KV nominal. 29) I have the following Breaker counts: 2 - Main Breakers; 2 - Tie Breakers; 36 - Feeder Breakers. Advise if breaker counts are correct. CORRECT. In the end we need all 36 feeder breakers to be energized by either of the 2 main breakers. 30) Arc Resistant 15KV SWGR Sections from Schneider Electric are 36" Wide, drawing E-1 provided shows the lineups sections as 30"W. Will there be sufficient room for the SWGR with the 36" Wide Sections. Provide your total width and length requirement. 31) Would Arc Resistant Gas Insulated Metal Enclosed SWGR be considered, it has a smaller foot print than the AIS AR SWGR, but only rated at 40KA? Provide this as an alternate. 32) Paragraph Installation Will the manufacturer be responsible for switchgear/power control room rigging and installation? Will University electricians wire field connections (control and MV cabling) to the switchgear? Yes. 33) Paragraph specifies design to be in accordance with IEEE C (Type 2B) which is Arc Resistant Switchgear. Just making sure this is what you are looking for. Yes. 34) Paragraph 4.1 Construction Are the dimensions of the Switchgear/Power Control Room limited to those presented in the Electrical Site Plan? Based on our experience, Arc Resistant Type 2B construction may require a larger area. Can the switchgear be constructed in a 2-high configuration? The area may be increased. A 2-high configuration can be provided as an alternate. 35) Paragraph Switchgear Doors We assume that the switchgear shall be Arc Resistant rated to IEEE C for Type 2B construction in compliance with Specification Paragraph To what level of Arc Fault (Short Circuit) shall the switchgear be rated? The spec asks for 2 options. 36) Paragraph 4.6 External Welded Ships Ladder Can the University provide more details on this requirement (purpose, location, load, etc.)? The purpose for the ladder is to inspect the top side of the gear on a yearly basis. The location can be anywhere where your blast area allows. The max load will be 300 lbs. (1 Texan going up and down the ladder). 37) Paragraph 4.14 Extension for future modification Do the dimensions presented on the Electrical Site Plan include the future modifications? Yes. The 36 breakers, 2 ties and 2 mains allows for this. Extensions beyond the plan may require additional site preparation/work. How should this be addressed in the quotation? No. 38) Paragraph 4.17 Are there site limitations that require shipping sections in no more than two vertical structures? No. Can the manufacturer recommend an alternate? Yes.

4 39) Paragraph 6.2 Circuit Breaker Rating Circuit breaker pricing can be provided for the three short circuit ratings identified (36kA, 50kA or 63kA); however, these ratings will also have a significant effect on the switchgear construction (and its pricing as well). What rating shall be used for the switchgear? 50kA only. The 63kA could be a space issue. 40) Paragraph The specification identifies secondary CPT voltage of 120/240VAC. Will this also represent the control voltages for the switchgear relay and protection circuits? Will a DC power supply system be required? The relays can be DC or AC. 41) In the SWGR we have configured it currently with one CPT per Lineup with a ANSI 83 Control Power Transfer Scheme. Will the Beaker Close and Trip Circuits be fed from these CPT's, because we currently have a DC Battery System to provide control power to the Breaker Close and Trip Circuits? Yes. 42) Will UTHSC - SA provide 480V, 3 Phase 3 wire for power feed to LV Transformer which will in turn feed a Panelboard which feeds the HVAC, Lighting and UPS Circuits? No. that is part of the bid. 43) One-line and more information about the equipment, I need to get the MV SWGR factory moving on bid package and there is not enough detail. The switchgear we are interested in purchasing is shown on the right of the one-line (8 breakers with the words Main Substation ). As I mentioned in the pre-bid, because of the 8 breakers we have lots of restrictions on what we can do for complete redundancy. The rest of the one-lines are our campus substations, not relevant to this bid. 44) Are you planning to purchase directly from the manufacturers or through a distributor? We ll do what provides us the best value. Submit your bid to perform the project as per plans and specs. 45) Due to the length of the Lineups, can we provide a Two High Breaker Construction on the Air Insulated Switchgear, which means there will needs to be a method to remove breakers from the Top cubicles which is precluded in the Spec under Article 6.10 "No lift truck, rails, ramps, channels, or transport device of any kind shall be required in order to move a circuit breaker from floor level to the fully connected position."? Mentioned in a previous question. YES, provide this as an alternate. 46) 1-line; (3) preferred relays; primary/secondary currents (to be communicated through by CPS). Answered previously. basic package must include: 27, 50, 51, 51N, 50GS, 59 and 87B 3-attached, from CPSE. 47) Please share the CPS fault level information from both sources. See attached pdf from CPS Energy.. 48) Please confirm that each of the four transformers feeding the new building are 10 MVA base rated. See attached pdf from CPS Energy. 49) What is the preferred control power requirements? Just DC? 125VDC? No preference. 50) Please provide any service entrance information from CPS on the two main breaker sections. Nothing exists yet. It will be new construction; we are currently in the easement and design phase. A new manhole will be established just outside the new 15kV switchgear to assist in primary delivery. 51) 4.8; Confirm the intent is to provide Arc Resistant switchgear in lieu of standard MV switchgear. Yes. 52) 4.14; Confirm future expansion for Power Control Room is required. Drawing E1 - Electrical Site Plan does not indicate future expansion is possible due to locations of existing walkway & capacitor bank (if we are doing a single high breaker configuration). No future expansion is planned. 53) 5.1.3; Confirm windows are only required on personnel doors & not on equipment rear access doors. Spec says all doors. Correct.

