1 ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS & CONSULTANTS BLOCK-B, B-1, IDA, AUTONAGAR -12 VISAKHAPATNAM, ANDHRA PRADESH QCI

2 INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN This Environmental Management Plan (EMP) is prepared for the proposed M/s. D.Bharathi, Mining of Silica Sand belonging to Smt. D. Bharathi, W/o. Sri D.Chiranjeevi Reddy, Chinthavaram Village and post, Chillakur Mandal, SPSR Nellore District. Smt. D. Bharathi, Nellore has applied for mining lease for Silica Sand for grant of mining lease over an extent of Acs. in Sy.No. 44/3,50/4,50/5 & 50/6 of Addepalli Village, Chillakur Mandal, Nellore District, Andhra Pradesh. The Director of Mines & Geology, has recommended for grant of mining lease for Silica Sand over an extent of Acs in Sy.No. 44/3,50/4,50/5 & 50/6 of Addepalli Village, Chillakur Mandal, Nellore District, Andhra Pradesh for a period of 20 years in favour of Smt. D.Bharathi, W/o. Sri D.Chiranjeevi Reddy, Nellore, subject to obtaining the Consent for Establishment from Andhra Pradesh Pollution Control Board as per S.O. 60 (E), dated and to issue a notice to the applicant company to submit Approved mining plan. The Government after careful examination of the proposal of the Director of Mines & Geology, have proposed to grant the of mining lease for Silica Sand over an extent of Acs in Sy.No s. 44/3,50/4,50/5 & 50/6 of Addepalli Village, Chillakur Mandal, Nellore District, Andhra Pradesh for a period f 20 years on favour of Smt.D.Bharathi, W/o. Sri D. Chiranjeevi Reddy, Nellore subject to submission of Consent for Establishment from Andhra Pradesh Pollution Control Board as per S.O dated and subject to submission of Approved Mining Plan under Rule 22(4) of Mineral Concession Rules 1960 vide Govt. of 2

3 A.P. Industries & Commerce (Mines I) Department Memo No /M.I(2)/2011 dated EXECUTIVE SUMMARY M/s. D. Bharathi, applied for Environmental Clearance for quarry lease covering total extent of acres carried out by opencast semi-mechanized method spread over in Survey No. 44/3,50/4,50/5 & 50/6 of Addepalli (V), Chillakur (M), SPSR Nellore District. Andhra Pradesh. S.No Location Extent in acres Lease Period 1 Sy.No. 44/3,50/4,50/5 & 50/6, Addepalli (V), Chillakur (M), SPSR Nellore (Dt) acres Partly Govt.Land and Other Patta Land-0.66 Acres 20 Years The Director of Mines & Geology executed vide proceedings No. 1630/MP/NLR/2013 dated: the lease for 20 years in favour of M/s. D. Bharathi. LOCATION OF THE MINE The applied area falls in the Survey of India Toposheet No.66 B/4 and is located in East Longitude North Latitude 80 o o o o o o o o o o o o

4 80 o o o o The mining lease area is located at 1.1 km from Eedulavaripalem at 1.1 kms and 1.78 Km due South of the Addepalli village and Chintavaram is located at the distance of 5.0 km due NW. The mining lease area can be approachable by road from Nellore via. Gudur-Chintavaram- Kamavaripalem road, a diversion due South will lead to Addepalli Village. INTRODUCTION OF THE PROJECT LAND The proposed Mining is a open cast method using hand tools. It is proposed to excavate Silica Sand with a production capacity of TPA. The silica sand Mine covering in an area of acres. The mining lease is granted for a period of 20 years. Land is located in Survey number 44/3,50/4,50/5&50/6, Addepalli Village, Chillakur Mandal, SPSR Nellore District, Andhra Pradesh Location M/s.D.Bharathi acres Silica Sand mining, Addepalli Village, Chillakur Mandal, SPSR Nellore Dt., A.P The present mining lease area falls in the partly Govt. Land and Other Patta land with documents and QL area at a distance of 1.10 kms Eedulavaripalem village and about 23.0 kms from Chillakur mandal. 4

