CONSTRUCTION UPDATE November 6, 2015

Size: px
Start display at page:

Download "CONSTRUCTION UPDATE November 6, 2015"

Transcription

1 CONSTRUCTION UPDATE November 6, 2015

2 Donaldsonville High School Athletic Addition East Ascension High School Athletic Addition St. Amant High School Athletic Addition St. Amant High School Freshman Academy East Ascension High School Freshman Academy (Contract will be awarded on Nov. 17) Donaldsonville High School New Library (Contract will be awarded on Nov. 17) Lowery Middle School Facelift (Contract will be awarded on Nov. 17)

3 Donaldsonville Primary School Build New Classroom Addition Donaldsonville Primary School Bus Drop-off Canopy Dutchtown High School Freshman Academy

4 APSB Office Re-roof / HVAC Upgrade Ascension Alternative School Additional Classroom Space / Administration Area Improvements Ascension Alternative School Electrical Upgrade Donaldsonville High School Campus Renovations Donaldsonville High School Restroom Renovations Donaldsonville High School Electrical Upgrades Donaldsonville Primary School Electrical Upgrades Dutchtown Middle Renovation of Old Gym into New Library Dutchtown Middle School Classroom Addition Dutchtown Middle School Expand Cafeteria Dutchtown Middle School Drainage Improvements Dutchtown Middle School Electrical Upgrades Dutchtown Primary Paving and Canopy Renovations Dutchtown Primary Restroom Renovations East Ascension High School Electrical Upgrades Galvez Middle School Lead Paint Abatement 2 Story Classroom Bldg Galvez Middle School Restroom Renovations Galvez Middle School Major Renovations Galvez Primary Building F Renovation Galvez Primary Electrical Upgrade Galvez Primary School Restroom Renovations

5 Gonzales Primary Playground Gonzales Primary Parking Lot and Façade Improvements Gonzales Primary School Classroom Addition Gonzales Middle School Gym Upgrades Gonzales Middle School Facelift, Fencing, Storage G. W. Carver New School Hwy 621 Central Primary Turn Lane Hwy 928 Spanish Lake Turn Lane Improvements to Service Distribution Center Lake Elementary School Expand Library Lake Elementary School Expand Kitchen Lake Elementary School Drainage Improvements Oak Grove Primary Expand Administrative Areas Oak Grove Electrical Upgrades Prairieville Middle School New Kitchen and Cafeteria Prairieville Middle School New Classroom, Admin. And Library Security Improvements Camera Systems, Door Hardware, Communications St. Amant High School Restroom Renovations St. Amant High School Electrical Upgrades St. Amant Middle School Renovations and Addition (Gym Upgrades) St. Amant Middle School Electrical Upgrades St. Amant Primary School New Entry Canopy Technology Improvements New Data Center

6 Donaldsonville High Library -

7 Lowery Renovations

8 FRESHMAN ACADEMY East Ascension High School

9 FRESHMAN ACADEMY St. Amant High School

10 FRESHMAN ACADEMY Dutchtown High School

11 Lake Elementary - Renovations Library Addition New Serving lines and equipment in Kitchen

12 Lake Elementary - Renovations Library Addition New outdoor classroom

13 Major Renovations to Prairieville Middle School New Classroom Building New Administration and Library New car drop off

14 New Kitchen and Cafeteria for Prairieville Middle School New Cafeteria and Kitchen New Sewer System New Parking and bus drop off

15 Renovations to Galvez Middle School Additional Classroom Space Administration Improvements Improve Campus Parking and Traffic flow Electrical Upgrades Replace Existing Fence

16 New Parking Lot, Façade Improvements, Playground Gonzales Primary School

17 Renovations to Dutchtown Middle and Primary School

18 Improvements to Service Distribution Center

19 Hwy 928 Spanish Lake Turn Lane Both Driveways have been poured and are both re-opened No more closures expected on our drive Temporary lane closures may occur between pick up and drop off times

