Franklin Pierce School District. Capital Projects Journal

Size: px
Start display at page:

Download "Franklin Pierce School District. Capital Projects Journal"

Transcription

1 Franklin Pierce School District Capital Projects Journal

2 Capital Projects Levy

3 Capital Projects Levy Envisioned and defined by FPS 2030 committee Levy collections began in 2012 Provides $27,500,000 in funds over 5 years for capital construction and improvements to District schools Over $11,000,000 in revenue raised to date

4 Promises Made Renovate Keithley Middle School Cafeteria (Building 600) Renovate Ford Middle School Cafeteria Installation of Learning Walls in District schools Energy Upgrades Including Mechanical Source of Funds for Small Projects

5 Promises Kept Keithley Middle School Cafeteria Renovation Project Duration: February 2013 to December 2014 Project Budget: $8,400,000 Scope of Work: Renovation of 14,720 square feet New Construction of 4,272 square feet Construction of a Central Kitchen Commons Space Administration Space Band Room Choir Room Computer Lab Site Improvements

6

7

8

9 FPS 2030 Report - January 20, 2015

10

11 Promises Kept Learning Wall Technology in Each Classroom Phase 1: June 2013 August 2013 Harvard Elementary James Sales Elementary Central Avenue Elementary Brookdale Elementary Transportation Training Room WHS Ridgeway Room FPHS Corrigan Room Project Budget: $694,651 Phase 2: June 2014 August 2014 Christensen Elementary Elmhurst Elementary Midland Elementary Collins Elementary Board Room New Portables Project Budget: $407,087

12 Phase 1

13 Phase 2

14 Promises Kept Energy Upgrades (Phase 1) Energy Upgrades to: Washington High School James Sales Elementary Central Avenue Elementary Brookdale Elementary Transportation Training Room WHS Ridgeway Room FPHS Corrigan Room Project Budget: $2,000,000 Grant Funds: $1,000,000 Levy Funds: $973,409 Projected Operational Savings: $30,259/year

15 Energy Upgrades Grant Phase 1

16 Phase 1

17 Promises Kept Provide Additional Classrooms Provide Ten Classrooms Over Summer of 2014 to Meet New Class Size Standard Five Double Portable Classrooms Added to Campuses at: Central Avenue Elementary (4 Classrooms) Harvard Elementary (2 Classrooms) Collins Elementary (2 Classrooms) Midland Elementary (2 Classrooms) Project Budget: $1,641,145

18

19 FPS 2030 Report - January 20, 2015

20

21 Promises Kept In Process Ford Middle School Cafeteria Renovation Current Status: In Design Project Duration: May 2015 to February 2016 Project Budget: $6,500,000 Scope of Work: Renovation of 12,150 square feet New Construction of 5,756 square feet Renovated Kitchen Commons Space Band Room Choir Room Site Improvements

22

23

24

25 Promises Kept In Process Energy Upgrades (Phase 2) Energy Upgrades to: Franklin Pierce HS Ford Middle School Gates High School Keithley Middle School Christensen Elementary Elmhurst Elementary Collins Elementary District-wide Computers Project Budget: $888,138 Grant Funds: $204,263 Levy Funds: $683,875 Projected Operational Savings: $31,500/year

26 Energy Upgrades Grant Phase 2

27 Promises Kept In Process Learning Wall Technology in Each Classroom Phase 3: June 2016 August 2016 Keithley Middle School Ford Middles School Gates High School Phase 4: June 2017 August 2017 Franklin Pierce High School Washington High School Project Budget: $460,402 Project Budget: $895,745

