Newtown and Holland Middle Schools Construction Project Bid Review
|
|
|
- Myron Clark
- 9 years ago
- Views:
Transcription
1 Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31, 2016)
2 AGENDA Facilities Improvements Update Newtown Middle School Bid Review/Recommendations Holland Middle School Bid Review/Recommendations Capital Improvements Project Update (20APR16 FACCOM Agenda Items) Final Accounting of NOC Construction 2016 Summer Projects Bid Review/Recommendations Holland ES Toilet Room Floor Tile Repairs Aramark Custodial Fees 1, 3, and 5 Year Proposal Public Comments
3 Facilities Improvements Update
4 Newtown Middle School Site Plan Sketch
5 Newtown MS 1st Floor Plan Sketch
6 Newtown MS 2nd Floor Plan Sketch
7 Newtown Middle School Construction Project Bid Review Bids opened March 1 & 3, 2016 Good competition Minimum 4 bids for each of the major contracts Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability On track to receive $2M in ACE Grant Funds On track to receive PDE reimbursement
8 Newtown Middle School Project Bid Results
9 Newtown Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 49,704,672 $ 46,298,250 Financing Costs $ 1,148,673 $ 917,899 Contingency for unforeseens $ 2,274,562 $ 2,191,275 Fees, Permits, Testing, etc. $ 5,054,403 $ 4,713,027 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 58,582,310 $ 55,820,451 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 55,433,637 $ 52,902,552
10 Bid Alternates Review Recommended Alternates Recommended Alternates Engineered stone fill for building pad Construction activities can continue following storm events. Clean, compacted fill beneath building slab. Alternate Garland roof w/ 25 yr. warranty Upgraded roof with additional 5 year warranty; LEED compliance Alternate building monitoring system controls and HVAC equipment BMS controls and equipment by JCI in lieu of Trane/Siemens Solar roof panels Offset 3% of building's electric use, teaching tool Extended warranty (all primes) Increase period from 1 year to 2 years value as there is complex equipment and BMS Install sod in lieu of grass in select areas Eliminates earth from entering the building and establishes lawn at building front where foot traffic is most anticipated Upgrade locker doors Durability and extended life of lockers Outdoor cafeteria seating Additional outdoor seating for students; program requirement that will provide for opportunities for the students Mill and Overlay Green Lane Road is deteriorated and will likely continue to do so during construction Sanitary line replacement (required) Required in order to obtain the proper approvals for the Project $ 320,000 $ 288,000 $ (110,000) $ 198,000 $ 102,000 $ 58,000 $ 2,800 $ 83,000 $ 87,000 $ 32,000 Lightning protection system $ 99,000 Protection for the building and expensive rooftop equipment Total Alternates $ 1,159,800
11 Bid Alternates Review Alternates Not Recommended Alternates Not Being Recommended Delete Four (4) Classrooms Base bid includes District requirement for 7 Learning teams Alternate Floor Finishes Less durable/lesser quality floor finishes with a shorter life cycle Alternate Light Fixtures Added cost with little value $ (391,000) Varies $ 19,900 Total Alternates Not Being Recommended $ (371,100)
12 General Construction Bids
13 Mechanical Construction Bids
14 Electrical Construction Bids
15 Plumbing Construction Bids
16 Environmental Abatement Construction Bids
17 Newtown Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 49,704,672 $ 46,298,250 Financing Costs $ 1,148,673 $ 917,899 Contingency for unforeseens $ 2,274,562 $ 2,191,275 Fees, Permits, Testing, etc. $ 5,054,403 $ 4,713,027 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 58,582,310 $ 55,820,451 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 55,433,637 $ 52,902,552
18 Newtown Middle School Project Summary of Square Foot Costs
19 Newtown Achievements Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability
20 Newtown MS Next Steps March 31, 2016: Award bids and alternates Approve PlanCon F, Attachment C, PlanCon G, and PlanCon H documents Award Construction Testing and Construction Waste Management Contracts May 2016 Ground breaking June 2016 Construction begins June 2018 New building complete August 2018 Students occupy new school June 2019 Demolition and fields complete
21 Newtown Discussion
22 Holland Middle School Site Plan Sketch
23 Holland MS 1st Floor Plan Sketch
24 Holland MS 2nd Floor Plan Sketch
25 Holland Middle School Construction Project Bid Review Bids opened March 29, 2016 Good competition Minimum 5bids for each of the major contracts Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability On track to receive $2M in ACE Grant Funds On track to receive PDE reimbursement
26 Holland Middle School Project Bid Results
27 Holland Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 43,488,168 $ 40,827,400 Financing Costs $ 1,045,526 $ 785,077 Reserve Contingency for unforeseens $ 3,482,930 $ 2,482,930 Reserve Fees, Permits, Testing, etc. $ 4,905,178 $ 4,905,178 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 53,321,802 $ 50,700,585 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 50,276,276 $ 47,915,508
