OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS
|
|
|
- Juniper Stafford
- 10 years ago
- Views:
Transcription
1 OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it provides many years of trouble free operation. Power system protection is designed to assure two seemingly contradictory purposes: 1. Maintain continuous (uninterrupted) flow of power 2. Act rapidly to isolate power system faults The most prevalent and at times insidious type of fault is the ground fault. This article discusses the fundamental issues pertaining to ground fault application on (Uninterruptible Power Supply) equipment. Examples are provided to illustrate the problem. A solution methodology is proposed. Data center power systems can be solidly grounded or high resistance grounded. Each method has its merits and disadvantages. The focus of this article is on solid grounding. Where solid grounding is employed, a low impedance return path is provided for ground currents. National Electrical Code (NEC) article requires ground fault protection on feeders 1000 amps or more on solidly grounded 4-wire system between 150 and 600 volts to ground. NEC requires the same on service entrance equipment. Figure 1 depicts a modern microprocessor based ground fault protection system. This figure illustrates a radial system - power can flow only in one (radial) direction. Under normal conditions, the currents in the three phases add up to zero. If a ground fault exists, the sum of the three phase currents will be equal to the ground current (or the zero sequence current). The sensor measures this current by summing the individual phase currents. The microprocessor will trip the circuit breaker when the zero sequence current exceeds its ground fault setting. The power distribution in a data center, however, is typically not radial. Multiple sources of power are tied together to increase system redundancy. This is very apparent in (Uninterruptible Power Supply) output switchgear equipment. Figure 2 depicts a parallel redundant architecture. Multiple modules are paralleled to increase both capacity and redundancy. A static bypass switch provides a path for power to flow around the modules when the modules can not handle the load. A manual bypass system is provided to bypass the entire system for maintenance. The modules are separately derived sources and are grounded per the NEC. The other power sources the utility source and the generator- are also grounded per the NEC. Figure 2 shows the utility and the generator with separate ground connections. This is acceptable as long as the neutral conductors are not extended (3 wire system). Where 4 wire systems are used, the transfer mechanism must be four pole or the generator must share the same grounding electrode conductor as the utility main. For short periods of time during power transfer (about 8 to 10 cycles) the static switch will run in parallel with the modules. This condition creates a path for zero sequence circulating currents to flow. Figure 3 illustrates this condition. One module is removed to simplify the diagram. A question may arise as to why these circulating currents exist. The modules and the utility source (or the generator source) are voltage sources. In a parallel condition, if two voltage sources are not exactly identical, a net voltage difference will exist. This net voltage could exist due to harmonics (voltage distortion) and the different characteristics of the sources. Additionally, the modules are controlled to lead the utility source by a few electrical degrees. If a low impedance closed path is provided, a circulating current will flow. Solid grounding provides a very low impedance closed path for all zero sequence currents. IEEE standard 142 (The Green Book) provides a discussion of circulating currents in parallel sources.