28 Capital Projects Other Funds FPS 2030 Report - January 20, 2015

29 Other Funds Sources of Funds: General Fund Dedicated Funds Grants Incentives Rebates Special Appropriations

30 2010 District Office

31 2010 District Office

32 2013 Portables

33

34 2013 Stadium Artificial Turf Replacement

35

36 2013 T&L Office Remodel

37 2013 Lower KMS Sports Field Restoration

38 2013 Classroom Renovation - James Sales

39 2013 Improvements at New Pathways

40 2013 Walk-in Cooler for Midland

41 2014 Stadium Repairs

42 2014 Collins Office Remodel

43 2014 Basketball Court Graphics - FPHS

44 KMS Lighting Re-Support FPHS Bleacher Seat Replacement FPHS Kitchen Equipment Upgrade

45 2014 Lower Ford MS Sports Field Restoration

46 2014 Re-Purposing of Gates Restroom

47 2014 Tile Floor Replacement - WHS

48 2014 Walk-in Cooler & Freezer- WHS

49 2015 Christensen Office Remodel

50

51 2015 Resurfacing of WHS Track

52 2015 Early Learning Center Project

53

54

55

Centinela Valley Union High School District. Measure CV Masterplan Update June 2011

Centinela Valley Union High School District. Measure CV Masterplan Update June 2011 Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3

More information

CONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012

CONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012 CONSTRUCTION UPDATE WWW.SVUSD.ORG SEPTEMBER 2012 The 2012-2013 school year is proving to be another year filled with exciting, much needed Measure B building projects. Facilities Planning & Construction

More information

2006 Bond. 2011 Bond. 11/12/2015 2015 Bond Timeline Report to Board of Trustees November 17, 2015

2006 Bond. 2011 Bond. 11/12/2015 2015 Bond Timeline Report to Board of Trustees November 17, 2015 2015 Bond Timeline Report to Board of Trustees November 17, 2015 2006 Bond $875k allocated to parking lot improvements on Shriner property Projects to be completed August 2016 Completes 2006 bond program

More information

1. Background. 2. Why this is Relevant to the 2014 Bond. 3. Attachments

1. Background. 2. Why this is Relevant to the 2014 Bond. 3. Attachments Issue Paper # 8: Modernization Renovation Projects 1. Background BSD s student population has grown since the last capital bond in 2006 and facilities have experienced normal wear and aging leading to

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating

More information

PAGE INTENTIONALLY LEFT BLANK

PAGE INTENTIONALLY LEFT BLANK PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation

More information

District Information

District Information Bond 2010 District Information 95.5% College Bound 2009 College Readiness Award from Texas ACT Council #1 Ranked Traditional High School in San Antonio by Children at Risk 458 AP test takers/ 875 tests

More information

Cherry Creek School District Update - 2012 Bond Projects

Cherry Creek School District Update - 2012 Bond Projects Cherry Creek School District Update - 2012 Bond Projects Summer Projects, 2013 September 9, 2013 School Locations Where Projects Have Been Completed Summer, 2013 Elementary Schools: Cimarron Creekside

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the

More information

Frequently Asked Questions

Frequently Asked Questions Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district

More information

Bensalem High School Renovation 2014-2016

Bensalem High School Renovation 2014-2016 Bensalem High School Renovation 2014-2016 Design Problems Inability to close off sections of the building during evening and weekend events. Concerns about the efficiency of staffing and supplying three

More information

Van Vleck ISD Bond Election

Van Vleck ISD Bond Election Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to

More information

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida

More information

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes. Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District

More information

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org Student Count Colorado School Finance Project Override, Sales Tax Dollars Purpose Comments BOND ELECTIONS: Alamosa 2,098 Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org BOND ELECTIONS: Alamosa Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the high school site, including locker rooms, an athletic storage building, a team building, track

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

HERMANTOWN COMMUNITY SCHOOLS. New High School Addition End of DD Design Review

HERMANTOWN COMMUNITY SCHOOLS. New High School Addition End of DD Design Review HERMANTOWN COMMUNITY SCHOOLS New High School Addition End of DD Design Review SITE AERIAL HIGH SCHOOL ELEMENTARY SCHOOL BUS GARAGES HOCKEY ARENA / DISTRICT OFFICE SITE FORCES EXISTING BUILDING INFORMATION

