1 1.0 EXECUTIVE SUMMARY: The Granite Mining[Black Granite] project (Minor Mineral) of Sri Suresh Jain 2.0 Ha is located at Survey No: 691, of Madanapalli Village & Mandal,. The Mine Lease[Quarry] was granted on the name of Sri Suresh Jain vide Director Mines & Geology, Hyderabad, Andhra Pradesh Notice No: 35582/R4-1/2011, Dated for a period of 20 Years upon submission of Approved Mining Plan, Environmental Clearance from MoEF and CFE & CFO from APPCB. The DMG Notice is enclosed as Annexure I. The Mining plan has been approved by Deputy Director of Mines & Geology, Kurnool, Andhra Pradesh vide Lr. No: 4825/MP-PLMR/2015, dated The Mine Plan Approval Letter is enclosed as Annexure II. SALIENT FEATURES OF THE PROJECT SITE S.No Particulars Details 1. Name of the Project Sri Suresh Jain 2. Nature/Production Black Granite Mining/Production 405 cum/year Size of the Project 2.0 Ha Type of Land Government Land 3. Location Details Survey No 691 Village Madanapalli Mandal Madanapalli District Chittoor State Andhra Pradesh Latitude & Longitude N E Toposheet No 56 K/6, 56 K/7, 56 K/10 & 56 K/611 4 Govt. Orders Mine Lease Order Notice: 35582/R4-1/2011, Dated M/s. Vison Labs, Hyderabad 1

2 Mine Plan Approval Lr. No: 4825/MP-PLMR/2015, dated Environmental Setting Nearest Village Nearest Town Nearest Railway Station Nearest Airport Inter State Boundary Water Bodies Forests Historical /Important Places Ecologically Sensitive Areas 6 Project Requirements Water Requirement Power Requirement Man Power Requirement 2015 Vudumvaripalli-1Km (WNW) Madanapalli 3.60 km(n) Vayalpadu-18.8 km [NE] Tirupathi 110 Km[E] Karnataka-Andhra Pradesh Km[W] Bahuda River -4.0 Km (N) Madanakonda RF - 0.9km(NNE) Arantlapalle RF 2.8km(S) Penchupadu RF-3.7 km[ssw] Avulakonda Extn. RF-5.7km[W] None None 4.0 KLD 80 KVA D.G. Set 28 No s 7 Mining Method Open Cast - Semi Mechanized 8 Project Cost 48.0 Lakhs 9 EMP Budget Capital Cost 3.40 Lakhs Recurring Cost 2.40 Lakhs 10 Present Proposal New Proposal and Applied for EC 11 Appraisal Category B2 category 12 Other Mines within 500 mts No mining projects are there within 500 meters M/s. Vison Labs, Hyderabad 2

3 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT: Project Details: The Granite Mining project (Minor Mineral) of Sri Suresh Jain 2.0 Ha is located at Survey No: 691, of Madanapalli Village & Mandal, Chittoor District, Andhra Pradesh. Project Proponent: Sri. Suresh Jain is the Proprietor of Black Granite Quarry lease over an extent of 2.0 Ha and having their registered office at H.No:4 A Rich Homes, 5/1 Richmond Road, Bangalore, Karnataka BRIEF DESCRIPTION OF THE NATURE OF THE PROJECT: As per EIA Notification dated 14 th Sep, 2006 and as amended till date, the project falls under, Category B2, which requires obtaining Environmental Clearance from SEIAA, Andhra Pradesh, Ministry of Environment & Forests, and Govt. of India. The method of mining will be open cast semi mechanized method by forming of proper benches. The mining of Black Granite production will be approximately 405 cu. m/annum. The lease area is 2.0 ha. Total minable reserve available is cu.m. OB / Waste generated entire lease period will be 45,900 cu m. The Granite will be transported through trucks. 2.3 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION: Rapid industrialization and growth in infrastructure has made global as well as domestic demand for Granite. So number of Granite manufacturing quarries & industries are coming up in this sector. Granite is the chief M/s. Vison Labs, Hyderabad 3

4 material in this sector, for the export industries like monuments, flooring slabs, Kitchen articles, sculptures & export. The size & quality parameters for supply of the mineral will be as per the requirements of the user industry. The mining and associated activities in the mineral rich areas increase the gain s in gross domestic product (Gross Domestic Product).Total of 28 people will be employed for the mining activity. It will create ample opportunity for employment to local population. For the mineral production applicant will pay royalty, direct and indirect taxes will also paid and it will also contributing to the regional revenue. The proposed Granite mining project will cater the need of requirement for individual and market. Besides this, the project will prove beneficial in terms of socio economic development. 2.4 DEMAND SUPPLY GAP: Granite is a constituent for infrastructural development projects like buildings and constructions. It has high demand in region due to increase in industrial and other infrastructural activities. 2.5 IMPORTS VS. INDIGENOUS PRODUCTION: The excavated granite will be dispatched to the block cutting industries located in the state and at different parts in the country. There will be indigenous inputs in the entire mining activity. The Granite is used in various Construction and Architectural uses as well as making decorative items, which also have export market. 2.6 EXPORT POSSIBILITY: Granite produced from the mine will fulfill the needs of the region and surplus if any, will be considered for export. M/s. Vison Labs, Hyderabad 4