20 Hwy 621 Central Primary Turn Lane Both Driveways have been poured and are both re-opened No more closures expected on our drive Temporary lane closures may occur between pick up and drop off times

21 New G.W. Carver Primary School

22 Renovations to Gonzales Middle School Facelift New Fence New Storage Building

23 St. Amant High School Restroom Renovations

24 Renovations to Gonzales Primary School

25 Renovations to Dutchtown Middle and Primary School Phase 1 - Before....After New Car Drop Off and Parking Lot..After

26 New Classroom Building Dutchtown Middle and Primary School This project includes a classroom building addition, gymnasium addition and renovations to existing cafeteria/kitchen and existing gym(new media center). New Classroom Building..!!! We Moved into the Classrooms in September 15, 2012!!!

27 New Gym Dutchtown Middle and Primary School

28 Cafeteria Expansion Dutchtown Middle and Primary School

29 New G.W. Carver Primary School Phase 1 - Entrance Road Parking Lot Drainage Turn Lane

30 Restroom Renovations to East Ascension High And Gonzales Middle School

31 Renovations to St. Amant Middle and St. Amant Primary Schools Before Renovated Gymnasium

32 Renovations to St. Amant Middle and St. Amant Primary Schools Before....After

33 Renovations to St. Amant Middle and St. Amant Primary Schools New Primary Entry / Drop Off

34 New APSB Data Center

35 Multi Campus Electrical Upgrades Donaldsonville High School East Ascension High School St. Amant High School Donaldsonville Primary School Gonzales Middle School

36 Restroom Renovations at Galvez Primary School

37 Restroom Renovations at Galvez Middle and Ascension Alternative School

38 Renovations to Donaldsonville High School

39 1. System Wide Security Assessment 2. SSO Program began April Camera System Installs by APSB IT Department 4. Security Master Plan for each Campus 5. Security Meeting with Principals Held August District Wide Security Improvements Cost Estimate 7. Radios Have been distributed to all Schools 8. Door Hardware has been Upgraded in all Classrooms 9. Security Fencing Ongoing

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS

DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS FEEDER SYSTEM: 1 HIGH SCHOOLS = (3) Garrett Academy of Technology Academic Magnet HS Septima Clark Academy MIDDLE SCHOOL + HIGH SCHOOL = (2) School of

More information

Frequently Asked Questions

Frequently Asked Questions Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district

More information

Van Vleck ISD Bond Election

Van Vleck ISD Bond Election Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Schools Under Construction for N.I.S.D.

Schools Under Construction for N.I.S.D. October 2009 NORTHSIDE INDEPENDENT SCHOOL DISTRICT Schools Under Construction for N.I.S.D. Facilities Construction Vernon Dunagin, AIA Assist. Superintendent of Facilities & Operations Leroy San Miguel

More information

Centinela Valley Union High School District. Measure CV Masterplan Update June 2011

Centinela Valley Union High School District. Measure CV Masterplan Update June 2011 Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3

More information

Design and Construction Planning Process Strongsville City Schools

Design and Construction Planning Process Strongsville City Schools Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION LEGEND RENOVATION ADDITION DRIVE IMPROVEMENTS WIDEN BUS LOOP ROAD TO WEST PROVIDE SECURE ADMINISTRATION ENTRANCE REPLACE AGING ELECTRICAL PANELS RENOVATE SPACE FOR FIVE (5) SCIENCE CLASSROOMS CONVERT EXISTING

More information

Performing Arts Wing. Existing Auditorium. Library. Student Entry. Omni Room Athletics/JROTC. Dance Bus Drop

Performing Arts Wing. Existing Auditorium. Library. Student Entry. Omni Room Athletics/JROTC. Dance Bus Drop Choir Band Performing Arts Wing Arts Courtyard Drama Liberal Arts Wing Team Arts Prefunction Loading Area Team Existing Auditorium Heritage Hall Auditorium Lobby Administration Library Visitor Entry Team

