EIA-EMP. Category B2

Size: px
Start display at page:

Download "EIA-EMP. Category B2"

Transcription

1 EIA-EMP Quarrying ORDINARY ROUGH STONE Category B2 Project Details EXTENT : Ha S.F.NO : 198(P) VILLAGE : VEERASOODAMANIPATTY TALUK : MELUR DISTRICT : MADURAI APPLICANT Thiru C.MANOGARAN S/o Chandran, Veerasoodamnipatty Village, Vanjinagaram -Post, Madurai District, Tamil Nadu. Ph: CONSULTANT SURIYA MINING SERVICES (AN ISO 9001: 2008 Certified and QCI/NABET Accredited Organization) 3/216, K.S.V, Nagar, Narasothipatti, Alagapuram, Salem Website: suriyamining.com suriyakumarsemban@gmail.com, ceo@suriyamining.com

2 ENVIRONMENTAL CLEARANCE SUMMARY S.No Particulars Description 1. Name of the Owner/Firm Thiru C. Manogaran S/o Chandran OWNER 2. Location of the quarry- S.F.No. S.F.No. 198(P) in Veerasoodamanipatty Village, Melur Taluk, Madurai District, Tamil Nadu. 3. Purpose of Application Proposal for Environment Clearance for Quarrying ORDINARY ROUGH STONE QUARRY. 4. Extent of quarry in Ha Hectares 5. Modernization/New Existing 6. Ownership Poramboke 7. Topo Sheet No. Topo Sheet No. : 58 J/8 8. Latitude / Longitude BLOCK LATITUDE LONGITUDE DGPS (Co-ordinates) A 10 o N 78 o E B 10 o N 78 o E C 10 o N 78 o E D 10 o N 78 o E E 10 o N 78 o E F 10 o N 78 o E G 10 o N 78 o E H 10 o N 78 o E I 10 o N 78 o E 9. Topography of MSL area The applied area is an existing quarry, again applied for Quarry lease. The area is moderately elevated hilly terrain ranges from 185m-200m RL above MSL. Top layer is partly weathered and fresh granulite is found below 6m depth. 10. Land Use Pattern The area occupies exposure of Charnockite rises to an elevation above the ground level. Quarries around the area are almost topographically hilly terrain with moderate heights. Water table of the area is said to be fluctuated between 36-38m in a year. 11 Method of Mining Open cast semi-mechanized mining using Hydraulic excavator and tippers in combination 12 Production (quantity in m3) Production Schedule is proposed as 20140M 3 ordinary rough stone for per annum 67M 3 or 11 load (Each of 6M 3 ) per day for the 300 working day per year by open cast mining. 1

3 13 Overburden/Waste Description Quantity Geological reserves M 3 Mineable reserves M 3 Year Gravel/ Topsoil (M 3 ) Overburden/Waste (M 3 ) First Second Third Fourth Fifth Total Life of Mine 5 years 15 Climatic condition Average Rainfall 850mm. Summer 27 C and 40 C Winter 20 deg C and 30 deg C 16 Proposed Bench Dimensions Bench Length Width Height (m) Level (m) (m) First 236m m 2m Second 236m m 6m Third 215m m 6m Fourth 189m 86-92m 6m Fifth 164m 60-66m 6m Six 138m 34-40m 6m Total 17 Water table 32m below ground level 18 Water requirement Purpose Quantity KLD Drinking and Utilities Dust Suppression and Green belt Source 1.0 Mineral water Total Nearby lake / river/ odai/ channel No water bodies nearby. etc. 20 Waste water No generation of waste water. 32m Industries 2.0 Wells of proponent site 21 APC Measures Dust expected to be generated from hauling roads, place of excavation etc will be suppressed by periodical wetting of land by spraying. 22 Habitation The Pattur Population of 3817 people. Other villages 2