5 2.7 DOMESTIC/ EXPORT MARKETS: Domestic Market Granites are most adaptable as interior veneers in sky scrapers. In architecture granites are mostly used for artistic veneers as they enrich other aspects of buildings. In India granite is used as kitchen platform, kitchen sink, name plates, foundation/inaugural stone etc. Granite ashtrays, flower vases and other art pieces have both domestic and export markets. Other uses for dressed or cuter shaped forms of different sizes are as flagging stones in the form of flat slabs or rectangular or irregular shapes over steps, walk ways, parks and terraces, parking streets and high ways or other traffic areas with rectangular blocks. Export Market The proposed mining activity is for indigenous consumption only for real state, decorative accessories etc. 2.8 EMPLOYMENT GENERATION: The total number of man power is required for the mining activity is 28 people. Skilled labour will operate the technical jobs and unskilled will do the other jobs. Following personnel are employed at the mine site. Designation No. of Persons Mines Manager 1 Supervisor 1 Hitachi/Excavator Operator 2 Compressor Operator 2 Tipper Operators 2 Semi Skilled Workers 10 Un Skilled Workers 10 Total 28 M/s. Vison Labs, Hyderabad 5

6 3.0 PROJECT DESCRIPTION: The project activity is Black Granite mining. In India, the number of operating opencast mines is steadily increasing as compared to underground mines. It is due to low gestation period, higher productivity, and quick rate of investment. On the contrary, opencast mining attracts environmental concerns such as solid waste management, land degradation and socio-economical problems. Most of the adverse impacts of mines are amenable to technological control by providing necessary preventive and control measures and finally through effective environmental management of the operating mines. Environment Clearance is required for project from State Environmental Impact Assessment Authority/State Expert Appraisal Committee as per MoE&F, EIA notification 2006 & Its Amendments thereof. 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY; The mining of Granite is carried out by open-cast semi-mechanized method. This is an independent project. No interlinked project is proposed. 3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES; The Granite Mining project (Minor Mineral) of Sri Suresh Jain 2.0 Ha is located at Survey No: 691, of Madanapalli Village, Madanapalli Mandal,. Top sheet No:, 56 K/6, 56 K/7, 56 K/10 & 56 K/11. Geographical Coordinates: Latitude & Longitude N E The Location Map, Topographical Map & Mine Layout Sketch are provided at Figure No: 3.1, Figure No: 3.2 & Figure 3.3. M/s. Vison Labs, Hyderabad 6

7 FIGURE 3.1 PROJECT LOCATION MAP Sri Suresh Jain Black Granite Mine M/s. Vison Labs, Hyderabad 7

8 FIGURE 3.2 TOPOGRAPHICAL MAP M/s. Vison Labs, Hyderabad 8

9 FIGURE 3.3 MINE LEASE SITE LAYOUT M/s. Vison Labs, Hyderabad 9

10 3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GIVEN INTO SHOULD BE HIGHLIGHTED: No alternative site has been taken into consideration as the mineral (Granite) is available at this site. 3.4 SIZE OR MAGNITUDE OF OPERATION: Mine area for the Proposed Black Granite Mine is 2.0 Ha and proposed production Capacity is 405 cu. m/annum. 3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM / FLOW CHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN). Details regarding topography geology, mineable reserves, and production details, Method of mining and extent of mechanization are given below; Topography: The subject area comes under revenue category. The lease area is a elongated small hilly surface with black granite boulders, it is mound type gently sloping due N-S part and covered with shrubs. The local elevation is about 17 m relief within the area with the highest and lowest elevations in the lease area are 815 m and 798 m from the assumed bench mark of 798 m and shown in plate-iii in mining plan. The surrounding areas are flat agricultural lands etc. Small plants and bushes are present all over the area. The drainage developed from this upland area flows due West & SW Regional Geology: The region of the subject area is belonging to Peninsular Gneiss of Archean Group. The Peninsular Gnessic complex comprising migmatite gneiss, grey granodiorite, Porphyritic granite and intruded dolerite and aplite veins. M/s. Vison Labs, Hyderabad 10

