1 ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The EMP has been designed within the framework of various legislative and regulatory requirements on environmental and socio-economic aspects. M/s. Om Sree Hanuman Granites proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction in an area of 1.0ha in Survey No. 140-C/A, Pallepalli Village, Rayadurg Mandal, Ananthapuramu District, Andhra Pradesh. In principle of application Quarry lease notice by Department of Mines and Geology, Government of Andhra Pradesh vide notice No. 1617/R3-1/2014 dated for period of 20 years. Mining plan approved by the Deputy Director of Mines and Geology, Government of Andhra Pradesh vide Letter no. 3000/MP-ATP/2015 dated It is proposes to conduct semi mechanized open cast method quarrying for Colour granite production of 2143 m 3 /annum from the lease area. Capital proposed for the quarrying is Rs. 50 Lakhs. M/s. Om Sree Hanuman Granites is conscious of its environmental responsibility towards the society in minimizing the pollution load due to this project and accordingly decided to carry out the. The objective of preparing environment management plan is to delineate effective measures to control and to mitigate the environmental pollution. This report presents the environment management plan, detailing the environmentally sound technology and the measures needed to contain and mitigate the anticipated environmental impacts due to the project. 1.1 Granite and its uses Granite is a very common intrusive igneous rock. It is light-colored granulose plutonic rock composed of the minerals feldspar, quartz and biotite & muscovite mica. These minerals make granite white, pink, or light grey. Granite also contains small amounts of dark brown, dark-green, or Colour minerals, such as hornblende and biotite mica. Granite is very hard and dense. It can be readily cut into very large blocks and it takes an extremely high polish. The name granite is derived from the Latin word granum, which means grain, an obvious 1-1

2 reference to the granular texture of granite. The average density of granite is between 2.65 and 2.75 g/cm 3, with a compressive strength of above 200 Mega Pascal (MPa). Uses Granite has been extensively used as a dimension stone and as flooring tiles in public and commercial buildings and monuments. With increasing amounts of acid rain in parts of the world, granite has begun to supplant marble as a monument material, since it is much more durable. Engineers have traditionally used polished granite surfaces to establish a plane of reference, since they are relatively impervious and inflexible. Granite tables are used extensively as a base for optical instruments due to granite's rigidity, high dimensional stability and excellent vibration characteristics. Rough-cut and polished granite is used in buildings, bridges, paving, monuments and many other exterior projects. Indoors, polished granite slabs and tiles are used in countertops, tile floors, stair treads and many other practical and decorative features. Presently, cut and polished granite slabs of 20 mm thickness are preferred for flooring, while tiles of 10 or 12 mm thickness are used for cladding. 1.2 Mining Method The mining operations are carried out by manually and semi mechanization as open cast mining. Hydraulic excavator and compressor jack hammers were used for cutting the rock. Close spaced drilling of 0.2m was adopted along a straight line and charged with low explosive to avoid feather cracks. Transportation will be made by trucks to dispatching points. 1.3 Mine Location M/s. Om Sree Hanuman Granites proposes to conduct semi mechanized open cast quarrying for granite production of 2143 m 3 /Annum. The quarry lease area of 1.0 ha is located at Survey No. 140-C/A, Pallepalli Village, Rayadurg Mandal, Ananthapuramu District, Andhra Pradesh. The quarry lease area falls in the Survey of India topo sheet no. 57 B/13 of Latitude 14 45'27.25"N and Longitude 76 50'39.25"E with an elevation of 544m. The nearest village Mallapuram located at a distance of 1.1Km from the QL area in Southwest direction. Railway station and Town is Rayadurg located at a distance of 5.6 km in SE direction. The road access is Rayadurg to D. Hirehal passing at a distance of 0.4Km from the QL area in East direction. Bondinakallu Reserved forest is at a distance of 0.8km in Southeast direction. Rayadurg RF is 1-2

3 at a distance of 4.0km in SW direction. Mallapuram RF is at a distance of 2.7km in SW direction. Hireadavi RF is at a distance of 5.9km in West direction. Dharmapuri RF is at a distance of 6.4km in East direction. Konthanahalli RF is at a distance of 6.1km in SE direction. Chinna Hagari River is passing at a distance of 8.3km in NW direction. Andhra Pradesh and Karnataka Interstate boundary is at a distance of 4.0km in NW direction. There is no national park, wildlife/bird sanctuary and critically polluted areas within 10km radius from the quarry lease area. Quarry lease location map is presented in figure 1.1. Details of the quarry lease area are presented in table 1.1. Latitude N 14 45'28.50" 14 45'25.90" 14 45'25.10" 14 45'26.00" 14 45'28.60" Longitude E 76 50'42.10" 76 50'40.70" 76 50'37.80" 76 50'37.20" 76 50'37.50" Table 1.1 Details of the Lease area State & District Mandal Village Sy. No./ Area in Ownership of Plot No. hectares occupancy Andhra Pradesh & Ananthapuramu Rayadurg Pallepalli 140-C/A 1.0 Ha Patta Land 1.4 Land use pattern of the lease area The QL area is a hillock raising to a height of 7m with boulders ground level. The boulders and granite sheet rock is well exposed without any overburden. Table 1.2 Land use in Lease Area S. No Purpose Extent (Ha) 1 Area under quarrying Waste dump area Road Infrastructure(Office, rest shelter) Green belt Vacant Total 1.0 ha 1-3