5 54) 6.10; spec reads no lift truck shall be required. Please confirm. Required if the alternate bid is 2- high breakers. 55) 8.2; Please clarify chemical & other contaminate filtration required. Mist or debris from adjacent facilities (UHS or UTHSCSA Central Energy Plant). 56) 18.1; Please confirm if 3ph 480V service is available for HVAC system. 120/208V would be used for UPS & building services. The power control room should have that integrated. 57) I have the following Breaker counts: 2 - Main Breakers; 2 - Tie Breakers; 36 - Feeder Breakers; Advise if breaker counts are correct. Yes, but 1 tie breaker would also work. 58) Arc Resistant 15KV SWGR Sections from Schneider Electric are 36" Wide, drawing E-1 provided shows the lineups sections as 30"W. Will there be sufficient room for the SWGR with the 36" Wide Sections. There is some flexibility in the land available. 59) Would Arc Resistant Gas Insulated Metal Enclosed SWGR be considered, it has a smaller foot print than the AIS AR SWGR, but only rated at 40KA? Yes, provide this as an alternate bid. 60) In the SWGR we have configured it currently with one CPT per Lineup with a ANSI 83 Control Power Transfer Scheme. Will the Beaker Close and Trip Circuits be fed from these CPT's, because we currently have a DC Battery System to provide control power to the Breaker Close and Trip Circuits? Yes. Yes to which one Close and Trip Circuits from CPT 120/240VAC Single Phase or DC Battery System 125VDC? Specs call for CPT's but does not mention DC Battery System but and Eye Wash Station is shown on Drawing E1 which typically means a DC Battery System is required advise? Provide DC system. 61) If power comes from the CPT we can provide each breaker with a 72 Hour Capacitor Trip Device if power if control power lost for some reason. YES. Good option. 62) At the prebid UTHSC was going to provide a list of approved relay manufacturer's and Relay Protective Features to be designed to, plus a One-Line. Can you advise when this information will be forthcoming? Provide the best product UTHSCSA does not have a preferred manufacturer 63) Article 14.1 Calls to provide "Indicating meters shall be 1% accuracy, 4½" square switchboard type, with taut band suspension unless otherwise specified." This is a spec for old Analog meters and this article does not specify they type of meter wanted ie: Ammeter, or Voltmeter. Include an analog meter for amps and voltage. This is to provide a back-up to any digital metering should it fail. 64) Will the metering be required for all the Mains, Ties and Feeders? Yes. 65) We propose to use our PM5563 Digital Meter in lieu of these meters which will give Amperage, and Voltage Reading plus other power system related information, would this be suitable to UTHSCSA? Yes. 66) The attached layout provided depicts that all breakers should be in a one-high configuration. Can you please confirm that a one-high configuration is required (one breaker per vertical section)? This is one option. A 2-high configuration is a good alternate. Please provide both options for us to consider along with any space requirements. This will be part of our review. 67) We can however, provide a two high option where 2 breakers can fit in one vertical section. A two high configuration would be the most cost effective because it would reduce the sections of the switchgear as well as the building square footage. We just wanted to confirm all vendors are using a onehigh configuration so our bid would be competitive. Yes, please provide this option as an alternative.

