1 A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT
2 INDEX LIST OF CONTENTS CHAPTER DESCRIPTION PAGE 1. INTRODUCTION Background Legal Requirement Objective PROJECT DETAILS Project location Justification of Site Selection Land Capital Cost of Project Means of Finance DETAILS OF MANUFACTURING PROCESS List of Machinery Manufacturing Process RESOURCES CONSUMPTION Raw Material Power Water Fuel Consumption Manpower POLLUTION POTENTIAL Water Pollution Water Consumption & Wastewater Generation Air Pollution Hazardous Waste Generation ENVIRONMENTAL MANAGEMENT PLAN Water Pollution Air Pollution Fugitive Air Pollution Stationary Source Emission Noise Pollution Solid/Hazardous Waste Manangment Recurring Cost of EMP CREP Program CONCLUSION 10
3 CHAPTER - 1 INTRODUCTION 1.1 Background Mr. Padmaben Jayantibhai Oad is residing at Vill: Ghala, Tal: Kamrej, Dist: Surat, of Gujarat State from last 30 years. She is Sand Extractor. Now, She proposes to get renewal of lease for sand extraction from river pat of Tapi. For this, She has applied to Geologist Office at Tapi on dated: 28/01/2009 for getting lease of sand extraction from the river pat of Tapi for Hector land. She proposes to extract sand-400 MT/day. The lease holder believes in sustainable development and equally concern about environment preservation and pollution control. The lease holder proposes to provide adequate Environmental Management System to meet desired norms prescribed by the statutory authority. The details about the proprietorship of the lease is given in Table 1 Table 1: Details of Proprietor Sr. Name of the Proprietor Qualification Experience Designation (Years) 1. Mr. Padmaben Jayantibhai Oad 10 th Pass 7 Sand Extractor 1.2 Legal Requirement As per Environmental Impact Assessment Notification 2006 dated 14/09/06 and amended time to time, the project covers under activity 1 (a) of the Category B of the Schedule of the EIA notification. Therefore, this Project for Sand Extraction- 400 MT/day requires obtaining Environmental Clearance Certificate from SEAC. 1.3 Objective The lease holder requires to submitting Pre-Feasibility Report including details of proposed project along with its EC application. The objectives of the report are: A. To assess the feasibility of the proposed plant. B. To identify various sources of pollution and anticipate the impacts of the proposed plant on the environment during operation phases. C. To evaluate Environmental Management Plan to prevent and mitigate the adverse impact on environment due to the project. 01
4 CHAPTER Project Location PROJECT DETAILS The location of the site is at Tapi River Pat at Vill: Ghala, Tal: Kamrej, Dist.: Surat of Gujarat State. The site is 50 m away from river bank.it is at Tapi river pat at Ghala. It is toward village side river pat. As per detailed map of surveyor & a Google map, the lease holders apply to the concern Geologist for getting lease for The salient feature of the proposed plant site and study area is discussed here under: 1. Land Use of Plant Site (% Share) a) Type of land : River Pat( Hactors) 2. Minimum Distances from Plant Site a) Village : 1.40 km b) Railway Station : km c) Highway : S km d) Air port : km e) Sea Coast : Arabian km 3. Displacement of Population : Nil 4. Places of Interest within 10 Km radius from the Plant Site (if any) Sr Place Details Name Distance (km) & Direction from the a. Historical Place b. Archaeological Place c. Wildlife sanctuary No such places within the study area No such places within the study area No such places within the study area d. National park No such places within the study area 2.2 Justification of Site Selection plant site Not Applicable Not Applicable Not Applicable Not Applicable The proposed site of the Sand Extraction is selected by viewing the various factors. Some of the important factors are as follows: The proposed site is situated in stream of river Tapi having easy availability of sand as it is perennial river. Every year during flood in monsoon, it will recoup the site. It is seasonal business running from 15 th November to 14 June of every year. During flood days, work will be closed. Also, the activity will be carried out in day time only. Here we attached our site Google map with the co-ordinates. While mapping river width at our site, total width of the river is found 500 m. The depth of the river from river bank side to bottom of main stream found 12 m and from site is 9 m. Development of communication system is good in the region due to proximity to Surat city.