More information

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION LEGEND RENOVATION ADDITION DRIVE IMPROVEMENTS WIDEN BUS LOOP ROAD TO WEST PROVIDE SECURE ADMINISTRATION ENTRANCE REPLACE AGING ELECTRICAL PANELS RENOVATE SPACE FOR FIVE (5) SCIENCE CLASSROOMS CONVERT EXISTING

More information

Gregory-Portland Independent School District. G-PISD BOND ELECTION November 6, 2012. Information Guide

Gregory-Portland Independent School District. G-PISD BOND ELECTION November 6, 2012. Information Guide G-PISD BOND ELECTION November 6, 2012 Information Guide Información en Español Información sobre la emisión de bonos del Gregory- Portland Independent School, el dia 6 de Noviembre 20012, es disponible

More information

DISTRICT-WIDE ELEMENTARY PROGRAMMING

DISTRICT-WIDE ELEMENTARY PROGRAMMING DISTRICT-WIDE ELEMENTARY PROGRAMMING PREPARED BY: GIBRALTAR DESIGN SUBMITTED TO: BOARD OF SCHOOL TRUSTEES School Board Meeting September 17, 2015 2015 Gibraltar Design, Inc. Table of Contents SECTION I.

More information

North East Independent School District 2011 Bond Proposal

North East Independent School District 2011 Bond Proposal North East Independent School District 2011 Bond Proposal North East ISD Garrett J. Sullivan, Executive Director Construction Management & Engineering Department The Process Community Planning and Advisory

More information

Public Building Commission of Chicago. Board Meeting August 20, 2013

Public Building Commission of Chicago. Board Meeting August 20, 2013 Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting

More information

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014 DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

Chicago Public Schools

Chicago Public Schools Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school

More information

ENERGY USAGE GUIDELINES

ENERGY USAGE GUIDELINES Mission ENERGY USAGE GUIDELINES The mission of Coppell ISD s Energy Management is to develop and implement energy resource strategies that increase conservation awareness from students, staff, and community,

More information

Online Survey Executive Summary

Online Survey Executive Summary Online Survey Executive Summary Center Moriches School District March 9, 2015 Online Survey Executive Summary METHODOLOGY The following results are based on a website and paper survey of 356 residents

More information

Wausau School District. Please vote! Referendum Tuesday, April 7, 2015. Our Mission To advance student learning, achievement, and success.

Wausau School District. Please vote! Referendum Tuesday, April 7, 2015. Our Mission To advance student learning, achievement, and success. Wausau School District Referendum Tuesday, April 7, 2015 Please vote! Our Mission To advance student learning, achievement, and success. Background Shared Key Interests (Align to Referendum) May 2011 A

More information

February 2014 Maintenance & Operations (M&O) Levy Question and Answers, Updated 12-17-13

February 2014 Maintenance & Operations (M&O) Levy Question and Answers, Updated 12-17-13 February 2014 Maintenance & Operations (M&O) Levy Question and Answers, Updated 12-17-13 Where do public schools get their money? We receive our funding from three sources - State, Federal and Local. About

More information

CONSTRUCTION UPDATE November 6, 2015

CONSTRUCTION UPDATE November 6, 2015 CONSTRUCTION UPDATE November 6, 2015 Donaldsonville High School Athletic Addition East Ascension High School Athletic Addition St. Amant High School Athletic Addition St. Amant High School Freshman Academy

More information

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Bond Priorities. Repairs and Maintenance. School Safety. Capacity Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.

More information

May 2014 Texas School Bond Elections

May 2014 Texas School Bond Elections May 2014 Texas School Bond Elections What are the individual districts needs? New facilities Renovations Technology Central facilities How much tax revenue can the district generate? Depends on district

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

3 Facility Organization Strategy

3 Facility Organization Strategy 3 Facility Organization Strategy TVC Master Plan McCool Carlson Green Architects 3 3 Facility Organization Strategy UAF s Tanana Valley Campus currently offers more than 40 certificate and degree programs

