EIA-EMP REPORT. Category B2

Size: px
Start display at page:

Download "EIA-EMP REPORT. Category B2"

Transcription

1 EIA-EMP REPORT MULTI COLOUR GRANITE QUARRY Category B2 EXTENT: HA S.F.NO: 568/1,575/2(p), 621/2(p) VILLAGE: SUBRAMANIAPURAM TALUK : SIVAKASI DISTRICT: VIRUDHUNAGAR PROPONENT M/s Pokarna Granite SANJA DAGA Managing Partner 105, Suriya Towers, Sardar Patel Road, Secunderabad, Telangana, India Pincode Ph: /7722, [email protected] CONSULTANT SURIYA MINING SERVICES NABET/QCI Accredited EIA Consultant, 3/216, K.S.V.Nagar, Narasothipatti, SALEM-4. Phone (0427) , Cell: [email protected], [email protected]

2 ENVIRONMENT CLEARANCE SUMMARY S. Particulars Description No 1. Name of the Owner/Firm M/s POKARANA LIMITED 2. Location of the quarry- S.F. No. Subramanipuram Village, Sivakasi Taluk, Virudhunagar District, Tamil Nadu. 3. Purpose of Application Proposal for Environment Clearance for Quarrying MULTI COLOUR GRANITE QUARRY. 4. Extent of quarry in Ha hectares 5. Modernization/New Existing 6. Ownership Own Patta land 7. Topo Sheet No. Topo Sheet No. : 58 G/15 8. Latitude / Longitude PILLAR LATITUDE LONGITUDE NAME DGPS (Co-ordinates) N E N E N E N E N E N E 9. Topography of MSL area The lease hold area is a plain ground. The deposit is a sub-surface one with topsoil cover. Major portion of the area applied for lease is covered by soil. The black cotton soil s thickness varies from 0.5Mts to 2.5Mts. The variation in water table in the area is 20Mts to 5Mts, in summer and winter respectively. The area receives rain fall mostly during North-East Monsoon and the average rain fall in about 600m.m per annum. The climate is dry and temperature raise up to 41 C in summer and is around 23 C in winter season. The wind direction in North East-South West and vice versa. They are some active granite quarries surrounding this leased hold area. 1 P a g e SURIYA MINING SERVICES, SALEM, TN

3 10. Land Use Pattern The area is a flat terrain with gentle slope from north to south. The regional crops are maize, groundnut, etc... Quarrying Area Hectares Dumping Area Hectares Afforestation & Safety Zone Hectares 11 Method of Mining Open cast semi-mechanized mining using Hydraulic excavator and tippers in combination 12 Production (quantity in m3) Production Schedule is proposed as 100cbm/year. Description Quantity Geological reserves M 3 Mineable reserves M 3 13 Overburden/Waste Year Topsoil & Weathered Granite Mineral Rejects 80% of ROM Total Waste I II III IV V Total Period of Lease 20years 15 Climatic condition Average Rainfall 600mm per annum. Summer up to - 41 C Winter up to 23 C 16 Water table 15 m below ground level 17 Water requirement Total Water requirement of the mining operations including dust suppression is about 6.5KLD and majority of this is proposed to be met from the bore well. 18 Nearby lake / river/ odai/ channel etc. There is no major river, pond, etc are found around 500m radius. A Seasonal odai track is flowing center of the lease area both of side leaving 10meters safety distance is provided. 19 Waste water No generation of waste water. 20 APC Measures Dust expected to be generated from hauling roads, place of excavation etc will be suppressed by periodical wetting of land by spraying. 21 Habitation Village Population Direction Distance 2 P a g e SURIYA MINING SERVICES, SALEM, TN

4 Subramaniyap 1000 SW 2.5kms uram Ottampatti 500 NE 1km Vetrilayurani 500 SE 4.5kms 22 Man power 18 employees 23 Ariel distance from Reserve forest, Sensitive areas, Forest, Bird sanctuaries, Wild life sanctuaries, National parks, Monuments etc., within 15km There is no Reserve forest is situated about 10 kms.. There is no Wildlife Sanctuary is located within 10kms radius. Bird Sanctuaries Nil Wild life sanctuaries - Nil Monuments Nil 24 Interstate boundary Nil 25 Precise area statement Approved by Government Letter No: 1475/MMB2/2006-1, dated Mining plan Prepared by Approved by J.RAJANNA RQP/MAS/169/2002A. From the Commissioner and Director of Geology and Mining, Guindy, Chennai Letter. No /MM2/05 dated P a g e SURIYA MINING SERVICES, SALEM, TN

5 1.1 PHYSIOGRAPHY: 1.0 SITE ANALYSIS The lease hold area is a plain ground. The deposit is a sub-surface one with topsoil cover. Major portion of the area applied for lease is covered by soil. The black cotton soil s thickness varies from 0.5Mts to 2.5Mts. The variation in water table in the area is 20Mts to 15Mts, in summer and winter respectively. The area receives rain fall mostly during North-East Monsoon and the average rain fall in about 600mm per annum. The climate is dry and temperature raise up to 41 C in summer and 23 C in winter season. The wind direction in North East-South West and vice versa. They are some active granite quarries surrounding this leased hold area. Fig. 1.1 General View of the Mining area 1.2 REGIONAL GEOLOGY The area forms parts of Quartzofeldspathic belt in the southern part of Tamil Nadu and Geology cab be broadly classifies in to Khondalite and Charnockite groups of rocks. Kondalite grouping this area is essentially made up of calk-granulize, crystalline limestone and garnetiferous sillimanite gneiss, with minor bands of Quartzite. Charnockite group on the other hand including the acid to intermediate charnokite with bands of pyroxene granulite. Both group 4 P a g e SURIYA MINING SERVICES, SALEM, TN