4 Fig 1.1 Location map of M/s. Om Sree Hanuman Granites 1-4

5 Fig 1.2 Quarry Lease Area sketch of M/s. Om Sree Hanuman Granites 1-5

6 2.0 Geology The subject area belongs to hillock raising to a height of about 7.0m with boulders ground level. The applied Q.L area is passing through the Eastern of this hillock. However the boulders and granite sheet rock is well exposed without any over burden. It represents late magmatic injection of closepet granite. 3.0 Regional Geology The oldest rocks in the area belong to migmatite complex, represented by migmatised quartzofeldspathic gneiss is exposed in the district. Regionally the area represents part of the Archaean Greenstone terrain of the Dharwar Craton. It has schistose rocks of greenstone belts. These are referred to as Archaean greenstone belts. This has been included by the rocks of Peninsular Gneissic Complex (PGC) which has gneisses. Migamatite and Migmatized granite suit of rocks. Gneisses and migamatites include porphyroblastic hornblende gneiss, hornblende biotite gneiss, nebulitic to homophenus hornblende gneiss, pink and green coloured migamatitic gneiss closepet Granite and its equivalents, namely dolerites porphyritic alkali feldspar granite and granodiorite, belong to the Proterozoic age have intruded the above set up. The greenstone belts, gneisses, migamatites and younger granitoids are intruded by the mafic dyke swarms. The stratigraphy of the region is given below Archean 3.1 Local Geology Younger Intrusive Peninsular Gneissic Complex Dharwar Super Group Epidote Veins Quartz veins and reefs Veins of alkali feldspar Dolerite/Basalt/Gabbro Dykes Biotite Granite Hornblend granite Biotite granite gneiss Hornblend granite gneiss Porphyritic hornblend granite Amphibolite, Hornblend schist Area belongs to hillock raising to a height of about 7m with boulders ground level. The applied Q.L area is passing through the Eastern of this hillock. The boulders and granite sheet rock is well exposed without any over burden. It represents late magmatic injection of closepet granite. 1-6

7 3.2 Brief description of litho units Texturally the rock in the lease area is with fine to medium grained. The rock is having Gray colour with black and White spots. The rock is asthatically good looking. Mineralogically the Granite consists of Quartz, Orthoclase, feldspar as essential mineral and other mafics Biotite, Mica, hornblend, etc., as accessory mineral with fine to medium grain with banded nature of red and black colour. The Granite available in the demarcated area is useful for Granite Cutting and Polishing purpose. 4.0 Exploration a. Present status: It is fresh quarry and not opened. 5.0 ESTIMATION AND CALCULATION OF GEOLOGICAL RESERVES Based on the prospecting work carried out and the present exposure of the rock, the reserves of the area have been estimated by the following parameters. We have taken 12m as proved zone and 6m as probable and possible zones in this area the recovery factor is taken only 19% as the joints and cracks are present in the rock. The reserves available in the lease are complied as stated below table 1.3. Category Section Table 1.3 Reserves Estimation Influence Section Volume in Distance in Area in m² m³ (AxB) m (A) (B) 19% in m³ (AxB) 0.19 Rock 81% in m³ (AxB)0.81 A-A Proved B-B C-C Sub - Total A-A Probable B-B C-C Sub - Total A-A Possible B-B C-C Sub - Total Grand - Total Reserves of the buffer zone: Total colour granite reserves = m 3 Total colour granite reserves blocked under buffer zone (lxbxh=358x7.5x24) = m 3 1-7

8 Total Mine able Reserves = Total Geological Reserves Reserves blocked under buffer zone i.e., = = m 3 Salable colour granite reserves as 19% R.F = m MINEABLE RESERVES AND LIFE OF THE QUARRY Initially, the total quantity of mineable reserves is considered as (economic) marketable reserves. In this way a total mineable reserves of 31081m 3 are available in this QL area. The average production is proposed to obtain 2066m 3 per year. At this rate of production, the expected life of the mine is calculated as below. Life of the quarry: Mineable reserves/annual production = 31081/2066 = 15years. 6.0 Mining Open Cast method of mining is carried out in this mine by manually and semi mechanization by using compressor operated jack hammer drills, excavators and dumper etc. Transportation will be made by trucks to dispatching points. Hydraulic excavator and compressor jack hammers were used for cutting the rock. Close shed drilling of 0.2m was adopted along the strike line and charged with low explosive to avoid feather cracks. 6.1 Removal/Excavation of O.B and other quarry waste The Northern side of quarry (in own land of lessee) is selected for dump yard for next five years and the waste will be stocked over a length of 82 m with width of 57 m to a height of 9.5m. Step dumping will be resorted. This material can be utilised to fill the pits after quarry operations are over. When the dumps reach their optimum height suitable greenery will be grown on these dumps to stabilize them. 6.2 SEPARATION OF LARGE PRIMARY BLOCKS FROM MOTHER ROCK BY PRE-SPLITTING The mining will be followed in the form of linear cut method. This involves losing of the primary block from mother rock. Hence primary cutting will be done by line drilling method where close spaced parallel holes along straight line will be made. Line drilling method is used for separation of primary blocks. 1) Once the free face is developed in working place, the primary cut is taken up over a maximum length of 10 mtrs with a width of 3mtrs and to a depth of 6 mtrs, depends upon the joints availability. These dimensions are confirmed as for field studies. Primary block will be cut into 1-8