More information

DESIGN DEVELOPMENT PRESENTATION

DESIGN DEVELOPMENT PRESENTATION October 26, 2015 DESIGN DEVELOPMENT PRESENTATION NEW SHIRLEY HALL MIDDLE SCHOOL & JOE M. TISON MIDDLE SCHOOL ADDITIONS AND RENOVATION WEATHERFORD INDEPENDENT SCHOOL DISTRICT Acknowledgments 3 Narrative

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF OPTOMETRY 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK COLLEGE OF OPTOMETRY 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK COLLEGE OF OPTOMETRY 2015 CAMPUS STATEMENT The College of Optometry, located at 33 West 42nd Street in mid-manhattan, was founded as a State College within the SUNY system

More information

Portland Parks & Recreation Budget Advisory Committee January 15, 2015 Public Comment and BAC Prioritization Summaries One-time Funding The following chart shows the budget proposals presented by PP&R

More information

Path to a New Horizon:

Path to a New Horizon: Path to a New Horizon: Bond Committee Report & Preliminary Recommendations Board of Education July 9, 2015 Bond Committee Peter Spadafore, Co-chair, LSD Board President Nancy Mahlow, Co-chair, Eastside

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023 School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL

More information

SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL

SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL March 16, 2015 SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL DUNCANVILLE INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 6 Site Plan 7 ACTON ELEMENTARY SCHOOL

More information

Higher Education Projects University of Illinois at Urbana-Champaign Gorski Reifsteck

Higher Education Projects University of Illinois at Urbana-Champaign Gorski Reifsteck Laboratories Bevier Hall Food Labs Renovation College of ACES Everitt Lab 4th Floor Remodel - Phase I Renovation College of Engineering MATSE Kiln House Renovation Phase I College of Engineering MATSE

More information

D. Scott Babbit 218 Wilkes Street Steilacoom, WA 98388

D. Scott Babbit 218 Wilkes Street Steilacoom, WA 98388 D. Scott Babbit 218 Wilkes Street Steilacoom, WA 98388 S U M M A R Y Principal of Babbit Neuman Construction Co. (BNCC, Inc.), overseeing the office staff including accounting, estimating, project management

More information

MAIN IDEA The rectangle at the right has an area of 20 square units. The distance around the rectangle is 5 + 4 + 5 + 4, or 18 units.

MAIN IDEA The rectangle at the right has an area of 20 square units. The distance around the rectangle is 5 + 4 + 5 + 4, or 18 units. 1-9 Algebra: Area Formulas MAIN IDEA The rectangle at the right has an area of 20 square units. The distance around the rectangle is 5 + 4 + 5 + 4, or 1. Find the areas of rectangles and squares. New Vocabulary

More information

ALEXANDRIA CITY PUBLIC SCHOOLS (ACPS)

ALEXANDRIA CITY PUBLIC SCHOOLS (ACPS) ALEXANDRIA CITY PUBLIC SCHOOLS (ACPS) The entire ACPS Capital Improvement Program can be found on-line at: http://www.acps.k12.va.us/budgets/ Approved FY 2016-2025 CIP Page 87 PAGE LEFT BLANK INTENTIONALLY

More information

CITY OF SANTA ROSA HIGH SCHOOL DISTRICT Sonoma County, State of California 2014-15 RESOLUTION NO. 2014/15-003

CITY OF SANTA ROSA HIGH SCHOOL DISTRICT Sonoma County, State of California 2014-15 RESOLUTION NO. 2014/15-003 CITY OF SANTA ROSA HIGH SCHOOL DISTRICT Sonoma County, State of California 2014-15 RESOLUTION NO. 2014/15-003 RESOLUTION CALLING FOR AN ELECTION AUTHORIZING THE ISSUANCE OF GENERAL OBLIGATION BONDS OF

More information

Finish Floor System Analysis

Finish Floor System Analysis Finish Floor System Analysis Introduction: When conducting a finish floor system analysis, it is important to consider not only the type of building the floor is going into, but also what space it is for.