4 are Alampatti (5993), Velluttupatti (4261) and Muthupatti (3393). 23 Man power 12 employees 24 Ariel distance from Reserve forest, Sensitive areas, Forest, Bird sanctuaries, Wild life sanctuaries, National parks, Monuments etc., within 15km The Alagar Reserve forest is situated about 3.5Km on western side. There is no Wildlife Sanctuary is located within 10kms radius. Bird Sanctuaries Nil Wild life sanctuaries - Nil Monuments Nil 25 Interstate boundary Kerala Interstate boundary is situated about 100 kms from the proposed site on the western side. 26 Precise area statement Approved by The District Collector, Madurai in letter No. 1627/ 2015-Mines, dated Mining plan Prepared by Approved by S.SURIYAKUMAR, M.Sc., M.Phil (Geology). F.C.C. (Mining), PGDBA, DIPC (Industrial Pollution Control). RQP/MAS/013/87/A. The Mining Plan approved by AD, Madurai Lr.No.1627/2015 Mines - dated Environment Plan The land area likely to be degraded due to quarrying, dumping, forming of haul roads etc. has clearly been indicated in the mine lay out plan 30 Total cost of the Project Project cost / investment : Rs Lakhs Expenditure : Rs lakhs 3

5 1.1 PHYSIOGRAPHY 1.0 SITE ANALYSIS The applied area is an existing quarry, again applied for Quarry lease. The area is moderately elevated hilly terrain ranges from 185m-200m RL above MSL. Top layer is partly weathered and fresh granulite is found below 6m depth. No major rivers or water courses found nearby the applied area. Water table lies at a depth of 32m from the surface evidenced from the adjacent tube well. The temperature of the region is reported to be 19.5 C to a max of 35.5 C during summer. The rainfall in this area is about mm during monsoons. There are no historical monuments or areas of public interest found in the vicinity of 10Km from the area preferred for quarrying lease. There is no permanent building within a radius of 300m. The area applied for lease is surrounded by ordinary rough stone quarries. It is shown in the satellite image (Fig.2) as well as in the Environmental Plan (Plate No.XI). Fig 1.1: General view of the area 4

6 1.2 REGIONAL GEOLOGY: Madurai district is comprised of Archaean peninsular gneisses such as Charnockites, Hornblende gneisses, Biotite gneisses and migmatites and are intruded by younger formations like pegmatite and quartz veins. These rocks are extensively weathered and overlain by recent valley fills and alluvium at places. The geological formations found in the District are Khondalite, Calc-granulite, complex gneiss mainly Hornblende-Biotite and crystalline limestone, Biotite gneisses, Granite gneiss, Granite, Pegmatite, and Quartzite veins. In general, stratigraphic succession of the geological formation met within this district is as follows: Age Recent to sub-recent Archaean Rock formation Soil, Alluvium Granite, hornblende, biotite gneiss, garnet sillimanite gneiss, quartzite and Biotite gneiss. Recent to Sub recent : Soils, Alluvium, Laterites, Colluvium and Kankar. Archaean: Granite, Hornblende-biotite gneiss, garnet Sillimanite gneiss, quartzites and charnockite. 1.3 GEOLOGY OF THE PRECISE AREA The rock type found in the area applied for lease is a type migmatised granulites with equigranular texture used for fensing stones, foundation rubble masses as ordinary Rough stone which contains mostly of quartz and feldspar with some biotite minerals It is a part of migmatite, completed remelted granulite looks like granite but due to close spaced joints it is used as ordinary rough stone. The formation of the deposit trends along NE- SW direction which dips steeply. The major portion of the deposit is sheared on northern side of the area. It is shown in the geological map (Kindly refer Plate No III). Top Red Soil (2m thick) Migmatite\ Granulite Charnockite Peninsular Gneiss - Recent - Archaean - Archaean - Archaean 5

7 Fig1. 2: Close view of granulite showing colour and texture 1.4 CLIMATIC CONDITIONS Madurai has the typical climate of the Deccan plateau. It remains hot and humid most of the year. Read on to get the complete information on the climate in this amazing city of India. Monthly reported rain fall data is given as below, RAINFALL The average rainfall of Madurai district is 850mm. Fig: 1.3 Annual Temperature and Rain fall data 6

8 Monthly reported rain fall data is given as under, Fig 1.4 Rainfall in mm SUMMERS The sun is at its glory and shines very brightly during the summers. During the summer months, i.e. from May to June, the tempera ture varies between 27 C and 40 C. Therefore, the climate is quite hot. May is the hottest month. Cottons are recommended during this time WINTERS In winters, which starts from December and lasts till February, the temperature ranges between 20 deg C and 30 deg C. The climate remains pleasant during this time, as the temperature rarely falls below 20 deg C MONSOON Though the rainfall is very frequent and uniform throughout the year, just like the flow of pilgrims and tourists, the city receives the major share of rainfall between the months of July and October. Fig 1.5 a) Average Temperature 7