5 THE SAILENT FEATURES OF THE PROJECT SITE Nature of the project M/s. D.Bharathi Silica Sand Mine Size of the Project acres TPA LOCATION OF PROJECT District & State SPSR Nellore District, Andhra Pradesh Village & Mandal Addepalli Village & Chillakur Mandal Land Availability Acres Nearest Village Eedulavaripalem village at a distance of 1.10 kms form project site. Ownership Partly Govt. Land and Other Patta Land Toposheet No. 66 B/4 GENERAL CLIMATIC CONDITIONS Normal Annual rainfall 794 mm Min and max temp C and 44 0 C Avg. relative humidity 70 % Avg. wind speed 8-13 KMPH Predominant wind direction Season Monsoon W & NW NE HISTORICAL / IMPORTANT PLACES Nearest human settlement Eedulavaripalem- at 1.10 km from mining area Nearest town Chillakur km from mining area Nearest railway station Gudur Railway Station kms Nearest Port Krishnapatnam Port-14.0 kms Archaeological/Historically None within 10 km radius from the site. Important Site Sensitive Places None within 10 km radius from the site Sanctuaries / National parks None within 10 km radius from the site 5

6 North: Sri Bharathi Minerals South: Durga Minerals West: None with in 500 mtrs distance East: Modern Minerals Mines located around 500 mtrs. GOOGLE MAP 6

7 TOPOMAP -10 km Radius M/s. D.Bharathi 7

8 DETAILS OF THE MINE MINE AREA: This mine lease (ML) area is located at Addepalli (V), Chillakur (M), SPSR Nellore District, A.P. The mine site extends over an area of acres. The Mining lease area is located at a distance of 1.10 km from Eedulavaripalem village. GEOLGOY AND EXPLORATION: TOPOGRAPHY: The physiography of the area is flat sand bearing terrain with scattered small bushes and scrubs. The height of the dunes existing in the area varies from M from the ground level. The dunes are very less in number, the area is almost flat with slant topography. The height increases towards west from eastern side. Regional Geology: The geology of the area is comprised of Nellore Schist belt covered by sand formed by huge cyclone effect and back water of Bay of Bengal. The sand is widely exposed into surface; rather than area is fully covered by sand everywhere. The sand migrates from place to place by air borne weathering in the form of dunes. In this area due to the influence of migration of sand deposit, the ditches and worked out pits will be filled with fresh sand slowly. The schist, sand and sandy soil incorporates the general regional geology of the mining lease applied area. The main geological sequence is as follows: Recents Silica Sand and Clay Nellore Schist Belt Allumina and Silica Rich Products Dharwars Schists, Phylite etc. 8

9 Archaeons Igneous Rocks Local/Area Geology: Local Geology and Lithology of the area is as follows: Silica Sand Fine Grade Sandy Soil Schists and Other Rocks Silica Sand 1 to 5.0 M Thick Sand with Sedimentation of Clayey Material Below 6 M (Not confirmed in any of the existing operating mines) The mining lease applied area is fully sandy in appearance throughout. Therefore the geological sequences are referred in general way. Details of Exploration: No other exploration is carried out in the area as the subject area is applied for grant of quarry lease. Exploration already carried out in the area No mining is carried out in the area as the subject area is applied for grant of mining lease. RESERVES: The reserves are calculated by drawing cross sections perpendicular to slope namely A-A1, B- B1, C-C1 & D-D1. Based on the working pits of the existing mining leases around the subject area, the influence of the pit upto RL 90 (below the ground level) duly considering 4 M from surface as Proved Deposit and 6 M below as Probable & Possible Resources so the entire resources are calculated. As the entire area is occupied by the single litho unit silica sand deposit with East- West trend with shallow dips (6 o ) towards North. The litho units show a conformable sequence with gradational transitions. Hence, cross sectional area method is adopted for estimation of 9