9 secondary blocks by jackhammer drilling and wedge cutting and this block will be dislodged from in-situe position by an excavator. 2) Line drilling method will be used for cutting the primary blocks which involve drilling and blasting. 3) The holes are charged with low explosive cartridge like gunpowder and non-delay detonators for smooth blasting. 4) The use of delay detonators causes fragmentation and cracks in rocks. The non-detonating cords are inserted into the holes and the holes are stemmed with muck and plugged at the mouth and fired. 5) Thus the block will separate from the mother rock, which is pulled off from the face with cranes or shovels. 6.3 Sub Division of Large Primary Block Into Secondary Block This will be done during close spaced holes (along a line) down to the depth and the secondary block will be removed easily by just pulling it with the help of proclain. Close spaced holes will be drilled to the half the length of the block on either side of it by using wedges blocks can be separated. 7.0 Production of commercial blocks After primary separation, the rock mass will be carefully examined to avoid hair line cracks, mineral segregations and veins etc. The dressing of the rough blocks will be made by chipping the edges and geometrically equating the edges of the block at the dressing yard. The rough blocks obtained after primary cut it will be dressed for obtained good geometric shape of granite. Thus the commercial blocks are produced. 8.0 LIST OF MACHINERY a) Since it has been decided to undertake semi-mechanized mining operations, the below mentioned mine machinery will be deployed. i. Excavator One (Bucket capacity: 1m 3, Boom length: 7m, Model: Tata Hitachi 200Lc) ii. 200 CFM AIR compressors One iii. Jack Hammers 3 units iv. 17 tonnes Tippers 3 Nos b) Minor Tools: Chisels, Crow bars, pick of axes spades and hammers of different sizes. Taking 25 working days in a month, there will be 300 working days in a year. The expected output of raw material per day is about 6 to 7 CBM on an average. Based on the demands from the purchasers, labour force will be increased. 1-9

10 9.0 Loading Equipment Loading of the blocks will be made by chain pulley with the help of crane or proclaim by the skilled labours to the hired trucks to transport the material to the destination of customer Employment Potential Table 1.4 Employment potential S. No Description Quantity 1 Mine Manager/Supervisor 1 2 Blaster cum Mate 1 3 Excavator operator 1 4 Compressor operator 2 5 Tipper operator 2 6 Drillers 4 7 Helpers 9 8 Cutters 9 9 Watchman 1 Total Scheme development and production The scheme of development and production for the first five years has been planned taking into consideration the nature of the deposit within the lease area. It is observed that the sheet rock is exposed on North-Eastern side of Q.L area without any overburden and therefore the development of the quarry is confined towards North-Eastern side of the Q.L area. The proposed year wise working area is demarcated on plan and section Production plan for five years There is a vertical and free face is available on North-Eastern side of the Q.L area. So the North- Eastern side of the Q.L area is selected to work for next five years production. It is envisaged to produce 2066 m 3 of salable granite blocks in each year. To raise this target production about m 3 of rock mass has to be mined. The site inspection reveals that the North-Eastern portion of Q.L area is suitable for development during first 5 years program. Most of this area is covered by the sheet rock from top to bottom. Year wise production and waste generation details are presented in table 1.5. Table 1.5 Year wise Granite Production and Waste generation Year Working Areas m 3 Bench Height m Volume in m 3 Recovery Factor Recoverable Blocks (20 %) m 3 Wastage (80%) in m 3 1st Year 50x50= x20=

11 Sub - Total nd Year 50x50= x20= Sub - Total rd Year 50x50= x20= Sub - Total th Year 50x50= x20= Sub - Total th Year 40x20= x20= Sub - Total Grand - Total DRILLING & BLASTING Drilling and blasting plays vital role in determining the size and shape of rough blocks. Drilling Pattern is important in developing a working face and also preparing the rough blocks suitable for their use in appropriate processing units. There are no important places in and around the area, blasting will be carried with precautionary measures Broad Blasting Parameters Drill-Hole patterns for primary and secondary smooth blasting. Uniform single line equidistant holes (line drilling) will be deployed for separation of blocks from mother rock. In the case of sheet rock the primary drilling will be in the form of equidistant vertical holes to take out blocks of Gang Saw Drilling Parameters i. Drill holes diameter: 74/Pmm ii. Depth and inclination of the blast holes: 3 meter in case of separation primary blocks depending on the block size. Then the drill-hole will be vertical. iii. Burden and Spacing: 1.5m X 3 m iv. Stemming and charging of the blast hole: The blast hole will be charged with 100 grams of explosives and filled with clan pills subsequently; the shot hole will be stemmed using brass stemming rods. v. Explosive type: (1) Slurry based explosives or Gun Powder Site services It is proposed to provide the site services like mine office and other statutory constructions like rest shelter, first aid, work shed and drinking water as required near the quarry lease area. Drinking water 1-11

12 will be supplied to the workers from the bore well opened in the adjacent agricultural field or from nearby village Water requirement Water requirement is mainly for drinking purpose, domestic purpose, green belt maintaining and for sprinkling on Mine haulage roads the water shall be drawn from nearby village. The domestic waste water shall be sent to septic tank followed by soak pit. Rainwater Catch Pond of 20 KL capacity will be provided to collect the storm water for reuse. This will ensure that the rainwater is effectively used and minimizes the drawl of ground water resources. The water requirement is presented in table 1.6. Table 1.6 Water Requirement S. No Water Usage Quantity KLD 1 Wet drilling operation (On production 100 Ltr/1 m 3 ) Water sprinkling on haul 1Ltr/Sq. Mt (400m 2 )+1/4 th for waste dump Ltr/Head (30No s) Green 0.2 KL for 0.03 ha 2 times a day 0.2 Total Environmental protection is an issue that no organization can neglect and hope to survive. The products of civilization are being dumped upon the environment to a degree that the environment finds difficult to assimilate. The key to the success of the integrated approach to pollution prevention and control is the management and operation of the organization. Effective committed management delivers a successful operation. As total commitment to the environment, not just for compliance with legal or regulatory compliance will be the essence of environment management. Many companies have recognized the benefits of implementing an effective environmental management system. Environmental management plan can be effectively implemented to mitigate the pollution levels by observing the following: a. Pollution will be prevented or reduced at the source b. Pollution that cannot be prevented will be recycled in an environmentally safe manner. c. Pollution that cannot be prevented or recycled will be treated in environmentally safe manner and 1-12

