Project Details-Minor Minerals (Other Than Sand)
|
|
- Lisa Fox
- 8 years ago
- Views:
Transcription
1 Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey No. 418/p (GKQL-7563/5551 to 5557), At: Vandh, Tal: Mandvi, Dist: Kutch, State: Gujarat. 3. Lease Area (Hectares) ha 4. Ownership of Land (Gove./Private land) Government Land 5. Status of operation (New project OR Existing project operating since ) Existing project since Status of Lease (Lease no., date of issue, lease GKQL No.: 7563/5551 to 5557, Date of issue: 29/11/2002, 6. period, date of application for lease renewal, Lease period.: 05 Years, Applied for renewal: 10/10/2007, etc.) Applied Lease period: 10 Years 7. Name of mineral to mine Bentonite 8. Mineral Reserve (MT) 1,80, MT 9. Rate of mining of mineral (MT/Month) 1250 MT/Month 10. Life of Mine (Years) years. 11. Whether project involves forest land? If yes, status of application for diversion of forest No the project does not involve any forest land. land. 12. Applicability of the CRZ Notification, 2011 Not Applicable ENVIRONMENT SETTINGS 13. If located within 15 km, aerial distance of the lease area from the nearest: i. Water body : Name Rukmavati River Vijay Sagar Dam Distance (Km) Direction ii. National park/wildlife Sanctuary/Biosphere Reserve: iii. Reserve Forest/protected forest: iv. Human Habitation: Vandh 1.70 NNW v. Railway Line : vi. Road: Mandvi-Bhuj state highway 7.00 SE vii. Notified/Protected Archaelogical sites: viii. Social infrastructures, e.g. school, hospital, historic / cultural / religious places, defence establishments, etc.: Dhunai Hospital Gangapar Prathmik Shala Shree Ram Mandir NE SW NE LAND USE PATTERN The land use for mining and allied purposes is as given below: Area Detail Present land use After III year E NEE 14. Present land use of lease area Lease Area ha ha OB Storage Area Green belt Area Open margin Area Area within the quarry lease area of mine (within: ha) Area within the quarry lease area of mine (within: ha)
2 Internal Road Area Loading Unloading Area Total Plot Area ha ha Pls. refer prefeasibility study report pg. no Geo-hydrological features Underground water level in this area will not intersect. Pls. refer Annexure no. 5 & Annexure no Predominant wind direction Endemic and endangered species of flora and No endangered species of flora and fauna found within 5 fauna, if any, in the area km radius. The project site is well connected with all infrastructures like National Highway, Railway, Airport, Telephone, Internet, Fax, Post, etc. Access Road Status & its Map Status of Access road Type Width of road Main Road 18. Width and condition of access road (kutcha / NH 8A Pucca pucca) to the lease area. (Bitumine) Meter Mandvi-Bhuj State Highway Pucca (Bitumine) Meter Internal Road From Mandvi-Bhuj State Pucca Highway to Vandh Village (Bitumine) Meter From Vandh Village to Kutcha Mining site Meter Pls. refer prefeasibility study report pg. no. 10. DETAILS ON MINING / EXCAVATION ACTIVITIES 19. Requirement of power supply and its source There is no requirement of power. WATER AVAILABILITY & ITS SOURCE SOURCE OF WATER: Dust suppression & tree plantation: Surface water from nearby abandoned mine. Domestic: By tanker water (Nearby agriculture farm/villages). 20. Requirement of water supply and its source WATER BALANCE DIAGRAM: The water consumption & generation at the different usages is as under: Category Water Consumpti on L/DAY Waste Water Generation L/DAY (a) Tree Plantation 200 NIL (b) Domestic (5 x 45 l/day) (c) Industrial: Other (Dust suppression) 1000 NIL Total (a + b + c)