2 The ground fault relays on circuit breakers (Figure 3) recognize these circulating currents as ground fault currents. If the magnitude of the circulating current is higher than the setting of the ground fault protection relay and the time delay on the ground fault trip is set very low, the circuit breaker will trip, sacrificing the critical load. Simplistic Designs Increase the Damage One simplistic solution is to eliminate the ground fault protection on the output switchgear equipment. This practice will actually reduce the reliability of the system. Consider a ground fault on the System output bus (Figure 4). Under normal conditions the static switch is open and the power is supplied through the module(s). Ground faults often start as low magnitude arcing faults and sometimes they progress slowly. Because ground fault protection is eliminated, this fault will continue to burn until the magnitude of the fault is higher than the overload setting (typically 300% of full load amperes) of the system. The ideal condition would be to detect this fault quickly and isolate it before it causes extensive damage. This has an effect on the equipment Mean Time To Repair (MTTR). Quick identification and isolation of faults will reduce damage. This translates to shorter repair time and the data center can be put back in service a lot faster. Comment [MM1]: Say: This has a effect on Power System Protection, An Introduction to Differential Systems The ideal protection system is the differential system. Zones of protection are the essential elements of differential systems. Figure 5 shows one zone of protection. Any current that enters a differential zone, must also leave that zone through one of the protected circuit breakers. Otherwise all the circuit breakers on the boundary of the zone will trip. Therefore, a fault inside the zone of protection will cause tripping of the circuit breakers that are on the boundary of that zone. But a circulating current will not set off a differential scheme. If a differential system were employed, the fault on the System output bus would be seen only by circuit breakers MOD1, MOD2 and MODS. These circuit breakers would open without much delay and isolate the fault. Defining the zones of protection is the task of the consulting engineer. The degree of protection specified is a function of the reliability expectations of the system. Figure 6 illustrates one method of defining the zones of protection. Comment [MM2]: For those of us who are not intimately familiar with differential zoning, an example drawing would help. To further illustrate the differential protection principle, consider a ground fault in zone 2 (Figure 6). Only circuit breakers BP1 and BP2 see this fault. Circuit breakers MAIN and will not see this fault. The system is selective irrespective of the ground fault settings on the circuit breakers. So it is not necessary to increase the setting on the main utility circuit breaker to obtain coordination between circuit breakers MAIN, BP1 and BP2. This system is far more advanced than zone selective interlocking. Zone selective interlocking does not resolve the circulating current nuisance tripping problem and does not provide zones of protection. It is not Necessary to Increase the Equipment Cost Differential relays are expensive and costly to implement. Therefore, the ideal system will not include differential relays. A properly designed low cost differential ground fault system can be developed with the following features: Comment [MM3]: Say: Therefore, the ideal differential ground fault system would have the following features: 2
3 1. The system would utilize the ground fault protection circuitry in the circuit breakers to create the differential scheme. Costly addition of differential relays is not desirable or necessary Each bus would be protected independently. A fault in one zone of protection would only trip the circuit breakers that are connected to that bus. 3. The system would be impervious to any and all circulating currents that can cause nuisance tripping of the circuit breakers 4. The system would operate correctly under any arrangement of the circuit breakers. With any and all interlocks (mechanical and electrical) removed, the system would sense ground faults correctly and trip only the correct circuit breakers. The above four rules can be incorporated into almost any project specifications. With such systems, it is no longer necessary to artificially set the ground fault relays to high levels in order to avoid nuisance tripping. Ground fault settings can be set low enough to provide maximum protection and minimize the damage at the point of fault. Comment [MM4]: The system would utilitze Comment [MM5]: desirable or necessary. Comment [MM6]: would be Comment [MM7]: would Comment [MM8]: are connected to Comment [MM9]: would be Comment [MM10]: would Comment [MM11]: would Comment [MM12]: almost any Challenge the Manufacturer Competent protection engineers can design the system referenced above. Some manufacturers may employ differential ground fault schemes in their products, but many do not. The system design engineer should be aware of the circulating current phenomenon and challenge the equipment manufacturer to develop appropriate differential schemes that accommodate it.. It is not necessary to degrade system reliability to satisfy the NEC and provide ground fault protection. Authors: Mike Mosman, P.E. Reza Tajali, P.E. Comment [MM13]: may employ differential schemes in their products, but many do not. Comment [MM14]: Say: The system Deigning Engineer should be aware of the circulating current phenomenon and challenge the Equipment Manufacturers to develop appropriate differential schemes that accommodate it. Michael Mosman is Vice President and Director of Electrical Engineering for CCG Facilities Integration Incorporated. CCG is an Engineering/Architectural firm located in Baltimore, Maryland, dedicated to the programming, design and commissioning of high-technology and mission-critical facilities. Mr. Mosman is a graduate of Washington State University in Electrical Power Engineering, a registered Professional Engineer in twenty states and a licensed master electrician. CCG Facilities Integration, Inc 1500 S. Edgewood St. Baltimore, MD [email protected] Reza Tajali, a registered electrical engineer in California and Tennessee, is a staff engineer for Square D s Power Systems Engineering group in Nashville, Tennessee. He has more than 20 years experience with electrical power distribution and control and holds two United States patents on switchgear products. He is responsible for performing power quality audits on data centers and other high reliability facilities. That work includes measurement, analysis and simulation of power systems. 1 In the proposed system, ground fault sensors will have to be wired in a special configuration. A full testing and commissioning program must be included as part of the specifications. 3
4 Square D Power Systems Engineering 1010 Airpark Center Drive Nashville, TN [email protected] Figure 1 Microprocessor Based Ground Fault Protection System Microprocessor Trip Circuit Electronic Ground Fault Sensing Unit 4
5 Figure 2 The Parallel Redundant Architecture G MAIN BP1 MOD11 MOD2 MODS BP2 To Load Bank 5
6 Figure 3: Circulating Currents and Nuisance Tripping 6
7 Figure 4: Perpetuating Bad Ideas Removing the Ground Fault Protection from the Output Switchgear Ground Fault 7
8 Figure 5: Differential Protection for the Modules Bus G MAIN BP1 MOD1 MOD2 MODS BP2 To Load Bank Zone of Protection 8
9 Figure 6: Defining the Zones of Protection G MAIN BP1 MOD1 MOD2 MODS Zone 2 BP2 To Load Bank 9
Reliability requires consulting engineers and end users to grasp design, maintenance basics. By Reza Tajali, P.E. Square D Power Systems Engineering
LOW VOLTAGE CIRCUIT BREAKER GUIDELINES FOR DATA CENTERS Reliability requires consulting engineers and end users to grasp design, maintenance basics By Reza Tajali, P.E. Square D Power Systems Engineering
Power Monitoring for Modern Data Centers
Power Monitoring for Modern Data Centers December 2010/AT304 by Reza Tajali, P.E. Square D Power Systems Engineering Make the most of your energy SM Revision #1 12/10 By their nature, mission critical
System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems
System Grounding and Ground-Fault Protection Methods for -Supplied Power Systems Bill Brown, P.E., Square D Critical Power Competency Center 1. INTRODUCTION The use of solid grounding for -supplied power
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System Cory David Smith, Project Manager, ECOM Engineering Inc., and David Lawrence Smith, Principal, ECOM Engineering
Switchgear Application Issues for Mission Critical Power Systems, Part One
Switchgear pplication Issues for Mission Critical Power Systems, Part One BSTRCT With the advent of high reliability data centers and telecommunication facilities, designers of commercial power face new
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services
Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination
Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application
Defining the Needs of Modern Data Center Power Systems, Low Voltage Circuit Breaker Application by Reza Tajali, P.E. Square D Company ABSTRACT In modern data centers, Uninterruptible Power Supplies (UPS)
Qualitative Analysis of Power Distribution Configurations for Data Centers
Qualitative Analysis of Power Distribution Configurations for Data Centers White Paper #4 2007 The Green Grid. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted,
Arc Flash Energy Mitigation Techniques
Arc Flash Energy Mitigation Techniques When short circuits occur on an electrical distribution system, an arc flash event usually forms. These arc flash events can cause dangerous and potentially fatal
New standardized approach to arc flash protection
New standardized approach to arc flash protection Samuel Dahl Juha Arvola Tero Virtala Arcteq Relays Ltd Arcteq Relays Ltd Arcteq Relays Ltd Wolffintie 36 F 11 Wolffintie 36 F 11 Wolffintie 36 F11 65200
Application of Four-Pole Circuit Breakers within Data Centers
Application of Four-Pole Circuit Breakers within Data Centers December 2013/AT324 by Frank Waterer, Fellow Engineer, Schneider Electric Engineering Services Make the most of your energy SM Revision #1
Arc Terminator Active Arc-Resistant Switchgear
Arc Terminator Active Arc-Resistant Switchgear Increasing safety and productivity by extinguishing internal arcing faults within the switchgear. The Square D Arc Terminator from Schneider Electric offers
415V DISTRIBUTION FOR GREEN DATA CENTERS
White Paper: HMRP-WP001-A5 June 5, 2012 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2012 Mirus International
The Application of Circuit Breakers to Reduce Downtime in Datacentres
The Application of Circuit Breakers to Reduce Downtime in Datacentres Tim Campbell BEng MIET. Marketing Manager, Terasaki Electric (Europe) Ltd. Abstract Circuit breakers fulfil several functions in the
How Much Voltage Drop Is Acceptable?