More information

Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement

Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement Guideline for Construction Reimbursement Rates 160-5-4-.16 (a) 7 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 NEW CONSTRUCTION REIMBURSEMENT

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

North East Independent School District 2011 Bond Proposal

North East Independent School District 2011 Bond Proposal North East Independent School District 2011 Bond Proposal North East ISD Garrett J. Sullivan, Executive Director Construction Management & Engineering Department The Process Community Planning and Advisory

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

CONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012

CONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012 CONSTRUCTION UPDATE WWW.SVUSD.ORG SEPTEMBER 2012 The 2012-2013 school year is proving to be another year filled with exciting, much needed Measure B building projects. Facilities Planning & Construction

More information

INDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft.

INDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft. ED. SPEC. ELEMENTARY SCHOOL SPACE BUDGET Program Menchaca ES Page 1 of 6 INDIVIDUAL CAMPUS PLAN ASSESSMENT al s Non- al s Size Pre-Kindergarten / Kindergarten - Classrooms 8 8 925 7,400 (minimum or 25

More information

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the

More information

SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL

SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL March 16, 2015 SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL DUNCANVILLE INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 6 Site Plan 7 ACTON ELEMENTARY SCHOOL

More information

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

Lacy Elementary. School Constructed: Building Age Range 1953-1997

Lacy Elementary. School Constructed: Building Age Range 1953-1997 School Constructed: Building Age Range 1953-1997 Lacy Elementary CIP 2006 Project Scope: Construct new general and special programs classrooms, and a new art and music classrooms (use new construction

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012 Centinela Valley Union High School District Measure CV Program Update July 23, 2012 Site Construction Progress Site Updates Hawthorne High School Lawndale High School Leuzinger High School 2 Hawthorne

More information

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Bond Priorities. Repairs and Maintenance. School Safety. Capacity Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.

More information

Chicago Public Schools

Chicago Public Schools Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school

More information

DESIGN DEVELOPMENT PRESENTATION

DESIGN DEVELOPMENT PRESENTATION October 26, 2015 DESIGN DEVELOPMENT PRESENTATION NEW SHIRLEY HALL MIDDLE SCHOOL & JOE M. TISON MIDDLE SCHOOL ADDITIONS AND RENOVATION WEATHERFORD INDEPENDENT SCHOOL DISTRICT Acknowledgments 3 Narrative

More information

IMAGINE INDIANA LIFE SCIENCES ACADEMY WEST

IMAGINE INDIANA LIFE SCIENCES ACADEMY WEST 2.21.107 Introduction Imagine Indiana Life Sciences Academy West (Imagine ILSA West) is a charter elementary and middle school located on the west side of Indianapolis, Indiana. The school is the second

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW

QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW Slide 2: Quick Update Slides 3-4: Project Timeline Slides 5-19: Project Photographs Slides 20-29: Roof Photographs Slides 30-32: Budget Summary

More information

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes. Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items

More information

The work has continued on final Phase 4 and is nearing completion.

The work has continued on final Phase 4 and is nearing completion. Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to

More information

Public Building Commission of Chicago. Board Meeting August 20, 2013

Public Building Commission of Chicago. Board Meeting August 20, 2013 Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL

SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL June 15, 2015 SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL JOSHUA INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 5 Independent School District Site Plan

More information

A school crisis is any event that drastically disrupts or alters a normal school day for your campus. More dynamic if the media covers the event!!

A school crisis is any event that drastically disrupts or alters a normal school day for your campus. More dynamic if the media covers the event!! Critical Incident Management Instructor: Lieutenant Mo Canady, Hoover Police Department What Is A School Crisis?? A school crisis is any event that drastically disrupts or alters a normal school day for

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014 DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.