6 of rocks were later migmatised and reconstituted giving rise to grey colored migmatite comprising Hornblende biotite gneiss, as well as garnet biolite gneiss and garnetiferous quartzfeldspathic granulite. The intrusion of younger pink granite as well as pink migmatitic gneiss and pink augen gneiss. The white garnetiferous sillimanite gneiss while the pink augen gneiss is due to blastic growth of pink potash feldspar augens with in the grey gneiss. A number of minor pegmatite and quartz veins repsent the last stage intrusive activity in the area. The fine/medium grained pink granite gneiss *(with or without garnet) seen in this area as alternate layers (lines) of mafic and yellow/orange/pinkish color forms the beautiful appearance similar to Rawsilk. The tentative geological succession of the rock type is as follow: Topsoil Pegmatite and Quartz veins, pink Fine/medium grained Granite/gneiss Quartz feldspathic granite Peninsular gneiss : Recent : Anchean : Anchean : Anchean : Anchean : Anchean 1.3 GEOLOGY OF THE PRECISE AREA The area applied for lease mainly composed of pink granite gneiss with of without garnet has the fine/medium silky texture and light yellowish pink yellow/ orange color of the rock. The deposit is a sub-surface deposit. The rock strikes North 6 East and South 60 West with steep dip. Strike and diagonal joints are seen. The typical land specimen is light yellowish pink in color with silky texture, fine to medium grained, consist mainly quartz, feldspar and less amount of mafic minerals like biolite mica. Even through the rock type appears has raw type, it s not similar to raw silk type area of Thiruvathvar since, this rock contains more of mafic lines. In few places the outcrops showed grey color of more than the pink/ orange color and looks as grey /granitic gneiss. 5 P a g e SURIYA MINING SERVICES, SALEM, TN

7 Fig.1.2 Texture and Colour of Sivakasi Yellow/Gold granite 1.4 DRAINAGE PATTERN OF THE AREA The area of flat terrain with gently sloping from north to south so natural drain towards south. Sub-surface water collection in rainy season is stored in deeper pit in the adjoining area and dewatered with the help of pumps to the natural drainage. 1.5 CLIMATIC CONDITIONS The district receives the rain under the influence of both southwest and northeast monsoons. The northeast monsoon chiefly contributes to the rainfall in the district. Most of the precipitation occurs in the form of cyclonic storms caused due to the depressions in Bay of Bengal. The southwest monsoon rainfall is highly erratic and summer rains are negligible. Rainfall data from seven stations over the period were utilized for analysis and a perusal of the data shows that the normal annual rainfall over the district varies from about 724 to 913 mm. Average rain fall is reported as 812mm per annum. It is minimum around Sathur in the south eastern part of the district. It gradually increases towards west, north and northwest and attains a maximum around Watrap. The district enjoys a subtropical climate. The period from April to June is generally hot and dry. The weather is pleasant during the period from November to January. Usually mornings are more humid than afternoons. The relative humidity is on an average between 65 and 85% in the mornings. Humidity in the afternoon is generally between 40 6 P a g e SURIYA MINING SERVICES, SALEM, TN

8 and 70%.The annual mean minimum and maximum temperatures are and C respectively. The daytime heat is oppressive and the temperature is as high as 40.2 C. The lowest temperature recorded is of the order of 19.3 C Summers The sun is at its glory and shines very brightly during the summers. During the summer months, i.e. from May to June, the temperature varies between 27 deg C and 40 deg C. Therefore, the climate is quite hot. May is the hottest month. Cottons are recommended during this time Winters In winters, which starts from December and lasts till February, the temperature ranges between 20 C and 30 C. The climate remains pleasant during this time, as the temperature rarely falls below 20 C Monsoon Though the rainfall is very frequent and uniform throughout the year, just like the flow of pilgrims and tourists, the city receives the major share of rainfall between the months of July and October. The average rainfall is 85 cm. Fig. 1.3 Monsoon Forecast 7 P a g e SURIYA MINING SERVICES, SALEM, TN

9 1.6 LAND USE PATTERN The area is a flat terrain with gentle slope from north to south. The regional crops are maize, groundnut, etc... Dumping of the waste is shown in plate no. 6 & 7. Table 1.1 Land Use Pattern S. No Description Present area (Ha) 1 Mining Area Dumping Area Afforestation & Safety Zone Total Ha 1.7 AIR ENVIRONMENT The impacts on air environment from a mining activity depend on various factors like production capacity, machinery involved, operation and maintenance of various equipments and vehicle. Apart from these, there will be other activities associated via transportation of mineral and waste, stocking facilities and dump management within the mine lease area that may contribute to pollution. The quarrying operation is limited to small area and there is no air pollution due to quarrying and quality of air does not change. The existing ambient air quality data in the mine has been assessed by keeping in view of the meteorological condition of the plant area. Pre-calibrated fine particulate sampler and respirable sampler have been used for monitoring the existing AAQ. The Ambient Air Quality study was carried out for the significant parameter viz, particulate matter 2.5 (PM 2.5), Respirable particulate matter (PM10), SULPHUR DIOXIDE (SO2) and oxide of nitrogen (NOX). The estimated valve for the parameters monitoring are represented in below table and the analyzed different parameters are within the limits prescribed by T.N.P.C.B. 8 P a g e SURIYA MINING SERVICES, SALEM, TN

