1 PRE FEASIBILITY REPORT. 23

2 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary Introduction of Project and Background Information Project Description Site Analysis Planning Brief Proposed Infrastructure Rehabilitation & Resettlement Project Schedule Analysis of Proposal 43 24

3 EXECUTIVE SUMMARY Particulars Details Location Tehsil Pahari, Distt Bharatpur, Rajasthan Total lease area 1.0 ha. Mineable Reserves 5,89,106 MT Capacity Proposed production 1,14,057 TPA (ROM) Life of Mine 5 years Ultimate depth of mining 184 Estimated project cost 30.00/-lacs EMP Cost 50,000 DG Set N.A. Highest and Lowest Elevation Almost Undulated having elevation mRL Land use Govt. Waste land Nearest Habitation/ Town Chinawara 1.5 km By Road Nearest Airport Gurgaon 100 km By Road Nearest Highway SH-13, 8.0 Km & SH-22, 5.5 Km from the lease area Nearest Railway Station Deeg 50.0 km by Road Power Supply Chinawara Nearest Dispensary and Govt. Hospital is at Pahari. Hospital Educational Facility Primary School is at Chinawara and Higher School is at Pahari. Nearest Telephone Facility Chinawara Water Demand and Supply 4.0 KLD, Source: through Water Tanker Nearest Tourist Places None within the study area Defense Installations None within the study area Archeological Features None within the study area Ecological Sensitive Zones None within the study area Nearest Streams/ Rivers/ -- Water Bodies (from mine boundary) Seismic Zone Seismic zone II. 25

4 1. INTRODUCTION OF PROJECT /BACKGROUND INFORMATION Mining project for Masonry Stone with M.L. No. 658/2004. The project is located near village Chinawara, Tehsil Pahari and District Bharatpur, Raj. Lease area 1.0 hect. Proposed production 1,14,057 TPA (ROM). 2.1 Identification of the project and project proponent Name of the Project Name of thelessee Location of the project Near Village Chinawara Tehsil Pahari, Distt Bharatpur (Raj.), Proposed Production 1,14,057 TPA (ROM). Lease Area 1.0 ha. (Govt. Waste land) Mob. No Status of the Firm An Individual 2.2 Brief description of the nature of the project: Grant Order has been issued on dated 16/02/2006 having vide letter no in the favor of Sh. Rujdar Khan and transferred on Dated 22/04/2015 having vide letter no in favor of.(annexure 1) Nature of the Project: Mining of Masonry Stone is Proposed in the Lease Area 1.0 Ha. (Govt. Waste land) which will be done by Open cast semi-mechanized method of mining, Near Village Chinawara, Tehsil Pahari, District Bharatpur, Rajasthan. Proposed Production is 1,14,057 TPA(ROM). 2.3 Need for the project and its importance to the country and or region: The Mining project falls in the area of the district Bharatpur, Rajasthan devoid of sufficient agriculture activities and other industrial growth. The earning sources of the region are limited. The region has scarcity of water. Mineral wealth of the state Rajasthan provides the employment opportunity to the people of the state. Mining is one of the major core 26

5 sector industries which play a crucial role in the process of country economic development. 2.4 Demands-supply gap: The demand of building Masonry Stone depends on the level of development and the rate of growth of the economy. However, there is a persistent demand for this commodity. Rajasthan being the largest producer is an important Masonry Stone producing state of India. It is useful for building Stone Material Etc. 2.5 Imports vs. Indigenous Production There will be no import for the project. There will be indigenous inputs in the entire mining activity. 2.6 Export Possibility The mining activity is not prospecting exports. 2.7 Domestic/Export Markets Lessee would like to sale out the mineral in domestic market as per requirement. No export is proposed. 2.8 Employment Generation (Direct or Indirect) The mining project will generate direct & indirect employment. About 16 people will get direct employment and 2-3 people will also be affected indirectly and employed with allied and related industries, such as transportation, maintenance, etc. 27