5 2.3 Land hectors of river pat land to be used for extraction of sand. A surveyor map is attached. A Google map showing site details with all coordinates is attached. 2.4 Capital Cost of Project Capital cost of the all lease will be of Rs. 12 lacs.this includes lease fees/royalty, machinery & manpower cost etc. all 2.5 Means of Finance: Lease holders own capital 03
6 3.1 List of Machinery: DETAILS OF MANUFACTURING PROCESS Sr. Equipments Qty. Capacity 1. Truck MT per trip( by volume) 2. Weigh Bridge 01 50MT 3. Boat with DDMP MTD of each boat 3.2 Manufacturing Process List of products: River sand- 400 MTPD, List of Raw Material : Dewatering of River mud 920 KLPD By-Product: 120 MTPD (Gravel) Sand Extraction Process CHAPTER 3 The lease holders will hire 06 nos of boat. Each equipped with 10 HP diesel driven mud pump to extract the sand from river pat of Tapi. The machines will Dewatered the mud -920 KLPD. out of 920 KLPD of mud water, 360 KLPD mud water will be return back to the river while 40 KLPD will be absorbed in sand and will evaporated. 120 MTPD gravel will be there while 300 MTPD sand will be received. 20 Truck having 2 trips per day (capacity-10mt of each) will be used per day to transfer 400MT of sand. After loading truck, it will goes to weigh bridge to weigh it. Then truck will be reached to actual users. The activity will be carried out in day time only. The work will be carry out in only off dry season. River mud Dewatering Screening Truck Loading by machine Truck Packing Weighing of Truck Transport Actual user 04
7 RESOURCE CONSUMPTION CHAPTER Raw Material: Dewatering of river mud- 920 KLPD 4.2 Power: Nil Work will be carry out in day time, electricity is not required. 4.3 Water 4 KL/day of water consumed for domestic purpose. No water requirement for process or utility 4.4 Fuel Consumption 120 liter per day of diesel will be consumed for operation of DDMP machines. 4.5 Manpower: The total manpower requirement for the proposed work will be 28. The break-up of manpower under different head is depicting as under: Table 8: Manpower details for proposed expansion Manpower Numbers Machine Operator 06 Helper 06 Watchman 01 Clerk/accountant 01 Management 02 Labour for loading of truck 12 Total 28 05
8 CHAPTER 5 POLLUTON POTENTIAL 5.1 Water Pollution The lease holder will Dewatered-920 KLPD of mud water from river stream. No utility water requirement.3.0 Kl/day water is required for domestic purpose. Only 3.2 Kl/day of sewage will be generated Water Consumption and Wastewater Generation Table 9: Water Consumption & Wastewater Generation Sr. Category Water consumption (KL/Day) Waste Water Generation/seepage of dewatered water (KL/Day) 1. Process Cooling Nil Nil 2. Domestic (sewage) Total Water Requirement (924 KL/day) Gardenin g Industrial(920) Domestic(4.0) Nil Process (920) Cooling (0.0) back to river 40 evp. Nil Drinking(0.8) Soak Pit (2.0) Figure 3: Water balance diagram for proposed operations 06
9 5.2 Air Pollution: During dewatering of river mud, there is moisture in sand. It may prevent air emission. Loading of sand will be carried out by labour only. Thus, there may not be fugitive emission. The moisture content of sand may prevent air emission. Over loading truck may leak the sand.poor body truck may leakage the sand. During transportation, there may be possibility of sand leakage. Rough road may cause leakage of sand. Combustion of diesel in DDMP may cause air pollution. Poor condition truck may cause air emission due to im-proper combustion of diesel. During passing of truck on rough road, may create dust emission. 5.3 Hazardous Waste Generation: Sr. Source of Waste Waste Quantity of Waste No Generation Category Type 1 Machinery 5.1 Used oil 200 Lit/Year 07
10 CHAPTER - 6 6,1 Water Pollution: ENVIRONMENTAL MANAGEMENT PLAN 920 KLPD of river stream mud water will be consumed, 360 KLPD of waste water generated, it will be return back to the river. No utility water consumption. Only 4.0 kl/day of domestic water consumption, it may cause to 3.2 KL/day of sewage generation. The temporary soak pit will be provided to discharge sewage. 6.2 Air Pollution: Fugitive Air Pollution: Sr. Sources Probable Exposure PM2.5 Microgm/ 01 Dewatering of river stream mud 02 Truck loading 03 Tran port of sand by truck Probable Exposure PM10 Microgm/m 3 Tolerance Limit PM2.5 Microgm/ m3 Toleran ce Limit PM10 Microg m/m3 Mitigation Measures m3 <60 < Due to moisture, no fugitive emmition in this process. <60 < Over loading is to be prohibited. Closed Body truck is to be used having provision to cover top by talpatri or kantan to prevent leakage. Dust mask is provided to the workers. <60 < Stabilized road will be provided. Over loading is to be prohibited. Closed Body truck is to be used having provision to cover top by talpatri or kantan to prevent leakage. Truck will be well maintained.dust mask is provided to the workers Stationary Sources Emission: Sr. Sources 01 Exhaust of DDMP Due to combustion of diesel 02 Truck Due combustion Diesel to of Probable Exposure SPM Probable Exposure SOx Probable Exposure Nox Tolerance Limit Mitigation Measures <150ppm <100ppm <50ppm SPM- By using good 100ppm quality diesel and by Sox extending exhaust 100ppm Nox beyond top of body of m/c <150ppm <100ppm <50ppm 50ppmy By using twell maintained truck and by providing smoke arrestor on silencer of truck 08
