1 Denver Metro Chamber of Commerce Infrastructure Committee Phil Washington, RTD General Manager February 21, 2014
2 RTD FasTracks Overview 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides; more than 21,000 new parking spaces Enhanced Bus Network & Transit Hubs (FastConnects) Redevelopment of Denver Union Station 57 new rail and/or BRT stations 2 Opportunities for Transit Oriented Communities
3 FasTracks Status West Rail Line (W Line) First FasTracks line to open April 2013, 8 months ahead of schedule Denver Union Station 96% complete East/Gold/Northwest Rail Lines (EAGLE) 50% complete I-225 Line 23% in construction progress; 77% in design progress U.S. 36 BRT Phase 1 of managed lanes 60% complete North Metro Line - NTP issued in Dec., Groundbreaking March 20 Southeast Rail Extension: 65% complete with advanced basic engineering 3
4 Denver Union Station Bus concourse ceremony May 9, 2014, service begins May 11 $484 million project will be a multimodal hub integrating light rail, commuter rail, Amtrak, buses, taxis, shuttles, bikes and pedestrians Partners include RTD, Colorado Dept. of Transportation, City and County of Denver, Denver Regional Council of Governments Historic building being developed into boutique hotel, restaurants and retail stores
5 Denver Union Station Update Installation of overhead power system and signaling systems will begin after May 2014 hand-over date Temporary Amtrak station may extend beyond the schedule hand-over date
6
7
8
9
10
11 Free MetroRide Additional transit capacity between DUS and Civic Center Free service will complement MallRide service; will run along 18th and 19th streets Stops two to three blocks apart for faster travel than MallRide Opening spring 2014
12 Free Metro Ride Spring 2014, Phase I DUS to Civic Center opening in 2014 Peak period fare free service 5 minute headways Fulfills RTD need to provide additional service for DUS commuters Mid-day and weekend ridership demand can be served by Mall Shuttle $830,000 annual O&M
13 Free Metro Ride, Long-Term RTD Plan DUS to Art Museum as defined in DMAP All-day service 5 min peak, 10 min offpeak headways RTD unable to commit to this level of service at this time without financial support from stakeholders $2 Million annual O&M
14 Transit Priority Measures Bus Bulbs Bus bulbs 18 th Street Eliminate need for buses to weave at curb stops Enhance pedestrian environment Designed to accommodate bike lane
15 Bus Bulb Rendering Bus bulbs and unique canopies designed in partnership with the City and DDP staff Received approval from LoDo Design Review Board
16 Construction Progress Bus pads completed on 19 th Street and Lincoln Foundations for canopies and markers Stop on 16 th Avenue at Civic Center is under construction Work to begin on 18 th Street this week 18 th /Market stop likely delayed working with property owner
17 Public Outreach Service included with DUS service change public hearings Construction updates to nearby businesses Planning public information sessions Feb/March timeframe Targeted outreach to blind and bicycle community once bus bulb constructed Full opening day marketing plan to be completed soon
18 Eagle P3 Project Includes East Rail Line, Gold Line, first segment of Northwest Rail and commuter rail maintenance facility Approximately three years from concept to contract Project Funding $2.2 billion $1.03 billion funded by federal grant Opening in
19 East Rail Line 22.8 miles electric commuter rail 6 stations 35-minute travel time to DIA Complete in 2016
20 Gold Line 11.2 miles electric commuter rail 7 Stations 25-minute travel time to Ward Road Complete in 2016
21 Northwest Rail Line Segment miles electric commuter rail Downtown to Westminster at the 71 st /Lowell Station 11-minute travel time to Westminster Complete in 2016
22 Project Schedule
23 Project Status DBE/SBE goals exceeded for design and on track for construction 43 Workforce Initiative Now candidates hired on project All original civil, track and structure designs complete 98 percent of right-of-way conveyed for construction Major UPRR and BNSF relocation work underway All 18 bridges on East Rail Line are complete or in work 11 of 13 bridges on Gold Line/Northwest Rail are complete or in work CRMF construction 95 percent complete Agreed final list of station names with input from local jurisdictions
24 Design Status Systems design work nearing completion Typical design questions and issues continue to be raised during construction Safety certification of the designs is progressing well Post-tensioning pier cap on South Platte River Bridge, January 2014