10 reserves with sectional influence of 50 M. The volume arrived from the cross sectional area is multiplied with the sectional influence and tonnage factor 2.5 MT for arriving the reserves. The calculation Silica Sand reserves are given below. Category of Deposit as per UNFC guidelines The thickness of the ore body is not uniform; it changes from place to place in strike direction. The quality of Silica Sand also changes from central zone to contact zones. The mineralization of Silica Sand is uniform in the entire applied area. The availability ore body is homogeneous. Geological parameters considered for Proved Category (G1) Geological Survey: A topographical survey with total station was carried out in the total applied area. The boundary pillars were demarcated in the mine. A topographical map is prepared in 1:50000 scale and all the surface features are shown. The Geological mapping was carried out based on the topographical survey. All the litho units with their attitudes are delineated on the map. With the above mapping conducted in this mining lease applied area. It is classified under G1 axis. Feasibility Axis Considered for Proved Category (F1) Geology: The Silica Sand is mineralized in a continuous vein form in NW-SE strike formed by the Marine Tidal action (Deposition). A continuous process in Geological Mapping also proved in surface pitting. Mining: The mining plan is specially designed with 1.5 meters bench height for proper recovery of Silica. The recovery of the Silica Sand from ROM is 98%. 10

11 Environment: There are no habitants within the area and hence no rehabilitation is required. The dump benches are properly designed. The mine is developed in such a way that it has no impact on surrounding lands is completely barricaded with green belt. Processing: No processing is required for Silica Sand. Infrastructure, constructions and services: Temporary office building, rest house for labor, drinking water and toilers will be developed in the mines. Costing Capital Cost The following capital investment is made towards mining machinery and other infrastructure Office & Infrastructure Rs. 5000/- Operating Cost/Ton Excavation of ROM (2.5 Tons/M 3 ) Rs. 85/- Handling Charges Rs. 125/- Salaries and Other Expenses/Ton Rs. 2/- Safety & Environment protection/ton Rs. 25/- Statutory Payments & Local issues/ton Rs. 5/- Royalty Rs. 175/- Total Production Cost Rs. 417/- Or Say Rs. 420/- Marketing: The average sale price of Silica Sand grade ore is Rs.600 to 700 per ton ROM. Economic Axis Considered for Proved Category (E1) Detailed Exploration: The detailed Exploration including geological survey, sand probing, and deep trenches, has indicated recoverable/saleable silica sand. Mining Report/Mining Plan/Working Mines The Mining plan is being prepared after detail study of exploration and proper design implemented as per guidelines of IBM. 11

12 Specific end use grades of reserves All the reserves assessed are above the cut off grade of above 99% Silica Sand. At present depth, the total ore extracted in the mine is economically consumed in the Glass Industry. Specific knowledge of Forest/Non-forest and Other land use data The applied mining lease area is Non-Forest, Waste Barren Govt. Land partly and a little bit Patta Land. Based on the detail study under EFG classification of UNFC, the reserves estimated will come under proved reserves of category IV. Proved Category: An evidence to the prevalence of the sand in the form of Blanket form of Deposit. The reserves are estimated afresh based on the direct evidences of mineralization clearly seen in the mine. Hence all the reserves estimated will come under Proved category. The reserves are estimated upto 90 M RL as the Silica Sand is proved upto 96 mt RL with Sand Probing. The details of section wise and category wise reserves are furnished in the table. Resources: The mineable available below 96 m will be considered as Sand resources, which have to be proved with deep probing. Sections Sectional Area Sectional Influence Volume TF Recovery 98% (M 2 ) (M) (M 3 ) (M 3 ) A-A B-B C-C D-D TOTAL PROVED RESERVES

13 RESERVES ESTIMATED AFTER EXPLORATION 4 Cross Sections were drawn with equal interval and considering the litho units assessed from geological traverses on the silica sand. Total Geological Reserves of Silica Sand If 98% is taken into account = Tons MINING: Manual method operations will be deployed. By deploying hand tools like Pavdas etc. During the plan period it is proposed to develop the benches of 3M depth. Movements of benches were designed in South to North. Mining Method: Mining is opencast manual method and is carried out in following stages a) Drilling of holes using Jack Hammers, Blasting Holes with Gun Powder Not applicable b) The material will be loaded into the tippers manually Year Wise Development: The sand is occurring right from the surface without much overburden in proposed mining block. Hence, there is no overburden necessitating pre-production development. It is a development cum production program right from starting of mining activity. Year Wise Production for next five years ( and ) It is proposed to raise about Tons of Silica sand per year in 300 working days on an average from this area. The production details c for each year. Rate of Production when the Mine is fully developed and expected life of the Mine The Rate of production will be maintained around Tons of Silica Sand per year. 13