More information

1/9/2015 P:\130217-03\Project Management\Program\Ripon Space Program - 7 January 2015.xlsx

1/9/2015 P:\130217-03\Project Management\Program\Ripon Space Program - 7 January 2015.xlsx MIDDLE SCHOOL Administration Office Principal's Office 200 1 200 Desk, conference table for 4-6 Conference Room 250 1 250 Conference table for 12 Open Office Area 250 1 250 2 Workstations Mail / copier

More information

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014 PROPOSITION E Associated General Contractors of America San Diego Chapter September 17, 2014 1 Facilities Centric Bond Aging Facilities Emphasis on Technology Infrastructure School Site Safety and Security

More information

M E M O R A N D U M. April 15, 2010. Planning, Housing, and Economic Development Committee

M E M O R A N D U M. April 15, 2010. Planning, Housing, and Economic Development Committee M E M O R A N D U M April 15, 2010 TO: FROM: SUBJECT: Planning, Housing, and Economic Development Committee Jennifer Renkema, Research Associate Office of Legislative Oversight Examples of Proposed FY11

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement

Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement Guideline for Construction Reimbursement Rates 160-5-4-.16 (a) 7 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 NEW CONSTRUCTION REIMBURSEMENT

More information

How To Plan A School District

How To Plan A School District OCPS Building Program Presentation to Central Florida ABC May 14, 2013 1 AGENDA Facilities Update Where are we now? Recent Facilities Condition Assessment Efficiencies Questions 2 In Planning Comprehensive

More information

L&S Associates, LLC. Educational, Environmental, Maintenance & Operations Consultants (EEMOCo)

L&S Associates, LLC. Educational, Environmental, Maintenance & Operations Consultants (EEMOCo) L&S Associates, LLC Educational, Environmental, Maintenance & Operations Consultants (EEMOCo) League City, Texas Home Office 281-386-6042 Tyler, Texas Area Office 903-504-1111 Athens, Texas Area Office

More information

SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL

SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL June 15, 2015 SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL JOSHUA INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 5 Independent School District Site Plan

More information

stadium designs BLRB architects TACOMA // SPOKANE // PORTLAND // BEND

stadium designs BLRB architects TACOMA // SPOKANE // PORTLAND // BEND stadium designs TACOMA // SPOKANE // PORTLAND // BEND about blrb architects Founded in 1953, BLRB is a mid-size regional firm with offices throughout the Northwest in Tacoma, Spokane, (Washington) Portland

More information

DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS

DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS FEEDER SYSTEM: 1 HIGH SCHOOLS = (3) Garrett Academy of Technology Academic Magnet HS Septima Clark Academy MIDDLE SCHOOL + HIGH SCHOOL = (2) School of

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

By James Britt, Elizabeth Erbes, Julie Rosin and Bill Good

By James Britt, Elizabeth Erbes, Julie Rosin and Bill Good connecting students, creating futures at central campus By James Britt, Elizabeth Erbes, Julie Rosin and Bill Good Central Campus... evolving as a 21st century educational environment... connecting students

More information

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT RIGHT: the proposed conceptual profile of the new Joe Redington Sr. JR/SR High School January 2014 Project Management Division New Knik Area Middle/High

More information

Property Tax Incentives Will Support Five Industrial and Commercial Projects

Property Tax Incentives Will Support Five Industrial and Commercial Projects FOR IMMEDIATE RELEASE June 25, 2014 CONTACT: Mayor s Press Office 312.744.3334 press@cityofchicago.org Department Planning and Development (DPD) (312) 744-9267 Property Tax Incentives Will Support Five

More information

Lincoln Public Schools

Lincoln Public Schools VANDERWEIL Lincoln Public Schools Technology Plan Introduction Agenda Technology Improvements Introductions Background, review of requirements Status Priorities and goals Budget options and discussion

More information

School District. Dr. Barry Amacker, Superintendent Jackson County School District

School District. Dr. Barry Amacker, Superintendent Jackson County School District Dr. Barry Amacker, Superintendent Jackson County School District Greetings JACO Nation, As we look forward to the 2015-16 school year, I would like to thank you for another great year in 2014-15. As you

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

INDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft.

INDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft. ED. SPEC. ELEMENTARY SCHOOL SPACE BUDGET Program Menchaca ES Page 1 of 6 INDIVIDUAL CAMPUS PLAN ASSESSMENT al s Non- al s Size Pre-Kindergarten / Kindergarten - Classrooms 8 8 925 7,400 (minimum or 25

More information

Jinyung Cha (Ms.) E-mail: jycha@business.kaist.ac.kr. Phone: +82-2 - 958-3244 Fax: +82-2 - 958 3210

Jinyung Cha (Ms.) E-mail: jycha@business.kaist.ac.kr. Phone: +82-2 - 958-3244 Fax: +82-2 - 958 3210 1 KAIST Business School International Center 85 Hoegiro, Dongdaemun - gu Seoul 130-722 KOREA ASCHOOL FACT SHEET 2012-2013 Last updated March 21. 2012 KAIST is the first school to offer MBA programs in

More information

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES. PARKVIEW ELEMENTARY SCHOOL October 2014

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES. PARKVIEW ELEMENTARY SCHOOL October 2014 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES PARKVIEW ELEMENTARY SCHOOL October 2014 I. PROJECT INFORMATION A. Name: Bellingham School District Parkview Elementary School B. Location: 3033 Coolidge

More information

Once you see it, you get it! A quick overview of projects..

Once you see it, you get it! A quick overview of projects.. Once you see it, you get it! A quick overview of projects.. Bank of Arizona, Scottsdale We re used to building in 22 months; Modular Technology built our 3 branches in just 5 months! Their quality is superior

More information

Bellingham, WA. (360) 555-5555 susancarey@email.net

Bellingham, WA. (360) 555-5555 susancarey@email.net Sample Chronological Résumé Susan Carey 4444 A Street 98229 susancarey@email.net Objective To obtain a nursing assistant position while completing my Practical Nursing Certificate. Highlights of Qualifications

More information

The Student Affairs Program Review Narrative Report. Members of the Student Affairs Program Review Team: John Beam/Josh Ramos/Johnnie Williams

The Student Affairs Program Review Narrative Report. Members of the Student Affairs Program Review Team: John Beam/Josh Ramos/Johnnie Williams The Student Affairs Program Review Narrative Report 1. COLLEGE: Laney College Discipline, Department or Program: Athletics Date: November 25, 2012 Members of the Student Affairs Program Review Team: John

More information

Angelo State University Construction Report

Angelo State University Construction Report May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning

More information

TECHNOLOGY PLAN SUMMARY

TECHNOLOGY PLAN SUMMARY IV. TECHNOLOGY PLAN SUMMARY The Oklahoma City Metropolitan Area Public Schools (OCMAPS) Technology Plan serves as a guide for OCMAPS funding of technology into the Oklahoma City Public School District

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

A Self-Audit of Your Current Campus Security Systems

A Self-Audit of Your Current Campus Security Systems A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Centennial Building Campaign

Centennial Building Campaign T H E B U C K L E Y S C H O O L Centennial Building Campaign THE BUCKLEY SCHOOL HAS PURSUED EXCELLENCE in educating boys since it was founded in 9. Over the past decade, it has become clear to the Board

More information

Fayette County Schools Reconfiguration and Realignment

Fayette County Schools Reconfiguration and Realignment Fayette County Schools Reconfiguration and Realignment Response to Questions: 1. What will happen to Collins Middle next year? Will the students stay split up for three more years? Yes, in the current

More information

Elgin ISD 2015 16 Salary Scale Classroom Teachers, Librarians, Specialists & Registered Nurses

Elgin ISD 2015 16 Salary Scale Classroom Teachers, Librarians, Specialists & Registered Nurses Elgin ISD 2015 16 Salary Scale Classroom Teachers, Librarians, Specialists & Registered Nurses Years Daily Annual Experience Rate Salary 0 $235.29 $44,000 1 $237.97 $44,500 2 $239.30 $44,750 3 $240.64