How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed
Fundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At
Choosing the Best Solution for Reducing Arc Energy
CONVENTION SESSION HANDOUT Choosing the Best Solution for Reducing Arc Energy Terry L. Schiazza, Business Development Manager Square D / Schneider Electric SESSION #11 Independent Electrical Contractors
ZONE SELECTIVE INTERLOCKING (ZSI) APPLICATION AND TESTING GUIDE SIEMENS WL UL489 AND UL1066 AIR CIRCUIT BREAKERS
Definition: Zone Selective Interlocking (ZSI) - A method which allows two or more ground fault breakers to communicate with each other so that a short circuit or ground fault will be cleared by the breaker
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your
Line to Ground Voltage Monitoring on Ungrounded and Impedance Grounded Power Systems
Line to Ground Voltage Monitoring on Ungrounded and Impedance Grounded Power Systems by Reza Tajali, P.E. Square D Company, Power Systems Engineering Group 295 Tech Park Drive LaVergne, Tennessee 37086
Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.
By Darrell G. Broussard, P.E. Introduction: As engineers, we are aware that electrical power systems have grown. How much have they grown? When was the last time you specified a 2400-volt system, a 4160-volt
ELECTRONIC POWER SYSTEMS
ELECTRONIC POWER SYSTEMS TRADEOFFS BETWEEN SINGLE-PHASE & THREE-PHASE POWER WHITE PAPER: TW0057 1 Executive Summary Modern Electronic Systems are quite often powered from a three-phase power source. While
Inverter / Charger Installation General Operations and AC and DC Connections
Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better
Unified requirements for systems with voltages above 1 kv up to 15 kv
(1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to
Primary and Secondary Electrical Distribution Systems
Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility
For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)
24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690
Reverse-feed applications for circuit breakers
Technical Publication PU01200001E Contents Description Page Intoduction.......................................................................... 2 breaker classifications..........................................................
415V DISTRIBUTION FOR GREEN DATA CENTERS
White Paper: HMRP-WP001-A1 October 1, 2010 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2005 Mirus International
Atlanta Chapter IEEE Industry Applications Society
Atlanta Chapter IEEE Industry Applications Society Electrical Equipment Room Design Considerations presented at the Sheraton Buckhead Hotel Atlanta, Georgia November 20, 2006 Outline 1. Definitions 2.
Part 1 System Modeling & Studies for Existing Systems
Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures
Isolated-Parallel UPS Configuration
Isolated-Parallel UPS Configuration 1 Inhalt 1 Introduction... 4 2 IP systems configuration... 6 3 Projects... 17 4 Conclusions... 17 2 Abstract The isolated-parallel UPS configuration has become well
Increased power protection with parallel UPS configurations
Increased power protection with parallel UPS configurations Making the selection between Centralized Bypass and Distributed Bypass systems Janne Paananen Application Engineer, Large Systems Group Eaton
A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software
A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software Abstract: The nature of explosive equipment failures, and the rate of serious burn injuries in the electrical industry
Paralleling Switchgear
Paralleling Switchgear By Maurice D Mello, P.Eng. Systems Engineer, GE Consumer & Industrial, Canada What is Paralleling? Paralleling is the operation in which multiple power sources, usually two or more
21 st Century Facilities
Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer
Cam switches. Page. Overview 4-2. ON-OFF switches, main switches, maintenance switches 4-3. Changeover switches, reversing switches 4-5
Eaton Wiring Manual / Page Overview - ON-OFF switches, main switches, maintenance switches - Changeover switches, reversing switches - (Reversing) star-delta switches - Multi-Speed Switches - Interlock
MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED
MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED CCG Facilities Integration Incorporated
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...