13 d. Disposal and other releases into the environment will be used only as a last resort and will be conducted in an environmentally safe manner. The proposed project is granite mine. The mine owners are aware of the adverse impacts due to the mining activity and propose to initiate a number of measures for the environment protection within the mine area and in the surrounding areas. The company has a stated environmental policy of ensuring regulatory compliance with respect to the statutory laws and regulations and those periodically issued by the Ministry of Environment, GOI, New Delhi, CPCB, New Delhi and State Pollution Control Board Sources of Pollution and Control Measures The sources of pollution are air and noise from the proposed activity mainly from Mining, drilling, Blasting and transportation of mineral. Waste material generation, dumping and restoration Air pollution and its control The granite quarrying does not involve much dust formation. The dust would be generated during drilling, smooth blasting, quarrying and also during handling and transportation of the material. The dust anticipated at drilling place will be suppressed by putting cloth around the hole. Use of sharp drill pits for drilling holes and drills with water flushing systems (wet drilling) to reduce dust generation. Water spraying to be adopted at Faces/sites before and after blasting, Faces/sites while loading. Over charging of blast holes should be avoided. Personal protective equipments like nose mask and goggles etc will be provided to the workers. Regular water spraying on haul roads during transportation of mineral and waste by water sprinklers. Over loading of transport equipments should be avoided to prevent spillage. Also, measures such as covering tarpaulin over the loaded material will prevent spreading of dust particles from the trucks. Speed controls on vehicle movements to limited speed. Wind reduction control by plantation. Over burden dump has reached the optimum size, it will covered with top soil and water will spread on top soil and grass will be developed on the dump. Limiting the height and slope of the stockpiles can also reduce wind speed. Regular checking and maintenance of vehicles should be conducted and pollution under control certificate be obtained. Periodical monitoring of ambient air quality will helps to take steps to control the pollutants Noise pollution and its control The major source of noise pollution is due to drilling of drill holes, machinery, smooth blasting and vehicular movement. Blasting operations will be carried out only during daytime so as to avoid high 1-13

14 noise intensity in night time. Noise barriers in the form of trees are provided to attenuate the noise levels and green belt of 6m width shall be developed to mitigate propagation of noise. Protective equipment to reduce the noise levels like ear muffs and other protective devices will be provided to the staff working near noise generating sources like drill machine operators and dumper drivers. Training would be imparted to mine personnel to generate awareness about the damaging effects of noise. The transport activity shall be restricted to day time to reduce impact on habitation. The engines of the tractors shall be switched off during loading operation, and shall be periodically maintained to ensure low noise levels. Proper maintenance of the equipment will also reduce the noise Occupational Safety and Health Health and safety aspects of the mine will be taken care off as per the World Bank (WB) guidelines on open pit mining. The guidelines provide the detailed information on the aspects that are required to be taken into account for maintaining proper health and safety issues. The workers continuously exposed to dust will be provided with protective devices like dust mask to prevent respiratory disorders. The workers continuously exposed to a high noise will be provided with ear muffs/ earplugs. Green belt in and around the mining area will be developed to attenuate noise and dust impact. The blasting carried out in the mine area will be carefully planned and executed under the supervision of a responsible officer, to avoid any accidents. Provisions of rest shelter for mine workers with facility of drinking water supply for the employees will be provided by the project authority. The standard of the drinking water will be per WHO guidelines. Periodical training programme to inform the employees about their task, associated risk, and safe working practices will be undertaken. Conduct of mock drill, Safe storage & handling of explosives. Training will also include information on accident prevention, proper control and maintenance of equipment and safe material handling practices. Awareness on safety and ensure using of personal protective equipments (PPE) by workers. Regular maintenance and testing of equipments will be done. A regular monitoring of the Occupational Health and Safety will reduce the chances of accidents in the mine. Records of job related accidents and illness should be maintained. This information will be reviewed and evaluated to improve the effectiveness of Environmental Health and Safety programme. 1-14

15 Occupational Safety and Health to Control Dust Inhalation Very little dust is expected to be generated during mining and does not affect the environment. However while drilling, wet drilling will be practiced. It is a small scale mining activity and not much vehicular movement is expected. All the above precautions would be adopted to prevent dust generation at site and to be dispersed in the outside environment. However, for the safety of workers at site, engaged at the strategic locations/dust generation points like drills, loading & unloading points dust masks would be provided. Dust masks would prevent inhalation of RSPM thereby reducing the risk of lung diseases and other respiratory disorders. Regular health monitoring of workers will be carried out Occupational Safety and Health to Control Exposure to Noise Blasting will be done using non delay detonators to reduce vibrations, and the amount of explosive used will also be less at a time. There will not be heavy earth moving machinery which may create some noise pollution. Thus the vibration and noise will be well controlled within permissible limits. To protect the workers from exposure to high levels of noise, following measures would be adopted: Provision of protective devices like ear muffs/ear plugs to workers who cannot be isolated from the source of high intensity noise, e.g. blasting; Reducing the exposure time of workers to the higher noise levels by shift management. Smooth blasting techniques, special explosives and silent non-explosive demolishing agent will be used. Muffed blasting and use of Milli-second detonators will help in reducing the noise pollution Control of Ground Vibration & Fly Rock generation In this area the applicant proposes to deploy blasting with less quantity of non-explosives. There will not be any impact on surroundings, as there are less blasting and intended to use low power explosives in this mine. It is a small scale mine and only limited No. of holes are blasted. Ground vibrations due to blasting and its impact on various mine structures, should be studied in details when the mine becomes operational, especially the charge per delay factor. General measures to reduce ground vibration & fly rocks resulting from blasting are given below: Blasting should be carried out in the daytime, as during the night time the sound intensity becomes higher; Blasting should not be carried out when strong winds are blowing towards the inhabited areas; 1-15