10 Parameters Table 1.2 Ambient Air Quality Data Particulate matter 2.5 PM 2.5) concentration (mg/m 3) 12 Respirable particulate matter concentration (PM10) mg/m 3) 34 Sulphur Dioxide concentration (mg/m 3) Oxide of Nitrogen concentration (mg/m 3) 1.8 WATER ENVIRONMENT BDL BDL The mining activity will be carried out on mound slope will not any effect on the ground water and the static water table in this area of below 20m WATER CONSUMPTION details are as follows: The water requirement for this proposed mining activity will be 6.5 KLD. Breakup Table 1.3 Water Balance S.NO PURPOSE QUANTITY(KLD) 1 Dust suppression purpose 5 2 Domestic purpose Green purpose 1.0 Total NOISE ENVIRONMENT In order to know the present noise levels in the proposed project site, noise levels are measured at mine site. High noise levels may have adverse impact on the workers and the surrounding environment. Noise levels are measure Lutran make level meter. The noise levels computed for minimum, maximum, day-equivalent, night-equivalent & day-night equivalent are presented in below table and the measured valve are within the limits prescribed by T.N.P.C.B. Table 1.3 Ambient noise quality data Noise level DB(A) Minimum 52.5 Maximum P a g e SURIYA MINING SERVICES, SALEM, TN

11 1.10 BIODIVERSITY Flora as observed and identified in the field are covered by photograph and shown below. Mostly Nona tree, Palm tree, acacia, neem and karuveli etc are found more on regional scale. The applicant has developed trees like Casuarinas, Eucalyptus etc with proper nursery garden and plantation on vacant land. Fauna is represented by rabbits, rat, scorpion, millipedes etc Fig. 1.4: a) Nona Tree b) Acacia Bushes Flora is represented by herbs and shrubs of local species and free regional trees and their botanical terms are given as under with numbers TREES S. No Name of trees Botanical Name Number Remarks 1 Vembu Azadirachta indica 8 Growing well 2 Nona Morinda tinctoria 37 3 Palmera Borassus flabelly 10 4 Bushes Acacia Nilotica SHRUBS S. No Local Name Botanical Name 1 Korai Elacocarpus aerratas 2 Erukku Calotrophis gigantea 3 indumul Pterolobium indicum 4 Aavarai Cassia auriculata 10 P a g e SURIYA MINING SERVICES, SALEM, TN

12 HERBS S. No Local Name Botanical Name 1 Poolai poondu Aerva lanata 3 Thumbai Leucas aspera 4 Peru Nerunji Pedalium murex 5 Kantangkathri Solanum xanthocarpum 6 Nerunji Tribulus terrestris LIST OF CULTIVATES CROPS IN THE CORE ZONE (500m) S. No BINOMIAL ENGLISH NAME TAMIL NAME 1 Cocos nucifera Coconut Thennai 2 Teak Tectona grandis Tekku 3 Casurina Casuarina equisetifolia Savukku 1.11 SOCIO-ECONOIMC ENVIRONMENT The mine area does not cover any habitation. Hence the mining activity does not involve any displacement of human settlement. No public building, places, monuments etc are not found within the lease area or in the vicinity. The mining operation will not disturb/ relocate any village or need resettlement POPULATION CHARACTERISTICS SUBRAMANIYAPURAM VILLAGE In Sivakasi taluk, Subramaniyapuram village had a total household 520 in 2001 which is increased 544 in according to census Village had a total person of 1879 in 2011 census previous census 2065 persons in There were about 914 men (48.72%) according to 2011 census and 1006 men (48.72%) in 2001 census marking an decrease of 92 men over the previous census. During 2001 there were about 1059 women (51.28%), which decreased to 965 (51.36%) in 2011 census. Subramaniyapuram village had a literate accounted for 1273 persons (61.65 %) in 2001 and increased to 1166 persons (62.05%) in There were about percent males in 2001 and percent in There were about 576 (54.39%) females decreased to 530 (54.92%) classes as literates in P a g e SURIYA MINING SERVICES, SALEM, TN

13 Sex composition is the most important demographic characteristics that affect the incidence of birth and death. The average sex ratio in Sivakasi Taluk, Subramaniyapuram village was 1053 during 2001 and increased in 1056 the year of The highest sex ratio may be either due to the migrants for educational purpose and employment opportunities and due to infant birth of female is very high. Table No: 1.4 Population Characteristics-Subramaniyapuram Village, Sivakasi Taluk, Virudhunagar District ( ) S. no Characteristics 2001 % 2011 % 1 Total Household Total Population Male Population Female Population Total Literacy Male Literacy Female Literacy Sex Ratio Fig No.1.5 Population Characteristics OCCUPATIONAL CHARACTERISTICS- SUBRAMANIYAPURAM VILLAGE The term workers denote the population engaged in primary, secondary and tertiary activities classified in the census reports of Indian government. During the year 2001 Subramaniyapuram village had 1359 workers accounting for percent of the total 12 P a g e SURIYA MINING SERVICES, SALEM, TN