The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies
The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies DATE: November 17, 1999 REVISION: AUTHOR: John Merrell Introduction In some short circuit studies, the X/R ratio is ignored when comparing
The following table shows approximate percentage wise the
SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are
Protect your home and family with Advanced Technology from Cutler-Hammer
Protect your home and family with Advanced Technology from Cutler-Hammer Residential Home Fire Statistics Annually - over 415,000 Residential Fires Annually - over 40,000 electrical fires over 350 deaths
Bypass transfer switch mechanisms
Power topic #6013 Technical information from Cummins Power Generation transfer switch mechanisms > White paper By Gary Olson, Director, Power Systems Development This paper describes the configuration
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com
Grounding of AC generators and switching the neutral in emergency and standby power systems
Power topic #6006 Part 2 of 2 Technical information from Cummins Power eneration rounding of AC generators and switching the neutral in emergency and standby power systems > White paper By Lawrence A.
FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
Minimizing Impact of Electric Utility Outages with Backup Generation
Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility
Fault Characteristics in Electrical Equipment
1. Introduction Proper design and installation of electrical equipment minimizes the chance of electrical faults. Faults occur when the insulation system is compromised and current is allowed to flow through
Low Voltage Switchgear
Arc Resistant Switchgear n Insulated and isolated bus n Separation barriers and top venting n Breaker shutters 12 SWITCHGEAR Arc resistant metal-enclosed low voltage switchgear is an optional product offering
ECE 586b Course Project Report. Auto-Reclosing
ECE 586b Course Project Report Auto-Reclosing Srichand Injeti May 5, 2008 Department Of Electrical and computer Engineering University Of Western Ontario, London Ontario Table of contents 1. Introduction...1
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY
ABC-1000 Automatic Boiler Level Controller Operation and Installation Manual
QUALITY STEAM SPECIALTIES SINCE ABC-1000 Automatic Boiler Level Controller Operation and Installation Manual Section: C500 Bulletin: C500.40 Date: 06-26-01 Supersedes: New PRODUCT DESCRIPTION: The Clark-Reliance
Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager
Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager Introduction There is a growing trend in the UPS industry to create a highly efficient, more lightweight and smaller UPS
Electrical Systems Commissioning
Electrical Systems Commissioning Catherine Melander, Questions & Solutions Engineering 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is
Low Voltage Transformer Through-Fault Protection: A System Approach
Data Bulletin 7400DB1001 Nashville, TN USA Low Voltage Transformer Through-Fault Protection: A System Approach Introduction Low Voltage Transformer Protection Criteria NEC Article 450 Transformers and
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated
Electronic Trip Circuit Breaker Basics Circuit Breaker Application Guide Class 0600
Electronic Trip Circuit Breaker Basics Circuit Breaker Application Guide Class 0600 Data Bulletin 0600DB1104 03/2012 Retain for future use. Electronic Trip Circuit Breaker Basics 0600DB1104 Table of Contents
Three-Phase Electric Power Distribution for Computer Data Centers
Three-hase Electric ower Distribution for Computer Data Centers WHITE AER E901 Geist January 008 Summary This paper will describe the characteristics of three-phase power and outline the advantages of
> Executive summary. The Role of Isolation Transformers in Data Center UPS Systems. White Paper 98 Revision 0. Contents.
The Role of Isolation Transformers in Data Center UPS Systems White Paper 98 Revision 0 by Neil Rasmussen > Executive summary Most modern UPS systems do not include the internal s that were present in
Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26
Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Assessing The Hazards Of High and Low Voltage Single-Phase Arc-Flash By Albert Marroquin One common question
Engineering Series Ratings: Is It Practical?