9 Fig. 1.5 b) Minimum and maximum temperatures 1.5 LAND USE PATTERN The area occupies exposure of Charnockite rises to an elevation above the ground level. Quarries around the area are almost topographically hilly terrain with moderate heights. Water table of the area is said to be fluctuated between 36-38m in an year. The area experience sub- tropical climate. The table indicating the area put on use at start of plan and additional requirement during plan period for calculation of net area and the area considered for reclamation has given below. Table 1.1 Land use pattern S. No Head Area put on use at start of plan (Ha) (Previous) Total Area used at the end of plan (Ha) % of Use i) Area under mining % iii) Un-worked area % iv) Roads % v) Green belt & Safety area % VI) Infrastructure % VII) Waste Dump WATER ENVIRONMENT Total No water bodies found nearby. Water drawn from the open wells are potable and the villagers are using for a long period. No adverse health effect has been reported due to consumption of water. The applicant have to test the water quality parameters like ph, TDS, COD, BOD, Salinity, hardness, fluorine etc. as the mine workers consumes. 8

10 1.7 AIR ENVIRONMENT As no mining activity no dust rise is observed. Dust fall data may be taken from the district observation for threshold values. 1.8 NOISE AND VIBRATION Threshold sound level is reported as 60dB. Noise level has to be studied prior to mining and after opening the quarry for production. Vibration may be negligible due to absence of heavy deep hole blasting. No activity to test vibration of longitudinal waves and its peak particle velocity. 1.9 FLORA AND FAUNA Flora as observed and identified in the field are covered by photograph and shown below. Mostly Erukku, Neem trees and Panai trees are found more on regional scale. The Applicant has developed trees like Teak, Mango, Casuarinas and Eucalyputs etc with proper nursery garden and plantation on vacant land Fig No.1.6 Regional trees of the proposed area 9

11 Flora is represented by herbs and shrubs of local species. Fauna is represented by rabbits, rat, scorpion, millipedes etc. Trees and their botanical terms are given below with numbers TREES: S. Name of trees Botanical Name Number Remarks No. 1 Vembu Azadirachta indica 8 Growing well 2 Panai Borassus flabellifer 10 Growing well 3 Pungai Growing well SHRUBS: S. No. Local Name Botanical Name 1 Nayuruvi Achyranthus aspera 2 Erukku Calotrophis gigantea 3 indumul Pterolobium indicum HERBS: S. No. Local Name Botanical Name 1 Poolai poondu Aerva lanata 2 Korai Elacocarpus aerratas 3 Thumbai Leucas aspera 4 Peru Nerunji Pedalium murex 5 Kantangkathri Solanum xanthocarpum Fauna is represented by rabbits, rat, scorpion, millipedes etc 10

12 1.10 SOCIO-ECONOMIC ENVIRONMENT INTRODUCTION This section of the EIA report deals with Socio-Economic Impact assessment of the proposed Mining Project promoted by M/s Thiru.C.Manogaran, Melur taluk at Pattur village, Sub-district Melur District of Madurai, Tamilnadu. The objects of the socio-economic impact assessment are as follows: a) To study the socio-economic status of the people living in the study area of the proposed mining project. b) To assess the impact on socio-economic environment due to proposed mining project METHODOLOGY The methodology adopted for impact assessment is as follows: a) The details of the activities and population structure have been obtained from Census 2001 and 2011 and analyzed. b) On the basis of a preliminary reconnaissance survey, two questionnaires were developed to make it suitable to fulfill the objectives of the study. c) Based on the above data, impacts due to mining operation on the community have been assessed and recommendations for further improvement have been made POPULATION CHARACTERISTICS- PATTUR VILLAGE In Melur taluk, Pattur village had a total household 736 in 2001 which is increased 975 in according to census Village had a total person of 3817 in 2011 census previous census 2946 persons in There were about 1959 men according to 2011 census and 1467 men in 2001 census marking an increase of 492 men over the previous census. During 2001 there were about 1479 women (50%), which increased to 1858 (48%) in 2011 census. 11