14 Open Cast Mining: Mode of workings: The proposed mining in the subject area is a manual open cast method. Mining of Silica Sand in this area involves in removing 2 slices of 1.5 M i.e. bench of 3.0 M depth. To mine Silica Sand simple tools like spades and ladles are required. Layout of mine working: For the next five years, the production of Silica Sand will be obtained by excavating bench of 1.5 M height on the section line A-A1 to D-D1 between the grids N & E Workings will be oriented in North-South and advances Southwards. YEAR WISE PRODUCTION FOR 5 YEARS ( TO ) Year Volume Bench Height Volume TF Reserves Recovery 98% 2% (M 2 ) (M) (M 3 ) (Tons) (M 3 ) (M 3 ) 1 st ( ) 2 nd ( ) 3 rd ( ) 4 th ( ) 5 th ( ) TOTAL AVERAGE

15 First Year ( ): During the 1 st year, the mining will be initiated from north of the mining lease applied area, the Silica Sand production will be obtained by excavating an area of M2 with a bench of 3.00 M Height between the grids N & E A total mass of Tons will be excavated producing 98% ( Tones) of saleable mineral and 2% ( ) of waste is anticipated to be generated. The mining advances southwards. Second Year ( ): During the second year, the mining will continue due south of 1 st year workings, the Silica Sand production will be obtained by excavating an area of M2 with a bench of 3.0 M Height between the grids N & E A total mass of Tons will be excavated producing 98% ( Tons) of saleable mineral and 2% ( ) of waste is anticipated to be generated. The mining advances southwards. Third Year ( ): During the third year, the mining will continue due south of 2 nd year workings, the Silica Sand production will be obtained by excavating an area of M2 with a bench of 3.0 M Height between the grids N & E A total mass of Tons will be excavated producing 98% ( Tons) of saleable mineral and 2% ( ) of waste is anticipated to be generated. The mining advances southwards. Fourth Year ( ): During the fourth year, the mining will continue due south of 3 rd year workings, the Silica Sand production will be obtained by excavating an area of M2 with a bench of 3.0 M Height between the grids N & E A total mass of Tons will be excavated producing 98% ( Tons) of saleable mineral and 2% ( ) of waste is anticipated to be generated. The mining advances southwards. 15

16 Fifth Year ( ): During the fifth year, the mining will continue due south of 4 th year workings, the Silica Sand production will be obtained by excavating an area of M2 with a bench of 3.0 M Height between the grids N & E A total mass of Tons will be excavated producing 98% ( Tons) of saleable mineral and 2% ( ) of waste is anticipated to be generated. The mining advances southwards. CHANGE IN MACHINERY: There is no change in the method of mining. The sand will be excavated by manually in next five years also without during and blasting and mechanization. EMPLOYMENT POTENTIAL: The human resources deployed will be as follows: S. No Designation Staff 1. Mines Manager 1 2. Skilled Workers 1 3. Unskilled workers (@ 3 t OMS) 59/day 4. Drivers of Tractors with Trailers 3 WASTE/SUB GRADE MATERIAL: There is no waste anticipated, except handling loss. 16

17 FRESH WATER REQUIREMENT & WASTE WATER GENERATION S.No Description Fresh water Waste water Disposal 1 Domestic 2.8 KLD 2.24 KLD Septic tank followed by soak pit 2 Dust 3.0 KLD - suppression ENVIRONMENTAL MANAGEMENT PLAN The Environmental Management Plan envisage for this Mining Project is described here under with a strong commitment to follow the best Environmental Practices to reduce the negative implication to make this Project a sustainable development endeavor. The management action plan aims at controlling pollution at the source level to the possible extent with the available and affordable technology followed by treatment measures before they are discharge. Air Environment and control measures: The proposed mining activity would result in the increase of suspended particulate matter due to fugitive dust resulting from excavation and transportation activities. Dust emissions and particulate emissions mitigation measures will be through water spraying at all the sources of dust formation and these measures are further elaborated as follows: Dust rising due to transportation will be controlled by covering the trucks with cloth; dust extractors will also be employed. Regular water sprinkling at dust emanating sources viz., storage dumps and transportation through haulage roads, etc will be carried out. Regular grading of haul roads and service roads will be taken up to clear accumulation of loose material. 17