25 Commuter Rail Vehicle Update 28 car bodies in assembly plant Rail car bodies and wheel sets fitted together in January 2014 Pilot cars complete assembly in May, transfer to Denver in Fall 2014 ISO 9001 audit by Bureau Veritas conducted December 2013 Interim Buy America audit conducted in December 2013 Procurement of 12 vehicles for North Metro is complete Phil Washington stands by commuter rail vehicle for scale size comparison during visit to Hyundai Rotem s Philadelphia plant, January 2014 Commuter rail car bodies and wheel sets are fitted, January 2014
26 Maintenance Facility Commuter rail maintenance facility, Dec. 26, 2013
27 Construction Progress East Rail Line: Commuter rail platform and canopy of Denver Airport station are in front of Westin Hotel towers
28 Construction Progress East Rail Line: 38 th & Blake Station platform and pedestrian bridge under construction, looking southwest
29 Construction Progress East Rail Line: Rail tamper straightens rails and ensures they are at the correct location and pitched angle
30 Construction Progress Gold Line: At-grade crossing construction at Carr Street, Arvada
31 Construction Progress Northwest Rail: South Platte River Bridge girders completed over freight railroads Consolidated Main Line
32 Coordination with Adjacent Projects Peoria Crossing girder installation across East Rail Line and Union Pacific alignment Peoria Crossing: Grade separation taking Peoria Street over East Rail Line and Union Pacific, on schedule to open to traffic this summer I-225 Light Rail Line: Coordinating design and construction activities at shared Peoria Station
33 Coordination with Adjacent Projects Denver International Airport Hotel and Transit Center DIA handed over station area on schedule at end of 2013 DIA still resolving punch list items DTP to begin track installation, overhead power system and signaling DTP to construct some operational facilities within the Transit Center RTD Bus Operations will use this facility
34 Coordination with Adjacent Projects Olde Town Arvada RTD pilot project in city s transit- oriented development will provide new bus transfer facility and 640+ spaces in structured parking garage Rendering of city-proposed Olde Town Station parking garage and bus facility
35 Coordination with Adjacent Projects 38 th & Blake Station: Denver projects include roadway reconfiguration at Blake over 38 th Street and a second pedestrian bridge over railroad corridor between 35 th and 36 th streets Westminster Station: Betterment request from Westminster enables the rail station to become a key element in Westminster s redevelopment plan for the area City rendering of Westminster Station area betterments
36 Questions? For more information on RTD FasTracks projects please visit:
Claret Consulting 18 December 2015
The Denver-based Regional Transport District (RTD) 2004 FasTracks program is a multi-billion dollar regional transportation expansion plan that was designed to meet the Denver metro area s infrastructural
More informationPhoto credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT
Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT January 2014 CONTENTS Study Purpose 4 Data Sources 5 Existing Conditions 5 Market
More informationDenver Union Station. Regional Transportation District Denver, Colorado
Denver Union Station Regional Transportation District Denver, Colorado Regional Transportation District Created in 1969 Eight-county service area Service area: 2,340 sq. miles 2.8 million population 15
More informationIDOT Chicago - St. Louis High-Speed Rail Program Management
1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff
More informationConnecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future 1 Governor s Proposal: Presents bold vision Based on: technical analyses & public outreach done as part of TransformCT o 18-month strategic planning
More informationEagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)
Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total
More informationWhen is BRT the Best Option? 1:30 2:40 p.m.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session
More informationRisk Management in the Development of a Penta-P Project
Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don
More informationSCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development
Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of
More informationGIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks
APA Transportation Planning Division 2011 Student Paper Competition GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks Patrick Picard 2208 E. 17 th Ave., Apt. #4
More informationNew Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril
New Haven Hartford Springfield Rail Project Gateway to New England Program Update July 2011 1 New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3
More informationWilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
More informationEffect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
More informationWhat we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.