13 Pattur village had a literate accounted for 1308 persons (44%) in 2001 and increased to 2156 persons (56 %) in There were about 53 percent males in 2001 and 65 percent in There were about 529 (35 %) females increased to 869 (46%) classes as literates in Sex composition is the most important demographic characteristic that affects the incidence of birth and death. The average sex ratio in Melur taluk, Pattur village was 1008 during 2001 and decreased to 948 the year of The lowest sex ratio may be either due to the migrants for educational purpose and employment opportunities and due to infant death of female. Table No 1.2 Population Characteristics Pattur Village, Melur Taluk, and Madurai District ( ) S. no Characteristics 2001 % 2011 % 1 Total Household Total Population Male Population Female Population Total Literacy Male Literacy Female Literacy Sex Ratio Fig No.1.7 Population Characteristic 12

14 OCCUPATIONAL CHARACTERISTICS - PATTUR VILLAGE The term workers denote the population engaged in primary, secondary and tertiary activities classified in the census reports of Indian government. During the year 2001 Pattur village had 1566 workers accounting for 53 percent of the total population of the Village. During 2011 there were about 2006 (52%) according to the census. There were about 860 men (58%) during 2001 which is increased to 1160 persons (59%) according to census There were about 706 female according to 2001 which is increased to 846 female during 2011 marking a decrease of 142 women over the previous census. In Pattur village had a total main workers accounted of 1543 (52%) persons during 2001 census which is increased to 1666 (43%) persons during There were about 691 (46%) women in 2001 and 702 (37 %) women according to the census 2011 marking an increase of 691women over the previous census. The study area has experienced a change in the occupational structure in the form of a decline in the proportion of cultivators, agricultural laborers and an increase in the proportion of secondary workers and tertiary workers. Table No.3 Occupational Characteristics of Population -Pattur Village, Melur Taluk, Madurai District ( ) S. no Characteristics 2001 % 2011 % 1 Total Population Male Population Female Population Total Workers Male Workers Female Workers Total Main workers Male Main workers Female Main Workers Total Cultivators Male Cultivators Female Cultivators Total Main Agricultural Labourers Male Agri.Labourers

15 15 Female Agri.Labourers Total Main HHI Male HHI Female HHI Total Main Other Tertiary workers Male OT Female OT Total Nonworkers Male Nonworkers Female Non workers Fig 1.8 Occupational Characteristic 1.11 HUMAN SETTLEMENT The following villages are found in the buffer zone with population as per 2011 census. The Pattur Population of 3817peoples of both male (1959) and female (1858). Name of Village Direction Distance from Population Mines (Approx) Pattur North Alampatti South Velluttupatti East Muthupatti West

16 2.0 ANTICIPATED ENVIRONMENTAL IMPACT AND MITIGATION MEASURE The mining plan proposed is for the a small production of rough stone without involving deep hole drilling and heavy blasting occasionally. Such limited mining activity is not likely to cause pollution of air, water and noise is concerned. The impact of mining on environment will be as follows. 2.1 AIR ENVIRONMENT There is no gaseous matter to be generated in this mine. Dust generation during drilling of shot holes, haul road, smoke from vehicles shall be controlled as given below, i) Dust extractor or wet drilling to be followed to control dust at source of emission during drilling, ii) Emission level in all machineries and transport vehicles to be tested once in a year to keep them in control with proper maintenance and service as per TNPCB Standards, iii) Water sprinklers along the sides of haul road shall be fixed to control fly of dust while transporting minerals and waste, iv) Avenue trees along roads and green belt around ML boundary shall be planted as per the norms of MoEF to control fly of dust, noise etc, v) In above all, labours engaged in such dust prone areas should be provided with safety devices like ear muff, mask, goggles etc as per the MMR, 1961 amendments and circulars of DGMS under the provisions of occupational diseases. vi) Labours may be permitted officially to undergo medical checkup to test silicosis and other respiratory check up once in 5 years And other guidance required under these laws should be strictly adopted. 2.2 WATER ENVIRONMENT The ground water table in this area is reported as 32m depth as evidenced from nearby wells. The mining operation in the proposed area is likely to be above the ground water table and thus the question of inundation of surface waters shall not arise. Due to this, the ground water may not be affected or polluted during the course of mining. 15