11 The Peninsular Gneissic complex comprises of migmatite-gneiss-granite suite of rocks, they are highly variable in mineralogical composition appearance structure and relative ages. The individual members have not been distinguished in a major part of the area. However, granite and migmatite gneiss occupy a large part of the area while bands of relatively younger coarse-grained gneissic granite occur in north eastern part. The Chittoor belt is located along the Peninsular Gneissic Complex comprises a complex assemblage of gneissic variants and granitic rocks which occupy almost entire lease area. The Peninsular Gneissic Complex in the area is representing mostly by Biotite Hornblende Gneiss Granite and Migmatite in NE part of the quarry lease applied area and made up of rocks of high grade metamorphism, migmatisation and intense deformation. These granites, which are often porphyritic are intrusive into the gneissic terrain and contain alkali feldspar space. The later in parts the colour to the granite which ranges from light to deep pink because of the massive nature of these intrusive. They are amenable to produce large size blocks, due to wide spaced joint pattern inherited to them. The granite deposits are mostly confirmed to the belt between Cuddapha and Chittoor Local Geology: The units exposed in the lease hold are dolerite (Black granite) and granite. The black granite is rising from minimum elevation of MSL 798 m to maximum elevation of 815 m within applied area trending N-S, the strike length of the body measured 350 m in the area with an average width of 55 m.[n-s Vertical, E-W vertical & Horizontal/Sheet joints] Area is characterized by rugged topography with isolated tors and inselbergs intervened by plain lands. Porphyroblastic granite with black amphibole a hornblende background with euhedral dark brown colour K Feldspar porphyritic srystals and extensively extracted in ard around the quarry lease. Mineralogically this rock is composed of quartz, plagioclase, microcline, orthoclase with subordinates amount of biotite, hornblende and magnetite etc. M/s. Vison Labs, Hyderabad 11

12 Physical Properties of the Dolerite Degree of Weathering : Though the dolorite shows surface weathering only over major part of the area it is expected that the dolerite shows weathering to a depth of 2.0m to 2.5m as can be seen in the working in the Dollar Dykes lease hold Density : 2.9 Poisson s ratio : 0.3 Permeability : Negligible Compressive Strength : 40Mpa Young s Modulus : Gpa Glassiness : The rock takes excellent polish Defects in the rock: Two sets of minor joints are present. However these are expected to disappear in two to three meters depth. Occasional presence of White Specks are noticed Color variation : The rock color change from dark black to slightly lesser dark at places Defects at the contact zone with granite ; The dolerite shows weathering and is coarse grained at the contact zone Geological Reserves: Based on the prospecting work carried out and the present exposure of the rock, the reserves of the area have been estimated in this area with the recovery factor is taken only 15%. A Geological evolution of the deposit: i. Frequency of the joints: Two sets of close spaced vertical joints are present in surface exposures breaking rock into small boulders. ii. Faults and folds are absent in the area iii. Splitting pattern. The rock is hard to vary hard and can be split into perfect blocks as can be seen from the blocks worked earlier and present along the track iv. Extent of Weathering: The black granite show only surface weathering over a major part of the area. M/s. Vison Labs, Hyderabad 12

13 Reserves The reserves are calculated by cross section method 6 cross section A-A1, B- B1, C-C1, D-D1, E-E1 and F-F1, are drawn cross sectional areas of overburden rock from RL 798 to RL 815) and sheet rock (from RL 798 to 815) are calculated. Sectional areas multiplied by strike influence gives the volume of the rock. The reserves from are considered as overburden and waste rock and mineable reserves. Details of calculation of proved mineable reserves 1. Proved reserves 3,71,650 cu.m 2. Reserves blocked in the buffer zone 7.5 m. 1,08,150 cu.m 3. Reserves blocked under safety slope 77,150 cu.m 4. Total reserves blocked 1,85,300 cu.m 5. Reserves available for Exploration 1,86,350 cu.m 6. Net mineable reserves@15% recovery 27,952 cu.m 7. Waste rock generated during mining lease period 45,900 cu.m Life of mine; At the proposed yearly production of 405 cu.m the life of the mine will be Mineable reserves/proposed annual production = 27,952/405 =69 years PROVED MINEABLE RESERVES [UNFC-111] Category Section & Influence Distance in m Sectional Area m2 Volume m3 15% Reserves (m 3 ) Granite(cu. m) A A B B C C D D E E F F Total Proved Reserves under UNFC Code M/s. Vison Labs, Hyderabad 13

14 RESERVES BLOCKED UNDER 7.5 M BUFFER ZONE Sections Sectional Area [m 2 ] Sectional Influence[m] Volume [m 3 ] A A B B C C D D E E F F Total Reserves Blocked RESERVES BLOCKED UNDER SAFETY SLOPES Sections Sectional Area [m 2 ] Sectional Influence[m] Volume [m 3 ] A A B B C C D D E E F F Total Reserves Blocked Life of the Mine: Total Mineable Reserves Production per Year = 27952/405 = Years Say 69 Years Method of Mining: Open cast method of mining is carried out in this mine by manually and semi mechanization by using compressor operated jack hammer drills, excavators and dumper etc., Transportation will be made by trucks to dispatching points ( Rail head/port). The mining operations are carried out by semi-mechanization as open cast mining by developing the benches of 6 m height in 2 phases of 3 m each. Wire saw cutting will be deployed based on the favourable conditions. The development if benches in the sheet rock M/s. Vison Labs, Hyderabad 14

