1 1 CHAPTER Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land in Naganapur Village, Mudhol Taluk, Bagalkot District, to mine Limestone & Dolomite Lessee wants to go for expansion of production from 5,000 tpa to 10,000 tpa of Limestone and from 10,000 tpa to 30,000 tpa of Dolomite, hence, this project needs Environmental Clearance. The mining development in the study area needs to be intertwined with judicious utilization of natural resources within the limits of permissible assimilative capacity. The Environmental Management Plan (EMP) is a valuable tool for resource management and conservation of environmental considerations can be conveniently & advantageously woven into the process of planning, implementation and operation of the project. Measures to enhance the quality of environment subsequent to mining are also incorporated in the EMP. The present Environmental Management Plan is aimed at ensuring sustainable development in the study area of the mining operations. The strategy is to control the pollution at the source to the extent possible, with the available and affordable technology, followed by treatment measures before the pollutants are discharged into the environment. As evaluated in the study area is not adversely affected with the mining activities however concerted efforts have been planned to integrated measures for improvement of the environment in the study area. The environmental attributes for which the management action plan is contemplated are Air quality, Water quality, Noise, Soil, Topography, Land use and the Socio economic status of the area. This Environmental Management Plan report has been prepared for submission to State Level Environmental Appraisal Committee/State Level Environmental Impact Assessment Authority constituted by MOEF for obtaining Environmental Clearance.

2 2 2. Purpose Of Environmental Management Plan Various purposes of the environmental management plan are; To support and implement development work to achieve environmental standards and to improve the methods of environmental management. To promote green-belt development. To encourage good working conditions for employees. To reduce fire and accident hazards. Budgeting and allocation of funds for environment management system. To adopt cleaner production technology and waste minimization program. 3. Status on Baseline Information The area is 1.7 kms NW of Naganapur. The lease area is situated in South at a distance of 0.25 km connecting Lokapur - Yadwad PWD Road. The lease area is 19 km from Mudhol, a Taluk head quarter. Bagalkot, the district head quarter is 45 km from the area. The nearest railway station is at Bagalkot which is at a distance of 45 kms from the lease area.the nearest airport is Belgaum, 100 kms. The nearest port is Goa which is 240 km. The nearest reserve forest (Kanasageri) is 0.1 Km East of the area and wild life sanctuary is near Dandeli which is 140 kms from the lease area. Topo sheet No. with Latitude and longitude: Topo sheet No 47 P/8: Latitude: N to N Longitude: E to E The topography of the area is almost flat and slope gradients in NE direction. The highest elevation is m towards SW and lowest elevation is m in NE above MSL. The dry agricultural land around the lease area is either agriculture or waste land. This type of small-scale open cast mining operations may not degrade the environmental conditions.

3 3 Water Regime The slopes are drained by nallas are outside the Lease area. These nallas flow towards NE and act as flood channel during rainy seasons. None of these are perennial. This area receives rainfall about 600 mm per year. The ground water table observed in this area is between 70 to 80 meters below the ground from the mining level. The area around the Mining operations is almost dry, barren & grazing with some vegetation & agricultural. Quality of the Air The quality of the air is polluted to some extent, however within the permissible limits, as JK & Katwa Cement Plants are nearby and the Lease area is surrounded by mines and crushers. However, there will be always good breeze from the adjoining open area. Climatic Condition The area enjoys arid climate. The hottest month is May and coldest month is December. The rainy season comprises of May to September. The temperature varies from 16 o C - 25 o C in winter to 30 o C-40 o C in summer. The weather is continued to be pleasant during November to march. This area receives rainfall of about 600 mm per year. Human Settlements There are no villages within the Lease area. Nearest village is Naganapur which is 1.7 km in SE direction, having total population of 1,102 and house hold population of 239. Public Buildings, Places of Worship and Monuments There are no public buildings, monuments or wild life parks in and around the area. No Places of worship and monuments in this mining area or near-by this place.