6 68) Article 4.4 of the Specifications "The switchgear shall be constructed for use in outside temperatures that do not exceed a maximum of 124 degrees Fahrenheit or a minimum of -22 degrees Fahrenheit." Switchgear is designed to a 40 deg C Ambient (104 Deg F) maximum and a minimum temperature of -20 Deg C (-4 Deg F). Within the Power Control Building we can maintain the temperature between 40 Deg C to 0 Deg C Ambient. Designing to an Ambient of 124 Deg F is excessive, suggest designing the Power Control room based on an outside Ambient of 115 Deg F to -10 Deg F. Yes, please proceed with the new range of +115 F to -10 F. 69) In regards to the 87B, 50GS, and 59 relays, are these intended only for tie breakers or all breakers? All breakers. 70) Fault level, do you have it? Will two high breakers in the switchgear be acceptable? Yes. Please provide this as an alternate. 71) What are the preferred protection relays or relay functions? Basic package must include: 27, 50, 51, 51N, 50GS, 59 and 87B. 72) Please share the CPS fault level information from both sources. See attached PDF from CPS Energy. 73) Please confirm that each of the four transformers feeding the new building are 10 MVA base rated. See attached PDF from CPS Energy. 74) Even though the relays are to have the 50, 51, 50GS, 51N, 27, 59 and 87B Functions 87B Bus Differential is utilized between the Mains and Tie Breakers to annumciate a short Circuit on the bus, not necessary on all the feeder breakers, and 27 and 59 is typical for the Main Breakers. Please elaborate on relaying per Main, Tie, and feeders separately? See attached PDF from CPS Energy. 75) The information only states relaying should include these fucntions, but does not necessarily state what functions shold be used. For example, CPSE Specification SWITCHGEAR, METALCLAD, 15KV Specification Number has on the Mains and Tie Breakers Schweitzer SEL351 for 50/51 Functions and SEL487 for Bus Differentail, and for Feeder Breakers SEL351 with contacts from the SEL487 wired to the feeder circuits. CPSE does not mention what manufacturer of the relay is suitable, should we use the Schnweitzer Relays like they use in their substations or are others approved. If others which manufacturer are acceptable to UTHSC - SA? Schnweitzer is an approved relay. 76) The provided drawing indicates a tie bus/cable between the two switchgear lineups. Does the tie require a breaker? Yes. If so does UTHSCSA prefer a tie breaker on one line-up, or a tie breaker on each line-up (in order to isolate the bus/cable completely from both energized line-ups. Yes. 77) For clarification: Each line-up is to be fed from 2 - CPS transformers rated at 34,500V 13200/7620V, 5000Kva. Correct but only one set of CPSE transformers is active at any given time. This may change in the future however where all four transformer are active. 78) Due to the length of the Lineups, can we provide a Two High Breaker Construction on the Air Insulated Switchgear, which means there will needs to be a method to remove breakers from the Top cubicles which is precluded in the Spec Under Article 6.10 "No lift truck, rails, ramps, channels, or transport device of any kind shall be required in order to move a circuit breaker from floor level to the fully connected position."? The single high design will be more than 89' in Length with the Rooms required at the end of the lineup required. Provide an alternate for a 2-high configuration with a truck option allowed. The footprint constraints for the gear is as shown on the exhibit and field conditions. We have CPSE and tunnel on either extreme creating this limitation in length.