18 Periodic maintenance of transport vehicles and equipment will be carried out to check emission levels. Greenbelt will be developed with avenue plantation all along the haulage roads and peripheral plantation all around the mine in order to control dust. Overloading of trucks will be avoided and carrying the ore/mineral in covered trucks will be taken-up to minimize pollution levels. Water Pollution Management: No rivers and other perennial water courses flow through the ML area. However, during rains the water flows through the slopes of the ML area and across the mine lease boundary and joins a natural drainage. The rainwater that collects in the mine pit bottom during the rainy season will be utilized for water spraying on the haul roads and mining area. This water will also be used for the plantation in and around the ML area. The total water requirement will be 5.8 KLD which will be utilized from nearby bore well. The usage will be as follows: Domestic Use KLD Dust suppression KLD The following that flows in the core zone will be routed adequately through channels to avoid any erosion and contamination. The mine pit water collected due to rains will be utilized for water spraying on the haul roads and for watering plantation. The waste water generated from the domestic usage will be fed to septic tank followed by soak pit. Noise Environment: There will be intermittent noise levels during excavation and while usage of jack hammer. The noise levels are expected to be below 75dB, This will however be for very short duration. No mining activities are planned during night time. A thick green belt will be developed to act as noise attenuator. The management plan for controlling noise pollution is envisaged as follows. 18

19 The noise generated is very much minimum as the Silica sand mining is majority of manual and minimum Vehicular Traffic. The machinery will be maintained properly to reduce the noise levels. The protective noise reducing gear like earmuffs, the company will provide earplugs. Proper maintenance of equipment. Providing noise insulation/padding wherever practicable. Provision of thick plantation in and around the mine is planned in order to reduce the noise and prevent it from reaching to surrounding habitation areas.. Analysis of Proposal: Financial and Social Benefits will be provided to local people. The waste water after Treatment will be used for Development of Green Belt in the Mined area. SOLID WASTE No solid waste generated. SOCIO-ECONOMIC ENVIRONMENT This mining project will contribute in the development of economic status of the region and indirectly provide a platform for many businesses; both on small and big scale. The company management would give preference to local people through both direct and indirect employment. SAFETY AND ENVIRONMENT The proponent will provide all necessary provisions stipulated under the Factories Act. In addition a safety committee will be formed and manned by equal participants from Management and Workers. Personal protection equipment (PPE) will be issued to each worker. Other safety equipments shall be used according to the nature of job involved. The management firmly believes in the concept of safety and environmentally sustainable growth. The authorities and staff are very much concern in Environment issues. The management is going to develop scientifically designed green belt around the premises to mitigate air and noise pollution impacts on the surroundings. The management proposed to monitor ambient air as per APPCB guidelines. 19

20 All the employees are provided with personal protective equipment such as helmets, hand gloves, safety shoes, goggles and apron as per their place of work. The management will provide safety training to all employees periodically and regularly. POST PROJECT ENVIRONMENTAL MONITORING PROGRAMME In order to maintain the environmental quality within the standards, regular monitoring of various environmental components is necessary. The mines manager will take care of Environmental Management activities with objectives as To implement control/mitigation measures To monitor this implementation process To determine and improve the efficiency of the implemented measures To identify any other unforeseen effect on environment not covered hereby and To inspect and maintain the plantation survival rate, regular cleaning drains, channels and water logged ponds and improve the drainage system and retaining walls over certain timelines. Regular monitoring of various environmental parameters shall be carried out to ascertain the following points: Status of air, noise, water, land pollution within the plant and in its vicinity; Generate data for predictive or corrective purpose in respect of pollution; and To assess and monitor environmental impacts periodically. PROJECT SCHEDULE AND COST ESTIMATES: The envisaged average annual production of TPA of Silica Sand The cost of the project: 80 Lakhs The annual cost estimated for Environmental Monitoring is Rs. 15 Lakhs 20

