1 Van Vleck ISD Bond Election November 4, 2014
2 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2
3 School districts must ask voters for permission to sell bonds (borrow money from investors) to build and renovate school buildings. The school district pays that loan back over an extended period of time, much like we all do with our home mortgages. Bonds cannot be used for salaries or operating costs such as utility bills, supplies, building maintenance, fuel, and insurance. 3
4 CAPITAL FUNDS (BOND FUNDS) - Pay for design, construction, expansion and renovation of schools. Capital funds can also be used for large expenditures such as the purchase of school buses or technology. CAPITAL FUNDS and OPERATING FUNDS are separated intentionally to meet different needs as described above. By law, the two must be kept in separate accounts and they are audited to ensure compliance. 4
5 5
6 [ Science Classroom Renovations [ Kitchen/Cafeteria Addition/Renovation [ Canopy Lighting $6,112,217 [ Site Lighting [ Wood structure testing [ Repair/Replace Plaster Soffits [ Repair Roof Structure at Weight Room [ Repair Cracked Brick [ Add Control Joints / Cut Weep Holes [ Replace Wood Decking / Metal Roof Edging [ Piping System Domestic Water Main [ Install A/C and Exhaust Fans at Restrooms [ Add A/C at MDF Room [ Add Rooftop Unit at Kitchen [ Replace Phone System with New IP Phone System [ Moisture Testing selected flooring areas 6
7 [ Repair Library Floor Foundation [ Repair Roof Leaks [ Replace Roof Drain Clams / Dome Strainers [ Replace Scuppers with Downspouts [ Replace All Rooftop A/C Units [ Replace Rooftop A/C Conduit, Wiring, Supports [ Install Emergency Exit Lighting [ Upgrade to New IP Phone System [ Install Additional Data Drops [ Install Security Camera System [ Moisture Testing and Replace VCT at Band Hall as needed [ Repair Floor Cracks at Cafeteria Dining area $2,596,649 7
8 [ Security Fencing [ Power Distribution System Upgrades [ Install Emergency Exit Lighting [ Upgrade to New IP Phone System [ Install Additional Data Drops [ Replace PA and Bell System [ Install Security Camera System $363,748 8
9 $380,988 [ Security Fencing [ Repair / Replace Wood Structure at Drama Building [ Repair / Replace Downspouts and Gutters [ Replace Damaged Wood Floor / Stairs at Weight Room [ Moisture Testing [ Upgrade to New IP Phone System [ Install Additional Data Drops [ Install Emergency Exit Lighting [ Wood Structure Ceiling Testing 9
10 [ Replace Rusted Gutters and Eave Trim [ Replace Gas Water Heater [ Install Emergency Exit Lighting [ Install Security Camera System [ Upgrade to New IP Phone System [ Install Additional Data Drops [ Purchase 10 New School Buses [ Fund School Bus Repair Budget $1,961,223 10
11 [ Fencing and drainage on site [ Repair / Seal Exterior Walls of Home Side Concessions [ Install New Exhaust System at Field House [ Wood Deck and Structure Testing [ Install Security Camera System $237,625 11
12 [ Re-grade Drainage Swales [ Repair / Replace Above-Ground Water Storage Tank [ Upgrade Power Distribution System [ Install Emergency Exit Lighting at exit doors [ Repair/Replace Outdoors Equipment [ Install Security Camera System $394,962 12
13 [ Safety for our students [ Anticipating 25% enrollment growth [ Growth requires additional classrooms / support space at both campuses [ Both campuses require major renovations and upgrades [ Committee recommended building one new/modern campus [ New building with new technologies more efficient operationally [ A single campus requires one team and one campus to maintain $22,455,090 13