3 Type of mining (Manual/Semimechanized/mechanized). Equipment s to be used (buidozers, hydraulic excavators, JCB, scrapers, loaders, etc.) Details of method of working with phasing operations) Pls. refer prefeasibility study report pg. no. 8. Semi-mechanized / Manually Excavators, trucks/trippers METHOD OF MINING Within lease area, excavation will be carried out by excavation machine and kept it at identified place for natural drying. After removing measure moisture content (Duration of drying-15 days) the dried material is unloaded in a truck/tractor, covered it by tarpaulin cover, weigh it and sell to processing units for its further process to convert it in a suitable product/ raw material. Each truck will be loaded till capacity reached as per R.T.O rules. Frequency of mining will be carried out based on order available and some reserve stock of Bentonite will be also kept at site. Loaded truck will be checked, weighted and dispatch to client for sale. Maximum 2-5 trucks will be kept at site for quick delivery. No activity will be carried out in night and during rainy season. Method of mining is describe in phase vise is described in prefeasibility study report pg. no Explosives, detonators to be used No explosive materials utilized. 25. Details of drilling, blasting N.A. 26. Safety measures at the time of blasting N.A. 27. Details of Over Burden (OB) removal and stacking 28. Height and width of benches and side slope Road slope is 1:3 29. Depth of ground water table (meters) meter OVERBURDEN Overburden is removed during surface mining; it is not contaminated with toxic components and is used to restore an exhausted mining site. Mine over burden had been kept on one side in such a way that the top soil is preserved for use in future for back filling with over burden and plantation over top soil. The mine over burdens is being back filled fully in part of the mine sites to avoid heaps of such materials on one hand and depression due to mining on other hand. Storage of overburden will be kept on periphery of excavated area to prevent fall of unauthorized entry/animals and run off rain water. Stack height of OB storage will be less than 9 meter. Methods of OB storage & removal of stacking is described in prefeasibility study report pg. no. 6.
4 30. Maximum depth of working (Meters). Whether it will intersect ground water table? Maximum depth of working: meter 31. Land use pattern of the lease area Per Post Sr. Particulars Operational Operational No phase(ha) phase(ha) 1 Pits ha ha Dumps/Mineral 2 Stack 3 Plantation 4 Road/Building 5 Bake filled 6 Remaining 7 Water 32. Man power requirement 5-6 people 33. No. of working days in a year Time of working hours in a day 9 a.m. to 6 p.m Measures proposed for protection of environmental attributes like and water, air, human health, etc. Measures for control of noise, vibration due to blasting Area within the total plot area of mine (within: ha) Area within the total plot area of mine (within: ha) Water is utilized for dust suppression for 2-3 months till end. Total ha ha WASTEWATER MANAGEMENT: Domestic wastewater disposed into underground soak pit system within premises having capacity of 1 m 3. AIR POLLUTION MITIGATION MEASURE Overburden material will be stacked at lower height & at identified place. Regular water sprinkling is carried out. During loading & unloading regular water spraying will be carried out. Water spraying of haul roads and other roads at regular intervals. Regular water sprinkling & strengthening of road will be carried out to avoid dustiness due to vehicular transportation. Provision of dust filters / mask to workers. All trucks are well covered by tarpaulin sheet. Provision of green belt all along the periphery of project site as well as along the road side leading to pucca road. Lying of haul roads as per the standards, black topping of permanent haul roads and service roads to avoid or eliminate air borne dust. Speed of the vehicles should be maintained within the prescribed limits. Trucks will not be over loaded and should be maintained to the body level. Condition of all trucks will be well maintained & its lubrication & maintenance records will be kept. Old age trucks will not be utilized. Only P.U.C. certified vehicle will be used No Industrial wastewater will be generated. Pls. refer prefeasibility study report pg. no. 8 & 13. CONTROL MEASURES OF NOISE: Proper maintenance of machinery, equipments and improvement on design of machines.
