PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
|
|
- Stella Hart
- 8 years ago
- Views:
Transcription
1 PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST: BHARUCH , GUJARAT 1
2 EXECUTIVE SUMMARY The application has been done for M/s. SAI MINERALS for the Environment Clearance of lease area hectare by Mr. Amarjitsinh R. Varachhiya partner of the mining of mineral Black Trap located at Survey No: 13, At: Ashnavi, Tal: Jhagadia, Dist: Bharuch, Gujarat. Resident of the applicant is located at G-7/8, Prestige Chamber, ABC Circle, Nr. Ashish Hotel, Bharuch. Some facts about the mining lease:- I. This is a Black Trap mining proposed project. II. The application for mining lease has been done on dated 31/12/2015. III. IV. Blasting shall be involved in this project. Application for explosive license from Petroleum and Explosives Safety Organization (PESO), (Formerly Department of Explosive) will be applied after getting EC from SEAC, Gandhinagar and permission from the Geology and mining department, Bharuch. Black Trap mining shall be done only is lease area as provided by the Geology and mining department. V. Approximately 20 Nos. of workers shall get employment opportunity. VI. VII. VIII. Category of project B Sr. No. In the schedule 1(a) The proposed Lease area hactare. IX. The lease area is located between the 21 40'39.58"N Latitude and 73 13'27.28"E Longitude. X. Proposed production of Black Trap 20,000 MT/Year. XI. Water consumption will be 5.00 KL/Day. Out of 5.00 KL/Day, 1.00 KL/Day will be required for domestic purpose and 4.00 KL/Day for sprinkling purpose. Source of water will be Bore Well located in our crushing plant which is nearer to our mining activity. 2
3 XII. XIII. XIV. XV. There shall be no any industrial water consumption and wastewater generation from the proposed project. There shall be no any permanent power requirement for the proposed project. Approximately 40 L/Day Diesel is required only for the mining machinery i.e. excavator, compressor which will be brought from nearby diesel pump. Overburden & rejected mineral materials will be the waste material which will be generated during mining. No such solid waste or hazardous waste shall be generated from mining. Only overburden and rejected materials (soil/stone) shall be generated. It shall be used for refilling of low lying area or for paving roads. There is no any National Park, Forest, Wild Life Sanctuary, Eco Sensitive Area and notified industrial area are presented within 15 km radius of the project. 3
4 INDEX SR. NO. DESCRIPTION PAGE NO. 1. Introduction of the Project / Background Information 5 2. Project Description 7 3. Site Analysis Planing Brief Existing Infrastructure Rehabilitation and Resettlement (R & R Plan) Project schedule and Cost Estimates Analysis of Proposal (Final recommendation) 18 4
5 CHAPTER 1 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 1.1 IDENTIFICATION OF THE PROJECT AND PROJECT PROPONENT This is a new proposed project of Black Trap mining. The project name is M/s. SAI MINERALS which is located at Survey No: 13, At: Ashnavi, Tal: Jhagadia, Dist: Bharuch, Gujarat. Category of project B Sr. No. In the schedule 1(a) The proposed Lease area hactare The applicant Mr. Amarjitsinh R. Varachhiya is a partner of this black trap mining project. Resident of the applicant is located at Correspondence Add: G-7/8, Prestige Chamber, ABC Circle, Nr. Ashish Hotel, Bharuch. We have Mining lease for quarry applied from Geology & Mining Department, Bharuch on dated: 31/12/2015. Please refer Annexure 1 of Form I 1.2 BRIEF DESCRIPTION OF NATURE OF PROJECT. Black Trap mining is a practice to extract Black Trap, mainly through blasting in Black Trap/Rocks area in an open pit mining. Black trap is a raw material for the kapchee, greet like construction material. In the construction business black trap plays an important role. Black trap is mineral present as stone benches. The height and thickness of bench is vary with place to place. The average thickness of the overburden is around 2.00 to 3.00 meters. The Over Burden or waste will be stacked separately and temporarily for ultimate dispose off by means of backfilling and also for covering the mine area. Black Trap is proposed to be excavating mechanically with blasting. The over burden/ waste is proposed to be backfilled in worked out areas. It is proposed to produce Black Trap at 20,000 MT/Year. 5
6 1.3 NEED FOR THE PROJECT AND IMPORTANCE TO THE COUNTRY The Mining project falls in the area of the Bharuch district, Guajrat. As industrial growth and infrastructure growth is going on day by day in Gujarat, there is huge requirement of concrete or kapchee that plays a very crucial role in any developing countries. These black trap should be transfered to stone crushing plant for making different size of kapchee. 1.4 DEMAND AND SUPPLY GAP As infrastructure growth and infrastructure growth is on peak in Gujarat, there is a huge demand of Black Trap as a raw material (To be used by stone crusher company). There is a marginal gap between demand and supply. 1.5 EXPORT POSSIBILITY Black trap extract from the mining will be transferred to the stone crushing unit. 1.6 DOMESTIC/EXPORT MARKET Black trap extract from the mining will be transported to the nearby stone crushing unit. No export is proposed. 1.7 EMPLOYEMENT GENERATION (DIRECT & INDIRECT) DUE TO THE PROJECT. About 15 staff members including labors directly and approximately 5 persons will be engaged indirectly in this proposed Black Trap mining project. Thus total 20 person will get employment including directly or indirectly. Considering 5 people in a family, total 20 x 5 = 100 person will be benefited and shall depend on the mining activities of this mining lease area. 6