7 79) Will a One-Line Diagram of the requested switchgear be provided prior to the bid deadline? No one-line of the new gear exists. That will be part of the vendor design. See attached one-line. 80) Please provide documentation, clarifying the quantity of circuit breakers in the switchgear totaling 38 in lieu of 36. The comment in the pre-bid meeting about 38 feeder breakers as incorrect. We ll only need 36 breakers for buildings, 2 breakers for the mains and any ties. 81) Is there a list of acceptable manufacturers for the proposed switchgear? We have no preference on manufacturers. We love everyone! 82) Please clarify what equipment, instrumentation or accessories are required to be furnished within the utility incoming sections of each switchgear line-up. The University or CPSE is only providing the conductor feeders. All other items must be provided by the vendor. CPS Energy (our utility company) will provide external meters for billing which means the power control room will have two exterior meters installed. 83) Please provide a list of acceptable manufacturers for the protective relays to be installed within the switchgear. Is there a preferred protective relay model number available for establishing the basis of design? We have no preference. Please provide the best product line available to you. 84) Are 2-high circuit breakers acceptable within each switchgear section or does the Owner request single high circuit breakers as interpreted from the dimensional drawing? 2-high breakers are a good alternate bid. Please provide one. 85) What vendor furnished equipment will be required in the control room? All of it. The gear needs to function without any University provided equipment. As mentioned in the pre-bid, the CPS Energy conductors, manhole system and vault will be addressed by campus. 86) Will more detailed specifications for the control room, such as insulation values, wind loads and design temperatures? Yes, that is listed in the specs along with elevations and temperature. Please note the temperature has been adjusted down; reference a previous question above.

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Submit shop drawings for equipment provided under this section Shop drawings shall indicate: Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,

More information

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

Addendum #2 Contract UK-11-13

Addendum #2 Contract UK-11-13 Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)

More information

Masterclad Medium Voltage Passive Arc-Resistant Switchgear

Masterclad Medium Voltage Passive Arc-Resistant Switchgear Masterclad Medium Voltage Passive Arc-Resistant Switchgear Square D Masterclad medium voltage passive arc-resistant (AR) switchgear is designed with utilities and industrial customers in mind who demand

More information

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY

More information

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS 4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE

More information

Paralleling Switchgear

Paralleling Switchgear Paralleling Switchgear By Maurice D Mello, P.Eng. Systems Engineer, GE Consumer & Industrial, Canada What is Paralleling? Paralleling is the operation in which multiple power sources, usually two or more

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers

More information

Primary and Secondary Electrical Distribution Systems

Primary and Secondary Electrical Distribution Systems Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility

More information

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED CCG Facilities Integration Incorporated

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009

A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009 A Comparison of Contemporary Electrical Distribution Equipment Standards San Francisco IEEE Industry Applications Society May 26, 2009 What are Standards? Clearly defined performance characteristics Based

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

Sample - No Commercial Use

Sample - No Commercial Use COMPLETE REVISION October 2010 Electrical PIP ELSSG01 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort

More information

Part 1 System Modeling & Studies for Existing Systems

Part 1 System Modeling & Studies for Existing Systems Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures

More information

LVA Take Offs in Bid Manager

LVA Take Offs in Bid Manager Electrical Sales and Distributor Training Low Voltage Assemblies (LVA) LVA Take Offs in Bid Manager This job aid helps to define some of the common selection questions that are encountered when configuring

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION SPECIFICATION EO-2022 REVISION 15 DECEMBER 2009 EFFECTIVE DATE DECEMBER

More information

Secondary Unit Substations

Secondary Unit Substations 14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

How To Get A Power Line Extension

How To Get A Power Line Extension GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

Arc Terminator Active Arc-Resistant Switchgear

Arc Terminator Active Arc-Resistant Switchgear Arc Terminator Active Arc-Resistant Switchgear Increasing safety and productivity by extinguishing internal arcing faults within the switchgear. The Square D Arc Terminator from Schneider Electric offers

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Switchgear Capabilities. NexGear is a Division of PowerSecure NASDAQ: POWR

Switchgear Capabilities. NexGear is a Division of PowerSecure NASDAQ: POWR Switchgear Capabilities NexGear is a Division of PowerSecure NASDAQ: POWR Discussion Points Introducing PowerSecure Introducing NexGear Solutions Offered Scope of Services Examples of Work Q & A NexGear,

More information

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination

More information

3.) Remove Page Nos. 15, 16, 17, 18, 19, 20, 21, 22 of 30 and replace with Page Nos. 15, 16, 17, 18, 19 & 20 of 28 marked, REVISED 10/18/2013.