6 3.0 PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects: The proposed project is mining unit of Masonry Stone in the area of 1.0 ha. Situated at N/v-Chinawara, Tehsil Pahari & District Bharatpur, Rajasthan. Proposed Production is 1, 14,057 TPA (ROM). No Interlinked or Interdependent project. 3.2 Location (Location map & Key plan is attached as Plate no. I & II respectively). Village : Chinawara Tehsil : Pahari District : Bharatpur State : Rajasthan The entire project area is 1.0 hectares. (Govt. waste land). The highest elevation of the lease area is 237mRL and lowest being 210mRL. 3.3 Details of Alternate Site Considered and the Basis of Selecting the Proposed Site, Particularly the Environmental Considerations Gone Into Should Be Highlighted: Mining is site specific project hence no alternate site is considered. 3.4 Size/Magnitude of Operation It is proposed to produce 1, 83,333 TPA (ROM) of Masonry Stone from the area of 1.0 hectares by Open cast semi-mechanized method of mining. 3.5 Project description with process details: It is a mining project of Masonry Stone from the lease area 1.0 ha, situated at near village Chinawara, Tehsil Pahari, District Bharatpur, Rajasthan. Proposed production is 1,14,057 TPA (ROM).The material generated from this mine will be used mainly as building stone for construction. 28

7 LOWEST LEVEL ULTIMATE DEPTHOF MINING WATER TABLE 190mRL 184mRL (6m bgl) mRL (20-25m bgl) Ground Water Table Proposed working will not intersect Ground water. Proposed Mining Method The Masonry Stone Mine shall be developed by Semi-Mechanized open cast mining by forming benches each of 6m height 3m width in a four pits. The masonry stone is being broken by blasting. This broken material is further drilled by jack hammer and then blasted to form masonry stone lumps which are being loaded by excavator into the hired trucks/dumpers. Extent of Mechanization Type of Machinery Nos. Capacity Excavator 1 L & T Compressor 1 Atlas Copco Drill Machine 1 Atlas Copco Tractor 4 Ford Dumper 4 Ashoka Leyland Loading Equipment JCB are available in the area on hire basis. Haulage and Transport Equipment 29

8 Haulage of the Masonry Stone within the mining area will be done by small excavator. Transport from mine head to destination Transport from mine head to destination will be done by the trucks. Source-Approved Mining Plan Production/Year Per Year ROM in volume Rejected (Tones) First Year 25,851 Nil Second Year 54,031 Nil Third Year 70,993 Nil Fourth Year 94,392 Nil Fifth Year 1,14,057 Nil Total 3,59,284 Nil Source-Approved Mining Plan 3.6 Raw material required along with estimated quantity, likely source, marketing area of final products, mode of transport of raw material and finished product: Raw material i.e. Masonry Stone will be produced by Opencast Semi Mechanized method of mining, proposed production is 1,14,057 TPA (ROM); it will be transported to users by using trucks. 3.7 Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. Not applicable. 30

9 3.8 Availability of water its source, energy/power requirement and source : The total water requirement for the project is estimated 4.0 KLD. Water for mining operation (dust suppression) and for domestic & drinking purpose will be arranged from tube well and Water Tanker. Sr. No. Purpose Total Requirement (KLD) 1 Dust suppression Drinking Green belt 1.00 TOTAL 4.0 Diesel for tippers/equipment about 180 Lt. per day is assumed to be consumed. Diesel will be brought from outside, from nearby diesel pumps. 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management /disposal: There is no top soil in the area. As there is no generation of waste, (5% of total minable reserve is considering as mining loss i.e. while transportation & loading) hence no waste rock management required Schematic Representations of the Feasibility Drawing Which Give Information of EC Purpose: 31

10 Prepared by M/s Udaipur Min-Tech. Pvt.Ltd 32

11 4.0 SITE ANALYSIS 4.1 Connectivity Connectivity Details from Project Site: Sr. No Particulars Details The village Chinawara, nearest population center is 2.0 km away from the lease area & it is connected with other important towns and cities through a good network of roads with regular public transport Road services. The Tehsil Headquarters of Pahari is at a distance of 16.0 Connectivity km by road & District Headquarter Bharatpur is km connected by road. The nearest railhead is at Deeg at a distance of 55.0 km from lease area. Nearest SH-13 at about 8.0 km Highway SH-22 at about 5.5 km Nearest Railway The nearest railhead is at Deeg at a distance of 50.0 km from lease area Station The nearest civilian airport for regular commercial flights is at Nearest Gurgaon the road distance from the lease area is around 100 Airport km. 4.2 Land form, land use and land ownership The lease area under mining lease is a Undulated ground. The highest elevation of the area is 237mRL and lowest elevation is 210mRL. Type of Land Area in Hectares Govt. Waste land 1.0 Total:

12 4.3 Topography The lease area is a Govt. Waste land. In general the area is having Undulated topography. There is no nalla flowing within the area. There is no village or human settlement in the lease area. The rain water spread out in the area & nearby areas. The highest contour in the area is 237mRL and lowest is 210mRL. 4.4 Existing Land use Pattern The lease area is Govt. Waste land (1.0 hect.). There is no village or hutments within the lease area. Existing land use pattern is given as below: Sr. No. Particulars Pre-Operational A) Mining Activity 1 Pits Top Soil Storage Dumps Road Mineral Stack Infrastructure Plantation Reclamation & 0.00 Plantation Backfilled 9 Water storage 0.00 B) Remaining Virgin. Land Total area 1.0 Hect. 4.5 Existing Infrastructure: All necessary infrastructures will be developed before mining operation commenced. Site services as per Mines Rules 1956 will be developed. First-Aid station with all necessary medical facilities, Toilets as per the provisions of Mines Rules will be developed. Regular medical checkup of the mine employees will be carried out as per the provisions of Mines Rules

13 4.6 Soil classification: The Soil of the Bharatpur District are grayish brown and yellowish Brown with wide variation in texture from sandy loam and clayey loam. The Soils at some palaces are affected by salinity/alkalinity. The soil of Bharatpur Bayana and Deeg Sub division are fertile. In northeastern part of the district, the soils are compact and have low permability, which causes water to stangnat on the surface during rainy season. Regional geology & local geology: a) Regional geology:- The regional Geological settings of Bhartpur District show a wide variety of rock type belonging to the Delhi Super group of Middle Proterozoic age. The rock formations which outcrop in Bhartpur District are mainly Calc Gneiss, Quartzite, Amphibolites, Mylonite, Dolomite, Migmatite, Gneisses, Cal schist, marble, mica schist etc. The regional Geological Sequence of the region as described by Geological Survey of India, Miscellaneous Publication No.30, Part 12, 2 nd revised edition is as follows: Super group Group Age Lithology Recent Soil, Sand dunes Post Delhi Pegmatite, Granite Delhi Super Ajabgarh/ Kumbhalgarh Lower- middle Muscovite-Biotite Group, Quartzite, Group Group Proterozoic amphibolites, mylonite, dolomite, migmatite, gneisses, Calc Gneiss, Cal schist, marble, mica schist, calcite, Alwar- Gogunda Group Biotite schist, Calc Biotite schist, Quartzite 35

14 b) Local Geology Massive Quartzite is outcropping in the entire mining lease area. Most of the part of Quartzite is weathered and fractured. Geologically the Massive Quartzite in the mining lease area belongs to Delhi Super group. The stratigraphic sequence of the litho unit present in the area is as follows:- Recent &sub recent - Alluvium & blown sand Delhi Super Group Ajabgarh Group Massive Quartzite Surface geological mapping has been done on a scale of 1:1000 and geological cross section and long section is prepared accordingly. 4.7 Climatic details The area is characterized by semi arid with an average annual rainfall of about 657 mm, which is mainly received during monsoon season of June to September. There is a large variation of temperature in the area. The minimum temp. recorded as 1.4º during winter whereas maximum temp. recorded during summer is 47º C. General wind direction is south west to north east. 4.8 Social Infrastructure The infrastructure like, toilets, first aid stations etc. will be provided inside the lease area. The nearest Hospital is available at Pahari & Educational facilities are at Chinawara (in the form of primary schools) & at Pahari (in the form of Higher schools) are available there. Medical facilities, Primary Health Centre are there in the area, imparting services, for advance medical facilities. In each village one health worker has been appointed by the Govt. to provide primary health facilities. The water required will be available by the local water well department in the lease area and through water tanker. 36

15 Communication services like post office and telephones are available in the nearby village. Some of the villagers are having mobile phones. An occupational health unit will be organized and the proposed measures will be adopted: Pre &Periodical Medical Checkup program for all the workers. Compulsory medical checkup program and first-aid box with necessary equipment will be provided. Training for workers. Safety equipment i.e. dusts mask, safety shoes, gloves etc. 5. PLANNING BRIEF 5.1 Planning concept It is proposed to produce 1,14,057 TPA(ROM) of Masonry Stone from the lease area. It is situated in Bharatpur District of Rajasthan. 5.2 Population projection Man power requirement for mining is estimated to be 16 Nos. Most of the employees will be recruited from neighboring village depending upon the availability of skilled & unskilled people. Migration of highly educated and skilled person will take place but it will be on temporary basis. So there will no permanent migration of people, hence there will be no population projection. 37