15 will be 0 safety slopes. The separation of blocks from the mother rock will be carried out by drilling, wedge cutting, blasting and excavation will be done by the machinery. Hydraulic excavator and compressor operated jack hammers were used for cutting the rock. Close spaced drilling of 0.3m was adopted along a straight line and charged with low explosives to avoid feather cracks. The secondary splitting, dressing of blocks will be done manually. The mining operations are to be carried in two stages 1. Development 2. Production Stage-I: The removal of weathered and under sized boulders will be cleared in the quarry lease by using excavators. The sheet that is exposed will be subjected to drilling, blasting and splitting from the mother rock. Rock Splitting/Wedging Thus 20 x20 to 40 x20 to 40 mass will be separated from mother rock by drilling the slotter holes on both sides of the mass and a top hole intersecting these two holes and a wire saw rope is passed through and cutting is done horizontally and vertically and by this there will be mass opening on all sides from mother mass. Stage-II: After removal of weathered and under sized boulders, The large boulders will be subjected to splitting into required sizes of blocks by using jack hammers and drilling series of deep holes at right angles at regular intervals, later by intersecting feather and M/s. Vison Labs, Hyderabad 15

16 wedges in these holes and hammering with sledge hammer eill release the blocks. The burner cutters will be deployed for shaping the boulders The boulders will be splitted to the required sizes with drilling and if required by using chemical compound at source. The boulders separated will be sent to the dressing yard for dressing The boulders, which fit into the required market grade size will be transformed into cuboids Secondary Splitting: After separation from the mother rock, it is properly checked by washing with water to identify defects and cracks. Based on this observation, the size is decided and the blocks are marked and separated by drilling and wedging. The separated blocks will be examined for defects and lines, then the blocks are marked in clear area and holes are drilled along the line of marking with the help of feathers and wedges the waste portion are separated forming a rectangular blocks, bulges will be removed by drilling and wedging to make them perfect blocks. A perfect block is that all sides make with each other Dressing: After primary separation the rock mass will be carefully examined to avoid hairline cracks, mineral segregations and veins. The dressing of the rough blocks will be made by chipping the edges and geometrically equating the edges of the block at the dressing yard. The rough blocks obtained after primary cut it will be dressed for obtaining good geometric shape of coloured granite. Dressing of dimensional rough blocks for exports: Dressing is the final phase of mining operation, wherin the secondary rough blocks are squared into rectangular sizes, there by avoiding uneven bulge or M/s. Vison Labs, Hyderabad 16

17 cavities and other defects. Jackhammers with compressor, feather end wedges and sledgehammers are the equipment generally used for dressing the block Extent of Mechanization: The machinery requirement is mainly for drilling and transporting the materials. The details of required machinery are presented in below. MACHINERY REQUIREMENTS S. No. Description Number(s) 1. Excavator Tata Hitachi 200 Lc 1 2. Jack Hammer 3 3. Air Compressor (300 CFM) 1 4. Tippers 2 5. Dewatering pumps Year wise Production Details: The year wise production proposed is shown in the following table YEAR WISE PRODCUTION DETAILS Year Working Bench Volume of Volume of Volume of area in Height (M) total Granite intercalated (m2) excavated Production waste material % (m3) (m3) (m3) 1st Year 450 6m nd Year 450 6m rd Year 450 6m th Year 450 6m th Year 450 6m Total Average M/s. Vison Labs, Hyderabad 17

18 3.5.9 Loading & Transport: Loading of mineral will be done by crane and will be sent to the temporary stock yard. Dumpers of 15 T will be used for transportation of Minerals/OB Waste Generation & Disposal: About 2295 m3 of waste in every year and about m3 of waste in first plan period and about m3 of waste in entire life period of the mine will be generated. The waste that will be generated will be dumped in west side of the QL area. A retaining wall will be constructed around the dump to preventing the slanting of boulders. The year wise waste generation in next 5 years as follows: YEAR WISE WASTE GENERATION Year Waste Generation in M 3 I 2295 II 2295 III 2295 IV 2295 V 2295 Total Entire the Lease period 3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT No raw material will be required. The final product will be sent to consumer industries based on their demand. The mode of transportation of raw material will be by road. Trucks will be used for transportation to the end users. M/s. Vison Labs, Hyderabad 18

19 3.7 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED Mineral will be utilized and sent for use to different end users. Some of the rejects/ waste will be used for the maintenance of roads. 3.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT AND SOURCE; Water Requirement: The daily water requirement will be 4.0 KLD, which will be sourced from outside Tankers. a)mine Site Blocks Washing Dust suppression Green belt b)domestic Drinking &Toilet Total water required Water Requirement 1.0 KLD 1.2 KLD 0.8 KLD 1.0 KLD 4.0 KLD Power Requirement: There will not be any requirement of power supply for the proposed project activity. The Quarry activities are envisaged to be carried out only during day time by manually and Semi mechanized method. All the equipment shall be operated with diesel as motive power. One D.G set of 80 KVA is proposed for back-up power and other requirements. 3.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL About m3 of overburden will be generated at the end of the five years period and m3 for entire the lease period. This will be initially dumped within the lease area, which is located at West side of the QL. No liquid effluent will be generated at the mine site. The domestic wastewater of 0.6 KLD generated will be sent to septic tanks followed by soak pits. M/s. Vison Labs, Hyderabad 19