More information

A Self-Audit of Your Current Campus Security Systems

A Self-Audit of Your Current Campus Security Systems A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,

More information

EARTHQUAKE SCENARIO. Orange County (CA) Department of Education http://emergency.ocde.us/tools.htm

EARTHQUAKE SCENARIO. Orange County (CA) Department of Education http://emergency.ocde.us/tools.htm EARTHQUAKE SCENARIO Wilson Elementary School is located on the outskirts of Sacramento, California. In addition to the principal and assistant principal, Wilson has 31 faculty members, two full-time counselors,

More information

Request for Proposal for Construction Management Services

Request for Proposal for Construction Management Services Willmar Public Schools- ISD 347 611 5 th Street SW Willmar MN 56201 Dr. Jeffrey Holm, Superintendent Request for Proposal for Construction Management Services Willmar Public Schools is soliciting Construction

More information

Franklin Pierce School District. Capital Projects Journal

Franklin Pierce School District. Capital Projects Journal Franklin Pierce School District Capital Projects Journal Capital Projects Levy Capital Projects Levy Envisioned and defined by FPS 2030 committee Levy collections began in 2012 Provides $27,500,000 in

More information

Description of Project Statewide Student Data Warehouse

Description of Project Statewide Student Data Warehouse Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data

More information

Security Survey Results Summary Parent Council - R.Tait McKenzie Public School 2010-2011 School Year

Security Survey Results Summary Parent Council - R.Tait McKenzie Public School 2010-2011 School Year Security Survey Results Summary Parent Council - R.Tait McKenzie Public School 2010-2011 School Year In an effort to get a sense of what parents currently think about security at the school, 400 surveys

More information

Best Practices for Safer School Facilities

Best Practices for Safer School Facilities Panelists: Laura Santos-Farry Director of School Safety and Risk Management, Eanes ISD Brian K. Combs Vice-President, COMBS Consulting Group, LP Shevis Moore Asst. Director of Loss Prevention Services,

More information

San Bruno Park School District. Bond Fund Modernizations and Site improvements

San Bruno Park School District. Bond Fund Modernizations and Site improvements San Bruno Park School District Bond Fund Modernizations and Site improvements For many years the district recognized the need to modernize it s aging structures and develop modern learning spaces. In the

More information

A Closer Look at the CMS Bond Request

A Closer Look at the CMS Bond Request Charlotte-Mecklenburg Schools 2013 Bond Referendum Our Children. Our Schools. Our Future. A Closer Look at the CMS Bond Request On Nov. 5, Mecklenburg County voters will decide on a $290 million bond referendum

More information

Dear Keller High School Families,

Dear Keller High School Families, Dear Keller High School Families, As we near the close of the 2014-15 school year, I am so proud of our community of learners for committing to the vision of KHS and its Tradition of Excellence! I would

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

Cherry Creek School District Update - 2012 Bond Projects

Cherry Creek School District Update - 2012 Bond Projects Cherry Creek School District Update - 2012 Bond Projects Summer Projects, 2013 September 9, 2013 School Locations Where Projects Have Been Completed Summer, 2013 Elementary Schools: Cimarron Creekside

More information

Responsibilities The principal/administrator will be responsible for the total energy usage of her/his building.

Responsibilities The principal/administrator will be responsible for the total energy usage of her/his building. 6811P: Resource Conservation Management Program Introduction The focus of the Resource Conservation Management Program is long-term, sustainable measures, practices and procedures that reduce consumption

More information

Preventative Maintenance

Preventative Maintenance Preventative Maintenance Safety Committee To have a preventative maintenance plan, you should have a Safety Committee. Designate persons involved with day to day operations and grounds control. Use your

More information

HICKMAN ELEMENTARY SCHOOL

HICKMAN ELEMENTARY SCHOOL HICKMAN ELEMENTARY SCHOOL 2 Facility Assessment Report, Garland Independent School District CAMPUS DATA HICKMAN ELEMENTARY SCHOOL 3114 Pinewood Dr., Garland, TX 75044 Facility # 133 Year Built 1975 No.