16 5.3 Land use Planning: Land use pattern (Hects.) Sr. No. Particulars Pre-Operational Operational Post-Operational A) Mining Activity 1 Pits (Convert into Water Reservoir) 2 Top Soil Storage Plantation with topsoil Dumps Road Mineral Stack Infrastructure Rain water storage Reclamation & Plantation Backfilled B) Remaining Virgin. Land Total area 1.0 Hect. 1.0 Hect. 1.0 Hect. 5.4 Assessment of infrastructure demand (physical and social). Temporary office and stores will be provided in the mine lease area. Specified first-aid box with all necessary facilities will be maintained at the site office and the rest shelter as per Mines Act Medical facilities, Primary Health Centre are there in the area, imparting services, for advance medical facilities. Communication services like post office and telephones are available in the nearby village. Some of the villagers are having mobile phones. 5.5 Facilities provided: Infrastructure Additional facilities will be made as per the requirement. Arrangements for safe and healthy working conditions have been done. Provision of Drinking water from nearby villages or through tankers in dry period. 38

17 5.5.2 Landscaping and green belt development To improve the aesthetic environment of the area it is proposed to plant 50 saplings at Operational stage at statutory barrier. During the first five years sapling of local species like Babool, Khejri, Neem, and Jaletc will be planted over an area of hect. Protection of Plants: Plantation Programme Year No. of saplings Year Wise Area (Hectare) I II III IV V At the End of five Year Total Following measures are proposed for protection of plants. The expected rate survival is assumed at 80%. To improve the survival rate in the adverse climate condition necessary consultation would be taken from the Forest department. Proposed plantation area shall be fenced properly for improving the survival rate. Plantation will be carried out in the lease area in phased manner Health and safety System During the Opencast Semi Mechanized working, and allied activities, all the precautionary measures shall be taken into account as per MMR 1961 and MCDR 1988 for safety and security. Following Safety & security measures will be enforced; Moving front of the quarry shall have temporary fencing. Permanent fencing will be provided where quarry has reached the ultimate pit limit. 39

18 Mine entrance will have a permanent check post and record shall be maintained of all persons / vehicles entering the mine area. Round the clock security arrangement shall be provided to prevent inadvertent entry of persons Disaster Management and Risk Assessment Inspite of following all the precautionary measures and following all safety rules, regulations and procedures, in mining accidents cannot be ruled out completely. The Project Proponent will formulate a Disaster Management Plan with the approval of DGMS. Following are the accidents which can take place in mechanised Opencast Semi Mechanized mining and measures proposed to be taken. Fall of human beings or fall of machines from benches/ dumps/haul roads. Due to drilling / blasting and handling of explosives. Fire & Explosion in machinery Emergency situation due to social reason such as public unrest, terrorism etc. Preventive Measures: Creating beam on the side of benches / haul roads of height greater than or equal to ½ tyre radius. Minimum height of beam shall be 1.2 m and slope Minimum clearance of 1.5 m will be maintained between outer tyre and beam. All provisions of MMR 1961, conditions imposed in permission for Deep hole drilling and blasting and use of HEMM, and conditions of explosive license will be followed. Fire fighting equipment in the machinery/ workshop/ office will be maintained. Persons will be trained in the use of fire fighting equipment and mock rehearsal will be conducted. 40

19 Training of security personnel. Procedures as laid down in Disaster Management Plan to be followed. Training; Persons will be trained in the following: Knowledge of Chemicals and use of protective equipment Procedures for reporting emergencies. Location and use of fire fighting equipment Knowledge of alarm system and siren Evacuation procedures. Training in first aid as per Mines Rules 1955 Emergency Equipment & Facilities: Mobiles. Fire fighting equipment s Emergency medical supplies Other protective equipment s i.e. goggles, helmet, face shield, hand gloves, safety belts, barricade tape. First Aid station as per the provisions of Mines Rules PROPOSED INFRASTRUCTURE S. No. Details 1 Lease Area 1.0 hectares. 2 Residential Area Not Applicable 3 Connectivity The village Chinawara, nearest population center is 1.5 km away from the lease area & it is connected with other important towns and cities through a good network of roads with regular public transport services. The Tehsil Headquarters of Pahari is at a distance of 16.0 km by road & District Headquarter Bhartpur is km connected by road. 41