11 6.3 Noise pollution: Sr. Sources Probable Exposure (dba) Tolerance Limit Mitigation Measures 01 Dewatering of river in day Ear plug is to provider to m/c operator and stream mud by DDMP helper 02 Truck loading in day Ear plug is to provider to m/c operator and helper 03 Tran port of sand by truck in day Ear plug is to provider to truck operator and helper 6.4:Sold/Hazardous waste management: 200 liter per year of used oil from the machine will be generated. This will be sold out to MOEF recyclers only 6.5 Recurring cost of EMP: Rs lakh will be allotted to make road stabilized, to provide PPE to the workers. 6.6 CREP program: We will provide free of sand to village panchayat for making school room, temple etc, Also, we will provide stationery to the nearby school for student. We will help nearby villager to clean out drain of village 09
12 CONCLUSION CHAPTER 7 Looking to: The size of project No ecological sensitive like national park / wildlife sanctuary, reserve forest area within 10 Km redial distance from the project site. No any displacement of population (R& R) due to proposed project. Sand as product & river mud as raw material. River stream to be used. Extraction & erosion of river due to activity may be recoup by every year in monsoon by flood. No underwater extraction beyond 3 meter depth. Only seasonal activity to be done. Only day time activity to be carried out. No water pollution potential, Mitigation measure suggested for stationry & fugitive emission. The site is away from habitation. we pray to SEAC to consider our project as Category-B2 and may grant EC. 10
PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
More informationPRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:
More informationPRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
More informationHow To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationProject Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
More informationTERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
More information2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1
More informationENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
More informationTOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
More informationPROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
More informationM/s. Karshanbhai Bhagvanbhai Rabari
PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationEnvironmental Management Plan
Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease
More informationCompliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter
More informationThe Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
More informationEnvironmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
More informationFinal Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationProject Details - Riverbed Sand Mining Project
Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hansmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. Hansmukhbhai Shambhubhai
More informationTERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
More informationForm -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri
More informationProject Details - Riverbed Sand Mining Project
Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hasmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. HASMUKHBHAI SHAMBHUBHAI
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
More informationAPPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
More informationFORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353
FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,
More informationCHANDAM7AIL,P SAND DEPOSIT
1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub
More informationBirmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
More informationPrepared and Submitted by
Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &
More informationEnvironment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
More information(IV) Proposed Terms of Reference for EIA Studies
ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project
More informationTERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
More informationENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
More informationConstruction Specification for Sewer Bypass Flow Pumping
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 4.01 April 2013 Pumping Table of Contents TS 4.01.01 SCOPE... 2 TS 4.01.02 REFERENCES... 2 TS 4.01.03
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
More informationAnnexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust
Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT
More informationENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