14 to house central administration, support, and community services [ Renovate existing classrooms to: Create a security vestibule $4,921,110 Create Administration offices Create a new Board Room [ Upgrade the restrooms to function properly [ Expand the technology department into vacated spaces [ Remaining classrooms could be used for community spaces and clinic [ Gymnasium could be used for community use [ Gymnasium Roof Repairs [ Replace existing phone system with new IP Phone system 14
15 [ Middle School Improvements $6,112,217 [ High School Improvements $2,596,649 [ Ag Building Improvements $363,748 [ Auditorium/Gym/Drama Improvements $380,988 [ Stadium Complex Improvements $237,625 [ Maintenance/Bus Barn/Transportation $1,961,223 [ Community Fields/Park Improvements $394,962 [ New Consolidated Elementary $22,455,090 [ E. Rudd Conversion $4,921,110 [ Technology Improvements $1,900,000 [ Bond-Related Fees $385,585 [ Bond Contingency $1,005,901 Total $42,715,100 15
16 How was the Bond Plan Developed? 2012 The Board of Trustees asked the district to evaluate the physical condition, safety, security, efficiencies, and capacities of its facilities Hired an architect, demographer, and financial advisor 2013 Studied facilities and conducted financial analysis 2014 District conducted a community survey A Facilities Planning Committee made up of 25 citizens reviewed the building condition reports, enrollment projections, and cost analysis The Committee came to full agreement on a plan and presented it s recommendation to the Board of Trustees 16
17 Crash Course: School Funding 101 The world s most complex math problem! How are your schools funded and where do all my tax dollars go? 17
18 Funding Picture Payroll, Insurance, Fuel, Maintenance, Supplies, Utilities, Training, etc. LOCAL 66% STATE 28% FEDERAL 6% 18
19 Van Vleck ISD sets your tax rate. VVISD does NOT determine the taxable value of your home. 19
20 Tax Rate Total Tax Rate $
21 Total Tax Rate $
22 Total Tax Rate $
23 Your taxes will not increase as a result of this bond election. The school tax rate and the amount paid are frozen when a taxpayer turns 65 years old. 23
24 Funding Picture School construction, buses, technology, other capital expenses HOMEOWNERS 42% INDUSTRY 58% State & Federal? NONE! 24
25 $42.7 million bond example HOMEOWNERS $17,980,000 INDUSTRY $24,800,000 State & Federal? NONE! 25
26 If you think you re too small to make a difference, you ve never spent the night with a mosquito. --African Proverb GO VOTE! 26
Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)
Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval
More informationFrequently Asked Questions
Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBuilding Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
More informationReport for. Dick and Jane Homeowner. 1234 Lovers Lane, Houston, Texas 77000
Report for Dick and Jane Homeowner 1234 Lovers Lane, Houston, Texas 77000 March 17, 2004 I NI NP R Inspection Item I. STRUCTURAL SYSTEMS o o o A. Foundations (If all crawl space areas are not inspected,
More informationCAPITAL EXPENDITURES
CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.
More informationWater Management & Damage Prevention:
Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and
More informationItems in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.
Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items
More informationHamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
More informationwww.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
More informationCALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES
More informationNovember 3, 2015 Bond and District Additional Assistance Election Information
November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationMEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
More informationDAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
More informationSMART Initiative Information
SMART Initiative Information On November 4 th, Broward County voters will have an opportunity to cast their ballots regarding an $800 million General Obligation Bond. The proceeds of this bond will be
More informationElection Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount
Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating
More informationBond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
More informationSchool Facilities Referendum Recommendations
Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation
More informationSchool Board Proposed Capital Improvements Program. Fiscal Years 2014-2023
School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL
More informationBond Refusal in Broward County - Frequently Asked Questions
FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. 1. Q: What is a General Obligation Bond referendum and
More informationCITY OF TUKWILA Mayor s Office/Human Services Division Minor Housing Repair Assistance Program 2014 Policies
CITY OF TUKWILA Mayor s Office/Human Services Division Minor Housing Repair Assistance Program 2014 Policies The Housing Repair Assistance Program provides and promotes the repair and maintenance of housing
More informationBUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist
More informationArticle 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
More informationTotal Home Inspection Checklist
Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationCONSTRUCTION UPDATE November 6, 2015
CONSTRUCTION UPDATE November 6, 2015 Donaldsonville High School Athletic Addition East Ascension High School Athletic Addition St. Amant High School Athletic Addition St. Amant High School Freshman Academy
More informationFinancing Options to support Energy Efficiency & Contractors
Financing Options to support Energy Efficiency & Contractors Renovation Loan Overview Renovation Loans offer a buyer the opportunity to buy a property and close as-is, financing both the purchase and repair
More informationFacility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationShingle Roofing: What s below the surface is important
What s below the surface is important The roof is leaking, the shingles look old, and the downspouts are dripping. It must be time to replace the roof or is it? Shingle roofs may seem simple, but a roof
More informationHOME INSPECTION CHECKLIST
CLOSING.COM LEARNING CENTER HOME INSPECTION CHECKLIST CONTENTS Attic 1 Balconies 1 Basement 1 Bathroom 2 Ceiling, Floors and Walls 2 Crawlspace 3 Decks and Porches 3 Doors and Windows 4 Drainage 4 Driveways
More informationFY16 School District Budget EXECUTIVE SUMMARY
FY16 School District Budget EXECUTIVE SUMMARY Purpose: To hold a public hearing and receive tentative approval of the FY16 Southeast Technical Institute (STI) Budget. STI began its initial budget process
More informationBuilding Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
More informationRehab Inspection Report Page 1
Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation
More information2004-2005 Business Office Department Improvement Plan
2004-2005 Business Office Department Improvement Plan Section I 1. Campus/Department: Business Office-Tax Office-Warehouse 2. Location: Galena Park ISD Administration Building 3. Budget Manager: Michael
More informationCedarfield Plantation
July 31, 2015 Dear Members: The purpose of this mailer is to inform and encourage all homeowners to vote on one of two options for repair/renovations for our pool house. On Saturday, July 25, 2015, and
More informationOpen House and Home Tour Checklist
1 The House Address: Number of floors: Listing price: Basement? Property tax: Outdoor space? Eugh closet space? Style: Eugh storage space? Square footage: Room for expansion? Number of bedrooms: What appliances
More informationHow To Check For A Deficiency
UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The
More informationSelf-Home Inspection Checklist
To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional
More informationHome Inspection Report
Report# 21009 Page 1 of 24 Home Inspection Report Property Address: 123 Maple Lane, St. Augustine, FL 32092 Prepared For: Mr. Smith Prepared By: EDGE Inspections www.edgeinspections.com PO Box 601055 Jacksonville,
More informationInspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com
More informationInspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg
Inspection Tech (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech Home Inspection Report Prepared For: Mr. & Mrs. Homebuyer Property
More informationAPPENDIX E: CAPITAL NEEDS SUMMARY
APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs
More informationA.C.E. Home Inspection Service www.acehomeweb.com St. Peters, MO 63376 (636) 978-9111
A.C.E. Home Inspection Service www.acehomeweb.com St. Peters, MO 63376 (636) 978-9111 Inspector Name: Tim Knight, ASHI Member 202490 Inspection No: 12121212 Inspection Date: 1/1/2012 Client: Address: John
More informationU.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!
U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or
More informationProperty Condition Assessment
Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar
More informationHome Management Checklist: Spring
Home Management Checklist: Spring HVAC System Attic Plumbing and Electrical Service air conditioning unit (Ventilation inspected as part of service call). Ensure gutters are discharging water away from
More informationPreventing Ice Dams on Roofs
Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
More informationBoard Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
More informationInspection Item COMMENTS
APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:
More informationWater Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
More informationFacility Assessment Report, Montgomery Independent School District
THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a
More informationA comfortable house is a great source of happiness. - Sydney Smith. Home Maintenance Guide
A comfortable house is a great source of happiness. - Sydney Smith Home Maintenance Guide HOME GUIDE By conducting regular maintenance checks, you can prevent small inexpensive repairs from becoming more
More informationHOUSTON MIDDLE SCHOOL
HOUSTON MIDDLE SCHOOL CAMPUS DATA HOUSTON MIDDLE SCHOOL 2232 Sussex Dr., Garland, TX 7504 Facility # 043 Year Built 960 (w/additions) No. of Buildings 2 No. of Portables 6 Approx. Total Square Footage
More informationSimplify. Homeownership
Simplify Homeownership Home Pulse An Innovative Program To Maintain Your Home. The Home Pulse Preventive Maintenance Plan will keep your home looking great, dramatically slow the deterioration process
More informationRESOLUTION NO. 2003-04-13
RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of
More informationSCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers
SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers WHAT IS THE ISSUE? Last year our School Board entered into a full-scale study of our educational facilities conducted by the Ohio
More informationDEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)
DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District
More informationINDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft.