Mayor Hancock s Vision for Building a World-Class City What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.
More informationAddendum to the Arterial Transitway Corridors Study
January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors
More informationAttachment 7. Design, Construction and Rolling Stock Requirements
Attachment 7 Design, Construction and Rolling Stock Requirements Portions of this Attachment 7 have been supplemented, modified or superseded by the Alternative Technical Concepts. Many, but not all, of
More informationVRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
More informationLight Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
More informationCost Reduction Opportunities
Cost Reduction Opportunities 9 December 2015 Presentation to MassDOT Board of Directors & MBTA Fiscal and Management Control Board Arup 2 A global, integrated, multidisciplinary firm of professionals 13,000
More informationLincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
More informationMount Royal College Transit Service Plan
Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back
More informationDoing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs
Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)
More informationEnvironmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationQuestions and Answers about the Orange Bus/Rail Investment Plan
Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range
More informationMichael B. Hancock Mayor. October 31, 2014
Michael B. Hancock Mayor City and County of Denver OFFICE OF THE MAYOR CITY AND COUNTY BUILDING DENVER, CO 80202-5390 TELEPHONE: (720) 865-9090 FAX: (720) 865-8787 TTY/ TTD: (720) 865-9010 October 31,
More informationAPPENDIX F:TRIPLE BOTTOM LINE ANALYSIS
APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS Triple Bottom Line Analysis Map (TBLAM) Project or Decision: College Ave Corridor for FC Moves long range transportation plan for College Ave., for redevelopment
More informationSeattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015)
Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015) Summary Description Proposed Project: Streetcar 1.3 Miles, 4 Stations otal Capital
More informationSouthwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations
More informationTravel and Accommodations
Travel and Accommodations Travel to the Woodrow Wilson School The Office of Graduate Career Services is located on the 2nd floor of Robertson Hall, at the corner of Washington Road and Prospect Avenue
More informationPublic Transportation: There are also public transit trains that run from both airports (blue line from O Hare, orange from Midway).
General Information Traveling to Chicago Air Travel: Chicago is served by O Hare International Airport (ORD) and Midway International Airport (MDW). Cab rides from the airports can take anywhere from 30
More informationDIGITAL DISPLAY GUIDE & SPECIFICATIONS
Where the Arts Come Alive! DIGITAL DISPLAY GUIDE & SPECIFICATIONS Patrick Woods Denver Theatre District 303.800.6172 PWoods@DenverTheatreDistrict.com ABOUT THE DENVER THEATRE DISTRICT The Denver Theatre
More informationRapid City Downtown Area Master Plan. Draft Plan Concepts April 2016
Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled
More informationFlorida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
More informationTransitways and the RouteAhead for Calgary Transit
Transitways and the RouteAhead for Calgary Transit Chris Jordan, P.Eng., M.Sc., Manager, Strategic Planning, Calgary Transit, Transportation, City of Calgary Jen Malzer, P.Eng., M.Sc., Senior Transit Planner,
More informationLos Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
More informationCITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
More informationProposed Service Design Guidelines
Proposed Service Design Guidelines July 2015 I. Introduction During Phase II of the Reimagining CityBus project, feedback from public outreach and data analysis conducted during Phase I of the project
More informationContext Sensitive Design for Urban Transportation in West Philadelphia
Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of
More informationAppendix E Transportation System and Demand Management Programs, and Emerging Technologies
Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking
More informationFigure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4
4-34 SEE FIGURE 4-22 N 14TH ST ROOSEVELT WAY N 130th Street N 130TH ST NE NORTHGATE WAY N 0 1/4 Miles Elevated Light Rail At-Grade Light Rail Elevated Light Rail Station At-Grade Light Rail Station Figure
More informationLegislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
More informationChapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
More informationTransit Technology Alternatives
Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and
More informationAll Systems Go! How Austin, Texas said yes to Urban Commuter Rail
All Systems Go! How Austin, Texas said yes to Urban Commuter Rail Capital Metro Today 500 square-mile service area Highest per capita ridership in Texas 130,000+ one-way trips every day 35 million total
More informationEvergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by
Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)
More informationJuly 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul
July 2010 Chair Peter Bell of the Metropolitan Council speaks about the Met Council s contribution of $1 million to a $1.5 million small business loan fund during a July 20 news conference with Mayor R.T.