20 4.0 SITE ANALYSIS 4.1 CONNECTIVITY (Mine Site) MODE DESCRIPTION Nearest Railway Station Vayalpadu-18.8 kms[ne] Nearest Airport Tirupathi Airport 110 kms[e] Nearest Highway National Highway 205[Ananatapur- Chennai] km[ne] Nearest Seaport Chennai 200 kms (SE) 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP Land Form: The lease area is covered in the Survey of India Topo Sheet No: 56 K/6, 56 K/7, 56 K/10 & 56 K/11 and is a hill rising to a height of mts and devoid of any forest and tree cover Land Use: The sanctioned lease area is Govt. Waste land 2.0 Ha and being not to put any other use Land Ownership: The sanctioned lease area is Govt. Waste land 2.0 Ha. 4.3 TOPOGRAPHY: The area is located on Topo Sheet No: 56 K/6, 56 K/7, 56 K/10 & 56 K/11 at the junction of Latitude N and Longitude E. The Lease area is a hill rising to a height of mts. The area is devoid of any forest or tree cover. In general the area is plain studded with isolating hillocks. Sometimes they may rise gently as continuous hills, presenting a rugged topography. M/s. Vison Labs, Hyderabad 20

21 4.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON- AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN. The existing land use is Govt. waste land and being not to put any other use S.NO PARTICULARS DETAILS 1. Archeological Important Places None 2. Ecological Sensitive areas None (National park, Wild Life Sanctuary & Biosphere Reserve etc.) 3. Reserved Forests Madanakonda RF - 0.9km(NNE) Arantlapalle RF 2.8km(S) Penchupadu RF-3.7 km[ssw] Avulakonda Extn. RF-5.7km[W] 4. River/Water Bodies Bahuda River -4.0 Km (N) 4.5 EXISTING INFRASTRUCTURE: There are no buildings & structures within the mine lease area except some vegetations existing in the lease area which will be cleared when required. Basic Amenities: A) Communication & Post-Office:- The Nearest Post & Telegraph Office is at village Madanapalli, which is about 3.6 Km[N] B) Government & Private Schools: - Madanapalli, which is about 3.6 Km[N] C) Nearest Hospital: - Madanapalli, which is about 3.6 Km[N] D). Nearest Dispensary is at Madanapalli, which is about 3.6 Km[N] M/s. Vison Labs, Hyderabad 21

22 4.7 CLIMATIC DATA FROM SECONDARY SOURCES: S.NO PARTICULARS DETAILS 1. Minimum Temp 14 C 2. Maximum Temp 47 C 3. Normal Rainfall 1050 mm 4.8 SOCIAL INFRASTRUCTURE AVAILABLE: Particulars Name Distance with Direction Nearest Habitation Vudumvaripalli 1.0 Km (WNW) Nearest Town Madanapalli 3.6Km (N) District Headquarter Chittoor 71 km (SE) Nearest Railway station Vayalpadu 18.8 Km (NE) Nearest Airport Thirupathi Airport 110 Km (E) Nearest Port Chennai 200 kms (SE) Nearest High way Nearest Dispensary & Govt. Hospital National Highway 205[Ananatapur- Chennai] Madanapalli 4.31 kms (NE) 3.6Km (N) Education Facilities Madanapalli 3.6Km (N) 5.0 PLANNING BRIEF 5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION The project activity is mining of Granite, which will be done by opencast semi mechanized method by forming benches. The ultimate pit limit is marked as shown on the Geological Plan & Sections. Conceptual plan period production & development details as furnished in the Conceptual Mine Plan. M/s. Vison Labs, Hyderabad 22

23 Dumping will be done at designated area within the lease area. At the end of the Conceptual Period complete dumps will be afforested and wherever possible and along road sides greenbelt development will be carried out. Safety bunds, fencing & retaining walls shall be constructed as per the directions and guidelines of Directorate General of Mines Safety. 5.2 POPULATION PROJECTION: The man power of mines includes Mines manager, Engineer, Geologist, skilled and unskilled Labours and medical officers etc. As for the socioeconomic is concerned from the Quarry activity nearby villagers shall get direct employment for about 28 persons. The proposed Quarry activities also shall bring the positive change in the villages as the mine shall provide indirect employment to more than 15 people. 5.3 LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.) In every year about 50 mts length of buffer zone will be planted along the boundary on Northern, Southern, Western & Eastern sides of the area. About 50 saplings consisting of Neem, Siris, Eucalyptus, Sisham,Kanju, Karanj and Amaltaas will be planted per year over an area of 50m x 6m at 3m grid interval. 5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL): The existing road network will be sufficient to meet the proposed production capacity. However, required infrastructure for transport within the leasehold area will be further strengthened and improved. No new routes or alternations are required in this regards. 5.5 AMENITIES/FACILITIES It is proposed to provide the site services like Mines office and other statutory constructions like Rest Shelter, First Aid, Work shed and Drinking water as required near the QL. Manager s Room 6m x 6m x 3m with ACC roof M/s. Vison Labs, Hyderabad 23