4 4 4. Land Environment Land area indicating that the area likely to be degraded due to mining, pitting, dumping, roads, workshop, etc. The annual production is 10,000 tpa of Limestone and 30,000 tpa of Dolomite in about 2.272Ha. The depth of excavation will not be more than 6.0 mts in the Plan Period. The excavated Limestone & Dolomite is sold to the customers. In this type of small-scale open cast Manual Mining operations, no township is planned and there are no other hazards generated. Reserves The reserve details for Limestone & Dolomite are as under: Limestone: Classification Limestone tonnes(t) Dolomite tonnes(t) Total Mineral resources 3,06,448 11,64,859 Proved Mineral reserves 2,33,830 7,24,253 Remaining resources 72,618 4,40,606 Mining An open cast, Manual Mining Method, will be adopted to operate the area. The annual production is 10,000 tpa of Limestone & 30,000 tpa of Dolomite. Loading is done manually. A bench height of 3m and a minimum bench width of 4m will be maintained with subbenches of 1.5 m each. Solid Waste The solid waste materials that are generated are inert in nature and will not result in to leaching of any substance or constituent. During the Plan period, about 10,525 tonnes of

5 5 waste will be removed/ excavated in the plan period, will be dumped in the lease area, in the area earmarked which needs 0.195Ha area and 3.0m height. Plantation will be made on the dump. Retaining wall and Garland drains will be made not allow any silt to go out. Afforestation Afforestation will be made in 0.025Ha for the plan period by phased manner by planting varieties of saplings along the lease boundary and along the approach road, in with the consultation of Horticulture and forest departments to maintain the green belt for balancing the ecological environment. Details of the afforestation program are given below: Afforestation Table Green Belt No.of Plants Year Approach Lease Boundary Dump Road Survival Rate 60% Saplings Local & fast growing plants like Honge, Neem, Badam etc.

6 6 CHAPTER-02 PRESENT ENVIRONMENTAL CONDITIONS BASE LINE ENVIRONMENT Climate The area has a tropical climate. The peak summer will be in the month of May. Highest temperature of 40 C during May and lowest temperature of 30 C during May was recorded in this area and the rainfall in this area was about 600mm. Temperature This is one of the important factors deciding the dispersion of air pollutants due to factors like lapse rate, inversion etc. In the area, it is observed from the records that the temperature varies slightly in the month. Relative Humidity The presence of water vapor in the atmosphere affects the amount of solar radiation received and reflected by the earth. Water vapor serves to scatter or absorb radiation energy, and hence, humidity has a major influence on air quality. Generally the relative humidity observed in the area is moderate. Precipitation Precipitation serves as a cleansing agent for the atmosphere by removing Particulate matter and soluble gases in a process called Wash Out. The rainfall in this area was about 600m. Wind Speed & Direction Wind is one of the most important modes in the distribution, transportation and dispersion of air contaminants. The velocity of the wind determines the travel time of particulate to a receptor and the dispersion rate of air contaminants.

7 7 EMP study & Scope The objective of preparing an EMP is to provide mitigative measures for protection of Environment. In order to obtain a clear picture of environmental parameters, the studies were carried out inside the area (Core zone) proposed for mining. Based on the available information and monitoring carried out in the area for various environmental parameters EMP of the area is prepared. The EMP for the subject Applied area is undertaken as part of obtaining clearance from Environmental angle. Quality Of Air Mining operations involve Jack-hammer drilling and blasting. It is OTFM Mining. Drilling, blasting & loading of minerals, is a major contributor for affecting the air quality. Loading and transport of minerals generate some small quantities of dust, which again depend on factors such as the topography, nature of material handled and climatologically parameters like wind speed, wind direction and stability classification of the area viz location of buffer zone villages. The quantum of Mining operations is limited and hence there shall not be regular fugitive emissions. However, care will be taken to suppress dust by sprinkling water at all loading places, mineral dressing/stack yards etc. LOCATION : A 1 Mine Site Unit in µg/m 3 Parameters Results Li Limits Units M Methods Sulphur Dioxide (SO 2 ), 24 hours Nitrogen Dioxide (NO 2 ), 24 hours Particulate Matter size less than 10µm), 24 hours Particulate Matter ( (size less than 2.5 µm), 24 hours µg/m 3 Improved West and Gaeke µg/m 3 M Modified Jacob & Hochheiser(Na-Arsenite) µg/m 3 Gr Gravimetric µg/m 3 Gr Gravimetric Note : BDL = Below Detectable limit