ED. SPEC. ELEMENTARY SCHOOL SPACE BUDGET Program Menchaca ES Page 1 of 6 INDIVIDUAL CAMPUS PLAN ASSESSMENT al s Non- al s Size Pre-Kindergarten / Kindergarten - Classrooms 8 8 925 7,400 (minimum or 25
More informationCOMPREHENSIVE PROPERTY INSPECTIONS
COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited
More informationDelaney-Vogel School
Wrentham Public Schools Delaney-Vogel School Schematic Design 1. INTRODUCTION Wrentham Public Schools contracted with Turowski2 Architecture, Inc. on November 11, 2015 to assess necessary roof repairs
More informationClear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015
Clear Fork Valley Local School District Roofing Repairs Spring/Summer 2015 Instructions to Bidders: Public Notice To Bidders (ORC 3313.46) Notice is hereby given that sealed bids will be received at the
More informationCentinela Valley Union High School District. Measure CV Masterplan Update June 2011
Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3
More informationHow to report a repair
How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,
More informationProjected Statements of Local Assessments. City of Saco, Maine. For the years ending June 30, 2015, 2016 and 2017
Projected Statements of Local Assessments For the years ending June 30, 2015, 2016 and 2017 Contents Independent Accountants Report............................................ 1 Projected Statements of
More informationPropery Inspection Report
Propery Inspection Report Cover Page,, Ok Inspection prepared for: Date of Inspection: 9/28/2014 Time: 8:30 AM Age of Home: 2011 MOL Weather: Clear 62 degrees Inspector: License #130 5400 Hwy 177, Marland,
More informationELIGIBLE REPAIR PROJECT PARAMETERS
THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationDistrict Information
Bond 2010 District Information 95.5% College Bound 2009 College Readiness Award from Texas ACT Council #1 Ranked Traditional High School in San Antonio by Children at Risk 458 AP test takers/ 875 tests
More informationHOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
More informationTruth in Sale of Housing Disclosure Report NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection!
NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection! Current Owner Name: Mpls City Property Atn Cped (p Contact: Mpls City Property Atn Cped (p Business/Relationship: Owner Address:
More informationDISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS
DISTRICT WIDE: MAGNET, CHARTER SCHOOLS AND PROGRAMS FEEDER SYSTEM: 1 HIGH SCHOOLS = (3) Garrett Academy of Technology Academic Magnet HS Septima Clark Academy MIDDLE SCHOOL + HIGH SCHOOL = (2) School of
More informationRoof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, 2014. RBA Project No. 2014007.00.
Report Fairbank Complex 40 Fairbank Road RBA Project No. 2014007.00 Prepared by: 33 Center Street, 2 nd Floor Burlington, MA Tel: 781-273-1537 Fax: 781-273-1695 TABLE OF CONTENTS Roof Repair Project Report...