24 Rest Room 6m x 6m x 3m with ACC roof Toilets 2m x 1.5m x 3m First Aid Provision is made in the Manager s Room Drinking water Provision is made in the Rest Room 6.0 PROPOSED INFRASTRUCTURE: 6.1 INDUSTRIAL AREA (PROCESSING AREA- MINE LEASE AREA) The total mine lease area is 2.0 Hectares. Mines office and other statutory constructions like rest shelter, first aid, work shed are available at the site and the same will be utilized for future. 6.2 RESIDENTIAL AREA (NON PROCESSING AREA) As the local person will be given preference for employment, hence no residential area/ housing is proposed. 6.3 GREEN BELT: In every year about 50 mts length of buffer zone will be planted along the boundary on Northern, Southern, Western & Eastern sides of the area. About 50 saplings consisting of Neem, Siris, Eucalyptus, Sisham,Kanju, Karanj and Amaltaas will be planted per year over an area of 50m x 6m at 3m grid interval. 6.4 SOCIAL INFRASTRUCTURE: Local people will be employed for excavation activity. The project will provide the indirect means of earnings in the area of vehicle driving, shops, construction etc. As a result the project will bring a positive impact on the adjacent civilization. The proponent will spend 1% of profit for the development of the area i.e. medical facilities, schools, temples and other social work. M/s. Vison Labs, Hyderabad 24

25 6.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO/ WATER WAYS ETC.) MODE DESCRIPTION Nearest Railway Station Vayalpadu 18.8 Km (NE) Nearest Airport Tirupathi Airport Km (E) Nearest Highway National Highway 205[Ananatapur-Chennai] km[ne] Nearest Seaport Chennai Port 200 kms (SE) 6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER): The total water requirement of the project is 4.0 KLD which will be used for Dust Suppression, Greenbelt Development & Domestic purposes and will be sourced from nearby villages through Tankers. 6.7 SEWERAGE SYSTEM: Domestic Waste Water will be sent to Septic Tank followed Soak pit. Outside discharge is not envisaged. 6.8 INDUSTRIAL WASTE MANAGEMENT: There is no generation of Industrial Solid waste due to this mining activity. 6.9 SOLID WASTE MANAGEMENT: About 2295 m3 of waste in every year and about m3 of waste in first plan period and about m3 of waste in entire life period of the mine will be generated. The waste that will be generated will be dumped in west side of the QL area in an area of 26m Length x 20m Width x 10m Height. A retaining wall will be constructed around the dump to preventing the slanting of boulders POWER REQUIREMENT & SUPPLY/SOURCE: There will not be any requirement of power supply for the proposed project activity. The Quarry activities are envisaged to be carried out only during day time by manually and Semi mechanized method. All the equipment shall be operated with diesel as motive power. One D.G set of 80 KVA is proposed for back-up power and other requirements. M/s. Vison Labs, Hyderabad 25

26 7.0 REHABILITATION AND RESETTLEMENT (R and R PLAN): 7.1 POLICY TO BE ADOPTED (CENTRAL/STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABOUR (A BRIEF OUTLINE TO BE GIVEN). Not Applicable as the lease area is Govt. land and there is no involvement of Rehabilitation and Resettlement plan. 8.0 PROJECT SCHEDULE AND COST ESTIMATES: 8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME SCHEDULE FOR THE PROJECT WILL BE GIVEN). The project will be started once obtain the Environmental Clearance and other necessary approvals from respective departments of state Government. 8.2 ESTIMATED PROJECT COST AND ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT Total project cost 48 Lakhs EMP Capital Cost 3.40 Lakhs EMP Recurring Cost 2.40 Lakhs 9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The Granite lease is result in growth of the surrounding areas by increasing direct and indirect employment opportunities in the region including ancillary development and surrounding infrastructure. Special emphasis on Financial and Social Benefits is being given to the local people including tribal population, if any in the area. The project will bring economical benefits to the state by the way of Royalty. Development of social amenities is in the form of medical facilities and providing books and school uniforms to the poor students nearby schools. No major adverse effect on environment is envisaged as the required mitigation measures are will be given priority. M/s. Vison Labs, Hyderabad 26

27 10.0 ENVIRONMENTAL MANAGEMENT PLAN: 10.1 POLLUTION SOURCES & CONTROL MEASURES: S.NO PARTICULARS SOURCE CONTROL MEASURES & MANAGEMENT 1. Air Pollution Drilling, Loading & Un Loading Haul Roads Transportation, a)wet Drilling System b)jackhammer are provided with Gunny bags c)regular Sprinkling of Water on haul roads d)greenbelt Development along Waste Handling the Buffer Zone of the Lease area, Haul roads & Waste Dumps & e)5.0 Mts of stack height is D.G. Set (80 KVA) provided for DG Set ( H = h x KVA) = x 80 KVA = 4.78mts f) Provision of dust masks g) Cloth for drillers 2. Water Domestic Waste a). 0.6 kld of Domestic Pollution Water wastewater will be sent to the septic tank followed by soak pit. b). Retention wall at the foot of the dump for allowing clean water out. c). Garland drains will be provided around the waste dump. d). Siltation tanks construction at the discharge end of garland drains to arrest silt. 3. Noise Drilling, a). Periodical maintenance of Pollution Material machinery b). Thick green belt along the Handling, Buffer Zone of the Lease area Loading, D.G. Set & Movement of c). Acoustic enclosure for the DG sets d). Speed of vehicles will be limited vehicles e). Provision of earmuffs/ear plugs to employees M/s. Vison Labs, Hyderabad 27