3.) Remove Page Nos. 15, 16, 17, 18, 19, 20, 21, 22 of 30 and replace with Page Nos. 15, 16, 17, 18, 19 & 20 of 28 marked, REVISED 10/18/2013. CITY OF HOUSTON Annise D. Parker Mayor P.O. Box 1562 Houston, Texas 77251-1562 Telephone Dial 311 www.houstontx.gov http://purchasing.houstontx.gov October 22, 2013 Subject: To: Letter of Clarification

More information

How To Choose A Transformer

How To Choose A Transformer Consider open loop MV network as an example source 1 source 2 NC NC NC or NO main MV switchboard A B Detail design of substation NC NC NC NO NC NC switchboard 1 switchboard 2 switchboard 3 MV MV MV LV

More information

Applying For New or Revised Electric Service

Applying For New or Revised Electric Service Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4 CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,

More information

Extend the Life of Existing Switchgear

Extend the Life of Existing Switchgear Extend the Life of Existing Switchgear January 2011/1910DB1002 by Hal Theobald, Product Manager Schneider Electric USA, Inc. Make the most of your energy SM Summary Introduction... p 3 Maintenance Requirements...

More information

David Payne, P.E. Associate Director February 18, 2014

David Payne, P.E. Associate Director February 18, 2014 David Payne, P.E. Associate Director February 18, 2014 Overview of Texas A&M University State's first public institution of higher education, was opened on Oct. 4, 1876 as the Agricultural and Mechanical

More information

SWITCHGEAR Section 16. SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less.

SWITCHGEAR Section 16. SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less. PART 1 - GENERAL SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less. RELATED SECTIONS Division 16 Section "Basic Electrical Materials and Methods" for general

More information

SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated

More information

SWITCHGEAR. EGP Switchgear

SWITCHGEAR. EGP Switchgear SWITCHEA EP Switchgear Cat generator set paralleling switchgear has been designed to integrate with Cat EMCP3 generator set controls. Now you can get greater efficiency, reliability and dependability all

More information

Current Limiting Protector For Systems rated 2.8-38kV and continuous currents through 5000A.

Current Limiting Protector For Systems rated 2.8-38kV and continuous currents through 5000A. Current Limiting Protector For Systems rated 2.8-38kV and continuous currents through 5000A. Arc Flash and Arc Blast reduction Network protection SCADA adaptable Indoor/outdoor application Professional

More information

Customer Substation Manual 08/05/02

Customer Substation Manual 08/05/02 Customer Substation Manual Table of Contents Section Page 2 of 85 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation

More information

Switchgear and Metal-Enclosed Bus

Switchgear and Metal-Enclosed Bus Section 18 Switchgear and Metal-Enclosed Bus 180. SWITCHGEAR ASSEMBLIES 180A. General Requirements for All Switchgear. This rule covers general requirements for all switchgear. Examples of switchgear found

More information

HPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80

HPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80 Buck-Boost Transformers Single and Three Phase Potted Buck-Boost Transformers Buck-Boost Applications & Standard Specification... 80 Selecting Buck-Boost Transformers... 81 Single Phase Selection Tables...

More information

Low Voltage Switchgear

Low Voltage Switchgear Arc Resistant Switchgear n Insulated and isolated bus n Separation barriers and top venting n Breaker shutters 12 SWITCHGEAR Arc resistant metal-enclosed low voltage switchgear is an optional product offering

More information

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s

More information

Fusible Disconnect Switch

Fusible Disconnect Switch Circuit Breakers Circuit breakers are used in panelboards and switchboards to provide circuit protection and provide a means of energizing and de-energizing a circuit. Siemens Sentron molded case circuit

More information

Low Voltage Transformer Through-Fault Protection: A System Approach

Low Voltage Transformer Through-Fault Protection: A System Approach Data Bulletin 7400DB1001 Nashville, TN USA Low Voltage Transformer Through-Fault Protection: A System Approach Introduction Low Voltage Transformer Protection Criteria NEC Article 450 Transformers and