8 8 Quality of Water a) Surface water: There seasonal nallah and tank existing nearby the Lease area, Precautions will be taken to avoid the wash-off from the mine to nearby nallah by construction of Check dams & retaining walls. b) Ground water: Ground water is unlikely to be encountered during the proposed period of working this mine. So any change in the ground water condition is ruled out. Ground Water Quality Data : Source-Borewell at Naganapur Analysis as per IS and APHA standards. Sl.No. Characteristics Acceptable Limits Permissible Limits Result IS IS Color Hazen units 5 15 <5 2 Odor Agreeable Agreeable Agreeable 3 Taste Agreeable Agreeable Agreeable 4 Turbidity NTU ph Value No relaxation Conductivity µ - mhos/cm Total Dissolved Solids mg/l Total Hardness as CaCO 3 mg/l Calcium as Ca mg/l Chlorides as Cl 2 mg/l Sulphates as SO 4 mg/l Alkalinity as CaCO 3 mg/l Magnesium as mg/l Nitrate as NO 3 mg/l 45 No relaxation Iron as Fe, mg/l 0.3 No relaxation Fluoride BDL Analysis as per IS and APHA standards. NS- Not Specified, ND-Not Detected, NA-Not Analyzed, C-Contaminated

9 9 Noise Level The noise level of the core & buffer zone is expected to be within the permissible Limits. Mining activity is likely to increase the noise levels at the loading points and jack hammer drilling locations. However, since, the workers will not be expected to be exposed to high levels of noise for considerable period of time, no extra precaution is proposed. Noise Level Status: Average Noise Level Monitoring Data during Day time Date : Sl. Time in hours Noise level in db No Lmax:61.5 Lmin:51.2 Leq:49.67 Standards to control noise pollution are as follows: Area Day (Leq db (A)) Night (Leq db (A)) Residential Commercial Industrial INFERENCE As per KSPCB Standards, Report Status:-Leq within Limits.

10 10 Land Environment The Lease area of 2.78 Ha is Patta land. The Lease area is proposed to be utilized for Mining and except for Mining the land is not used for any other purpose. The buffer zone consists of patta lands which are barren, agricultural & grazing lands. The major activity in the buffer zone is dry and whatever agriculture activity takes place is entirely dependent on rains. The crop includes jawar, maize, ground-nut, sunflower, etc.

11 11 CHAPTER-03 ENVIRONMENTAL MANAGEMENT PLAN Introduction Mineral deposits are exploited for the sustained development of the country. But this economic activity is likely to cause some adverse impact on the environment and ecosystem of the area. Therefore, it is obligatory on the part of the Applicant to implement suitable control measures to mitigate the adverse impact of the various mining operations. After analyzing and study of the mining, it is found that the mining activity certainly will have little effects on the different environmental parameters as is evidenced in the earlier chapter. It is possible to control the deterioration of environment due to mining activity by adopting and monitoring few fixed practices as described in detail in this chapter. Climate The proposed Mining activities are not likely to contribute to any variation in the climate parameters of the region. The variations observed are on a regional scale and the control factors lie much beyond the small area considered for Mining. Hence, no management measures are needed and proposed. Air Environment The sources of air pollution in the region will be due to Mining and the related transportation activities. The meteorology of the area becomes an important parameter in environmental issues in the mining settlements. Suitable measures to protect the inhabitants and environment against the dust and fumes emanating from vehicular movements are required to be taken. The dust generated is from the mine haul roads and drilling/loading sites. It is proposed to take up mitigative measures in the form of sprinkling water in the sensitive areas and also create green belt along lease boundary to act as a dust barrier. The gaseous pollutants namely SO2 & NOx are below detection

12 12 level. As stated earlier the gaseous pollutants in and around the mine are well within the permissible limits. There is no likelihood of the concentrations exceeding the standards as there is very small quantity of dust emanating from the Jack-hammer drilling & blasting. There is no other factory or beneficiation unit in the Lease area. However, gaseous pollutants will be monitored as per the requirement. Dust Control The dust generated from Jack-hammer drilling is controlled by dust extractors; blasting dust will be controlled by muffling; dust from loading and transport operations will be controlled by water spraying. For these purposes water tanker fitted with sprayer will be used at haul road, etc. Sprinkling water on the roads by tanker will be practiced for dust suppression. Further the green belt proposed all round the Lease area will act as a dust filter and arrest the spread of air borne dust on to the nearby agricultural lands and villages. The office complex is also suggested to be surrounded by green belt, to arrest the spread of dust to the other locations. Noise Environment The haulage vehicles shall be maintained with proper lubrication, fitting of effective silencers and maintenance to reduce the noise. Workers are provided with earplugs to avoid the noise from the machineries. The proposed green belt around the lease area will help in reducing the noise level. Water Environment Water Consumption and Waste Water Management Water consumed for Consumption Discharge a) Domestic use b) Gardening. c) Industrial purpose KLD/day KLD /day 1.09(70%) NA NA Treatment units Provided Soak pit NA NA Final disposal point Land NA NA