More informationM/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
More informationIntegrated waste management system for the reuse of used frying oils to produce biodiesel for municipality fleet of Oeiras
LIFE ENVIRONMENT Programme Integrated waste management system for the reuse of used frying oils to produce biodiesel for municipality fleet of Oeiras Project co-funded by the LIFE Environment programme
More informationEnvironmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
More informationProposed (Concrete Cutting And Drilling) Environmental Management Plan
SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part
More information1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance
Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )
More information12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
More informationEnvironment Situation in Timor-Leste
Environment Situation in Timor-Leste Historically; 1. East-Timor or Timor-Leste, the Portuguese name of the country. 2. It was colonialised by Portuguese 450 years and Occupied by Indonesian 24 years.
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationPre-feasibility Report
1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.
More informationRISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,
More informationHistory of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
More informationRISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning
More informationPROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
More informationCivil Engineering Sector Labour-Management Health and Safety Committee
PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION
More informationAPPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
More informationProposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
More informationTAMIL NADU POLLUTION CONTROL BOARD FORM I
TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu
More informationThe Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery
More informationTERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
More informationBHARAT PETROLEUM CORPORATION LIMITED
TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION
More informationEnvironmental and Social Monitoring Report
Environmental and Social Monitoring Report Project Number: 44932-054 July 2015 INDIA: 145 MW Grid Connected Solar Project Sand Land Real Estate Private Limited Safeguards Monitoring Report (April 2013
More informationForm -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli
More informationU l t i m a t e e f f i c i e n c y D re D ging
1 Ultimate efficiency Dredging We have a deep attitude. 2 Ultimate efficiency 3 Growth of global population, tourism, transportation of people and goods together with increased awareness of the need to
More informationEnvironmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
More informationUse of Substitute Fuels in Large Combustion Plants (LCPs)
Use of Substitute Fuels in Large Combustion Plants (LCPs) By Pat Swords Content of the Presentation What are substitute fuels What is the experience to date with these fuels What are the regulatory implications
More informationWaste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone
More informationAPPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
More informationENVIRONMENTAL IMPACT ASSESSMENT REPORT
ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and
More informationQ 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.
Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some
More informationProject Details-Minor Minerals ( Rajula Building Stone)
Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,
More informationState of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015
State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions
More informationDisposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets
Disposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets Working in partnership with: Blank inside front cover page Best Management Practice for Catering Outlets Fat,
More informationSir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents
F. No. J-11011/218/2013-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:gkk37@rediffmail.com Tele fax:
More informationIngredion ANZ Pty Ltd
Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)
More informationA Truck Driver s Guide to Care and Maintenance of Diesel Particulate Filters (DPFs)
A Truck Driver s Guide to Care and Maintenance of Diesel Particulate Filters (DPFs) Disclaimer: This handbook is not a substitute for the detailed instructions/warranty limitations supplied by the manufacturer
More informationDocument No. 2015-207
Henan Province Environment Assessment Center Document No. 2015-207 Technical Review Report on Gushi Biomass Power Project-Environment Impact Assessment Report Henan Province Environment Protection Bureau:
More informationEnvironment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
More informationMBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
More information