14 population of the Village. During 2011 there were about 997 (53.06%) according to the census. There were about 663 men (65.90%) during 2001 which is decreased 535 persons (58.43%) according to census There were about 696 (65.72%) female according to 2001 which is decreased 462 (47.88%) female during 2011 marking a decrease of 234 women over the previous census. In Subramaniyapuram village had a total main workers accounted of 1339 (64.84%) persons during 2001 census which is decreased 853 (45.40%) persons during There were about 653 (64.91%) women in 2001 and 498 (54.49%) women according to the census 2011 marking decreases of 155 women over the previous census. Study on occupation characteristics of population should analyze the workforce engaged in different type of occupation. Cultivators are the major category of occupation representing the workforce owning land. Subramaniyapuram village had total cultivators 274 (20.16% of the total workers) cultivators. The proportion of cultivators to total workers is calculated as a percent for the two census years 2001 and 2011 for the taluk of Sivakasi in Subramaniyapuram village. There were about 162 (24.43%) men in 2001 which is decrease 58 (10.84%) according to census Subramaniyapuram village had female cultivators 112 (16.09% of the female workers) cultivators during 2001 census which is decreased 33 (7.14 %) during according to census The distribution of agricultural laborers in the study area for the two census periods has revealed that the study area has experienced a decline in the proportion of workers classed as agricultural laborers between 2001 and Sivakasi taluk in Subramaniyapuram village had agricultural labourers 307 (22.59 % of the total workers) agricultural labourers during census There were about 153 (23.08 % of male workers) men in 2001 which is decrease 7 (1.31% of male workers) according to census years Subramaniyapuram village had female agricultural laborer decreased 5 (1.08%) census 2011 compare to the previous census year 2001 about 22.13% of female workers. This group includes the employment of workers in manufacturing activities. Agro based industries, located in the study area engages a sizeable amount of workers. The distribution of secondary workers in the study area is calculated as percent to the total workers. 13 P a g e SURIYA MINING SERVICES, SALEM, TN

15 The proportion of secondary workers to total workers has experienced decreasing trend in the Subramaniyapuram village area between 2001 and Secondary workers during 2001 and 2011 it could be stated that this may be due to the opening of a number of manufacturing units in the study area. The tertiary workers include the labour force engaged in service sector such as education, medical, judicial, finance, administration, recreation, trade and commerce and transport. In Subramaniyapuram village had tertiary workers accounted for about percent of the workers during 2001 census it is increased 74.82% according to census There were about male tertiary workers of 328 (49.47% of the male workers which is increases 430 (80.37% of the male workers) according to census There were about 408 women tertiary workers (58.62 % of the female workers) during 2001census which is almost equally increased to (68.40 % of the female workers) according to census The study area has experienced a change in the occupational structure in the form of a decline in the proportion of cultivators, agricultural laborers and an increase in the proportion of tertiary workers. In Subramaniyapuram village had non workers population accounted of 882 (46.94% of the total population) according to census Which is decreased from previous census 2001 had population 706 (34.19%). There were about male non workers of (34.10% of the male population) during the census Which is increased 379 (41.47 % of the male population) according to census Because of more number of people are educated most of people living the village had cracks industries money earn our daily life. Table No: 1.5 Occupational Characteristics of Population -Subramaniyapuram Village, Sivakasi Taluk, Virudhunagar District ( ) S. no Characteristics 2001 % 2011 % 1 Total Population Male Population Female Population Total Workers Male Workers Female Workers Total Main workers Male Main workers P a g e SURIYA MINING SERVICES, SALEM, TN

16 9 Female Main Workers Total Cultivators Male Cultivators Female Cultivators Total Main Agricultural Labourers Male Agri.Labourers Female Agri.Labourers Total Main HHI Male HHI Female HHI Total Main Other Tertiary workers Male OT Female OT Total Nonworkers Male Nonworkers Female Non workers Fig No: 1.6 Occupational Characteristics 15 P a g e SURIYA MINING SERVICES, SALEM, TN

17 2.0 EVALUATION OF IMPACTS Opencast mining activity causes some adverse impacts on the surrounding environmental unless proper environmental management plan is adopted. Selecting suitable sites for mining and adopting the guidelines prescribed by the Ministry of Environment, Forest & Climate Change (MoEFCC) and Indian Bureau of mines (IBM), one can minimize the major possible impacts. In this chapter, an attempt has been made to quantify the possible environmental impacts on various features such as air, water, noise, land, ecology and socio-economics. The following aspects have been studied to identify the possible impacts while achieving the total production of 100 cum/year of colored Granite. The magnitude and significance of the environmental pollution caused by mining depends on method of mining, scale and concentration of mining activity. 2.1 AIR ENVIRONMENT Mining is carried out by open cast semi mechanized methods using jack hammer drilling & wire saw cutting and using low explosive blasting. Based on the various operation involved in the production of minerals, the various emission sources has been identified as given below. a. Point sources b. Area sources. c. Line sources. Drilling operation of the mine is considered as point sources. Extraction of minerals from mine, are considered as area source. Transportation of materials from mining benches to various end points is considered as line sources. The impacts of above sources on air environment are discussed below. a) Drilling & blasting The concentrations due to low explosive blasting will be confined to a maximum distance of 10m from the area of blasting. These concentrations will not emit 16 P a g e SURIYA MINING SERVICES, SALEM, TN