13 13 It is proposed to use water for sprinkling over the roads for suppression of dust. The major source of water pollution in open cast mining is the surface run-off carrying the fine silt. The problem is prevalent mostly in rainy season. For this control measures by way of providing check-dams along the boundary of the project site & outside the Lease area, will be initiated and will be strengthened further. Lessee will also take up erection of retention walls along the dump toes, slopes & take up afforestation on the side of these retention walls to minimize the flow of silt. Drains will be constructed to channelize the water in loose soil areas to prevent erosion. Storm Water Management Check dams will be constructed to contain the surface run-off of the silt and sediments from the lease area during heavy rainy season. Garland drain around the mining will be made to divert the water from working areas. Land Environment The Dhanbad declaration on Environmental Management in Mining Industry states It is imperative that in order to ensure the continued and sustained progress of the mining industry in India, the environmental dimensions should be integrated into the planning, design, development, operation and working practices of quarry on scientific and rational lines, by the Governments and the industry in a mutually reinforcing manner. The land related Environmental Management Plan (EMP) has been presented here under two sections viz., Soil & Water conservation and Afforestation. Land Restoration/Reclamation Land restoration or reclamation of the area is very essential in any mining industry. Proper measures adopted during restoration will control most of the adverse environmental impacts of Mining and also improve the aesthetic beauty of the area. Due to the Mining activities in this area the profile of the ground will change due to formation of pits. At the end of the Mining operations, the pit will be rehabilitated. The pit will be

14 14 properly fenced and utilized as water tank for Agriculture as the Lease area is surrounded by Agriculture lands. Provision of Green Belt along the affected area Development of greenbelt around the project site-50 plants around the lease boundary, 25 plants along the approach road and 25 plants on the waste dump will be planted. The major pollutant is generation of dust. This is an effective way to check pollutants and their dispersion into surrounding areas. The degree of pollution attenuation by a green belt depends on its height and width, foliage surface area and density. The main objective of green belt is as follows: a. Mitigation of impacts due to fugitive emissions caused by vehicles b. Attenuation of noise levels c. Ecological restoration d. Creation of aesthetic environment Control on Soil erosion There is little or no soil production in the area. The soil, produced will be dumped along lease boundary on which plantation will be made Wild Life Protection: Presently, there are no wild animals spotted in the core zone. However, the practice of afforestation programme and other control measures shall bring greenery to the area and also the vegetation of mixed species and availability of water will form a natural habitat for these wild animals and helps in conservation of the flora and fauna of the area. Fencing & trenching of the lease area boundary shall be proposed as part avoiding entry of animals within the quarry/pits towards unauthorized entry & wild life protection.

15 15 Management of Socio Economic: As already explained in the earlier paras the mining industry will improve the economic status of the people and area. Continued Mining activities, will benefit the local people due to provision of more infrastructural facilities provided by the mining industry. Disaster Management Plan Disaster Management Plan is envisaged with a goal to prevent hazards and accidents at work places by careful design, operation, maintenance and inspection of the Mining machineries & equipments. All the Mining activities will be in accordance with the approved Mining plan and directives of Directorate General of Mines Safety. All the eligible employees will be sent to refresher courses from time to time on safety issues. The control measures will be adopted to take care of hazards/disasters that may occur during Mining operation. a. Safety awareness through competitions, posters & organizing safety weeks every year b. Fire fighting & first aid provisions will be provided in mines office & Applied lease area. c. All safety appliances to be made available to all the staff. d. Proper maintenance of haulage roads. Conclusions, Suggestions/recommendations To obtain Limestone & Dolomite an open castmanual Mining Method, will be adopted to operate the area. The annual production is about 10,000 tonnes/year of Limestone 30,000 tonnes/year of Dolomite. Loading of minerals is done manually. The suspended particulate matter getting airborne from the Mining activity gets dispersed in close proximity itself and settles down early. The noise levels due to the proposed Mining activity are also not of a higher order that calls for immediate corrective measures. There is positive socio-economic front in the surrounding region due to the proposed mining industry. The practice of afforestation scheme is a step in the right direction towards achieving ecological balance.