17 Surface is sloping due south and the rain water during both seasons flows to the nearby odai\nullah. In case of slurry water, it should be allowed to settle in a pit before passing through the natural drainage system. If necessary, settling tank has to be constructed to desilt before leaving the quarry premises so that the natural drainages shall not be silted. Percolation into ground water may be allowed through a sump at any one corner of the pit for recharging of ground water level. The discharged water from the quarry shall be potable and it will not have any impact over the quality of the water regime. 2.3 NOISE AND VIBRATION Generation of noise from blasting shall be controlled by delay arrangements in blasting and use of proper quantity of explosives and strength. Protective devices shall be provided for use of persons employed in the vicinity. Wherever the noise level is found in excess of the stipulated limits (85db), necessary protective devices like ear plug, mask will be provided to the employees exposed to such noisy and dusty conditions. No deep hole blasting is adopted and only small dia explosives are used for breaking the hard rock and boulders. Where ever necessary muffle blasting shall be followed to control fly rocks from blasting VIBRATION Being limited mining activity with small production of ordinary rough stone per day and no deep hole blasting is adopted. Only small dia blast holes are proposed to be for breaking the hard rock and boulders and Muffle blasting method shall be followed to control fly rocks fragments during blasting if required. 2.4 TOP SOIL MANAGEMENT The limited quantity of waste of proposed to be dumped along 7.5m inner boundary. In order to stabilize the sides of waste dump(s), suitable vegetation over it will be adopted. 16

18 2.5 PROPOSAL FOR RECLAMATION LAND AFFECTED BY MINING ACTIVITIES DURING AND AT THE END MINING LEASE PERIOD The depth persistence of the ordinary rough stone deposit is proved beyond the workable limits of 32m from the petro-genetic character of the granite body. The mine area shall be fenced on top of open cast working with type S1 fencing. It is proposed there is no immediate reclamation of the pit. However, the pit will be utilized for miscellaneous purposes like pisciculture or as a water reservoir after the mining activities over. 2.6 STABILIZATION AND VEGETATION OF DUMPS The materials to be dumped shall be very hard in nature and it does not require any grading separately. The materials like rough stone rejects shall be graded automatically during dumping by Excavator and tipper combinations.. In order to stabilize the sides of waste dump(s), suitable vegetation over it will be adopted to prevent erosion of dumps during rainy season. Part of top soil will be spread over the non-active dumps and sapling of trees along slopes will be planted in order stabilize the dumps. It is proposed to plant 20 trees per annum during the mining plan period as described in the land use and afforestation plan 2.7 SOCIO-ECONOMIC BENEFITS ARISING OUT OF MINING The mine area does not cover any habitation. Hence the mining activity does not involve any displacement of human settlement. No public buildings, places, monuments etc exist within the lease area or in the surrounding area. The mining operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is anticipated. The impact of mining activity in the area is positive on the socio-economic environment of the region. Pattur village in Rough stone quarry is providing employment to local population and it will be give preference to the local people whenever there is requirement of man power GENERAL The coming of the project will bring overall improvement in the locality, neighborhood and the state by bringing industry, roads, water supply, electricity, employment, living standard and economic growth. 17

19 2.7.2 EMPLOYMENT The socio-economic conditions of the surrounding villages are poor as there is no significant source of earning. The occupational activities are agriculture, cattle rearing and employment in mines but on daily wages. The mining activity will provide employment to local people which will increase socio economic status of the area IMPROVEMENTS IN PHYSICAL AND SOCIAL INFRASTRUCTURE The opening of the proposed project will enhance the socio-economic activities in the adjoining areas. This will result in following benefits:- Improvements in physical infrastructure. Improvements in Social Infrastructure. Increase in Employment Potential Contribution to the Exchequer. Prevention of illegal mining. During and Post-mining enhancement of green cover. 2.8 PROGRAMME OF AFFORESTATION Appropriate species of trees like Teak, Mango, tamarind & other trees will be planted along the lease boundary as well as over Non-active dumps at a rate of 20 trees per annum with an interval of 5m. The survival rate expected to be 80%. The program of planting trees is given in Land use and Afforestation Plan (Kindly refer Plate X). Year Place Types of Trees Number I II III IV V Lease Boundary & Dump Lease Boundary & Dump Lease Boundary & Dump Lease Boundary & Dump Lease Boundary & Dump Teak, Mango, Tamarind and other regional trees. etc, Teak, Mango, Tamarind and other regional trees. etc, Teak, Mango, Tamarind and other regional trees. etc, Teak, Mango, Tamarind and other regional trees. etc, Teak, Mango, Tamarind and other regional trees. etc, Rate of Survival % % % % % 18