More information

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy

More information

A USERS GUIDE TO ARC RESISTANT LOW VOLTAGE SWITCHGEAR & MOTOR CONTROL ANALYTICAL COMPARISON VS ARC FLASH TEST RESULTS

A USERS GUIDE TO ARC RESISTANT LOW VOLTAGE SWITCHGEAR & MOTOR CONTROL ANALYTICAL COMPARISON VS ARC FLASH TEST RESULTS A USERS GUIDE TO ARC RESISTANT LOW VOLTAGE SWITCHGEAR & MOTOR CONTROL ANALYTICAL COMPARISON VS ARC FLASH TEST RESULTS By: Gabriel Arce, ABB, San Luis Potosi, Mexico Casey McCollum, ABB, Houston, TX John

More information

REQUIREMENTS FOR CUSTOMER-OWNED PRIMARY SERVICES SUPPLIED AT 4 kv TO 35 kv PRIMARY GUIDE

REQUIREMENTS FOR CUSTOMER-OWNED PRIMARY SERVICES SUPPLIED AT 4 kv TO 35 kv PRIMARY GUIDE BC Hydro Distribution Standards REQUIREMENTS FOR CUSTOMER-OWNED PRIMARY SERVICES SUPPLIED AT 4 kv TO 35 kv PRIMARY GUIDE JUNE 2010 Changes Visible Edition This document shows all changes that have been

More information

DATA CENTER UNIQUE CHARACTERISTICS AND THE ROLE OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS

DATA CENTER UNIQUE CHARACTERISTICS AND THE ROLE OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS DATA CENTER UNIQUE CHARACTERISTICS AND THE ROLE OF MEDIUM VOLTAGE VACUUM CIRCUIT BREAKERS ABSTRACT Data Centers are a critical part of the world economic systems. Billions of electronic transactions happen

More information

16300 MEDIUM VOLTAGE DISTRIBUTION

16300 MEDIUM VOLTAGE DISTRIBUTION 16300 MEDIUM VOLTAGE PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST Contractor: WorleyParsons Canada Services Ltd. Project: Hebron Topsides Project Package: 2001 Switchgear and MV MCC s Category: XXXXX-XXXXX Closing Date: 31 October 2011 General

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star

More information

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems Safe energy distribution that meets the highest industrial requirements NATUS switchgear systems your advantages minimal use of insulant

More information

Eaton Electrical Inc. 1000 Cherrington Parkway Moon Township, PA 15108 United States tel: 1-800-525-2000 www.eatonelectrical.com.

Eaton Electrical Inc. 1000 Cherrington Parkway Moon Township, PA 15108 United States tel: 1-800-525-2000 www.eatonelectrical.com. Page 1 Abstract Adequate space is a concern for electrical installations for several reasons including: Worker safety; Working room; and Adequate clearances for personnel working on energized equipment

More information

SECTION 16346A METAL-CLAD MEDIUM VOLTAGE ARC RESISTANT SWITCHGEAR

SECTION 16346A METAL-CLAD MEDIUM VOLTAGE ARC RESISTANT SWITCHGEAR METAL-CLAD MEDIUM VOLTAGE ARC RESISTANT SWITCHGEAR PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. 1.02 RELATED

More information

Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms

Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms ABB innovations for changing demands ABB (www.abb.com) is a leader in power and automation technologies that enables utility

More information

1997 ELECTRIC UTILITY CONFERENCE SUBJECT VII-I APPLICATION OF ARC-RESISTANT METAL-CLAD SWITCHGEAR IN POWER DISTRIBUTION CENTERS

1997 ELECTRIC UTILITY CONFERENCE SUBJECT VII-I APPLICATION OF ARC-RESISTANT METAL-CLAD SWITCHGEAR IN POWER DISTRIBUTION CENTERS 1997 ELECTRIC UTILITY CONFERENCE SUBJECT VII-I APPLICATION OF ARC-RESISTANT METAL-CLAD SWITCHGEAR IN POWER DISTRIBUTION CENTERS Robert A. Patten Manager of Product Development Distribution Systems Division