16 Maximum permissible charge per delay should be decided on the basis of the distance of structure to be protected from the blasting. The number of rows in a blast should not be more than four so that fly rock generation and ground vibration is reduced. Peak particle velocity or ground vibrations for safety of nearby structures and buildings should be well within 12.5 mm/sec; residential To contain fly rocks, stemming column should not be less than the burden of the hole, and the blasting area should be muffled; Each blast should be carefully planned, checked, and executed under the supervision of a responsible officer. Blasting data/observations should be recorded; and As per the mining plan, in order to ensure slope stabilization, controlled production blasting shall be adopted to avoid tension cracks and back breaks. Such cracks may get filled with water, which reduces the stability of excavated slopes and the angle of slopes Peak Particle Velocity The vibrations are measured as per the assessment criteria given under Bureau of Indian Standard, IS: (Reaffirmed 2003) Underground Blasts. - Criteria for Safety and Design of Structures Subject to Per the assessment criteria, the value of ground particle velocity may be computed from the following expression: Where V = K1 [Q 2/3 /R] 1.25 V = Ground particle velocity in mm/sec K1 = Constant which may be normally taken as 880 for soil, weathered or soft rock and 1400 for hard rock. Q = Charge per delay (kg), and R = Distance (m) from blast point Based on the above equation, the ground particle velocities at different distances (3 m, 5 m, 10 m, 20 m, 50 m, 70 m, 100 m, 150 m and 200 m) are calculated considering K1 as 880 for soft rocks and 1400 for hard rocks. As per the Standard, for safety of structures from threshold damage, the ground particle velocity should not exceed the following: 1-16

17 Soil, Weathered or Soft rock 70 mm/sec Hard Rock 100 mm/sec The results are presented in the Table 1.7 below for the maximum charge Table 1.7 Ground Particle Velocity (V) Charge Peak Particle Velocity (V) mm/second S. Constant Per Delay Distance from the Blasting (R in meters) No (K1) (Q in Kg) It is clear that with Q = 0.2 kg charge per day shall result in ground particle velocity is 1.14 mm/sec in soft rock within a distance of 70 m while in the hard rock the ground particle velocity is 1.16 mm/sec shall be within 100 m. There shall not be any structure with in 70 m of the quarry area, and it may be, concluded that the ground vibrations generated by blasting during the mining operations will not likely to effect the structures proposed in the vicinity of > 70 m from the point of blast. Concrete structures like office, store etc should not be proposed within the core mine area. These structures otherwise will be affected by the ground vibrations Water Quality Management The operation of the mine will not generate any appreciable quantity of liquid waste. The ground water table in this belt is 23m below form the surface and the quarrying will be done on above the surface. Maximum depth of the quarry will be 10m from top of the hill which is about 10m height from ground level, flooding by ground water is not anticipated. However during rainy months, there is a possibility of wet conditions developing in the working pit this will be minimized, if not altogether eliminated, by adopting simple techniques like digging trenches all round to drain off rainwater and preventing surface run off from entering and flooding working pit. The water from the pits will be pumped by deploying suitable pumps, if and when required, the mine drainage can be effectively managed and the pit kept dry to keep up the production schedule Water Resources In this area water table is at greater depth of 23m BGL. There are no wells or springs in the area. Hence there will not be adverse effect on ground water due to quarrying. The daily water requirement for the mine operations would be approximately 3.7 KLD. Water sprinkling on mine haulage roads etc shall consume 1.4 KLD. Wet drilling operations consume about 0.7 KLD. For green 1-17

18 belt development water consumption is about 0.2 KLD. Domestic purpose is about 1.4 KLD. The drinking water is to be sourced from nearby village through tankers and rainwater collected will be used for sprinkling, green belt development and etc. The generation of wastewater from domestic sources is expected to be approximately 0.9 KLD, which will be sent to septic tank followed by soak pit Water Management Following measures will be adopted to mitigate the impact on the water resources: The blasting activities will have to take care on the sinkholes, cracks and fissures in the site activities. During excavation and drilling activities effort must be taken to avoid face collapse at these cracks and fissures. To prevent surface water contamination by oil/grease, leak proof containers shall be used for storage and transportation of oil/grease. The floors of oil/grease handling area will be kept effectively impervious. To prevent degradation and maintain the water quality during rainy season, adequate control measures should be adopted to check the mine run-off into the natural streams Catchment Area Treatment Plan A catchment area treatment plan has been developed keeping in mind the results of the hydrology/ hydrogeology of the area and the climate data. As there are no perennial water sources running on or through the site, the mine water discharge is limited to the monsoon season only. To keep water from entering the mine during this period, a garland drain will be developed along the mine s top bench, which will bend to guide the water to the nearest natural surface drain. In terms of water quality, good mining practices are planned, additionally the natural state of surrounding areas, should ensure that rain water run-off from the mine does not contain any toxic elements. As the site has no overburden, potential discharge of sediments is quite limited and any residual particles which are washed down will be captured by a sump located at the lowest bench. The sump will be cleaned regularly and discharge water monitored consistently. If required, based on monitoring, an additional catch pit can be located at the main garland drain. The sump proposed in the bottom bench will be designed based on the peak discharge and will be expanded over a period of time to accommodate the increasing quantum of water discharge. 1-18