18 continuously. However presence of personnel near the blasting site during blasting will be totally avoided. So, the impacts of blasting on the air environment will be minimal. b) Extraction & loading: Extraction & loading will be done by a crane and excavator and these activities of mine operation is contributing to the area source emission and the extend influence of this operation is about 100m 2 c) Haulage & transportation In this operating mine, the dressed block form face to the consumers is transported by hired trucks. The trucks will be well maintained so that exhaust smoke does not contribute abnormal valves of noxious and unburnt hydrocarbons. The other sources of air pollution are due to the dust generated during the movement of tippers on the haul road. The above source, which includes drilling, low explosive blasting excavation, and haulage for transport of blocked, will contribute to dust pollution in the air ANTICIPATED IMPACTS The impacts envisaged due to mining activity are evaluated based on various factors the emission inventory of the pollutants is as follows, the main air pollutant would be dust or particulate matter generated by handling and transportation of colored granite. But the impacts of mining operation on air quality is minimum as mining involved methods by using jackhammer drilling & wire saw cutting & low explosive blasting and as the production quantity is very less i.e.0.4 Cum/day only. The maximum concentration of particulate matter (PM 10) recorded in mine lease is 34µg/m 3. The envisaged production of minerals is only 0.4 cum/day. Prediction levels of PM10 were found to be within permissible limits. Anticipated impacts is assessed by considering increase of 10 % in core zone on the PM10 levels due to the mining operation and the following table shows the overall scenario. The dust generated due to mining operations will be controlled by water sprinkling through water tankers. 17 P a g e SURIYA MINING SERVICES, SALEM, TN

19 OVERALL SCENARIO Particulars Baseline concentration 34 Predicted concentration 3.4 Overall scenario 37.4 Specified NAAQ Limits 100µg/m 3 Concentration (µg/ m 3 ) Core Zone 2.2 NOISE ENVIRONMENT Noise will be produced at the mine is due to operation of machinery, drilling blasting, and movement of vehicles. The noise generated by the mining activity is dissipated within a small zone around the mine. There are no major impacts of the mining activity in the vicinity however; pronounced effect of above noise levels will felt only near the activity working area and on the personnel working in the vicinity. The impacts of noise on the village are negligible as the villages are located far from the mine site. 2.3 WATER ENVIRONMENT The water regime is unpolluted by any external source, quarrying will not have any impact on water regime IMPACT ON SURFACE WATER There are no major streams and rivers, which can get affected by the mining. Hence there will be no effect on the surface water. During the plan period quarrying will go to depth of 8 meters from the present level of mining. During the monsoon period, the rainwater, if gets stagnated, will be drained out. The benches will made with an inward slope to facilities run off faster on to the mine floor. Small bunds, garlands and silting tanks also will be constructed to minimize inflow muddy water which carries fine materials. 18 P a g e SURIYA MINING SERVICES, SALEM, TN

20 2.3.2 IMPACT ON GROUND WATER the ground water regime. Mining activity will be above the BWL (20m). Hence, there will be no effect on IMPACT ON WATER QUALITY Water quality in the buffer zone has indicated that the ground water is free from heavy metal concentration and these mining activities will not interference on the water quality. There is no generation and discharge of waste water from this mine. 2.4 LAND ENVIRONMENT Various components of land environment have been identified for study fo impacts mine operations. Details of the same are given below: SOLID WASTE GENERATION Removal of weathered rock and the rock waste is the only solid waste that will be generated from this mine. Some of the materials from the waste may be sorted out and used for making small blocks to be used by the local unit for making tiles. The markets for tiles are good at the moment and they will offer a better substitute for marble in terms of price and quality. Some rejected and unsorted materials may be used in the civil engineering projects in the vicinity of the area. The waste materials can also be crushed into smaller sizes and can be used as road metal. The waste generated during the five years dumped in the zone separate reserved for during within the Q.L. area. The dump is designed in such a way that it will have slopes equal to the angle of repose of such materials. Garland drains have to be sunk along around the leading edge of the dump. A retaining wall will be constructed around the dump to preventing the slanting of boulders care will be minimizing the waste generation at the source. About 608 m 3 /Year of waste will be generated from this mine. The topsoil, weathered granite and granite waste will be dumped along the boundary southern side of the lease hold area (safety zone). 19 P a g e SURIYA MINING SERVICES, SALEM, TN

21 2.4.2 IMPACT ON LAND USE The mine is located in an area of 2.980Ha.No forestland is involved. It may not be possible to complete regain the original topography of the area. During quarrying whatever solid waste is generated shall be dumped at dumping site in outside the Q.L. area. The mining lease area is not a part of any type of forest. Entire mine lease area is govt. land hence all the impact on land use is positive because aesthetic environment will not be effected, as the mine is located on a plain with some bushes. There is no forest area located within 10km from the lease boundary. Due to opencast mining activities, the landscape will be slightly changed. There will be no land subsidence as the country is made up of hard rock. The soil cover in this mine is almost nil and agriculture is seen mainly in the plains in the vicinity of the lease area and the mining will not have any impact on the agricultural pattern. Only few bushes will be cleared to facilitate mining and other related activities and there are no big trees, which may have to be cut IMPACT OF GROUND VIBRATION Fragmentation of rock by blasting is an important operation in mining project, where hard rock occurs. Blasting will be done only when it is absolutely necessary, using low intensity explosives. Blasting of the minerals at the proposed mine will be done by using lowdensity chemical explosive like ECM/CaOH will be used. Sometimes smooth blasting may be done using silent non- explosive demolishing agents like Acconex. The ground vibration caused by blasting will not have any affect as the mining is on a mound and the vibrations will be minimum and will not be carried too far due to the hard nature of the rock. 2.5 BIOLOGICAL ENVIRONMENT There is no adverse impacts are anticipated due to the proposed mining activity on biological environment. However with the implementation of the environment management measures, there will be improvement in the parameters of biological environment. The tree species found with the core zone represent the common type of flora species along with small shrubs and bushes. Due to mining activities community structure of the 20 P a g e SURIYA MINING SERVICES, SALEM, TN