More information

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA: 705 671 6099

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA: 705 671 6099 Buying A New Home Presented in Partnership with Greater Sudbury Public Library PHONE SDHBA: 705 671 6099 1 Four Month Series DATES: Sept 13: Underground / Cash Deal Oct 11: Talking with Builder / Renovator

More information

DCSD 2015-2016 Classified Salary Ranges

DCSD 2015-2016 Classified Salary Ranges I Intern $ 9.00 $ 9.00 $ 9.00 S Classifield Substitute $ 8.23 $ 16.83 $ 25.42 1 Senior Temporary Employee $ 8.23 $ 9.93 $ 11.63 2 Concessions Manager - District Stadium $ 8.35 $ 10.62 $ 12.89 Instructor

More information

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016 I. Purpose DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016 To provide a standard for a reasonable A/E fee structure on State of Utah Projects

More information

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating

More information

OHLONE COMMUNITY COLLEGE BOND MEASURE G

OHLONE COMMUNITY COLLEGE BOND MEASURE G Monthly Report OHLONE COMMUNITY COLLEGE BOND MEASURE G Fremont, California June 2014 TABLE OF CONTENTS 1. Executive Summary 2. Safety Status 3. Schedule Status 4. Design Progress 5. Construction Progress

More information

ENERGY CONSERVATION GUIDELINES

ENERGY CONSERVATION GUIDELINES MIDWAY INDEPENDENT SCHOOL DISTRICT ENERGY CONSERVATION GUIDELINES The following energy conservation guidelines are applicable to all district personnel and facilities. The directors of departments and

More information

DISTRICTWIDE FACILITIES MASTER PLAN. February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS

DISTRICTWIDE FACILITIES MASTER PLAN. February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS DISTRICTWIDE FACILITIES MASTER PLAN February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS Table of Contents Executive Summary. 2 Section 1: Bridgewater Elementary School. 4 Background Deferred Maintenance

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

MINOOKA COMMUNITY HIGH SCHOOL DISTRICT #111

MINOOKA COMMUNITY HIGH SCHOOL DISTRICT #111 MINOOKA COMMUNITY HIGH SCHOOL DISTRICT #111 Mission: To Inspire and motivate our students with an educational experience that leads to achievement and success. December 8, 2015 Dear Incoming Freshman and

More information

The Charter School Law establishes the following for charter schools with respect to school construction:

The Charter School Law establishes the following for charter schools with respect to school construction: Charter Schools - School Construction The Charter School Law establishes the following for charter schools with respect to school construction: 1. A charter school may be located in an existing public

More information

Questions related to specific materials, methods, and services will be addressed at the conclusion of each presentation.

Questions related to specific materials, methods, and services will be addressed at the conclusion of each presentation. CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members.

More information

BERNALILLO COUNTY 2016-22 CAPITAL IMPROVEMENT PLAN (CIP) & GENERAL OBLIGATION BOND

BERNALILLO COUNTY 2016-22 CAPITAL IMPROVEMENT PLAN (CIP) & GENERAL OBLIGATION BOND April 19, 2016 Public Meeting #4 Hiland Theatre BERNALILLO COUNTY 2016-22 CAPITAL IMPROVEMENT PLAN (CIP) & GENERAL OBLIGATION BOND Commission District 3 Tonight s Agenda 2 County Staff Introductions, Spanish

More information

SELECTED SPECIAL EVENTS PROJECTS

SELECTED SPECIAL EVENTS PROJECTS 1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,

More information

E X I S T I N G F A C I L I T I E S

E X I S T I N G F A C I L I T I E S Los Angeles Unified School District Facilities Services Division E X I S T I N G F A C I L I T I E S 68 TH STREET ELEMENTARY SCHOOL FOOD FACILITIES BUILDING Monthly Program Status Report August 2011 Prepared

More information