19 Presently, the capacity of the sump is designed to hold the entire quantum of peak discharge water for more than 10 minutes. The garland drain shall be provided surrounding the mine area. Garland drain and siltation pond need to be constructed of appropriate size to arrest silt and sediment flows from soil and mineral dumps. The water so collected will be utilised for watering the mine area, roads, green belt development etc. The drain should be regularly desilted and maintained. The garland drain (size, gradient and length) and sump capacity will be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the area adjoining the mine site. Sump capacity should also provide adequate retention period to provide proper settling of silt material. The surface water around the mine, and infrastructure will be regularly tested and appropriate control measures adopted in case of any pollutant is detected above the prescribed limits Waste Management plan During five years operations a total rock mass m 3 will be excavated and 10328m 3 of granite blocks will be recoverable from this rock mass and remaining material of about m 3 will go as waste Dump Area Waste will be dumped in the outside area over a length of 82mtrs, width of 57mtrs and to a height of 9.5 mtrs in the Northern side of the lease area. (For lease period i.e., 20 years total area is 0.59ha). During the first five years about 44032m 3 of waste material will be generated. Step dumping will be resorted. This material can be utilized to fill the pits after quarry operations are over. When the dumps reach their optimum height suitable greenery will be grown on these dumps to stabilize them Land Management Land degradation is one of the major adverse impacts of opencast mining in the form of excavated voids and also in the form of waste dumps. Land reclamation plan must be implemented simultaneously with the mining activities Land Reclamation No reclamation is proposed in the five years period because, the mining will be continued to further depths and reclamation could be possible only after completion of mining up to the proposed depth. Reclamation and rehabilitation of the lands affected by quarrying will be done by back filling, soil anelioration and afforestation. The back filling of the mine starts from the Eastern end proceeds 1-19

20 towards Western side. Drainage will be developed along the slopes of the mound. Reclamation of the effected land includes back filling, Drainage development, spreading and fertilization of soil, leveling and revegetation etc., Care will be taken to implement the said factors Soil Conservation Measures Top soil, if any will be properly stacked at earmarked dump site with adequate measures and the same will be used for reclamation and rehabilitation of the mined out areas. Topsoil will not used for refilling, but may be sparingly used for plantation purpose and also dumped in the dump yard. To prevent soil erosion and wash-off of dump-fines from freshly excavated benches and dumps following measures shall be adopted: Garland drains will be provided around the mine wherever required to arrest any soil from the mine area being carried away by the rain water; Toe drains with suitable baffles will be provided all along the toe of the soil dumps to arrest any soil from the dump slopes being carried away by the rain water; Loose material slopes will be covered by mineation by making contour trenches at 5 m interval to check soil erosion both due to wind and rain; Retaining walls (concrete or local stone) will be provided, around the stockpile or wherever required, to support the benches or any loose material as well as to arrest sliding of loose debris House Keeping Proper housekeeping and cleanliness will be maintained in the infrastructure facilities. Wet mopping will be adopted to conserve water. Sign boards will be provided in the work areas and the road and building highlighting the safety and occupational aspects Transport Systems Railway station and Town is Rayadurg located at a distance of 5.6 km in SE direction. The road access is Rayadurg to D. Hirehal passing at a distance of 0.4Km from the QL area in East direction. The finished product and waste material is transported by road using trucks of 17 Tons capacity. The number of trips will be approximately 1 in two days for transportation of mineral and the trucks are covered with tarpaulin. The lessee will deploy three tippers to transport the finished product, waste blocks, unfinished and finished blocks from quarry site to yard and trucks to transport sized dimensional blocks from yard to destination. Cranes will do the loading of blocks. The materials while transporting do not pose any hazard. Sufficient parking facilities will be provided for vehicles loading 1-20

21 and unloading of material. Safety signs will be displayed inside and outside the mine to avoid road accidents Environmental Greening Program Environmental greening program is an important component of the and is an imperative requirement for sink of air pollutants including noise as per the guidelines issued by the Ministry of Environment and forests, Govt. of India. Conceptualization, design and implementation of the proposed activity, taking into account the specific requirement of the proposed mining activity and the site conditions are presented. Green cover in mining area not only help in reducing pollution level, but also improves the ecological conditions and prevent soil erosion to great extent. It further improves the aesthetics and beneficially influences the microclimate of the surrounding. In every year about 50m length of buffer zone will be planted along the boundary in all directions of the area. About 33 saplings consisting of Neem, Teak will be planted per year over an area of 50m x 6m at 3m interval. The environmental greening program as designed comprises the location and development of a shelterbelt and Afforestation in about 0.03 Hectares. The shelterbelt will contain species, which act as windbreakers so that the environment within the mine is contained; the planting of different species in rows is envisaged in general in the greenbelt. A dedicated cell in the mine should be established for post plantation care, which include, regular watering, manuring, protective measures etc. Diseased and dead plants should be uprooted and replaced by fresh saplings. Regular monitoring on survival rate and remedial action should be done in an organized and planned manner Socio-economic Environment The project provides an opportunity for the local people to get employment directly or indirectly and helps in the upliftment of the socioeconomic status of the area. The proposed project would generate an employment of 30. The local inhabitants of the area live in the villages surrounding the mine area and their main occupation is Agriculture. In a small way they rear cattle and sheep for sustenance. The mining activity in this belt will benefit the locals both directly and indirectly. The direct beneficiaries will be those who get employed in the mines as skilled and un-skilled workers. The indirect beneficiaries will be those who open small business to sell goods required by the residents whose Per Capita income will be enhanced by the mining activity, and thereby their purchasing power. In the long run a lot of social good is expected in the comparatively backward area when the inhabitants will be able to send their children to 1-21