22 vegetation will not change, whereas diversity of plant species and food web index of the area compared to the existing level. 2.6 SOCIO ECONOMIC ENVIRONMENT It will be obvious to assume that the activities of the mining operation have to be produced some improvement in the socio-economic levels in the study area. The lessee will provide employment to local population and it will give preference to the local people whenever there is requirement of manpower. The proposed mining activities will provide employment to persons of different skills and trades. The local population is the largest plausibility among these employees. The employment potential ameliorated economic conditions of these families directly and provided employment to many other families indirectly who are involved in business and service oriented activities. This in-turn will improve the socio-economic conditions of the area. 2.7 OCCUPATIONAL HEALTH AND SAFETY The mine is going to be developed mainly semi mechanized opencast method by using jackhammer drilling, wire saw cutting & low explosive blasting. No major crushing or pulverization will be done here. The small- scale mining will not have any ill effects on labour. Excessive dust and noise are the chief health hazards for the miners. As already mentioned these causative factors are well within the safety limits and the proponents will strictly implemented the prescribed safety measures. The health of the workers will be regularly checked and suitable medical facilities should be created on or close to the site. Highest safety will be ensured in the working conditions of the miners. 21 P a g e SURIYA MINING SERVICES, SALEM, TN

23 3.0 ENVIRONMENTAL MANAGEMENT PLAN The mining development in the study area needs to intertwine with judicious utilization natural resource within the limits or permissible assimilative capacity. The assimilative capacity of the study area is the maximum amount pollution load that can be discharged in the environment without affecting the designated use and is governed by dilution, dispersion and removal due to natural physio-chemical and biological processes. The environment management plan (EMP) is required to ensure sustainable development in the study area. This section discusses the management plan for mitigation/abatement impacts and enhancement of beneficial impacts due to mining. The environment management plan (EMP) has been designed within the framework of various Indian legislative and regulatory requirements on environment and socio-economic aspects. Environmental management plan giving the environmental protection measures at mine to meet the stipulated norms of IBM/MoEF&CC are as detailed. 3.1 AIR POLLUTION CONTROL MEASURES The present ambient air quality measurement in the mine area are well within the limit due to the proposed production of 100 Cum/Year of colored granite, there will be marginal increase in dust concentration. Mitigative measures suggested for air pollution control are based on the baseline ambient air quality monitoring data. From the point of view maintenance of an acceptable ambient air quality in the region, it is desirable that air quality should be monitoring on a regular basis to check the standards prescribed by CPCB and in cause of non-compliance appropriate mitigative measure shall be adopted. The following dust prone areas are identified for adopting control measure in the mine area. 1) Drilling & wire saw cutting blasting 2) Excavation 3) Transportation 22 P a g e SURIYA MINING SERVICES, SALEM, TN

24 The environmental control measures which will be implemented to control the fugitive dust release from the proposed production are given below: Wet drilling system & dust proof Optima wire saw cutting ( using water - reduces dust ) Use of sharp drill bits for drilling holes. The charge concentration of the explosive will be between grams per linear meter. Water sprinkling arrangement such as specially fabricated tankers mounted in tipper are deployed at mine site to control; the fugitive dust generation from the haulage roads. Regular grading of haul roads service to clear accumulation of loose materials. The blasted blocks (Temporary) are wetted by spraying water. Avoiding blasting during high windy periods, times and temperature inversion periods. Excavation operations are suspended during periods of very strong winds. Massive afforestation for control of dust. Spraying of water on sub grade stacks. The vehicle and machinery are kept in well maintained so that emission of fugitive constitute is minimized. Plantation of wide leaf trees, creepers, tall grass around working pit, along roads will help suppress dust. Tall trees with an average height of 5m will be developed all along the boundary of the lease area to minimize the dispersion of the dust from the mining. Periodical monitoring of air quality to take steps to control the pollutant OCCUPATION HEALTH & SAFETY MEASURES All the precautions would be adopted to prevent dust generation at site and to be dispersion into the outer environment. However, fir the safety of workers at site, engaged ay 23 P a g e SURIYA MINING SERVICES, SALEM, TN

25 strategic locations/ dust generation points like drilling, loading and unloading points, etc. dust masks would be provided. Dust masks would prevent inhalation of RSPM thereby reducing the risk of lung disease and other respiratory disorders. Regular health monitoring of workers will be carried out. 3.2 NOISE POLLUTION CONTROL MEASUREs The ambient noise level monitoring is carried out in and around the proposed mine shows that ambient noise levels are well within the stipulated limits of CPCB. Noise generation may be for an instant, intermitted or for continuous periods, with low to high decibels. Periodic inspections and checks of the risk prone areas and equipment have to be conducted. will be practiced. To control noise pollution during the proposed mining operation following steps The noise generated by the machinery will be reduced by proper lubrication of the machinery and equipment. The workers employed should be provided with personal hearing protection equipment, with earmuffs and earplugs combined, as a protection from the high noise level generated at the plant site. The provision of green barrier along the boundary will further reduce the propagation of noise level generated. Limiting time exposure of workers to excessive noise. Speed of trucks entering or leaving the mine is limited to moderate speed of 25 kmph to prevent undue noise from empty tippers SAFETY IN BLASTING Care should take to evacuate the mining area completely at the time of low explosive blasting operations. The blasting team should be equipped with all personal safety and precautionary measure. The following safety measure will be attention while conducting the blasting operations. 24 P a g e SURIYA MINING SERVICES, SALEM, TN