20 The nearest railhead is at Deeg at a distance of 50.0 km from lease area. SH-13, 8.0 Km SH-22, 5.5 Km 4 Green Belt During the first five years sapling of local species like Babool, Khejri, Neem, Amal Tas etc will be planted over an area of hect. 5 Social Infrastructure Social Infrastructure and other necessary other facilities will be provided by mine s proponent. 6 Water Management 4.0 KLD, Source: tube well and water tanker. 7 Sewerage System Domestic Effluent treated in soak pits and overflow used for gardening 8 Industrial Waste N.A. Management 9 Solid Waste There are some subgrade mineral will be generated which will be Management stacked separately. 10 Power requirement N.A. 7. REHABILITATION & RESETTLEMENT PLAN There is no human settlement within the mine lease area. No human settlement will be disturbed due to the mining activity. So, no Rehabilitation and Resettlement is proposed. 8. PROJECT SCHEDULE 8.1 Proposed schedule and approval for implementation The Proposed project shall be established after getting the Environmental Clearance from SEAC, Jaipur. 42

21 8.2 Project cost estimation Estimated Project Cost for the proposed project is Rs. 40.0/- Lacs. (A) (B) Capital investment/- Site facilities = Rs. 30,000 Machineries & Tools = Rs 35, 20,000 Financial assurance = Rs. 1, 00,000 PMCP = Rs. 2, 00,000 Social fund & activities = Rs. 50,000 EMP = Rs. 50,000 Labour Skill Welfare Programme = Rs. 50,000 Total cost = Rs Lacs/- Operational cost- The mineral will be mined from the lease area and the cost of per ton of mining will be approx. Rs. 125/- per ton. 8.3 ECONOMIC VIABILITY The anticipated cost of mining is Rs. 125/- per ton cost. Average sale value is assumed at Rs /- ton of Masonry Stone. Hence the project will be viable. 9. ANALYSIS OF PROPOSAL Project will create direct & indirect employment opportunities within the surrounding region. Unit will use good faith efforts to employ local people from the nearby villages depending upon the availability of skilled & unskilled man-power surrounding the project site. In the proposed project would require significant workforce of non-technical and technical persons. Migration of highly education and skilled experience will result in increase of literacy in the surrounding villages. 43

22 In addition, the proposed expansion of project shall enhance the prospects of employment. Assessment of the potential socioeconomic benefits during mining focused primarily on work force requirements, acquisition of supplies, and the temporary increased demand for services related to the mining project like food, housing, communications, law enforcement, medical care, local transportation etc. Due to these, additional revenue to local suppliers for required products and services related to the construction and operation phases of the project will generate. Thus, mining activities will provide numerous new, although temporary, work opportunities for both skilled and unskilled labor, as well as contribute significantly to the local economy. Additional government revenue expected from royalty, taxes, duties and other fees. An added benefit to the proposed project will result in considerable growth of stimulating the industrial and commercial activities in the state. Small and medium scale industries may be further developed as a consequence. 44

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

FORM i, pre FEasiBilitY REpORt. EnViROnMEnt ManaGEMEnt plan FOR. area=1.01.16. proposed production: - 36,000 tpa. project COst: - 10 lacs

FORM i, pre FEasiBilitY REpORt. EnViROnMEnt ManaGEMEnt plan FOR. area=1.01.16. proposed production: - 36,000 tpa. project COst: - 10 lacs FORM i, pre FEasiBilitY REpORt & EnViROnMEnt ManaGEMEnt plan FOR M/s. BUILDING LIME STONE MINE OF SHREE MONGHIBEN JINABHAI MAKWANA area=1.01.16 (survey no. 59/ p 2,59/p1/p1/p 2, Vill.ElaMpuR, tal. una

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1.0 Introduction: Background: The Quarry lease, for Black Granite over an extent of 1.482 ha. in Sy Nos. 10 & 23, Sankavaram Village, Kanigiri

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1 TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 3 2.0 Introduction of Project and Background Information 4-5 3.0 Project Description 6-12 4.0 Site Analysis 13-20

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR MARBLE MINE(MINOR MINERAL) NEAR VILLAGE KHO(PALPUR), TEHSIL: RAJGARH, DISTRICT: ALWAR, RAJASTHAN NON- FOREST LAND PRE-FEASIBILITY REPORT CATEGORY A (Sariska Wild life Sanctuary is located in 5.0 km

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1 [ASPERMOEF GUIDELINCE FORP.F.R., CIRCULARDATED 30 th DECEMBER 2010] 1. EXECUTIVE SUMMARY M/s Madhya Pradesh Minerals Supply Company is the applicant of the proposed project. The

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information