1 Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year to ) Prepared on Behalf of SRI SANJAY KUMAR PRADHAN At/Po-Sarankote,Saida Dis.- Deogarh, Odisha PREPARED BY The Techno Chamber, Plot No. 16/5, Cuttack Road, Bhubaneswar, Odisha

2 1.0 EXECUTIVE SUMMARY Sarankote Stone Quarry, over an area of 2.40 Acres or Ha. is located in village Sarankote under Barakote Tahasil of Deogarh District, Odisha. In accordnance to the provisions of OMMC (Ammendment) Rule, Sri Sanjay Kumar Pradhan, Sarankote, Saida, Deogarh, Odisha have been declared as highest bidder against long term stone sairat lease for a period of five years ( to ). Tahsildar Barkote issued a letter to deposit EMD, preparation and approval mining plan and to obtained environment clearance in the stipulated time. In accordance of rule 27- A(3) of OMMC Rule, 2004 (ammended on 2014) the mining plan has prepared and approved by Deputy Director Geology, Zonal Survey, Sambalpur, Odisha. For obtaining environment clearance the pre-feasibility report is being prepared and submitted. The proposed lease area is bounded by latitude N N and longitude E E & It is a part of the area covered in the Survey of India Toposheet No E 45 N 2(73 G / 2). Lease area can be accessed 1.50 km from Sarankote and nearly 2.50 Km from N.H-6. The lease area is about 25 km away from the district head quarter Deogarh and is about 350 Km away from the state capital Bhubaneswar. There is no existence of public road or railway line within the lease area. Most of the commercial transportation is done through road networks. The nearby market is at Kala located at a distance of 4.50 km from the lease area. Telecommunication facilities have vastly improved with the advent of mobile phones. The District Headquarter Telecom office is running at Deogarh. The proposed Sarankote Stone Quarry, over an area of 2.40 Acres or Ha. bearing Khata No. 133, Plot N The total lease area is Non forest land, with nof road metal rock exposures and Soil & Alluviums. The area is not fit for agriculture as there is neither seasonal nor perennial nala within the lease area. Drainage system in the region is dendritic. The surface run off likely to be generated will be channelized through surface natural gradient. 2

3 The Project will bring economical benefits to the state by way of royalty on the mineral excavated and dispatched. It provides employment to the people residing in vicinity directly or indirectly. The mine management will also help nearby villages by providing aid to school, conducting medical and social awareness camps, helping in formation of self help groups, etc. Thus the project is viable and will bring about socioeconomic improvement of the area and will prove beneficial to the area. 2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of project and project proponent In case of mining project, a copy of mining lease / letter of intent should be given. Sarankote Stone Quarry has been applied for 5 (Five) years, over an area of 2.40 Acres or Ha. in village Sarankote under Barakote Tahasil of Deogarh District, Odisha. The Tahsildar Barakote have been declared as highest bidder for long term sairat to Sri Sanjay Kumar Pradhan, Sarankote, Saida, Deogarh, Odisha. ( The copy of the letter from Tahasildar is enclosed as annexure in the approved Mining Plan). 2.2 Brief description of nature of the project. Sarankote Stone Quarry is located in village Sarankote under Barakote Tahasil of Deogarh District, Odisha over an area of 2.40 Acres or Ha. The lease area of 2.40 Acres or Ha. bearing Khata No. 133, Plot No The total lease area is Non forest land and of Pathar Chatan Kissam. The project site is located at a distance of 25 Km from the district head quarter Deogarh and is at a distance of 350 Km from the state capital Bhubaneswar. The nearest railway station is at Barsuan located at a distance of 72 Km from the lease area. Lease area can be accessed 1.50 km from Sarankote and nearly 2.50 Km from N.H-6. The proposed ML area concession is for five years i.e to The project for production of road metals (minor minerals) from Sarankote Stone Quarry has been proposed for a production of 6325 cum within the five year period. 2.3 Need for the project and its importance to the country and or region. Due to the increase urbanization now days, there is an increase in demand of minor 3