More information

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A SURGE PROTECTIVE DEVICES (SPDs) INTEGRATED UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective

More information

261000 Medium Voltage Electrical Distribution

261000 Medium Voltage Electrical Distribution Sections Included In This Standard: 1.1 General 1.2 Underground Cable 1.3 Medium Voltage Switches 1.4 Transformers 1.5 Electrical Manholes 1.6 Switch Vaults 1.7 Distribution Switchgear/Switchboards This

More information

Choosing for tranquility

Choosing for tranquility Medium voltage switchgear with withdrawable circuit breakers MCset Choosing for tranquility Web enabled Power & Control Building a New Electric World Innovation at every level Busbar compartment This section

More information

Earth Fault Detection Basics in Theory

Earth Fault Detection Basics in Theory Earth Fault Detection Basics in Theory Author: Dipl.-Ing. Ingo Kühnen Woodward Power Solutions Krefelder Weg 47 47906 Kempen, Germany Kempen, 16.04.2010 Earth_Fault_Detection_20100416.doc page 1 1. Star

More information

Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.

Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E. By Darrell G. Broussard, P.E. Introduction: As engineers, we are aware that electrical power systems have grown. How much have they grown? When was the last time you specified a 2400-volt system, a 4160-volt

More information

01.4IB.51200B PowlVac-AR Arc Resistant Switchgear. 5kV & 15kV 1200A, 2000A, 3000A, & 4000A Forced Cooled. Powered by Safety

01.4IB.51200B PowlVac-AR Arc Resistant Switchgear. 5kV & 15kV 1200A, 2000A, 3000A, & 4000A Forced Cooled. Powered by Safety PowlVac-AR Arc Resistant Switchgear 1200A, 2000A, 3000A, & 4000A Forced Cooled Powered by Safety PowlVac-AR Arc Resistant Switchgear 01.4IB.51200B Contact Information Powell Electrical Systems, Inc. www.powellind.com

More information

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service

More information

DOCUMENT 009102 - ADDENDUM NO. 2. Issued to all Bidders: Date: February 3, 2015. Contract Name: 13,800-Volt and 480-Volt Switchgear

DOCUMENT 009102 - ADDENDUM NO. 2. Issued to all Bidders: Date: February 3, 2015. Contract Name: 13,800-Volt and 480-Volt Switchgear DOCUMENT 009102 - ADDENDUM NO. 2 Issued to all Bidders: Date: February 3, 2015 Contract Name: 13,800-Volt and 480-Volt Switchgear SUA Bid No.: #21-14/15 This addendum forms a part of the Bid described

More information

PRODUCT GUIDE. SL Medium Voltage IEC Vacuum Contactors

PRODUCT GUIDE. SL Medium Voltage IEC Vacuum Contactors PRODUCT GUIDE SL Medium Voltage IEC Vacuum Contactors Table of Contents 1 Overview Introduction....................................................2 Features........................................................2

More information

Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services

Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services Introduction Power Distribution Equipment is a term generally used to describe any apparatus used for the generation,

More information

Process and Motor Controls in Central and Remote Buildings: PlantWeb Center, the Intelligent Remote Building

Process and Motor Controls in Central and Remote Buildings: PlantWeb Center, the Intelligent Remote Building Apr-07 Page 1 This paper introduces the PlantWeb Center and the use of Intelligent Motor Control. Emerson Process Management 1996 2007 All rights reserved. DeltaV, the DeltaV design, SureService, the SureService

More information

Inverter / Charger Installation General Operations and AC and DC Connections

Inverter / Charger Installation General Operations and AC and DC Connections Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better

More information

INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002

INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002 INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002 NEW GAS INSULATED SWITCHGEAR (GIS) FOR ALL MEDIUM VOLTAGE APPLICATIONS H. Fink, ABB Calor Emag Mittelspannungs GmbH; M. Hyrenbach, ABB Calor

More information

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

Design of electrical power system for a 1000MW nuclear power generating station

Design of electrical power system for a 1000MW nuclear power generating station Design of electrical power system for a 1000MW nuclear power generating station K Raja, K Yesunadam Dept. of Electrical & Electronics Engineering, Lingaya s Institute of Management & Technology, Vijayawada,

More information

IRRIGATION PUMPING Table of Contents - Section 900

IRRIGATION PUMPING Table of Contents - Section 900 IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS

More information

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.