Engineering Series Ratings: Is It Practical? By the National Electrical Manufacturers Association The 2005 National Electrical Code (NEC) introduces a change regarding series ratings for circuit breakers
Product Data Bulletin
Product Data Bulletin Power System Harmonics Causes and Effects of Variable Frequency Drives Relative to the IEEE 519-1992 Standard Raleigh, NC, U.S.A. INTRODUCTION This document describes power system
High-Efficiency AC Power Distribution for Data Centers
High-Efficiency AC Power Distribution for Data Centers White Paper 128 Revision 2 by Neil Rasmussen > Executive summary The use of 240 volt power distribution for data centers saves floor space, simplifies
2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY
2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY Thomas P. McNamara, P.E. Manager, Development Engineering ABB Inc. Power Technologies Medium
HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE
Appendix B-2 - Electrical Safety In Design Final Report TECHNOLOGIES THAT REDUCE LIKELIHOOD OF INJURY FROM ELECTRICAL HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE The following are technologies that reduce
What are the basic electrical safety issues and remedies in solar photovoltaic installations?
What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic
Motor Protection Voltage Unbalance and Single-Phasing
Motor Protection Voltage Unbalance and Single-Phasing Cooper Bussmann contributes the following information, which is an excerpt from their 190-page handbook SPD Selecting Protective Devices Based on the
Parallel Circuits. Objectives After studying this chapter, you will be able to answer these questions: 1. How are electrical components connected
This sample chapter is for review purposes only. Copyright The Goodheart-Willcox Co., Inc. All rights reserved. Electricity Objectives After studying this chapter, you will be able to answer these questions:.
Neutral Currents in Three Phase Wye Systems
POWER SYSTEMS ENGINEERING DATA PUBLISHED BY SQUARE D, OSHKOSH, WISCONSIN Subject: Neutral Currents in Three Phase Wye Systems by Robert Arthur Square D Company Oshkosh, Wisconsin (414) 46-80 and R. A.
Paralleling Power Sources Which Share a Common Neutral
Paralleling Power Sources Which Share a Common Neutral By: Tony Hoevenaars, P.E., President & CEO, Mirus International, Inc. Mike McGraw, President, NSOEM, Inc. When paralleling power sources that share
CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS
CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS David D. Roybal, P.E. Senior Member, IEEE Eaton Electrical 3697 Mount Diablo Boulevard Lafayette, CA 94549 Abstract Low-voltage circuit
Bus Protection Considerations for Various Bus Types
Bus Protection Considerations for Various Bus Types Caitlin Martin Bonneville Power Administration Steven Chase, Thanh-Xuan Nguyen, Dereje Jada Hawaz, Jeff Pope, and Casper Labuschagne Schweitzer Engineering
Considering the effects of UPS operation with leading power factor loads
Considering the effects of UPS operation with leading power factor loads Over the past five years, a new generation of data processing and communications equipment has become prevalent in modern data centers
A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009
A Comparison of Contemporary Electrical Distribution Equipment Standards San Francisco IEEE Industry Applications Society May 26, 2009 What are Standards? Clearly defined performance characteristics Based
Modular architecture for high power UPS systems. A White Paper from the experts in Business-Critical Continuity
Modular architecture for high power UPS systems A White Paper from the experts in Business-Critical Continuity Abstract Today, more than ever before, energy efficiency and cost-savings are among the top
What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?
What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? Comparing apples-to-apples bids Plant Services Special Report A shock hazard analysis should be included as part of an arc
TECH TIP # 37 SOLVING SERIES/PARALLEL CIRCUITS THREE LAWS --- SERIES CIRCUITS LAW # 1 --- THE SAME CURRENT FLOWS THROUGH ALL PARTS OF THE CIRCUIT
TECH TIP # 37 SOLVING SERIES/PARALLEL CIRCUITS Please study this Tech Tip along with assignment 4 in Basic Electricity. Parallel circuits differ from series circuits in that the current divides into a
Phase Balancing of Distribution Systems Using a Heuristic Search Approach
Phase Balancing of Distribution Systems Using a Heuristic Search Approach Lin, Chia-Hung*, Kang, Meei-Song**, Chuang, Hui-Jen**, and Ho, Chin-Ying** *National Kaohsiung University of Applied Sciences **Kao
Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear.