20 2.9 PROPOSAL FOR WASTE MANAGEMENT The ordinary Rough stone waste is hard and porous and will not produce any waste which will pollute the ground water. More than 95% of materials shall be crushed down to various sizes and fines shall also be screened and washed for material sand. No much waste available even for dumping. 3.0 PROJECT COST 3.1 Proposed financial estimate / budget for (EMP) Environment Management a) Project cost / investment i) Land Cost : Rs 15,00,000 ii) Machinery to be used : Rs 121,00,000 iii) Refilling / Fencing : Rs 75,000 iv) Labourers Shed : Rs 75,000 v) Sanitary facility : Rs 50,000 vi) Other items : Rs 75,000 Total Rs lakhs b) Expenditure i) Drinking water facility for the labourers = Rs 75,000 ii) Sanitary arrangement = Rs 70,000 iii) Safety kits, = Rs 75,000 iv) Dust control = Rs 75,000 v) Afforestation etc. = Rs 3,80,000 vi) Social responsibility = Rs 4,00,000 Total = Rs lakhs * NO EIA STUDIES CONDUCTED Signature of the Applicant Signature of RQP/ EIA Coordinator (Mining) SURIYA MINING SERVICES, SALEM (Accredited EIA consultant Organization) 19

EIA-EMP. Category B2

EIA-EMP. Category B2 EIA-EMP Quarrying MULTI COLOUR GRANITE (RED MULTI) Category B2 Project Details EXTENT : 3.44.5 Ha S.F.NO : 59/2B, 59/3A (P), 59/3B, 60/2A & 3A VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

EIA-EMP REPORT. Category B2

EIA-EMP REPORT. Category B2 EIA-EMP REPORT MULTI COLOUR GRANITE QUARRY Category B2 EXTENT: 2.980 HA S.F.NO: 568/1,575/2(p), 621/2(p) VILLAGE: SUBRAMANIAPURAM TALUK : SIVAKASI DISTRICT: VIRUDHUNAGAR PROPONENT M/s Pokarna Granite SANJA

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1.0 Introduction: Background: The Quarry lease, for Black Granite over an extent of 1.482 ha. in Sy Nos. 10 & 23, Sankavaram Village, Kanigiri

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1. INTRODUCTION: 1.1 Background: The mining lease, for colour granite over an extent of 1.0 ha. in Sy No.333 of Arikara Village, Alur Mandal,

More information

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a 1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

Building Stone Quarry

Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SOHAN ART & GRANITE INDUSTRY have granted quarry lease for Black Granite over an extent of 1.00 Hectare in Sy. No. 101 of Kappali Village, Ramasamudram Mandal, Chittoor

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

For Building Stone Quarry

For Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02. COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.09 PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED. PERIOD

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

RISK ASSESSMENT. STONE QUARRY (2.40 Ha) RISK ASSESSMENT FOR STONE QUARRY (2.40 Ha) Gat no. 85, A/p Karanjvihire, Tahsil Khed, District Pune, Maharashtra OF M/s Shankar Ramchandra Earthmovers Pvt. Ltd. Risk Assessment for Stone Quarry Mining

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

G. M. Nagaraju Environment Management Plan

G. M. Nagaraju Environment Management Plan ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

ROUGH STONE QUARRY. S.F.NO: 33, Pudunaduvalur village, Perumabalur Taluk & District, Tamil Nadu. LEASE PERIOD: 28.05.2007 to 27.05.

ROUGH STONE QUARRY. S.F.NO: 33, Pudunaduvalur village, Perumabalur Taluk & District, Tamil Nadu. LEASE PERIOD: 28.05.2007 to 27.05. ROUGH STONE QUARRY S.F.NO: 33, Pudunaduvalur village, Perumabalur Taluk & District, Tamil Nadu LEASE PERIOD: 28.05.2007 to 27.05.2017 Quarry lease area 0.90.0 Ha Proposed Rough Stone Production - 31359m

More information