28 4. Solid Waste Rock Waste / a). Waste Will be stacked in the Over Burden west side of the Lease Area over a length of 26 mts, width of 20 waste mts and to a height of 10 mts (11475m3 in 5 b).retaining wall will be years) & (45900m3in20years) constructed around the dump c).garland drains will be constructed around the dump d).rock Waste is crushed into smaller sizes and used as a road metal e).over Burden waste is used in filling low lying areas f).rejected material is used in making of tiles 5. Reclamation - Reclamation will be taken up on need basis before the conclusion of Mining operations. The Back filling of the mine starts from the E end to W side. Drainage will be developed along the slopes of the mound. M/s. Vison Labs, Hyderabad 28

29 10.2 BUDGETS FOR IMPLEMENTATION OF EMP: S. No Particulars Proposed Capital Cost (Rs.) Recurring Cost (Rs.) Per Annum Purpose of Recurring Cost 1. Dust Suppression 70,000 60,000 Mobile Water Tanker Capacity 5KL, Daily 1 250/- per trip 2. Green Belt 40,000 25,000 Sapling Cost, Labour Development Cost & Manure Cost 3. Retaining Wall 25,000 10, mtrs/annum 4. Check Dam 25,000 10,000 Maintenance Cost 5. Garland Drain 25,000 10,000 Maintenance Cost 6. Occupational 50,000 40,000 Periodic Medical Health & Safety Checkups & Medicines 7. Environmental 0 60,000 Ambient Air Quality Monitoring Monitoring, Water Quality Analysis & Noise Levels (Will be out sourced) 8. Nose masks, Cloth 50,000 10,000 Purchasing of for drillers & Gunny Damaged pieces etc. bags for jackhammer etc. 9. Safety 50,000 15,000 Periodical maintenance Equipments[Shoes, Belt, Ear Plugs, Ear muffs etc] Total 3,35,000 2,40,000 M/s. Vison Labs, Hyderabad 29

30 10.3 ENVIRONMENTAL MONITORING PLAN: S. Potential No. Impact 1 Air Emissions Action to be Followed Ambient air quality within the premises of the Mine Lease Area and nearby habitations to be monitored. 2 Noise Noise generated from various mining activities 3 Waste Water Quality Sampling & Analysis of Waste Water Parameters for Monitoring Frequency Monitoring of Location PM 10, PM 2.5, Periodic during Four SO 2, NO x and operation Locations CO. phase As per CPCB/ APPCB guidelines Spot Level recording Noise As per CPCB Guidelines Periodic during operation phase Periodic during operation phase 4 Health Employees andall relevant Regular Labour health checkparameters ups ups 11.0 OCCUPATIONAL HEALTH & SAFETY: check Five Locations The management of occupational safety & health is the prime responsibility of mine management. The following facilities will be provided to the employs; Provision of Dust masks to prevent exposure of persons to dust Provision of ear muffs/ear plugs for protecting workmen from adverse affects of noise Regular health monitoring of workers will be carried out. First Aid Facility at site. - - M/s. Vison Labs, Hyderabad 30

31 12.0 CONCLUSION: The Granite Mining of Sri Suresh Jain an extent of 2.0 Ha is located at Survey No: 691, of Madanapalli Village, Madanapalli Mandal, Chittoor District, Andhra Pradesh will be environmental compatible to the surrounding due to the high standards of pollution control measures to be adopted during the operational phase. Environmental Management Plan will help minimize adverse impacts on the environment. Where impacts occur, immediate action must be taken to reduce the escalation of effects associated with these impacts. To ensure the relevance of this document to the specific mine development stage, it needs to be reviewed throughout all phases. Hence, it is requested that necessary Environmental Clearance may be accorded for implementation of the project. M/s. Vison Labs, Hyderabad 31

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1. INTRODUCTION: 1.1 Background: The mining lease, for colour granite over an extent of 1.0 ha. in Sy No.333 of Arikara Village, Alur Mandal,

More information

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE OF THE PROPOSED COLOUR GRANITE MINING PROJECT APPLICATION. AT SURVEY NO. 54/P,2.0 HECTARE

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN 1.0 Introduction: Background: The Quarry lease, for Black Granite over an extent of 1.482 ha. in Sy Nos. 10 & 23, Sankavaram Village, Kanigiri

More information

STANDARD TEMPLATE FORM-1 PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & APPROVED MINING PLAN. For. Black Granite Mine of.