4 minerals like sand and stone. Hence the execution of mining activities for extraction of minor minerals is in process. The main objective of the project is to fulfill the growing demand of the minor minerals in the field of development and construction. Road metal/building stone is mainly used in construction or road and buildings. Further they are also required by railway projects for track laying and other construction activities. In current times, governments emphasizes on rapid improvement of basic infrastructure like roads, railways, dams and other social infrastructure - both in rural and urban areas, there is a constant requirement for ensuring regular supply of these minor minerals. The increasing mining of minor mineral (Stone Quarry) has uplifted the economy of minor mineral producing localities which has resulted into up-liftment of the standard of living of the people in the adjoining area, besides contributing to the exchequer of the State and Central Government. The project also generates revenue and provides employment to the people of nearby locality. 2.4 Demand- Supply Gap. Now a days Government has given a special emphasize on growth of infrastructure industrial development. Minor minerals like road metal/stone/ boulders/aggregates are one of the basic inputs in any kind of construction work. Since these are low value items and is voluminous - the users of this basic input- looks for local supply sources instead of transporting the material from far away areas. Thus any efforts for increasing minor mineral production in the locality must be encouraged to ensure smooth supply of aggregates to match the pace of developmental activities in the area. Further, from the mineral conservation point of view, focus is to develop systematic mining for known small and medium size deposits. 2.5 Imports vs. Indigenous production. There are no imports of such low value mineral. In fact since these minerals are low value - high volume items- efforts are made to source the material from the nearest point of supply. This is to avoid high cost of transportation and keeping the cost within 4

5 reasonable limits. 2.6 Export Possibility. The excavated materials will be marketed in the local market only. There is no export possibility for the stone excavated from the lease area. 2.7 Domestic/ export Markets. The excavated materials will be marketed in the local market only. 2.8 Employment Generation (Direct and Indirect) due to the project. Keeping in view of semi-mechanized method of mining, a total of 07 nos (Both skilled & non-skilled) of workers are to be employed in mine during the tenure of the plan period. Indirect employment through creation of shops, hired vehicles, etc also can be generated to full fill the day to day requirements of the mining personals. 3.0 PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any. The project has been proposed for extraction of road metal from the Sarankote Stone Quarry. It is estimated that the amount of total production of road metal during the plan period is 6325 cum which is to be extracted by semi-mechanized method of mining. This project is not linked or dependant on any other project. 3.2 Location (map showing general location, specific location, and project boundary & project site layout) with coordinates. The project site is located in Survey of India Toposheet No E 45 N 2(73 G / 2)and bounded by latitude N N and longitude E E The description of the project site has been given in surfacal geological plan along with the mining plan. Lease area can be accessed 1.50 km from Sarankote and nearly 2.50 Km from N.H-6. The lease area is about 25 km away from the district head quarter Deogarh and is about 350 Km away from the state capital Bhubaneswar. There is no existence of public road or railway line within the lease area. Most of the commercial transportation is done through road networks. The nearby market is at Kala located at a distance of 4.50 km from 5

6 the lease area. Telecommunication facilities have vastly improved with the advent of mobile phones. The District Headquarter Telecom office is running at Deogarh. The vegetation is scanty with small bushes exist in the lease area. There is no human settlement within the quarry lease. 3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. As it is a mining project, no alternate site has been considered for the project. 3.4 Size or magnitude of operation. Total lease area is of 2.40 acres or Ha. of non-forest Govt. land and the applicant will work within the said area for the plan period of 5 years, to with a total production of 6325 Cum of road metals/building stones for construction Roads and buildings with the nearby locality. 3.5 Project description with process details. Based on the topographical survey of the entire lease area, geological mapping was carried out and Geological plan has been prepared on a scale of 1:1000 with contour interval of 2m. The existing features have been marked. Based on the exposures, opened working quarries, attempts have been made to mark the mineralized zones in the Surface Geological Plan. Based on the geological plan and the contour base plan, the Geological cross sections have been prepared which are enclosed as Plate No-2. Geological Resources From the geological study and from the exposed quarry faces it can be expected that the deposit may extend further 15 m below. Proved, Probable and Possible reserves have been estimated during the preparation of this mining plan. Proved has been estimated by taking 5 m from the existing quarry bottom. Probable reserve has been estimated by taking 5 m below the proved limit. Similarly a depth of 5 m below the probable reserve limit has been considered as possible reserve. The details section-wise calculation or geological reserve is given below; GEOLOGICAL RESERVE 6