26 A blasting SIREN should be used at the time blasting audio signal Before blasting and after blasting, red & green flags should be displayed as visual signals. Warning notice boards indicating the time of blasting and NOT TO TRESPASS are displayed prominently. 3.3 WATER POLLUTIN CONTROL MEASURES The action program for minimizing adverse affects on water regime is to prevent wash-off of mine water and uncontrolled run-off water during monsoon. Proposed measures for this are as follows: a) Building/extending of retention/toe wall at the foot of the dumps. b) Construction of garland drains along the slops to divert the rainwater course away from the dumping areas. c) Covering of dump slopes with grass plantation to stabilize and prevent erosion. d) Plantation of trees along the rides and slopes. 3.4 LAND ENVIRONMENT STORAGE AND REUSE OF TOP SOIL: Topsoil removed during clearing of the area for granite extraction shall be stacked separately to check the erosion of the stacked soil. A retaining wall shall be constructed all around the topsoil stockyard. Planting of grass and local species etc. are proposed on the surface of this stack to prevent erosion and to increase the soil nitrogen. As per the analysis of the soil samples they are found to be basic in nature. During afforestation, it is recommended to plant fast growing species with good quality canopy cover and dense leaf density and some ornamental species to give a good aesthetic look. It is recommended to sow neem, mahogany plants as soil and climate conditions are suitable for the growth of these plants SOIL WASTE MANAGEMENT Removal of weathered rock and the rock waste is the only solid waste that will be generated from this mine. Some of the material from the waste may be sorted out and used for making small blocks to be used by the local unit for making lines. The market for tiles is good at 25 P a g e SURIYA MINING SERVICES, SALEM, TN

27 the moment and they will offer a better substitute for marble in terms of price and quality. Some rejected and unsorted material may be used in the civil engineering projects in the vicinity of the area. The waste materials can also be crushed into smaller sizes and can be used as road metal. The waste generated during the five years dumped in the zone separately reserved for dumping within the Q.L. area. The dump will be designed in such that it will have slopes equal to the angle to the repose of such material. Garland drains have to be sunk along around the leading edge of the dump. A retaining wall will be constructed around the dump to preventing the slanting of boulders care will be taken to minimize the waste generation at the source. About 608 m 3 /Year of waste will be generated from this mine. The topsoil, weathered granite and granite waste will be dumped along the boundary southern side of the lease hold area (safety zone) Stabilization of dumps Land restoration or reclamation of the area is very essential in any mining industry. Proper measure adopted during restoration will control most of the adverse environmental impacts of quarry and also improve the aesthetic beauty of the area. Due to the quarry activities in this area the profile of the ground will change due t formation of pits. At the end of the quarry operations, the top soil/minerals rejects will be utilized for back filling wherever suitable and rehabilitation. Following steps shall be taken for improving and protecting the environment. A) Quarry lease area. B) Surrounding the quarry lease area. C) Surrounding the statutory building. D) On the undisturbed virgin lease area. i. Surrounding the mining area The dust generated during the quarrying operations will be carried by wind and will be deposited over the trees and on the adjacent area around the quarry in the buffer zone. To filter this dust, a green belt of 10m width shall be developed along the quarry lease area i.e., around ultimate pit limit. This green belt will also act as sound barrier. In between the lease tree 26 P a g e SURIYA MINING SERVICES, SALEM, TN

28 saplings, grass and bushes shall be grown. Creation of the green belt around the lease areas shall be undertaken on priority basis and shall be completed concurrent to quarry over a 10-year period. ii. Surrounding the statutory buildings All around the proposed statutory buildings and along the road side trees shall be planted in addition to the existing ones which will, protect the workers from the noise and dust. To plant trees around the statutory buildings, the topsoil that is going to be mined from the area shall be laid to form a strip of 10-15m width and 0.5m thickness. iii. On the undisturbed virgin lease area The undisturbed virgin lease area shall be utilized for afforestation purposes by developing the area with local varieties. This work shall be done after the cessation of quarry operations. iv. Afforestation plan The topsoil and weather granite will be stored separately and the same will be spread on the boundary safety zone. Trees like neem will be planted at a rate 10 tree per annum and rate of survival expected to 80% in this area. Table 3.1 Showing programme of year wise afforestation of the five year period. Year Number.& type of tress Rate of Survival First 10 neem 80% Second 10 neem 80% Third 10 neem 80% Fourth 10 neem 80% Fifth 10 neem 80% 27 P a g e SURIYA MINING SERVICES, SALEM, TN

29 Apart from the green belts and aesthetic plantation for eliminating fugitive emissions and noise control, all other massive plantation effort shall be decided and executed with the assistance and co-operation of the local community. Based on the community needs the afforestation would mainly aim at: a) Protection & development of nature vegetation b) Protection of soil erosion c) Plantations of fuel wood blocks to meet the energy requirement. 3.5 SOCIO ECONOMIC BENEFITS There are positive impacts on socio-economic of people living in the villages. The villages in buffer zone depend upon agriculture. Mining operation in the subject area has positive impacts by providing direct and indirect job opportunities. There will be employment opportunities in transportation of ore to destination. This will result in following benefits:- Improvements in physical infrastructure. o Improvements in Social Infrastructure. o Increase in Employment Potential o Contribution to the Exchequer. o Prevention of illegal mining. o During and Post-mining enhancement of green cover. 3.6 POST PROJECT MONITORING guidelines. The lessee will monitor the environmental parameter as per TNPCB/IBM/CPCB 3.7 IMPLEMENATION OF EMP & MONITORING PROGRAMME The environment management plan is detailed on the basis of impact assessment. Control and mitigation measure for the adverse impacts envisaged. As the major environmental attributes have been confined to the project area alone, implementation of the proposed control measures and monitoring thereof will be undertaken on the regional basis. The 28 P a g e SURIYA MINING SERVICES, SALEM, TN