STANDARD TEMPLATE FORM-1 PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & APPROVED MINING PLAN. For. Black Granite Mine of. STANDARD TEMPLATE FORM-1 PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & APPROVED MINING PLAN For Black Granite Mine of Sri Syed Alisher (MINE LEASE AREA: 8.0 ha.) At Sy.No: 333 Bidinamcherla Village,

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 200 Cum/year of Black Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SOHAN ART & GRANITE INDUSTRY have granted quarry lease for Black Granite over an extent of 1.00 Hectare in Sy. No. 101 of Kappali Village, Ramasamudram Mandal, Chittoor

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

Black Granite (Mine Lease Area: 1.00 ha) Sy. No: 377/1B & 380/2B of. Muthukur village, Peddapanjani Mandal, Chittoor District, Andhra Pradesh.

Black Granite (Mine Lease Area: 1.00 ha) Sy. No: 377/1B & 380/2B of. Muthukur village, Peddapanjani Mandal, Chittoor District, Andhra Pradesh. Standard Template, Form-1, Pre-Feasibility Report Environmental Management Plan Approved Mining Plan Black Granite (Mine Lease Area: 1.00 ha) At Sy. No: 377/1B & 380/2B of Muthukur village, Peddapanjani

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs.

1.1 INTRODUCTION. The Lessee is proposes to produce about 7315 Cum/year of Colour Granite. The total cost of the project is Rs. 1. INTRODUCTION 1.1 INTRODUCTION M/s.M.S.P GRANITES have granted quarry lease for Colour Granite over an extent of 16.56 Hectare in Sy. No. 01 of Kori Village, Parvathipuram Mandal, Vizianagaram District,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

R. M. ESWARA NAIDU Bommaiahpalli Village, Nalagampalli Post, Bangarupalyam Mandal, Chittoor District, Andhra Pradesh Mobile No: +91 98451 27702

R. M. ESWARA NAIDU Bommaiahpalli Village, Nalagampalli Post, Bangarupalyam Mandal, Chittoor District, Andhra Pradesh Mobile No: +91 98451 27702 R. M. ESWARA NAIDU Bommaiahpalli Village, Nalagampalli Post, Bangarupalyam Mandal, Chittoor District, Andhra Pradesh Mobile No: +91 98451 27702 To, The Member Secretary, State Level Environmental Impact

More information

M/s. Sri Nageswari Granites (Black Granite Mine 3.00 Ha.)

M/s. Sri Nageswari Granites (Black Granite Mine 3.00 Ha.) STANDARD TEMPLATE FORM-1 PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & APPROVED MINING PLAN For M/s. Sri Nageswari Granites (Black Granite Mine 3.00 Ha.) At Sy. : Gap Area Auvulapalli &Vuppurapalli

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

SWETHA GRANITES DOOR.NO.2-12, GUDLANAYANAPALLI VILLAGE & POST, KUPPAM MANDAL, CHITTOOR DISTRICT-517425 PH: +91 99124 03904, +91 94410 55574

SWETHA GRANITES DOOR.NO.2-12, GUDLANAYANAPALLI VILLAGE & POST, KUPPAM MANDAL, CHITTOOR DISTRICT-517425 PH: +91 99124 03904, +91 94410 55574 SWETHA GRANITES DOOR.NO.2-12, GUDLANAYANAPALLI VILLAGE & POST, KUPPAM MANDAL, CHITTOOR DISTRICT-517425 PH: +91 99124 03904, +91 94410 55574 To, The Member Secretary, State Level Environmental Impact Assessment

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

G. M. Nagaraju Environment Management Plan

G. M. Nagaraju Environment Management Plan ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

STANDARD TEMPLATE FORM-1 PREFEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN. For. BLACK GRANITE MINE (MINE LEASE AREA: 1.00 Ha.)

STANDARD TEMPLATE FORM-1 PREFEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN. For. BLACK GRANITE MINE (MINE LEASE AREA: 1.00 Ha.) STANDARD TEMPLATE FORM-1 PREFEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN For BLACK GRANITE MINE (MINE LEASE AREA: 1.00 Ha.) At SY. NO. 277/2(P), 282/1(P) & 282/3(P), VENKATAPURAM VILLAGE, DARSI MANDAL,

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES:

STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES: STANDAD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES: S. No Information Required Information to be furnished by the Proponents 1 Name of the project or activity 7.781 Ha. of Marble Mine NEW MINE

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

OVER AN EXTENT OF 5.378 HECTARES OF COLOUR GRANITE MINE. M/s. Margra Exports (P) Ltd No.76,Cathedral Road, Chennai.

OVER AN EXTENT OF 5.378 HECTARES OF COLOUR GRANITE MINE. M/s. Margra Exports (P) Ltd No.76,Cathedral Road, Chennai. ENVIRONMENTAL MANAGEMENT PLAN For OVER AN EXTENT OF 5.378 HECTARES OF COLOUR GRANITE MINE In Sy. No: 01, of Addukonda village, Tekkali Mandal, Srikakulam District, Andhra Pradesh Proposed By M/s. Margra

More information

TAMIL NADU POLLUTION CONTROL BOARD FORM I

TAMIL NADU POLLUTION CONTROL BOARD FORM I TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. Stone Plus Colour granite Quarry

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS 2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information