7 Category Section Line Sectional Area (m 2 ) Length of Influence (m) Volume (Cum) Recoverable (Cum) a b c d e= c x d f = e x 90% Proved A-A' Probable A-A' Possible A-A' GRAND TOTAL Mineable Reserves The mineable reserve has been calculated by considering ultimate pit slope of the working quarry and leaving 7.5m from the lease boundary for safety zone. While assessing the mineral reserves of the deposit measured and indicated categories of mineral resources have been considered and accordingly the mineral reserves are calculated assuming loss due to pit slope and its proximity with the lease boundary. The details of mineable reserve is given below; MINEABLE RESERVE Category Section Line Sectional Area (m 2 ) Length of Influence (m) Volume (Cum) Recoverable (Cum) a b c d e= c x d f = e x 90% Proved A-A' Probable A-A' GRAND TOTAL Open cast semi-mechanized method will be adopted during the mining operation within the plan period. The proposed mining will be done in a single shift basis. During the plan period, it has been planned to a quarry within the lease area to achieve the targeted production. Open cast semi-mechanized method will be adopted considering 7

8 various technical parameters like surface topography, deposit, quality variations, and geotechnical aspects, to produce the targeted quantity of aggregates. During the plan period a systematic development of benches of 5 m height and the width of the benches will be kept at more than height.. Drilling and blasting will be adopted to loosen the hard materials. Excavation will be done by using 0.9 m³ capacity excavators. Drilling and blasting will be done by jack-hammer drill driven by compressor. Loading will be done excavator and transporting will be done by trucks. The detail of Year-wise production and extent of mechanization are given below; Summary of Production Schedule during the Plan period Year Volume (Cum) Recoverable (Cum) Mineral Rejects (Cum) Total Details of Extent of Mechanization Sl. No Machine Capacity No. of Units 1 Excavator with breaker 0.9 cu.m. 2 no. 2 Wheel loader 1.2 cu.m. 2 no. 3 IR HP 450 compressor (450 CFM) & 110mm 1 no. each 4 Tipper Taurus 10 T 02 nos The lessee will process the raw material through the crushing unit established near to the lease area and the raw material from the lease will send to the crusher unit to get different 8

9 sized road metal i.e. 0-4mm, 4-6mm, 6-12mm, 12-20mm and 0-55mm, which will be sold the finished product to the local consumers as per their requirement. 3.6 Raw material required along with estimated quantity, likely source, marketing area of final product/s, Mode of transport of raw material and finished product. No raw material is required for the extraction of stone. 3.7 Resource optimization / recycling and reuse. Not applicable in the present case as all size of minerals will be extracted and transported to destined place. 3.8 Availability of water its source, energy / power requirement and source. Water Requirement This is a mining project to produce sized road metal as a raw material for civil, railway constructions etc. As such no raw material is required for the purpose. However, total water approx.100 liters/day will be required for different purposes like Domestic, Dust suppression, Plantation purposes and the water will be supplied from the pre-existing ground water sources from the nearby villages. Power requirement No electrical power shall be required for operations as the mining will be worked out during day time only. Minimal power required for office shall be taken from the State Eclectic Supply Unit, Odisha. 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management / disposal. Solid waste generation & its disposal During the plan period a total 10% of total mineralized zone has been considered as mineral reject.a total of cum of mineral reject are likely to be generated during plan period. The year-wise generations of rejects are given below. Year Volume (Cum) 10% (Cum)

10 TOTAL The generated rejects will be stacked over the temporary dump within the lease area in the non working area. Proper safety precaution will be taken care for the stacked rejects. Periodically that will be utilized for road construction and maintenance of approach road and existing public use road of surrounding areas. Liquid effluent No liquid effluent will be generated at the mine site due to the mineral excavation. 4.0 PROJECT DESCRIPTION 4.1 Connectivity Lease area can be accessed 1.50 km from Sarankote and nearly 2.50 Km from N.H-6. The lease area is about 25 km away from the district head quarter Deogarh and is about 350 Km away from the state capital Bhubaneswar. There is no existence of public road or railway line within the lease area. Most of the commercial transportation is done through road networks. The nearby market is at Kala located at a distance of 4.50 km from the lease area. Telecommunication facilities have vastly improved with the advent of mobile phones. The District Headquarter Telecom office is running at Deogarh. 4.2 Land form, land use and land ownership The project site is located in Survey of India Toposheet No E 45 N 2(73 G / 2) and bounded by latitude N N and longitude E E The lease area is a Non-Forest land (Pathar Chatan) and the total lease hold area is barren not fit for agriculture as the area is covered with out-crops of road metal rock exposures. Therefore forest clearance is not required under F.C. Act The Lessee is a private limited company. 4.3 Existing infrastructure 10