More informationBest Practices for Safer School Facilities
Panelists: Laura Santos-Farry Director of School Safety and Risk Management, Eanes ISD Brian K. Combs Vice-President, COMBS Consulting Group, LP Shevis Moore Asst. Director of Loss Prevention Services,
More informationMay 2014 Texas School Bond Elections
May 2014 Texas School Bond Elections What are the individual districts needs? New facilities Renovations Technology Central facilities How much tax revenue can the district generate? Depends on district
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More informationPart I: Summary PHA Name/Number
Part I: Summary PHA Name/Number Locality (City/County & State) Original 5-Year Plan Revision No: A. Development Number and Name Work Statement for Year 1 FFY_2012 B. Physical Improvements Subtotal Annual
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSTATE OF MICHIGAN. Bond Qualification Process Overview. School Bond Qualification and Loan Program Bureau of Bond Finance
Michigan Department of Treasury 3160, (Rev. 4-06) STATE OF MICHIGAN Bond Qualification Process Overview School Bond Qualification and Loan Program Bureau of Bond Finance Michigan Department of Treasury
More informationI NI NP R Inspected Items
6/ /07 The Inspection of the property listed above must be performed in compliance with the rules of TREC. The inspection is of conditions which are present and visible at the time of the inspection, and
More informationVirginia Maintenance Code Requirements
Virginia Maintenance Code Requirements THE VIRGINIA MAINTENANCE CODE The City of Roanoke has adopted and enforces the Virginia Maintenance Code (VMC) on all existing structures located in the city. This
More informationSolving Persistent Moisture Problems and Moisture Damage
B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started
More informationSUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX
SUMMARY REPORT Report Number: 1860 Inspection Date: Saturday, February XX, XXXX Property Address: XX XXXXX XXX Toronto, ON XXX XZX Client Name: Xxxx Xxxxxxxxxxxxx Prepared by: Andrew Marioselva BSc,CHI
More information31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012
31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT
More informationINTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
More informationHome Inspection Report
Home Inspection Report 555 Wind Way, Fake City, OR 54645 Inspection Date: Monday May 12, 2014 Prepared For: John Doe Prepared By: House to Home 3468 N. Bartlett Ave Milwaukee, WI 53211 262-754-5973 christopher@ahit.com
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationNYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
More informationPerforming Arts Wing. Existing Auditorium. Library. Student Entry. Omni Room Athletics/JROTC. Dance Bus Drop
Choir Band Performing Arts Wing Arts Courtyard Drama Liberal Arts Wing Team Arts Prefunction Loading Area Team Existing Auditorium Heritage Hall Auditorium Lobby Administration Library Visitor Entry Team
More informationBudget Edition May 2015 roposed Budget 7 am to 9 pm District Office Budget Change Tax Levy Increase Vote Day Details A Look Inside
1 Budget Edition May 2015 Residents to vote on 2015/16 proposed budget May 19 Southern Cayuga Central School District residents will vote on a $16,397,112 budget proposal for the 2015-16 school year on
More informationGeorgia Home Inspection Services
Cover Page Property Inspection Report My street, Anytown GA, 30000 Inspection prepared for: John Doe Inspection Date: 7/18/2011 Time: 5pm Age: 25+ Size: >1500 Weather: Clear This ranch style home is in
More informationWalkthrough Inspection Checklist
Walkthrough Inspection Checklist This checklist is to aid during an IAQ Walkthrough of the school. The checklist includes considerations both inside and outside the school building: Instructions: 1. Read
More informationHome Inspection Report
Home Inspection Report Cincinnati, Ohio 45000 Prepared for: Dean Murphy Prepared by: BEDROCK ENTERPRISES, INC. 4060 Simca Lane Cincinnati, OH 45211 20:13 July 07, 2008 Page 1 of 18 Definitions NOTE: All
More informationCANTERBURY HOMEOWNERS ASSOCIATION, INC. Financial Statements & Supplementary Information For the Year Ended December 31, 2013
CANTERBURY HOMEOWNERS ASSOCIATION, INC. Financial Statements & Supplementary Information For the Year Ended December 31, 2013 INDEPENDENT AUDITORS' REPORT Board of Directors Canterbury Homeowners Association,
More informationCONDITION OF QUALITY ITEMS
CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If
More informationPROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
More information