22 school. The change, though slow, is bound to be perceptible. The management will involve in social activities of stakeholders/surrounding community by planning the betterment of neighboring social conditions through awareness and welfare programs to ensure an improved relation, useful in the long run. Many of the beneficiaries of such programs will include own employees as well. The goodwill of the local populace can never be ignored. It is proposed to supply drinking water and medical facilities to the villagers. The management will also support for vocational training and assistance in utilizing government programs. The channels employed may vary either through direct contact or by means of local organizations. Another important facet of social environment identified by the project proponents is a green appearance; hence the management will develop a green belt towards aesthetic beautification as the same is necessary to be considered as a responsible, social neighbor Disaster Planning The mining operation shall be carried out under the management control and direction of a qualified mines manager holding a Second class manager s certificate of competency to manage a metalliferous mine granted by Director General of mines safety (DGMS). DGMS have been issuing a number of standing orders and circulars to be followed by the mine management in case of disaster, if any. Moreover mining staff would be sent to refresher courses from time to time to keep them abreast of the regulations. However following natural/ quarrying hazards may occur during normal operation Slope failure at the mine faces; Accident due to explosives; Accident due to heavy equipment/machinery; Sabotage in case of magazine; and Accidents due to fly rocks and boulders. In order to take care of above hazards/disasters, the following control shall be adopted: All safety precautions and provisions of Metalliferous Mine regulation 1961 are strictly followed during all mining operations; Checking and regular maintenance of garland drains and earthen bunds to avoid any inflow of surface water into mining area; Entry of unauthorized persons shall be prohibited; Fire fighting and first aid provisions in the mines office and mining Area; Provision of all the safety appliances such as safety boots, helmets, dust masks, ear mufflers, goggles etc. would be made available to the employees and regular check to ensure the use; 1-22

23 Training and refresher courses for all the employees working in the hazardous premises; Working of mine as per approved plan, related amendments and other regulatory provisions; Cleaning of mine faces shall be done regularly; Handling of explosives, charging and blasting shall be carried out by competent persons only; Provision of magazine at safe place with fencing and necessary security arrangement; Suppression of dust on the haulage roads by providing water sprinkling Environment Management Cell A Cell for Environmental Management within Mine lease area at the project level, will take the overall responsibility for co-ordination of the actions required for environmental management and mitigation, and for monitoring the progress of the proposed management plans and actions to be taken for the project. The Cell will be under the overall supervision of the Mine Manager, and responsible for monitoring of the implementation of the various actions which are to be executed by the agencies specified in the EMP. The Cell will be headed by Mine Manager and the other members of the cell that will include a Horticulturist. The EMC will prepare a formal report on environmental management and mitigation for the Environmental issues at the Mine, at six-monthly intervals. Reports on any urgent or significant issues may be prepared at shorter intervals. Apart from responsibilities listed above, the EMC will have the responsibility of the following: Collection of water and air samples within and outside the work zone; Analyzing the water and air samples; Implementation of the control and protective measures; Land reclamation and vegetation; Co-ordination of the environment related activities; Collection of the statistics of health of workers; Green belt development; Awareness and implementing safety programmes; and Monitor the progress of implementation of EMP Post Project Monitoring The survey of post project monitoring comprises of the following monitoring aspects; a. Ambient air quality survey b. Noise Level Monitoring 1-23

24 c. Water quality monitoring Ambient air quality and noise level Monitoring will be carried out at minimum four stations, two stations within mine site and two stations nearby residential areas outside the mine. Parameters like particulate matter, sulphur dioxide, oxides of nitrogen carbon monoxide and lead will be monitored in case of ambient air quality. Water quality monitoring will be carried out in the mine working area, sump and nearby village. The frequency of monitoring is preferably once in three months on 24 hour basis. The samples will be collected in accordance with the procedures given by CPCB Other Management Aspects Records will be maintained for the analysis of ambient air quality, noise levels and water quality. These records are not only required for the perusal of the Pollution Control Board authorities to take preventive action against the environmental pollution. The management will maintain the records as per the hazardous waste regulations and EPA regulations and apply for the annual consents for air and water, and renewal of authorization for the storage of hazardous waste as per the Hazardous Waste (Handling & Management) Rules, The records of hazardous waste manifest will be maintained. The mine will obtain the consent for establishment (CFE) and consent for operation (CFO) from State Pollution Control Board as required under section 25/26 of the Water act, 1974 and under section 21/22 of Air Act, 1981, before commissioning and production as directed by the Hon ble Supreme Court of India. The CFO will be renewed each year by the management in consultation with SPCB. The mine will submit environmental statement every year before September 30. The management ensures that it will comply with all the directions and regulations issued by the Ministry of Environment and Forests, New Delhi, State and Central Pollution Control Boards. The Consent for Establishment, Consent for Operation will be displayed in a conspicuous location for the information of the inspecting authorities of different departments Cost proposed for Environmental Protection Measures The cost estimate of environment management is presented in table 1.8. Table 1.8 Environment Management - Cost Estimate S. Description Item Capital Recurring Remarks No. cost (Rs.) cost (Rs.) 1 Air pollution Nose masks 30 No's Once a week. Replaceable, and cost may increase with time Cloth for drillers 15 no's 1.0m each Issued quarterly Gunny bags for covering the surface As and when needed, Lump of jackhammer holes sum. Road 1 Ltr/600 Sq. m. and waste dump settling (1/4 of wetting) Ltrs tank Water tanker one tankers per day for 300 days 1-24