28 Bid Alternates Review Recommended Alternates Recommended Alternates Alternate Garland roof w/ 25 yr. warranty Upgraded roof with additional 5 year warranty; LEED compliance Alternate building monitoring system controls and HVAC equipment BMS controls and equipment by JCI in lieu of Trane/Siemens Solar roof panels Offset 7% of building's electric use, teaching tool Engineered stone fill for building pad Construction activities can continue following storm events. Clean, compacted fill beneath building slab. $ (50,000) $ (115,000) $ 450,000 $ 150,000 Install sod in lieu of grass in select areas Eliminates earth from entering the building and establishes lawn immediately Upgrade locker doors Durability and extended life of lockers Outdoor cafeteria seating Additional outdoor seating for students; program requirement that will provide for opportunities for students Delete Wood Paneling at Lobby Area More durable, sustainable wall finish, with accessibility to utilities located in ceiling Use of Steel Railing System at Learning Stair More durable and less susceptible to damage/vandalism $ 22,000 $ 1,200 $ 32,000 $ (191,000) $ (45,000) Crosswalk at Buck Road $ 82,000 Must be accepted as this is a part of Land Development requirements Lightning protection system $ 75,800 Protection for the building and expensive rooftop equipment Total Alternates $ 412,000
29 Bid Alternates Review Alternates Not Recommended Alternates Not Being Recommended Delete Four (4) Classrooms Base bid includes District requirement for 7 Learning teams Alternate Floor Finishes Less durable/lesser quality floor finishes with a shorter life cycle Reduce the Size of Front Canopy Provides a dry zone for student drop off, demarcation for car stacking, and defines the school entry Remove Tablet Arms from Mezzanine Seating/LGI Area serves LGI keep tablet arms to provide a desk surface for students Salvage Existing Bleachers for Auxiliary Gym Bleachers are over 40 years old and at the end of their useful life Alternate Auditorium Seating Physical samples were unavailable for seating can be reconsidered at a later date $ (416,300) Varies $ (175,000) $ (7,400) $ (7,000) $ (14,000) Total Alternates Not Being Recommended $ (619,700)
30 General Construction Bids
31 Mechanical Construction Bids
32 Electrical Construction Bids
33 Plumbing Construction Bids
34 Environmental Abatement Construction Bids
35 Holland Middle School Project Budget vs. Bid Results Budget Actual Construction Costs $ 43,488,168 $ 40,827,400 Financing Costs $ 1,045,526 $ 785,077 Reserve Contingency for unforeseens $ 3,482,930 $ 2,482,930 Reserve Fees, Permits, Testing, etc. $ 4,905,178 $ 4,905,178 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 53,321,802 $ 50,700,585 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 50,276,276 $ 47,915,508
36 Holland Middle School Project Summary of Square Foot Costs
37 Holland Achievements Project under budget and on schedule LEED Gold, sustainable, energy efficient building Value added alternates incorporated for durability and maintainability
38 Holland MS Next Steps March 31, 2016: Award bids and alternates Approve PlanCon F, Attachment C, PlanCon G, and PlanCon H documents Award Construction Testing Contract May 2016 Ground breaking June 2016 Construction begins June 2016 to August 2018 Phased completion of building renovations and additions August 2018 Students occupy all new areas October 2018 Final sitework complete
39 Holland Discussion
40 Total Projects Comparison Budget vs. Bid Results Newtown Middle School Budget Actual Construction Costs $ 49,704,672 $ 46,298,250 Financing Costs $ 1,148,673 $ 917,899 Contingency for unforeseens $ 2,274,562 $ 2,191,275 Fees, Permits, Testing, etc. $ 5,054,403 $ 4,713,027 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 58,582,310 $ 55,820,451 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 55,433,637 $ 52,902,552 Holland Middle School Budget Actual Construction Costs $ 43,488,168 $ 40,827,400 Financing Costs $ 1,045,526 $ 785,077 Reserve Contingency for unforeseens $ 3,482,930 $ 2,482,930 Reserve Fees, Permits, Testing, etc. $ 4,905,178 $ 4,905,178 FF&E $ 400,000 $ 1,700,000 Project Budget without ACE Grant $ 53,321,802 $ 50,700,585 LEED Gold ACE Grant achievable though project design and construction $ 2,000,000 $ 2,000,000 Total Project Cost, Excluding Financing $ 50,276,276 $ 47,915,508 Budget Actual GRAND TOTAL: $ 105,709,913 $ 100,818,060 Difference: $ 4,891,853 Contingency Available for Both Projects: $ 4,674,205
41 Public Comments?
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
NORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room
AGENDA BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room 1. Call to order at 6:30 p.m. 2. Review of Three Year Life Safety Recommendations from EGM Architects 3. Review of
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION
Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /
CAPITAL EXPENDITURES
CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
The work has continued on final Phase 4 and is nearing completion.
Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual
15 Attachments (separately bound) 15.1 Project Manual - Table of Contents - Outline Specifi cations 15.2 Drawings (half size) - Drawing List Section 15.3 15.1 Project Manual Separately bound and being
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
Repair and Remodeling Estimating Methods. 4th Edition. RSMeans
Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling
Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015
Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access
KIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
A Century of Progress with Pride
The City of Berwyn Engineering Department A Century of Progress with Pride November 12, 2014 Re: Waiting List Application I am interested in the following programs and would like to be added to the waiting
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
DESIGN AND CONSTRUCTION DEPARTMENT - July 2014
DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.
Estimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check
#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check Zoning laws Deed restrictions on home size, foundation style, roof pitch, etc. Suitability (slope, wetland issues, etc.) Accessibility
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
Schedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239
1. Maintenance Building Component Detail Est. Cost. Alkali Building Envelope Replace windows $40,425 Replace worn and rippling carpet $81,335 Improve ligh>ng control an sensoring $230,239 Repair and replace
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
NAHB 1-00-0000 PRODUCT DEFINITION
NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
CLEANING FREQUENCIES FOR THE FOLLOWING AREAS
CLEANING FREQUENCIES FOR THE FOLLOWING AREAS ENTRANCES, LOBBIES, RECEPTION, FOYER APPA Level 2 Tiled and linoleum floors will be dust mopped and damp mopped/washed Doormats will be lifted and vacuumed
TechPractices: Home Front Homes:
TechPractices: Home Front Homes: PATH's Technologies in Practice are large scale housing projects throughout the U.S. where innovative technologies are being installed and used. Information is presented
Building Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
CHARLOTTE COUNTY Community Development Department
CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004
HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing
Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011
Building the Case for Construction Management Dick Hierstein, IaCMA and Larry Gleason, CPMI Handouts and presentation are available Iowa League of online Cities // 2011 at www.iowaleague.org Outline Owner
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
The Charter School Law establishes the following for charter schools with respect to school construction:
Charter Schools - School Construction The Charter School Law establishes the following for charter schools with respect to school construction: 1. A charter school may be located in an existing public
Seattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
FLORIDA STATE UNIVERSITY INTERNATIONAL PROGRAMS VALENCIA "GOLD" STUDY CENTER
FLORIDA STATE UNIVERSITY INTERNATIONAL PROGRAMS VALENCIA "GOLD" STUDY CENTER REPORT ABOUT RESTORATION, ARCHAEOLOGICAL AND HISTORICAL REMAINS AND SUSTAINABLE "GARNET AND GOLD GO GREEN" DECISIONS. 1.- RESTORATION
Project Management Division
CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins
BILL OF QUANTITIES Part No.: Part Description
Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
Design and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No.
Charles H. Cross III, AIA, NCARB, LEED AP Charles Cross Architecture, PC Renovations for a New 18 Bed Gero-Psych Nursing Unit Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum
SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete
SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic
17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
SEWER BACK UP PREVENTION PILOT PROGRAM
SEWER BACK UP PREVENTION PILOT PROGRAM FINANCIAL ASSISTANCE FOR HOMEOWNERS Village of South Holland 16240 Wausau Avenue South Holland, IL 60473 www.southholland.org Table ofcontents Page What is the Program?
SEWER BACKUP PREVENTION PROGRAM
SEWER BACKUP PREVENTION PROGRAM The Village of La Grange Park is pleased to announce a program to assist single-family homeowners with the cost of plumbing improvements to address sanitary sewer related
Public Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
Exterior Condition Report
Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,
This report presents the findings and recommendations of the assessment of energy use and
This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that
SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER
NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below
Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC
Presented by The Facilities Management Group TFMG / TFMG Architecture, PC in conjunction with EMTEC Engineers, LLC Why are we here today? To solicit public comments to help us create the Comprehensive
I. AMFITEATRU HOTEL ** For more details visit : http://www.unita-turism.ro/ro/sale-olimp-estival.html
NEPTUN OLIMP BLACK SEA RESORT SALE PRICE = 24.000.000 euro - Negociable price Amfiteatru** Belvedere**- Panoramic** Complex from Neptun-Olimp Resort has a total area of 44,308 square meters Olimp Resort
FORENSIC INVESTIGATION QUESTIONNAIRE
FORENSIC INVESTIGATION QUESTIONNAIRE PSE Project Number: - - Project Name: Person(s) Interviewed: Relationship to House: Please answer the following questions to the best of your ability. Exact dates are
RFP #015-020. Request for Proposals. Case High School Fieldhouse and Locker Room Renovation and Renovation
Racine Unified School DISTRICT 3109 Mount Pleasant Street Racine, Wisconsin 53404 262-631-7030 RFP #015-020 Request for Proposals Case High School Fieldhouse and Locker Room Renovation and Renovation The
How To Plan A Building
State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site
MARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
BUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
Element D Services Heating, Ventilating, and Air Conditioning
Load Calculation Criteria PART 1 - GENERAL 1.01 OVERVIEW A. This section includes requirements for calculating HVAC cooling and heating loads. B. Load calculations must be performed in accordance with