5 Plan for managing storm water. Details of garland drains to be provided Plan for managing dust, noise, silt and other pollutants during mining activities Details on transportation route & measures proposed for control of fugitive emission during transportation 40. Plan for post mining use/ reclamation of pits. Personal protective devices i.e., earmuffs and earplugs will be provided to workers. All vehicles which create high noise will be avoided. Creation of wide green belts of dense foliage between mine areas. Proper maintenance, lubrication and tuning of machinery would be ensured. The greenbelt with species of rich canopy around the lease area and along the roads will further attenuate the noise levels. Mining activity will be restricted to day time only. Conducting periodical medical check up of all workers for any noise related health problems Proper training to personnel to create awareness about adverse noise level effects. Planned noise monitoring at suitable outside location for proper effective remedial actions. No blasting activity is carried out. For control of noise pls. refer prefeasibility study report pg. no. 14. PLAN FOR MANAGING STORM WATER: Generally mining is not carried out during monsoon while mine is filled by storm water. Floor area of mine will be kept tapered to runoff stormed water at lower level. Storm water will be stored at this one deep corner of lower level lease area Mine is dewatered by means of pumps after monsoon is over for its further reuse in water sprinkling & tree plantation purpose. Storage of over burden will be kept at periphery of mine area to prevent surface water runoff into mines and divert it in to nearby natural drain Pls. refer prefeasibility study report pg. no. 8. For managing dust, silt and air pollutant mitigation measures, plan is described in serial no. 35. For managing noise pollutant mitigation measures, plan is described in serial no. 36. Pls. refer prefeasibility study report pg. no. 12 & 14 For transportation route & its measures proposed for control of fugitive emission during transportation, plan is described in serial no. 18 & 35. Pls. refer prefeasibility study report pg. no. 10, 12 & 14. The abandoned mine sites shall be made fully secured with wire fencing or any such methods to avoid falling of animals and loss of lives when site is full of water harvested during the rainy seasons. Appropriate signage, security and protection measures shall be provided. The mine over burdens is being back filled fully in part of the mine sites to avoid heaps of such materials on one hand and depression due to mining on other hand. Proper leveling and adequate plantation shall have to be done. Preferably locally predominant species shall be
6 Provision of fencing the pits in case of use as water reservoir. Plan for green belt development, area of green belt, no. & types of species to be planted and budgetary outlay for the same selected for plantation. Adequate slopes shall be maintained to ensure that the animals, people can come out without any problem if they reach by chance or fall in abandoned mines. The post mining study for water quality and ecosystem degradation or improvement, shall be carried out to establish the relations and learning the lessons for future (if require & suggested by SEAC committee). The possibilities shall be explored to utilize the old mines for various purposes such as underground storage facilities, solid waste disposal areas, etc that can be beneficiary to the society. Pls. refer prefeasibility study report pg. no. 17. Not applicable. Pls. refer post mine plan detail in prefeasibility study report pg. no. 17. In order to mitigate the air pollutants and improving the ecology and the aesthetic of the area, unit will develop a green belt at periphery of project premises. Special care will be taken during planting the trees, their type and density. Local spices growing in this area will be planted within periphery of premises and on both side of road. Pls. refer prefeasibility study report pg. no. 20.
7 COMPLIANCE TO CHECKLIST FOR PROPOSED MINING PROJECT SEEKING ENVIRONMENTAL CLEARANCE 1. Category/Sub category & Schedule 1(a), Cat: B 2. Form I Form I 3. Pre-feasibility report Attached 4. Proof of ownership of land Enclosed as Annexure 1 (Copy of 7/12, and/or Power of Attorney) 5. Area survey plan Enclosed as Annexure 2 6. Google images/access Road Map /Panoramic view of the site 7. Letter for Distance of the mining area from the nearest human settlement For Google Images pl. refers feasibility study report, Pg. No. 4 to 5 and For Access Road Map pl. refers feasibility study report, Pg. No. 10 Enclosed as Annexure 3 8. Is the mine lease area less than 5 Ha Yes. Land Lease Documents are enclosed as per Annexure 4 (Copy of Lease deed & N.A.) 9. Production & Manufacturing Process Pl. refers feasibility study report, Pg. No Facilities for storage of goods or material, Pl. refers feasibility study report, Pg. No. 7 Explosive License 11. Water & wastewater management Pl. refers feasibility study report, Pg. No Air pollution detail & its Management Plan Pl. refers feasibility study report, Pg. No Noise impact assessment Pl. refers feasibility study report, Pg. No Solid & Hazardous waste generation and its Pl. refers feasibility study report, Pg. No. 15 management 15. Geology of the area Enclosed as Annexure Hydrology indicating water bodies and Enclosed as Annexure 6 ground water conditions 17. Land use pattern Pl. refers feasibility study report, Pg. No Details of over burden removal and stacking Pl. refers feasibility study report, Pg. No. 2 & Plan for managing storm water. Pl. refers feasibility study report, Pg. No Plan for labor and safety of the mining area Risk of contamination of land/water during Operation & its Mitigation Pl. refers feasibility study report, Pg. No About post mine plans Pl. refers feasibility study report, Pg. No Environment Management Plan Pl. refers feasibility study report, Pg. No Environment Monitoring Plan Pl. refers feasibility study report, Pg. No. 22
8
9
10
11
12 ANNEXURE-3
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34 ANNEXURE-5 GEOLOGY OF AREA MINING SITE
35 ANNEXURE-6 HYDROLOGY OF AREA MINING SITE
36
37
38
39
40
41
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
More informationENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
More informationPRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:
More informationProject Details-Minor Minerals ( Rajula Building Stone)
Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist
More informationPRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
More informationPRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
More informationCHANDAM7AIL,P SAND DEPOSIT
1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING
More informationProject Details-Minor Minerals (Sand Stone)