25 2 Water pollution 3 Noise pollution 4 Occupational Safety and Health 5 Environmental monitoring Plantation on road side - 3m interval and buffer zone - 3m interval plus maintenance Sub Total Construction of garland drains Re-plant the non-surviving plants, watering and protection from animals Once only for the lease period/life of mine De-silting operations Yearly and manual operations Construction of check dams Once in year, cost incurred is to buy sand bags and filling sand Construction of retaining wall for Cost of construction of wall waste dump in slope side around the dip side of the dump. Sub Total Maintenance of machinery suitably - Included in main cost Rs per 3 months PPE's like Ear muffs - Rs. 15 each Once in six months Sub Total First aid kits - 2 No's Fire Once in year, replace by extinguishers - 2 No's conducting periodical checkup PPE's to all employees (hand gloves Safety shoe twice in a Rs. 30, safety Rs and helmets once in three years and Rs. 100) hand gloves thrice in a year Training and awareness programs on risk factors during emergencies by the experts Periodical medical checkup and supply of medicines - Rs. 600 per head Sub Total Ambient air quality studies - Once in six months - 2 locations Water quality studies - Once a year - 2 Locations Noise studies - Once in six months - 2 Locations Vibration studies - Once in year - 1 locations Sub Total Grand Total Once in six months and create sign boards about the risk and safety precautions regularly Once in a year and supply of medicines for every three months Will be done through MoEF&CC/NABL recognised laboratories 1-25

G. M. Nagaraju Environment Management Plan

G. M. Nagaraju Environment Management Plan ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1. INTRODUCTION: 1.1 Background: The mining lease, for colour granite over an extent of 1.0 ha. in Sy No.333 of Arikara Village, Alur Mandal,

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1.0 Introduction: Background: The Quarry lease, for Black Granite over an extent of 1.482 ha. in Sy Nos. 10 & 23, Sankavaram Village, Kanigiri

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

RISK ASSESSMENT. STONE QUARRY (2.40 Ha) RISK ASSESSMENT FOR STONE QUARRY (2.40 Ha) Gat no. 85, A/p Karanjvihire, Tahsil Khed, District Pune, Maharashtra OF M/s Shankar Ramchandra Earthmovers Pvt. Ltd. Risk Assessment for Stone Quarry Mining

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.M.S.P GRANITES have granted quarry lease for Colour Granite over an extent of 16.56 Hectare in Sy. No. 01 of Kori Village, Parvathipuram Mandal, Vizianagaram District,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SOHAN ART & GRANITE INDUSTRY have granted quarry lease for Black Granite over an extent of 1.00 Hectare in Sy. No. 101 of Kappali Village, Ramasamudram Mandal, Chittoor

More information

For Building Stone Quarry

For Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Building Stone Quarry

Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Environment Impact Assessment study:

Environment Impact Assessment study: (A) Environment Impact Assessment study: 1. Pollution Potential: Air Emission: Dust Emission during Mining, Transportation & Crushing of the Stones which will be controlled by water sprinkling and development

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

The report discusses the Management plan for mitigation of adverse Environmental impacts and increases the beneficial impacts due to mining.

The report discusses the Management plan for mitigation of adverse Environmental impacts and increases the beneficial impacts due to mining. 1.0 Introduction The report discusses the Management plan for mitigation of adverse Environmental impacts and increases the beneficial impacts due to mining. The environmental impacts can be categorized

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02. COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.09 PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED. PERIOD

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

1. INTRODUCTION. The lessee proposes to produce only about 10,188 TPA of Barytes. The total cost of the project is Rs. 20 lakhs only.

1. INTRODUCTION. The lessee proposes to produce only about 10,188 TPA of Barytes. The total cost of the project is Rs. 20 lakhs only. 1. INTRODUCTION 1.1 INTRODUCTION M/S SOUTHERN MINING COMPANY was granted a Barytes mine Lease area over an extent of 4.048 hectares in Sy. No: 944,945 & 946 of Kalva Village, Orvakal Mandal, Kurnool District

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a 1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P) VILLAGE : DEVGAON TEHSIL : RITHI DISTRICT : KATNI MINERAL : SAND STONE KHASRA NO : 7 PART AREA : 2.00 HECTARE PRPOSED PRODUCTION: 800 M 3 /YEAR STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED UNDER

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. Stone Plus Colour granite Quarry

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

Andhra Pradesh Latitude & Longitude 13 0 30 36.2 N 78 0 29 59.6 E Toposheet No 56 K/6, 56 K/7, 56 K/10 & 56 K/611

Andhra Pradesh Latitude & Longitude 13 0 30 36.2 N 78 0 29 59.6 E Toposheet No 56 K/6, 56 K/7, 56 K/10 & 56 K/611 1.0 EXECUTIVE SUMMARY: The Granite Mining[Black Granite] project (Minor Mineral) of Sri Suresh Jain 2.0 Ha is located at Survey No: 691, of Madanapalli Village & Mandal,. The Mine Lease[Quarry] was granted

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE OF THE PROPOSED COLOUR GRANITE MINING PROJECT APPLICATION. AT SURVEY NO. 54/P,2.0 HECTARE

More information

STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES:

STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES: STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES: S. No Information Required Information to be furnished by the Proponents 1 Name of the project or activity 7.781 Ha. of Marble Mine NEW MINE

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information