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
More informationThe Drake Hotel, Where the Magnificent Mile Begins. Guests of the hotel can choose from the following options.
The Drake Hotel, Where the Magnificent Mile Begins. Guests of the hotel can choose from the following options. Valet parking: $65.00 per day, on-site There is a choice of several Self-Parking Garages near
More informationEagle P3 Project Procurement Lessons Learned. Acronyms
Eagle P3 Project Procurement Acronyms Regional Transportation District August 31, 2011 1600 Blake Street Denver, Colorado 80202-1399 303.628.9000 RTD-Denver.com As the Regional Transportation District
More information7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track
7 th Street SW Cycle Track: Calgary s First Centre City Cycle Track Nominated for: The City of Calgary Category: Sustainable Urban Transportation Award Contact: Surendra Mishra, P. Eng., Traffic Engineer,
More informationAPPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
More informationFor more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
More informationUptown Station - A Model For the Coming Train Feeding Craze
FOR IMMEDIATE RELEASE July 14, 20112 ATK-12-067 Amtrak Contact: Marc Magliari 312 544.5390 Town of Normal Contact: Mark Peterson 309 454.9501 TOWN OF NORMAL, ILLINOIS, U.S. DEPARTMENT OF TRANSPORTATION
More informationConnecticut s Bold Vision for a Transportation Future
Connecticut s Bold Vision for a Transportation Future Middlesex Chamber October 15, 2015 Commissioner Jim Redeker 1 2 The Challenge, Vision, & Plan The Challenge our infrastructure, our economy, our quality
More informationComprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;
More informationEvaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in
More informationDESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
More informationRegional Rail Briefing. March 24, 2010
Regional Rail Briefing March 24, 2010 Agenda o o o o o o o Welcome Special Greetings Overview of High Speed Rail for Florida Station Representatives Responses -Orlando International Airport (OIA) -Orange
More informationA Review of Transit Technology Specifications
. Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.
More informationDIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012
DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 Project Review: DCAC Meeting #2 March 8, 2012 Reviewed stakeholder meetings Online survey findings Market Assessment Macro Market Factors,
More informationAgenda. } Beltline Study Background } PEL Basics } UW Survey Results } Strategy Development and Results } Next Steps
Fall 2014 1 Agenda } Beltline Study Background } PEL Basics } UW Survey Results } Strategy Development and Results } Next Steps 2 Study Limits (University Avenue/US 14 to County N) 3 } Motor vehicle congestion
More informationDCO Modeling and Visualization Workshop: Toward a 4D Planetary Carbon Model 11-13 May 2015 Washington, DC, USA. Logistical Information
DCO Modeling and Visualization Workshop: Toward a 4D Planetary Carbon Model 11-13 May 2015 Washington, DC, USA Logistical Information BRIEF SCHEDULE 10 May: Icebreaker reception at the Mayflower Renaissance
More informationKATHIE CANNING EXECUTIVE DIRECTOR
OVEMBER 20, 2013 DISTRICT NOVEMBER ADVISORY BOARD MEETING KATHIE CANNING EXECUTIVE DIRECTOR AGENDA INTRODUCTION/OVERVIEW 2014 PROJECTIONS COMPETITIVE OVERVIEW 2013 CLIENT ADVISORY BOARD CAPITAL IMPROVEMENT
More informationAEROTROPOLIS ATLANTA HARTSFIELD-JACKSON ATLANTA INTERNATIONAL AIRPORT 175,000+ 100+ SQUARE MILES 1 REGIONAL COMMISSION 4 INTERSTATE SYSTEMS
$32.5B OF DIRECT ECONOMIC IMPACT AEROTROPOLIS ATLANTA BY THE NUMBERS 5 MARTA STATIONS 1 REGIONAL COMMISSION 4 INTERSTATE SYSTEMS 36 AIRLINES 100+ SQUARE MILES 4,700 ACRES (H-JAIA) 1.3M SQUARE FEET OF AIR
More informationPrimer on Transportation Funding and Governance in Canada s Large Metropolitan Areas
Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions
More informationDowntown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity
FOR SALE E Mill Plain & E Main Street, Vancouver, WA E 16th St Main St Columbia St Washington St E 15th St E Mill Plain Blvd Downtown Vancouver Full Block For Sale 1.03 Acre Redevelopment Opportunity $2,00,000
More informationHow To Expand Commuter Rail Between Worcester And Boston
AN INDEPENDENT VOICE FOR RESPONSIBLE GOVERNMENT CONNECTING THE HEART OF THE COMMONWEALTH WITH THE HUB OF THE UNIVERSE: MAKING THE CASE FOR EXPANDING COMMUTER RAIL SERVICE BETWEEN WORCESTER AND BOSTON Report
More informationJoint Development and Real Estate Committee. Board Item I-A. March 25, 2010
Joint Development and Real Estate Committee Board Item I-A March 25, 2010 Negotiate and Execute an Easement Agreement with the District of Columbia for the Metropolitan Branch Trail Bridge at Rhode Island
More informationCase Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO
Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO Transit Agency Profile and Reason for Selection of Transit Agency Overview The Regional Transportation District (RTD) in Denver is one
More informationThe financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
More informationTOD Affordable Housing Preservation Policy Forum. Aaron Miripol, Urban Land Conservancy April 30, 2012
TOD Affordable Housing Preservation Policy Forum Aaron Miripol, Urban Land Conservancy April 30, 2012 Urban Land Conservancy (ULC) was established to acquire, develop and preserve real estate assets in
More informationREINVENTING TRANSIT FROM A SOCIAL SERVICE TO A CRITICAL PUBLIC UTILITY
REINVENTING TRANSIT FROM A SOCIAL SERVICE TO A CRITICAL PUBLIC UTILITY THE PRE 1950 PAST. Extensive networks for streetcars, trams and buses. Operated by the private sector through a system of franchises
More informationBOARD OF DIRECTORS REPORT
BOARD OF DIRECTORS REPORT To: Phil Washington, General Manager Date: From: Bruce Abel, Assistant General Manager of Bus Operations GM Date: April 9, 2012 Board Meeting Date: May 15, 2012 Subject: August
More informationSTATE OF DELAWARE DEPARTMENT OF TRANSPORTATION CAPITAL TRANSPORTATION PROGRAM TRANSIT FACILITIES 3-306
SUPPORT SYSTEM TRANSIT FACILITIES 3-306 NEWARK TRANSIT HUB PROJECT SCOPE/DESCRIPTION: Funding was authorized to begin a study to select a site for the Newark Transit Hub. Future improvements may include
More informationDowntown Denver - A City of 16 Streets
Downtown Denver Partnership 2015 Denver City Council Candidate Questionnaire Distributed: Tuesday, March 3, 2015 Due Date: Wednesday, March 18, 2015 at 5 pm please email to Brittany Morris Saunders at
More informationCHAPTER 6 6-12 Planning Best Practices for the Bottineau Corridor
One of the first victories for equity advocates was the addition of three new stations to the line. This change came about through a combination of local advocacy and a change in the Federal New Starts
More informationPURPOSE AND NEED FOR ACTION
Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to
More informationThe LYNX Transit Master Plan. METROPLAN Orlando Presentation
2030 Paw Print: The LYNX Transit Master Plan D b 2010 December 2010 METROPLAN Orlando Presentation Project Partners Project Overview 18 Corridors Bridge between 5 Year Service Plan and Long Range Transportation
More informationINVITES APPLICATIONS FOR THE POSITION OF: Senior Manager of Capital and Budget Strategy - Denver International Airport. An Equal Opportunity Employer
CITY AND COUNTY OF DENVER Career Service Authority 201 W Colfax Ave, Dept 412, Wellington E. Webb Municipal Office Building Denver, CO 80202 (720) 913-5668 http://www.denvergov.org/jobs INVITES APPLICATIONS
More informationChapter 9: Transportation
Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation
More informationMeasuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
More informationGrowth of Addis Ababa
Growth of Addis Ababa Founded in 1887, and has expanded rapidly Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would reach to eight million.
More informationTABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street 9-10. Market Street 11-14
TABLE OF CONTENTS Executive Summary 1-3 Introduction 4-6 Illustrative Site Plan 7 East-West Streets 8 Cooper Street 9-10 Market Street 11-14 Federal Street 15-16 MLK Boulevard 17-20 North-South Streets
More information30 Years of Smart Growth
30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,
More informationExhibit Book Metro-North Railroad Committee Meeting 3/23/2015. Table of Contents: April 26 Schedule Change - Page 2
Exhibit Book Metro-North Railroad Committee Meeting 3/23/2015 Table of Contents: April 26 Schedule Change - Page 2 Master Page # 1 of 5 - Metro-North Railroad Committee Meeting 3/23/2015 Memorandum Date:
More informationMajor Improvement Schemes in Basingstoke
Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester
More informationAlternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
More information1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
More informationExpressLanes CAG Summit. March 2, 2010
ExpressLanes CAG Summit March 2, 2010 1 Project Goals Move More People, Not More Vehicles > Increase Throughput of HOT lanes > Effectiveness (Mode Shift) > Efficiency (Cost of Project Relative to Benefits)
More informationFrequently Asked Questions (FAQs) about DART
Frequently Asked Questions (FAQs) about DART What is DART? Where can I take the bus? Where can I take the train? How much does it cost to park at a station? Can I take a train to American Airlines Center?
More informationR-06: Innovation and Technology Fund
Project Number R-06 Subarea Systemwide Primary Mode Facility Type Length Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION This
More informationJess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources
Eric Silva, AICP Assistant Director, Development Services Division Miami-Dade Regulatory and Economic Resources Albert Hernandez, P.E. Deputy Director, Planning and Engineering Miami-Dade Transit Jess
More informationIntroduction to Station Area Planning The Charlotte Story
Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History
More informationAppendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates
Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,
More informationProposed Program of High Capacity Transit Improvements City of Atlanta DRAFT
I 20 West Heavy Rail Northside Drive Bus Rapid Contingent Multi Jurisdicitional Projects Atlanta Light Rail Clifton Light Rail * I 20 East Bus Rapid * Atlanta BeltLine Central Loop Irwin AUC Line Downtown
More informationProject Management Oversight Services
Solicitation Number: Reference-Number-FTA-08-PMOC Project Management Oversight Services Federal Transit Administration Our fundamental business strategy is forging strong, long-term relationships with
More informationAPPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL
DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System
More informationDowntown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
More informationWelcome to the 35/36th St Pedestrian Bridge Public Meeting
Welcome to the 35/ Pedestrian Bridge Public Meeting Preliminary Purpose The project s purpose is to provide additional pedestrian and bicycle connectivity over the heavy rail and commuter rail corridor
More information2013 Transit-Oriented Development Status Report
2013 Transit-Oriented Development Status Report RTD and FasTracks Overview RTD oversees a 47-mile rail transit system that services 46 stations on five corridors including: The 5.3-mile Central Corridor
More information