7 CHAPTER 2 PROJECT DESCRIPTION 2.1 TYPE OF PROJECT (including Interlinked and Interdependednt projects, if any) This is a Proposed Mining project for production of mineral Black Trap from the lease, having an area of hectare. 2.2 LOCATION (MA P SHOWING GENERAL LOCATION, SPECIFIC LOCATION AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES. The entire project area is hectare. The area break up in the following table: Lease area (Ha) Agricultural land (Ha) Grazing land (Ha) Forest land (Ha) Total (Ha) Nil Nil Nil Proposed Project is located at Survey No: 13, At: Ashnavi, Tal: Jhagadia, Dist: Bharuch, Gujarat. Site layout plan as per Annexure 3 of Form I application. Key plan of the project is attached as per Annexure 2 of Form I application. Short view is attached as per Annexure 4 of Form I application. The lease area is located between the 21 40'39.58"N Latitude and 73 13'27.28"E Longitude. 2.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATION GONE INTO SHOULD BE HIGHLIGHTED. The mining is proposed in the lease area only for excavation of mineral Black trap and overburden/soil layer. 7
8 2.4 SIZE AND MAGNITUDE OF OPERATION Proposed project is Black Trap Stone quarry project in a lease area of hectare which is proposed to produce Black 20,000 MT/Year by opencast mining. 2.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM/FLOW CHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN) Manufacturing process with flow diagram is attached as per Annexure 5 of Form I application. 2.6 REGIONAL GEOLOGY Ashnavi Village and Mangrol Taluka falls in Bharuch district of Gujarat State. RAW MATERIAL REQUIRED ALONG ESTIMATED QUANTITY, LIKELY SOURCE, AND MARKETING AREA OF FINAL PRODUCTS MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT. This is a proposed project for mining of Black Trap and mining shall be done by blasting. So only Explosive Material shall be used as Raw Material for blasting Purpose. No another major Raw Material is required. Raw Material shall be obtained after getting permission from Petroleum and Explosives Safety Organization (PESO). Final product shall be marketed in Mandvi, Vyara, Songadh, etc. The Final Product will be Black Trap which will be transported directly by road through Tractor or Truck to the Stone Crushing Unit Located in the nearby Area. 2.7 RESOURCE OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED. No optimization/recycling and reuse envisaged in the project. 8
9 2.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY/POWER REQUIREMENT AND SOURCE SHOULD BE GIVEN. Water consumption will be 5.00 KL/Day. Out of 5.00 KL/Day, 1.00 KL/Day will be required for domestic purpose and 4.00 KL/Day for sprinkling purpose. Source of water will be Bore Well located in our crushing plant which is nearer to our mining activity. Diesel will be used for running mine machinery, Excavator and Compressor. Total Diesel consumption shall be 40 L/Day. Diesel will be brought from nearby diesel pumps. No another power is required for the project. 2.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL. Overburden & rejected mineral materials will be the waste material which will be generated during mining. There is no such waste or hazardous waste shall be generated from mining. Only overburden and rejected materials (soil/stone) shall be generated. It shall be used for refilling of low lying area or for paving roads. 9
10 CHAPTER 3 SITE ANALYSIS 3.1 CONNECTIVITY The existing project site is well connected with all the infrastructure i.e. telephone, fax, road, railway, airport, etc. The nearest railway station is Jhagadia which km in NW direction from project site. The nearest airport is Surat which km in SW direction from project site. The nearest city is Bharuch which km in WNW direction from project site. Also the school, collages, hospital, etc are available within the 15 km radius from the project site. 3.2 LAND FORM, LAND USE AND LAND OWNERSHIP. The entire lease area is hactare. The total lease area will be used for the Black Trap mining. Mr. Bhagibhai Mohanbhai Gamit is a Partner of this proposed mining area. Lease application copy is attached- Annexure-1 A copy of 7-12 documents and NA is attached as per Annexure 6 of form I application. 3.3 TOPOGRAPHY (ALONG WITH MAP) Topography of the area is plain terrain. Kindly refer Google map for topo sheet attached as per Annexure 1 of Form I application. 10
11 3.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON- AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO THE PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN. The proposed land is Non Agriculture. A copy of 7-12 documents and NA of land is attached as per Annexure 6 of Form I application. There is no any National Park, Forest, Wild Life Sanctuary, Eco Sensitive Area and notified industrial area are presented within 15 km radius of the project. 11
12 CHAPTER 4 PLANNING BRIEF 4.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION. It is a mine project hence mining of Black Trap shall be carried out. The production of Black Trap is Proposed at around 20,000 MT/Year. Transportation of Black Trap shall be done to the Stone Crushing Unit through road by covered Tractors and/or trucks. Other facilities such as power, transportation and communication, social infrastructure facilities are locally available near project site. 4.2 POPULATION PROJECTION The project is small in magnitude. No influx of population is expected as labor shall be hired from nearby area and/or local villages. About 15 staff members including labors directly and approximately 5 persons will be engaged indirectly in this proposed Black Trap mining project. Thus total 20 person will get employment including directly or indirectly. 4.3 LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.) Proposed Black Trap mining is covered hectare area. SR. NO ITEMS Proposed Green Belt Total Mining area Depth of mining hectare Green belt shall be developed Mining shall be done as per guidance along periphery of of Geology and Mining Department lease area. 12