More information

Pendergast Students Among First in U.S. to Take Online PARCC Test Thanks to Bond

Pendergast Students Among First in U.S. to Take Online PARCC Test Thanks to Bond Register for kindergarten NOW! See details on page 3 Serving the Community of Pendergast Elementary School District #92 Pendergast Students Among First in U.S. to Take Online PARCC Test Thanks to Bond

More information

SPONSORSHIP PROPOSAL 2014-2015

SPONSORSHIP PROPOSAL 2014-2015 HOUGHTON COLLEGE ATHLETICS SPONSORSHIP PROPOSAL 2014-2015 One Willard Avenue Houghton, NY 14744 P 585.567.9556 F 585.567.9365 brianna.allen@houghton.edu athletics.houghton.edu THE HIGHLANDER EXPERIENCE

More information

30401 Agoura Road, Agoura Hills, CA 91301. Property Photos

30401 Agoura Road, Agoura Hills, CA 91301. Property Photos Roger Beck, SIOR Senior Managing Director Lic. # 00917957 rbeck@charlesdunn.com Direct 818.455.8208 Office 818.455.8200 Fax 818.304.8991 Gelena Skya-Wasserman Director Lic. # 01813986 gskya@charlesdunn.com

More information

Tempe Elementary School District No. 3- Tempe, AZ Escalante Park

Tempe Elementary School District No. 3- Tempe, AZ Escalante Park Tempe Elementary School District No. 3- Tempe, AZ Escalante Park The NFL Foundation Grassroots Program has awarded Tempe Elementary School District No. 3 a $100,000 field surface grant to help install

More information

Workforce Investment Area 13. an adjusted full-time equivalent enrollment of 611 students.

Workforce Investment Area 13. an adjusted full-time equivalent enrollment of 611 students. Workforce Investment Area 13 A R K A N S A S The Tennessee College of Applied Memphis Main Campus is located on Alabama Avenue, just across Interstate 40 from St. Jude s Hospital and only half a mile from

More information

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5 EXECUTIVE SUMMARY Page 1 of 5 ACTION ITEM: Academic Renovations and Deferred Maintenance Phase I, Revised Revised Project Implementation Approval, (ASU). ISSUE: ASU requests Revised Revised Project Implementation

More information

PRIVATE BUSINESS USE FOR QUALIFIED 501(C)(3) BONDS

PRIVATE BUSINESS USE FOR QUALIFIED 501(C)(3) BONDS PRIVATE BUSINESS USE FOR QUALIFIED 501(C)(3) BONDS Courtney A. Strutt Todd Davis Brown Law Firm PRIVATE BUSINESS USE GENERAL RULE Borrowers may lose their tax exemption if they have more than 5% of Private

More information

Schools Under Construction for N.I.S.D.

Schools Under Construction for N.I.S.D. October 2009 NORTHSIDE INDEPENDENT SCHOOL DISTRICT Schools Under Construction for N.I.S.D. Facilities Construction Vernon Dunagin, AIA Assist. Superintendent of Facilities & Operations Leroy San Miguel

More information

E X I S T I N G F A C I L I T I E S

E X I S T I N G F A C I L I T I E S Los Angeles Unified School District Facilities Services Division E X I S T I N G F A C I L I T I E S 68 TH STREET ELEMENTARY SCHOOL FOOD FACILITIES BUILDING Monthly Program Status Report August 2011 Prepared

More information

SMART Initiative Information

SMART Initiative Information SMART Initiative Information On November 4 th, Broward County voters will have an opportunity to cast their ballots regarding an $800 million General Obligation Bond. The proceeds of this bond will be

More information

Elementary School to enclose the open plan design of some classrooms.

Elementary School to enclose the open plan design of some classrooms. 2012 BOND The 2012 Bond included renovations of Bromwell Elementary School to enclose the open plan design of some classrooms. It also included renovations to correct some current code deficiencies and

More information

We know what brings schools together.

We know what brings schools together. School Work We know what brings schools together. About Us Martin Gardner Architecture, P.C. has been providing excellence in design and building consulting services in eastern Iowa for nearly 30 years.

More information