21 CONCLUSIONS The land that is going to be disturbed cannot be reclaimed during the lease period, as the Silica sand is persisting at further depth and it will take a very long time to exhaust. No measures are proposed for reclamation of the disturbed land during the next five years. There is no other significant negative impacts are anticipated as the involved mining activities are very small. All possible measures shall be adopted to control pollution emissions to the minimum and kept below CPCB/MoEF/SPCB standard norms (Air, water, noise standard limits). 21

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a 1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1.0 Introduction: Background: The Quarry lease, for Black Granite over an extent of 1.482 ha. in Sy Nos. 10 & 23, Sankavaram Village, Kanigiri

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

G. M. Nagaraju Environment Management Plan

G. M. Nagaraju Environment Management Plan ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY.

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY. GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY. Dr Ashutosh Roul, PhD Senior Manager(Mines),NALCO. NALCO Asia s largest integrated Aluminium Complex, Encompassing

More information

For Building Stone Quarry

For Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of M/s Valchand K Shaha At Sy No: 105/4A Yamagarni Village, Chikkodi Taluk, Belgaum District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01 Project

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

1. INTRODUCTION. The lessee proposes to produce only about 10,188 TPA of Barytes. The total cost of the project is Rs. 20 lakhs only.

1. INTRODUCTION. The lessee proposes to produce only about 10,188 TPA of Barytes. The total cost of the project is Rs. 20 lakhs only. 1. INTRODUCTION 1.1 INTRODUCTION M/S SOUTHERN MINING COMPANY was granted a Barytes mine Lease area over an extent of 4.048 hectares in Sy. No: 944,945 & 946 of Kalva Village, Orvakal Mandal, Kurnool District

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P) VILLAGE : DEVGAON TEHSIL : RITHI DISTRICT : KATNI MINERAL : SAND STONE KHASRA NO : 7 PART AREA : 2.00 HECTARE PRPOSED PRODUCTION: 800 M 3 /YEAR STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED UNDER

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES:

STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES: STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES: S. No Information Required Information to be furnished by the Proponents 1 Name of the project or activity 7.781 Ha. of Marble Mine NEW MINE

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1. INTRODUCTION: 1.1 Background: The mining lease, for colour granite over an extent of 1.0 ha. in Sy No.333 of Arikara Village, Alur Mandal,

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SOHAN ART & GRANITE INDUSTRY have granted quarry lease for Black Granite over an extent of 1.00 Hectare in Sy. No. 101 of Kappali Village, Ramasamudram Mandal, Chittoor

More information

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P.

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P. VILLAGE : SALIYA BINEKA TEHSIL : BANDA DISTRICT : SAGAR MINERAL : CRUSHER STONE KHASRA NO : 270 AREA : 2.00 HECTARE PRPOSED PRODUCTION : 18000 M 3 /Year STATE : MADHYA PRADESH LEASE PERIOD : 10 YEAR SUBMITTED

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

PRE-FEASIBILITY REPORT FOR FULLERS EARTH QUARRYING

PRE-FEASIBILITY REPORT FOR FULLERS EARTH QUARRYING PRE-FEASIBILITY REPORT FOR FULLERS EARTH QUARRYING In 2-00 Acres of Patta Land Survey Number: 68/1 Kudhalli Village Chincholi Taluk Kalaburgi District, Karnataka By Srishail G Sajjan S/o Sri Gutteppa Sajjan

More information

Building Stone Quarry

Building Stone Quarry ENVIRONMENTAL MANAGEMENT PLAN For Building Stone Quarry Of Sri. Shivappa Puttappa Basapur In part of Sy No. 28/A, Bingapur village, Hangal Taluk Haveri District, Karnataka (Extent- 1-00 Acres) 1 CHAPTER-01

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.M.S.P GRANITES have granted quarry lease for Colour Granite over an extent of 16.56 Hectare in Sy. No. 01 of Kori Village, Parvathipuram Mandal, Vizianagaram District,

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation. Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information