13 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) 4.3.1PHYSICAL INFRASTRUCTURE The road facility is already available which shall be used and maintained. The labour requirement shall be drawn from the nearest villages, which shall also be trained as per requirement. Other requisite infrastructure as transport of mine labours is available by way of jeep, two-wheeler. Medical facility i.e. first aid is available at project site. Private Clinic & Hospital, Government Dispensary is available within 15 km of the project site SOCIAL INFRASTRUCTURE About 15 staff members including labors directly and approximately 5 persons will be engaged indirectly in this proposed Black Trap mining project. Thus total 20 person will get employment including directly or indirectly. Primary infrastructure like road, water, phone, etc are easily available in nearby area. 4.4 AMENITIES/FACILITIES An office-cum-store shall be constructed near working area. Water is required for drinking purpose as well as for domestic, sprinkling and plantation. Source of water will be Borewell. First aid box with all necessary materials will kept all time in the office building for minor injury. 13
14 CHAPTER 5 PROPOSED INFRASTRUCTURE 5.1 INDUSTRIAL AREA (PROCESSING AREA) An office-cum-store will be constructed at mine area for primary necessities. 5.2 RESIDENT AREA (NON PROCESSING AREA) No residential area is proposed. Workers are available in nearby area. 5.3 GREEN BELT To improve the environment of the area it is proposed to plant 40 trees along periphery of the mine. 5.4 SOCIAL INFRASTRUCTURE This project shall providing employment oppertunity for about 15 people directly and indirectly, employment shall be generated for providing about 5 persons which are shopkeepers, mechanic, drivers, transporters etc. The lessee will be responsible for social benifits like water, health care measures, educational benifits, promotion of culture & religious activities. 5.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO / WATER WAYS ETC) The existing project site is well connected with all the infrastructure i.e. telephone, fax, road, railway, airport, etc. The nearest railway station is Jhagadia which km in NW direction from project site. The nearest airport is Surat which km in SW direction from project site. The nearest city is Bharuch which km in WNW direction from project site. 14
15 Also the school, collages, hospital, etc are available within the 15 km radius from the project site. 5.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) Water consumption will be 5.00 KL/Day. Out of 5.00 KL/Day, 1.00 KL/Day will be required for domestic purpose and 4.00 KL/Day for sprinkling purpose. Source of water will be Bore Well located in our crushing plant which is nearer to our mining activity. 5.7 SEWAGE SYSTEM 0.8 KL/Day Sewage shall be generated from the domestic purpose only which is disposed through soak pit/septic tank system. 5.8 INDUSTRIAL WASTE MANAGEMENT No Industrial waste will be generated from the proposed project. 5.9 SOLID WASTE MANAGEMENT Overburden & rejected mineral will be the waste material which can be generated during mining. The waste accumulated shall proposed to be backfilled in the worked out area and a part of the waste material is proposed to be taken away by nearby villagers for masonry works, road repair/construction at no cost. It is proposed at the end of the life of mine the waste available in the area shall be spared all around the water reservoir. A few quantities of waste stone shall be set all around the rainwater accumulation. This shall strengthen the banks of the rainwater accumulated and shall be used for plantation after spreading soil over it POWER REQUIREMENT Power shall be required only for running the machines, involved in it. Diesel shall be used as fuel and shall be purchased from the local suppliers. No another power is required for this project. Mining activities shall be done is day time only. 15
16 CHAPTER 6 REHABILITATION AND RESETTLEMENT(R&R PLAN) No R&R plan is required as no displacement of people is proposed for the mining project. 16
17 CHAPTER 7 PROJECT SCHEDULE AND COST ESTIMATES 7.1 Likely date of start of construction and likely date of completion (time schedule for the project to be given) This is a proposed Black Trap mining project. There is no such construction activity is required for this project. Only a small office is required when operation shall be occurred. The application shall be made for the lease approval. After getting Environment Clearance from SEAC, they will start work for setting of office. 17
18 CHAPTER 8 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) 8.1 CONCLUSION In the interest of mineral development infrastructure boom and improving the social conditions of the local habitants, this proposed project should be allowed after considering all the environmental aspects. 18
PRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1
More informationM/s. Karshanbhai Bhagvanbhai Rabari
PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT
More informationProject Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationPre-feasibility Report
1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.
More informationPRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone
More informationProject Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE
More informationForm -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri
More informationPRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
More informationForm -1 Mining Plan & Pre-feasibility Report
Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on
More informationNIMAPALLI STONE QUARRY
EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
More informationPRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
More informationMineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT
PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri
More informationPre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
More informationFORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353
FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
More informationHow To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
More informationENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
More informationCONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1
CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF
More informationEnvironment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT
More informationAPPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra
More informationNUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha
PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE
More informationEnvironment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
More informationProject Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to
More informationForm 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu
Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance
More informationProject Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT
Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity
More informationAPPENDIX I. (See Paragraph-6) FORM 1
APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan
More informationTERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR
More informationForm-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &
Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50
More informationP.F.R. TABLE OF CONTENTS
P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39
More informationApplication Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu
Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu
More informationForm-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI
Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)
More informationAppendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN
Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT
More informationAPPENDIX I (See Paragraph -6) FORM I
APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage
More informationNear Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report
PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi
More informationINDEX 1.0 EXECUTIVE SUMMARY... 23
INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...
More informationProject Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT
PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due
More informationCHANDAM7AIL,P SAND DEPOSIT
1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub
More informationBASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS
2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?
More informationAPPLICATION (FORM-1, PRE-FEASIBILITY REPORT)
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,
More informationRatdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.
PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4
More informationTAMIL NADU POLLUTION CONTROL BOARD FORM I
TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and
More information2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
More informationAPPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details
1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
More informationNo. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division
No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi- 110 003 To The Managing Director
More informationENVIRONMENT MANAGEMENT PLAN
6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the
More informationAPPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
More informationAPPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage
More informationVillage Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)
(1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in
More informationM/s Gokul Stone Industries
Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance
More informationPRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN
PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE
More informationExtent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu
PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State
More informationProject Details-Minor Minerals ( Rajula Building Stone)
Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist
More informationRISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,
More informationAPPLICATION FOR ENVIRONMENTAL CLEARANCE
APPLICATION FOR ENVIRONMENTAL CLEARANCE CREATIVE ENGINEERS & CONSULTANTS NABET ACCREDITED, NABL ACCREDITED TESTING LABORATORY& ISO 9001: 2008 CERTIFIED COMPANY 9B/4, BHARATHWAJAR STREET, EAST TAMBARAM,
More informationAppendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources
Appendix 25 Content of a Competent Person s Report for Petroleum Reserves and Resources (See rule 18.20) The Competent Person s Report for Petroleum Reserves and Resources must include the following: 1.
More informationAnnexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust
Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,
More informationPre Feasibility Report
Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,
More informationAPPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,
More informationGuidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
More informationRISK ASSESSMENT REPORT
RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning
More informationLOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh
Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationAPPLICATION THE GRANT OF ENVIRONMENT CLEARANCE
APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand
More informationPROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
More information