11 There is no existing infrastructure within the proposed lease area. Workshop: A well equipped workshop will be constructed and adjoining to the lease area. Site office: A site office will be constructed nearby the lease area. Rest/Shelter/ Rest room: A Rest shelter/ Rest room will be constructed in the lease area; further drinking water will be made available in the site office. 4.4 Soil classification During mining operation no toxic substance will be generated or involved, the impact on soil quality is not likely to be more intensive than the existing level. 4.4 Climate data from secondary sources The area experiences sub tropical climate with abundant rainfall during monsoon months. The summers are not very hot due to thick forest in the area. April-May is the hottest months and December-January the coolest months. The area enjoys high precipitation during the monsoon season. The area may be divided into four seasons. Hot season starts from March to May, period from June to September are the monsoon season and the cold season is from December to February. The average temperature in summer ranges between C and during winter the temperature ranges 7-12 C. 4.5 Social infrastructure available The general living condition of the people in the nearby area is below poverty line. Agriculture has not been developed in the region to the extent it should have been. People, therefore, depend mostly on this type of mines or other local work for their livelihood. This has got a positive impact on the living condition of the local inhabitants. Besides the direct employment in the mines, indirect engagement may be two to three times. Mining activity in the area has brought some positive effect like better employment potentiality, better health care, better living, better sanitation conditions, better education facilities etc. 5.0 PLANNING BRIEF 11

12 5.1 Planning concept (Type of industries, facilities, transportation etc) town and country planning / development authority classification Open cast Semi mechanized mining method will be adopted for Stone Quarry mining. Project will produce cum of road metals/building stones, which will be utilized for domestic use only (in order to fulfill the local requirement). 5.2 Population projection Keeping in view of semi-mechanized method of mining, a total of 07 nos (Both skilled & non-skilled) of workers are to be employed in mine during the tenure of the plan period. 5.3 Assessment of Infrastructure Demand (Physical & Social) Necessary approach & mine roads will be constructed. 5.4 Amenities / facilities The management of the mine will extend facilities like a) Safety tools and implements that are required will be used during blasting. b) Provision of drinking water c) Direct and indirect employment opportunities d) Conducting medical camps for workers and nearby villagers at regular intervals. e) Arrangement of safety and healthy working conditions f) Misfires will be handled carefully as per stipulated procedures. 6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial area (Processing area) Temporary arrangements like site office, rest shelters & approach roads etc shall be provided. No permanent infrastructure is proposed. 6.2 Residential Area (Non processing area) As the local person shall be employed, no residential building is proposed. 6.3 Green Belt 12

13 It is proposed to develop a green belt in and along the periphery of the Quarry lease area of during the plan period. The species chosen for green belt are fast growing with good canopy and dense leaf density. The avenue plantation shall have fruit and flower bearing and some ornamental plants to give good aesthetic look. The scheme of afforestation is as given below: Year Location Extent (m²) No. of Saplings Species to Safety Zone Mango, Chakunda, Cashew, Krushnachuda, Banyan,etc. 6.4 Connectivity Lease area can be accessed 1.50 km from Sarankote and nearly 2.50 Km from N.H-6. The lease area is about 25 km away from the district head quarter Deogarh and is about 350 Km away from the state capital Bhubaneswar. There is no existence of public road or railway line within the lease area. Most of the commercial transportation is done through road networks. The nearby market is at Kala located at a distance of 4.50 km from the lease area. Telecommunication facilities have vastly improved with the advent of mobile phones. The District Headquarter Telecom office is running at Deogarh. 6.5 Drinking Water Management Water required for drinking purpose will be obtained through tankers from the nearby available sources. 6.6 Sewerage System Does not arise 6.7 Industrial Waste Management Does not arise 6.8 Solid Waste Management The generation of overburden is proposed to be nil. However about 10% of total rock 13