More information

Rule 5.500 Fast Track Analysis for National Life Insurance Co.

Rule 5.500 Fast Track Analysis for National Life Insurance Co. Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION

More information

Evaluating Water-Damaged Electrical Equipment

Evaluating Water-Damaged Electrical Equipment Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to water through flooding, fire

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design Basis of Design This section applies to the design, installation and integration of metering and monitoring equipment, including: hardware installed in the electrical service and distribution equipment,

More information

The following components are common to most cubicles; this example is an ABB HK cubicle.

The following components are common to most cubicles; this example is an ABB HK cubicle. 4.0 CIRCUIT BREAKER CUBICLE Learning Objectives The circuit breaker cubicle is the component of the switchgear that holds the circuit breaker, and the controls and cabling for the distribution system.

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS

OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it

More information

SECTION 16341 MEDIUM VOLTAGE SWITCHGEAR

SECTION 16341 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes metal-enclosed

More information

Power Management Module 2. Installation

Power Management Module 2. Installation Power Management Module 2 30 300 kva Installation Table of Contents Safety... 1 Safety Instructions... 1 Certification Standards Three Phase... 1 Product Safety... 2 Special Precautions... 2 System Description...

More information

Contents. Description. Product Selection Guide

Contents. Description. Product Selection Guide .1 Medium Voltage Switchgear Introduction Indoor Type VCP-W Metal-Clad Switchgear Assembly (5/15 kv shown) Product Selection Guide Product Offering Chart Metal-Enclosed Contents Description Notes Additional

More information

Power-Zone 4 Arc Resistant Low Voltage Switchgear

Power-Zone 4 Arc Resistant Low Voltage Switchgear Power-Zone 4 Arc Resistant Low Voltage Switchgear with ArcBlok Technology Make the most of your energy SM Workplace safety 2 I Power-Zone 4 Arc Resistant Low Voltage Switchgear Five to ten arc flash explosions

More information

School District Design and Project Management For Rochester, NY

School District Design and Project Management For Rochester, NY The following is a list of projects completed by Engineered Solutions or its President Eric Sheffer, P.E.: Medium Voltage Design and project management for replacement of 1500KVA double ended substation

More information

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more

More information

Electrical Distribution System Study

Electrical Distribution System Study Electrical Distribution System Study Final Study Report Revised December 16, 2011 Primary Electrical Distribution System Study Kennesaw State University REVISED December 16, 2011 INDEX TITLE PAGES Executive

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

ELECTRIC METERING COMMERCIAL & INDUSTRIAL ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS

More information

This section applies to the design and installation of transformers.

This section applies to the design and installation of transformers. ELECTRICAL: TRANSFORMERS BASIS OF DESIGN This section applies to the design and installation of transformers. Design Criteria 13.8-kV equipment shall be 15-kV class. Coordinate with short-circuit studies

More information

21 st Century Facilities

21 st Century Facilities Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer

More information

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems Suitable for Emergency, Peak and Prime Power System Applications Low Voltage Automatic Transfer Switch Systems THE POWER AUTHORITY THE POWER AUTHORITY ASCO s experience and commitment to excellence in

More information

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution Medium Voltage Products ZN1 12 kv arc-proof air-insulated switchgear for primary distribution ZN1 an innovative switchgear for power distribution requirements ABB ZN1 primary distribution switchgear is

More information

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

Utility generation line card

Utility generation line card Utility generation line card Integrated Power Solutions Integrated Power Assembly Integrated Power Assembly Deposit on Base Enclosure Medium Voltage COMPONENTS AND Assemblies VCP-W Switchgear Metal-Clad

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Offshore oil platform power and control system

Offshore oil platform power and control system Offshore oil platform power and control system Summary I. Background II. Customer challenges III. Proposed solution IV. Customer benefits V. Conclusion Schneider Electric - Division - Name Date 2 I. Background

More information