16 16 Suggestions/Recommendations Even though there is no perceptible impact from the Mining activity on the environment of the region, it is imperative that mitigative measures have got to be implemented on full scale for creating environmental balance and intern maintain the ecology of the region. The following suggestions/recommendations merit due consideration in this regard. As no control over wind can be exercised, the frequency of the dust suppression measures like constant watering of the haul roads shall be practiced. Afforestation as envisaged in the Mining plan is to be carried out so that it not only enhances the green canopy but also stop the spread of dust particles and air borne pollutants. Surface water conservation measures and groundwater recharge be given high priority. Environmental Monitoring-Financial Implications After an in-depth study of the Environmental Management Plan, the management may make estimates of expenditure on annual basis for the implementation of different environmental protection programme will be implemented as required. Capital Cost Sl.No. Activity Quantity Capital Cost/Yr.(Rs) 1 Toe wall for Dump 131m 2,62, Check dam for Dump 20m 40, Garland drain for Dump 200m 1,00, Garland drain around lease area 745m 3,72, Compound wall around lease area 735m 14,70, Siltation Pond 5x10m 1,00, Total 23,44,000-00

17 17 Recurring Cost Sl.No. Activity Quantity Recurring Cost/Yr.(Rs) 1 Afforestation/Green belt development 100 saplings 50, Water for Drinking, Dust suppression & Plantation 8.56KLD 8,56, Period Medical Checkup & PPE supplies Yearly 1,95, Environmental Monitoring Yearly 1,00, Fire Tracing & Fire Watchers Yearly 75, CSR Activities Yearly 1,00, Total 13,76, ************************

18 18 ENVIRONMENTAL MANAGEMENT PLAN FOR NAGANAPUR LIMESTONE & DOLOMITE MINE For M.L. No.2425 in 2.78 Ha, in Sy.No.76/2 Non-Forest, Patta Land, B-Category, Manual Mining, At Naganapur Village, Mudhol Taluk, Bagalkot District, Karnataka State of SMT. RAJESHWARI M. VIRAKTAMATH Lokapur

19 19 INDEX Chapter Contents Page No Project Details Present Environmental Conditions- Base Line Environment Environmental Management Plan LIST OF ANNEXURES 1 Environmental Monitoring Report

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Building Stone Quarry

Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

PROJECT PROPONENT : B.ASHOK KUMAR, S/O. B.SHESHANNA SHETTY, YESHAWANTHA NAGAR, SANDUR -583119, BELLARY KARNATAKA.

PROJECT PROPONENT : B.ASHOK KUMAR, S/O. B.SHESHANNA SHETTY, YESHAWANTHA NAGAR, SANDUR -583119, BELLARY KARNATAKA. BUILDING STONE QUARRY NOTIFICATION. No. DMG/DDH/QLS/NTN-17/2014-15/1659, EXTENT : 14.55 ACRES, SITUATED IN SY. No. 240 OF KALINGERI VILLAGE, SANDUR TALUK, BELLARY DISTRICT, KARNATAKA. PROJECT PROPONENT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

For Building Stone Quarry

For Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02. COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.09 PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED. PERIOD

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P) VILLAGE : DEVGAON TEHSIL : RITHI DISTRICT : KATNI MINERAL : SAND STONE KHASRA NO : 7 PART AREA : 2.00 HECTARE PRPOSED PRODUCTION: 800 M 3 /YEAR STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED UNDER

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.M.S.P GRANITES have granted quarry lease for Colour Granite over an extent of 16.56 Hectare in Sy. No. 01 of Kori Village, Parvathipuram Mandal, Vizianagaram District,

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P.

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P. VILLAGE : SALIYA BINEKA TEHSIL : BANDA DISTRICT : SAGAR MINERAL : CRUSHER STONE KHASRA NO : 270 AREA : 2.00 HECTARE PRPOSED PRODUCTION : 18000 M 3 /Year STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

About Pure Earth and the Toxic Site Identification Program

About Pure Earth and the Toxic Site Identification Program About and the Toxic Site Identification Program is a New York based not-for-profit organization that partners with governments, NGOs and community groups to solve life-threatening pollution problems in

More information