14 exposed zone has been considered as reject.a total of m³ of reject are likely to be generated during plan period. The generated rejects will be utilized for road construction and maintenance of existing road of surrounding areas 6.9 Power requirement & Supply / sources The mine will work in day time only, so no lighting arrangement will be required and the other equipment will be run by diesel. 7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN 7.1 Policy to be adopted (Central / State) in respect of the project affected persons including home oustees, land oustees and landless labourers (a brief outline to be given) No human settlements are existing in the ML area and no humans will be displaced from the area, so the proposed project does not involve any rehabilitation and resettlement. 8.0 PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given) The project will commence once the Environmental Clearance and other necessary statutory clearance certificates are obtained from the respective departments / authorities. 8.2 Estimated project cost along with analysis in terms of economic viability of the project Capital Cost The capital cost covers the expenditure incurred towards Mine development, cost involved towards land, infrastructure, plant and machineries etc. Besides the interest during development stage insurance, margin money on working capital, contingencies etc have also been included in the figures. The details of the break ups are furnished below. 14

15 Sl. No Major Head Rs. In Lakh 1 Cost of infrastructure Cost of Machinery & Plant Contingency 2.00 TOTAL Cost of Production of Road Metal Sl. No. Material Description Production Cost Rs. Per Ton 1 GSB ( 0 60mm) mm (20-60 mm) mm (20-40 mm) mm (12-20mm) mm (6-12mm) mm (4.75-6mm) CRF (0-4.75mm) Present rate of sell price Sl. No. Material Description Selling Ex-Crusher Rs. per Ton 1 GSB ( 0 60mm) mm (20-60 mm) mm (20-40 mm) mm (12-20mm) mm (6-12mm) mm (4.75-6mm) CRF (0-4.75mm)

16 Cost Benefit Analysis Sl. No. Material Description Selling Ex- Crusher Rs. per Ton Production Cost Rs. Per Ton Profit in Rs per Ton 1 GSB ( 0 60mm) mm (20-60 mm) mm (20-40 mm) mm (12-20mm) mm (6-12mm) mm (4.75-6mm) CRF (0-4.75mm) Considering cost of production in all aspects and selling price of the produced building stone, the project is economically viable. 9.0 ANALYSIS OF PROPOSAL (Final Recommendation) The project operation will provide livelihood to the poorest section of the society/ economically backward population and tribal s in the area. It provides employment to the people residing in vicinity directly or indirectly. The mine management will also help nearby villages by providing aid to school, conducting medical and social awareness camps, helping in formation of self help groups, etc. Thus the project will bring about socio-economic improvement of the area and will prove beneficial to the area. With progress in mine development activities, the per capita income of local people will increase which will reduce the public expenditure of the Govt. on social consumption need. Ultimately, it will add to the Govt. exchequers in the form of various taxes & returns. On the whole, overall development of the area will be there. 16

17 However, the feasibility report indicates that the mining of road metal is technically and economically viable under foreseeable operating scenario. Hence, the minor mineral road metal as a raw material for domestic use, civil work etc from surface mining is economically viable. ********** 17

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR DANKARI BLACK STONE QUARRY EXTENT-4.00Acres PLOT NO-600, KHATA NO-221 SAIRAT CASE NO-74/2014-15 VILLAGE: DANKARI, TAHSIL: DHARMASALA DISTRICT: JAJPUR, STATE-ODISHA. LESSEE M/S

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

LORE SILICA SAND MIINE

LORE SILICA SAND MIINE PRE FEASIBILITY REPORT OF Submitted to MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE GOVT. OF INDIA Paryavaran Bhawan, CGO Complex Jor Bagh Road, New Delhi-110 003 LORE SILICA SAND MIINE Village: Lore,

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

Make in India Campaign

Make in India Campaign Frequently asked questions (FAQs) DIRECTORATE OF COMMERCE & INDUSTRIES GOVERNMENT OF MANIPUR --- Make in India Campaign FAQ 1. What are the policies or schemes under which the Government is providing incentives

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by

Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) 1 2 3 4 5 I. Tamil Nadu Districts Municipalities (Hill Stations) Building Rules 1993. Rules Required Available

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information