Arc Flash Mitigation Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear. Distance is Safety We will discuss through examples of actual occurrences and possible
Evaluating AC Current Sensor Options for Power Delivery Systems
Evaluating AC Current Sensor Options for Power Delivery Systems State-of-the-art isolated ac current sensors based on CMOS technology can increase efficiency, performance and reliability compared to legacy
Comparing UPS System Design Configurations
Comparing UPS System Design Configurations By Kevin McCarthy White Paper #75 Revision 1 Executive Summary There are five main UPS system design configurations that distribute power from the utility source
Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies
Soonwook Hong, Ph. D. Michael Zuercher Martinson Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies 1. Introduction PV inverters use semiconductor devices to transform the
4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS
4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE
Arc Flash Safety in 400V Data Centers
Arc Flash Safety in 400V Data Centers Strategies for protecting employees from underappreciated yet potentially deadly hazards By Dave G. Loucks PCM Solution Manager Eaton Corporation Executive summary
Safety By Design. Strategies for Electrical Contractors
Safety By Design Strategies for Electrical Contractors Introduction Engineering and system design significantly impact worker safety System design provides opportunity to eliminate/minimize workers exposure
QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room
QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings
Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)
Lab 4: 3-phase circuits. Objective: to study voltage-current relationships in 3-phase circuits; to learn to make delta and Y connections; to calculate and measure real, apparent, and reactive powers. Equipment:
Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392
1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of
ARC FLASH CALCULATIONS & LABELING REQUIREMENTS
ARC FLASH CALCULATIONS & LABELING REQUIREMENTS Presented by: Edmund Elizalde EYP Mission Critical Facilities, Inc. Slides by: Lonnie Lindell SKM Systems Analysis, Inc. 1 Agenda NEC 110.16 NFPA 70E IEEE
Figure 1 - Crydom 3RHP Three-phase Hybrid Solid State Contactor. Crydom Inc.
Crydom RHP Series 3 Phase Hybrid Solid State Contactor By Paul Bachman Fellow Engineer, Crydom, Inc. ABSTRACT Solid State Relays and Contactors (SSRs) have been available in one form or the other for over
Determining the Cause of AFCI Tripping Branch/Feeder and Combination Arc Fault Circuit Interrupters Class 760
Data Bulletin Determining the Cause of AFCI Tripping Branch/Feeder and Combination Arc Fault Circuit Interrupters Class 760 Retain for future use. 0760DB0204 Replaces 0760DB0204 R09/07 Precautions DANGER
Trade of Electrician. Three-phase Distribution Boards And Socket Circuits
Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity
Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more
Power Quality for Information Technology System
Power Quality for Information Technology System ITS OBVIOUS THE TOLERANCE IS DIFFRENT But What isn t Tobvious? HOW MANY OF YOU HAVE : A COMPUTER AT HOME? = Computers are not screens and Keyboards COMPUTERS
Arc Flash Mitigation & Selective Co-ordination
Arc Flash Mitigation & Selective Co-ordination Michael Hodder March 2015 Overview This seminar will provide information on: Mitigating arc flash hazards Selective Coordination What can we do to make these
PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY
PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY Scope These program criteria apply to programs having titles involving Electrical Engineering Technology including: electrical engineering, electrical
Earth Fault Detection Basics in Theory
Earth Fault Detection Basics in Theory Author: Dipl.-Ing. Ingo Kühnen Woodward Power Solutions Krefelder Weg 47 47906 Kempen, Germany Kempen, 16.04.2010 Earth_Fault_Detection_20100416.doc page 1 1. Star