30 lessee will ensure the implementation of the measures within the mine area and carrying efficient monitoring. On the environment, it is suggested to monitor the environmental parameters regularly. The details of investments to carry out the regular monitoring and pollution control measure are given below in table 3.2. Sl. no Table-3.2: Cost of environmental protection measure (in Rs) Particularly/Activity Capital Cost 01 Green Belt Development 40,000 10, Check Dams /Gully plugs/ Retaining Wall/ Road side drain cutting/ Maintenance/Parapet wall 2,50,000 60, Water spraying of haulage roads 2,50,00 50, Environmental monitoring Occupational health & safety miscellaneous 1,50,000 3,20,000 Total 6,90,000 3,20,000 Recurring Expense/annum The applicant will adhere to all the terms & conditions laid in respect of safe working keeping in view of the sustainable Environmental Management and will comply with the provision of the Environmental Protection Act-1986, the mines Act-1952 & Mineral Conservation 7& Development Rules-1988 and any other Rules noticed from to time. Signature of the Applicant Signature of RQP/ EIA Coordinator (Mining) SURIYA MINING SERVICES, SALEM (Accredited EIA Consultant Organization) 29 P a g e SURIYA MINING SERVICES, SALEM, TN

EIA-EMP. Category B2

EIA-EMP. Category B2 EIA-EMP Quarrying ORDINARY ROUGH STONE Category B2 Project Details EXTENT : 4.00.0 Ha S.F.NO : 198(P) VILLAGE : VEERASOODAMANIPATTY TALUK : MELUR DISTRICT : MADURAI APPLICANT Thiru C.MANOGARAN S/o Chandran,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

EIA-EMP. Category B2

EIA-EMP. Category B2 EIA-EMP Quarrying MULTI COLOUR GRANITE (RED MULTI) Category B2 Project Details EXTENT : 3.44.5 Ha S.F.NO : 59/2B, 59/3A (P), 59/3B, 60/2A & 3A VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.M.S.P GRANITES have granted quarry lease for Colour Granite over an extent of 16.56 Hectare in Sy. No. 01 of Kori Village, Parvathipuram Mandal, Vizianagaram District,

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a 1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

PROJECT PROPONENT : B.ASHOK KUMAR, S/O. B.SHESHANNA SHETTY, YESHAWANTHA NAGAR, SANDUR -583119, BELLARY KARNATAKA.

PROJECT PROPONENT : B.ASHOK KUMAR, S/O. B.SHESHANNA SHETTY, YESHAWANTHA NAGAR, SANDUR -583119, BELLARY KARNATAKA. BUILDING STONE QUARRY NOTIFICATION. No. DMG/DDH/QLS/NTN-17/2014-15/1659, EXTENT : 14.55 ACRES, SITUATED IN SY. No. 240 OF KALINGERI VILLAGE, SANDUR TALUK, BELLARY DISTRICT, KARNATAKA. PROJECT PROPONENT

More information

Building Stone Quarry

Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

OVER AN EXTENT OF 5.378 HECTARES OF COLOUR GRANITE MINE. M/s. Margra Exports (P) Ltd No.76,Cathedral Road, Chennai.

OVER AN EXTENT OF 5.378 HECTARES OF COLOUR GRANITE MINE. M/s. Margra Exports (P) Ltd No.76,Cathedral Road, Chennai. ENVIRONMENTAL MANAGEMENT PLAN For OVER AN EXTENT OF 5.378 HECTARES OF COLOUR GRANITE MINE In Sy. No: 01, of Addukonda village, Tekkali Mandal, Srikakulam District, Andhra Pradesh Proposed By M/s. Margra

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

For Building Stone Quarry

For Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P) VILLAGE : DEVGAON TEHSIL : RITHI DISTRICT : KATNI MINERAL : SAND STONE KHASRA NO : 7 PART AREA : 2.00 HECTARE PRPOSED PRODUCTION: 800 M 3 /YEAR STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED UNDER

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P.

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P. VILLAGE : SALIYA BINEKA TEHSIL : BANDA DISTRICT : SAGAR MINERAL : CRUSHER STONE KHASRA NO : 270 AREA : 2.00 HECTARE PRPOSED PRODUCTION : 18000 M 3 /Year STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

RISK ASSESSMENT. STONE QUARRY (2.40 Ha) RISK ASSESSMENT FOR STONE QUARRY (2.40 Ha) Gat no. 85, A/p Karanjvihire, Tahsil Khed, District Pune, Maharashtra OF M/s Shankar Ramchandra Earthmovers Pvt. Ltd. Risk Assessment for Stone Quarry Mining

More information

1. INTRODUCTION. The lessee proposes to produce only about 10,188 TPA of Barytes. The total cost of the project is Rs. 20 lakhs only.

1. INTRODUCTION. The lessee proposes to produce only about 10,188 TPA of Barytes. The total cost of the project is Rs. 20 lakhs only. 1. INTRODUCTION 1.1 INTRODUCTION M/S SOUTHERN MINING COMPANY was granted a Barytes mine Lease area over an extent of 4.048 hectares in Sy. No: 944,945 & 946 of Kalva Village, Orvakal Mandal, Kurnool District

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information