Project Details-Minor Minerals (Sand Stone) Sr. Details Particulars No. PROPOSAL 1. Name of Lease Holder MANSUKHBHAI CHIKANBHAI KALADIYA 2. Location Address Sand Stone mining at Survey no:- 503 Paiki,
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
More informationM/s. Karshanbhai Bhagvanbhai Rabari
PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,
More informationProject Details-Minor Minerals (Black Trap)
Project Details-Minor Minerals (Black Trap) Sr. Details Particulars No. PROPOSAL 1. Name of Lease Holder AMITBHAI JESABHAI GORIYA 2. Location Address Black Trap mining at Survey no:- 209 Paiki, Village:-
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationEnvironment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
More informationHow To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
More informationEnvironmental Management Plan
Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease
More informationEnvironmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
More informationProject Details - Riverbed Sand Mining Project
Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hansmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. Hansmukhbhai Shambhubhai
More informationRISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,
More informationRISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,
More informationProject Details - Riverbed Sand Mining Project
Project Details - Riverbed Sand Mining Project Sr. No. Details Particulars PROPOSAL 1. Name of Lease Holder Mr. Hasmukhbhai Shambhubhai Khunt (Proprietor) 2. Location address M/s. HASMUKHBHAI SHAMBHUBHAI
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
More informationENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
More informationAPPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
More informationEnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
More informationForm -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
More informationTERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
More informationEnvironment Impact Assessment study:
(A) Environment Impact Assessment study: 1. Pollution Potential: Air Emission: Dust Emission during Mining, Transportation & Crushing of the Stones which will be controlled by water sprinkling and development
More informationAPPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT
More informationFORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353
FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,
More informationENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
More informationPROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone
More informationENVIRONMENT MANAGEMENT PLAN
1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and
More informationRISK ASSESSMENT. STONE QUARRY (2.40 Ha)
RISK ASSESSMENT FOR STONE QUARRY (2.40 Ha) Gat no. 85, A/p Karanjvihire, Tahsil Khed, District Pune, Maharashtra OF M/s Shankar Ramchandra Earthmovers Pvt. Ltd. Risk Assessment for Stone Quarry Mining
More informationFinal Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
More informationFauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.
Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationTERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT
More informationForm-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &
Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50
More informationBASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS
2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?
More informationCOMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.
COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.09 PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED. PERIOD
More informationForm -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationPRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan
More informationThe Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
More informationAppendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN
Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT
More informationTERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
More informationENVIRONMENTAL MANAGEMENT PLAN
Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA
More informationForm-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI
Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS
More informationAPPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details
1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity
More informationPROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a
1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to
More informationPre-feasibility Report
1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.
More informationTERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
More informationForm 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu
Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance
More informationAPPLICATION FOR ENVIRONMENTAL CLEARANCE
APPLICATION FOR ENVIRONMENTAL CLEARANCE CREATIVE ENGINEERS & CONSULTANTS NABET ACCREDITED, NABL ACCREDITED TESTING LABORATORY& ISO 9001: 2008 CERTIFIED COMPANY 9B/4, BHARATHWAJAR STREET, EAST TAMBARAM,
More informationSolid Waste Treatment Facility Solid Waste Permit Application
Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR
More informationS/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).
RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year
More informationAPPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra
More informationTHE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
More informationPre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report
More informationSTANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite
STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the
More informationM/s Gokul Stone Industries
Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance
More informationTOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
More informationBuilding Stone Quarry
ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01
More informationBHARAT PETROLEUM CORPORATION LIMITED
TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION
More informationABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation
More informationProject Details Minor Minerals
M/s.Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya Survey. 24/ 4 paiki Vill. Miyani, TAL: Porbandar, Dis. Porbandar. Mo.. 9825919283 To. State Level Expert Appraisal Committee, Paryavaran Bhavan,
More information2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationFor Building Stone Quarry
ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE
More informationForm-I for seeking clearance for project attracting CRZ notification
Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under