1 Draft SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of a qualified and experienced transportation consultant or consultant team to assist the department in preparing an application to the Federal Railroad Administration (FRA) for one or more High Speed Rail (HSR)/Intercity Passenger Rail (IPR) grants. The top priority is the Milwaukee, WI to Twin Cities, MN portion of the High Speed Rail Corridor between Chicago and the Twin Cities through the $8 billion HSR/IPR program contained in the American Recovery and Reinvestment Act of 2009 (ARRA). The grant application will request funds to complete the environmental study of selected alternatives and thirty percent of preliminary engineering study for the preferred route of the Milwaukee to Twin Cities portion. Mn/DOT s intent is to acquire the services of knowledgeable and experienced transportation professionals for developing a joint grant application with the Wisconsin Department of Transportation (WisDOT) for the Milwaukee-Twin Cities corridor that is compliant with State and Federal guidelines, the FRA s Strategic Plan, released in April 2009, and Guidance that will be released by June 17, Please provide a work plan and cost estimate for developing this application package. There are two potential additions. Please provide a work plan and cost estimate for developing additional grant applications for each of the following: The St. Paul Union Depot will be renovated to again become a multi-modal transportation hub. The Northern Lights Express is a 140-mile corridor from the Twin Cities to Duluth, MN that may be eligible for funding other the ARRA or the Passenger Rail Improvement and Investment Act of 2008 (PRIIA). Milwaukee, WI to Twin Cities, MN Corridor Corridor Description The 415-mile corridor between the Twin Cities and Chicago is part of the Chicago Hub Network, one of ten designated regional high-speed rail systems in President Obama s vision to build a network of high-speed rail corridors across America ( This corridor is one of several major branches in the Chicago Hub Network, a system also known as the Midwest Regional Rail Initiative (MWRRI), a cooperative, multi-agency effort that - 1 -

2 began in 1996 and involves nine Midwest states (Indiana, Illinois, Iowa, Michigan, Minnesota, Missouri, Nebraska, Ohio, and Wisconsin) as well as the Federal Railroad Administration (FRA). Midwest Regional Rail Initiative elements include: Operation of a hub and spoke passenger rail system centered on Chicago Use of 3,000 miles of existing rail right of way to connect rural and urban areas Track and signal improvements and introduction of modern trains operating at speeds up to 110 mph Provision of multi-modal connections to improve system access Improvement in frequency, reliability, speed, and on-time performance Approximately 130 miles of this corridor are in Minnesota from La Crescent to the Twin Cities. Amtrak s current service takes eight hours to make the trip between the Twin Cities and Chicago, with a frequency of one trip each way daily. With the proposed MWRRI, Minnesotans could travel to Chicago on an additional six round trips per day in approximately five-and-a-half hours of travel time. The estimated capital cost of the Minnesota portion of the system is $500 million in 2008 dollars. The entire MWRRI is estimated at a capital investment of $9.65 billion in 2008 dollars. The Chicago-Milwaukee-Twin Cities corridor including a Milwaukee to Green Bay branch costs $1.86 billion in 2002 dollars. The FRA provided a grant to the MWRRI in 2008 to conduct alternatives analysis and public outreach and update cost estimates; this work will be initiated soon. The MWRRI timeline suggests for a corridor or corridor segment, two years to complete advanced planning and environmental assessment and two to five years for construction once funded. Amtrak is the assumed operator for this route. Wisconsin has conducted detailed studies of key segments of the Chicago-Milwaukee-Twin Cities route. Wisconsin has received a Finding of No Significant Impact from FRA covering improvements planned for the Milwaukee to Madison portion of the corridor and will be seeking ARRA funds for construction of this portion of the corridor through a separate application. For the Milwaukee-Twin Cities portion of the corridor, the MWRRI system map shows the corridor following the route defined in a Finding of No Significant Impact from Milwaukee to Madison, turning northwest to Portage, and joining the existing Amtrak alignment along the Mississippi River. However, route alternatives analysis is required by FRA for each of the segments in Minnesota and Wisconsin; this will include considering the existing Amtrak route from Milwaukee to Portage (missing Madison) and alternative alignments serving the City of Eau Claire in Wisconsin and the City of Rochester in Minnesota. Finally, analysis must be done to consider if the Twin Cities terminus should be at the St. Paul Union Depot or if trains can stop there, but continue on to a terminus in downtown Minneapolis. Project Parameters The following is a list of preferences and guidance on the suggested format of the application. Please present specific suggestions on development of the application and its components based - 2 -

3 on your experience with grant and funding application development for federal solicitations that have been useful in delivering competitive and successful applications. Timeline - The Milwaukee-Twin Cities portion of the corridor is expected to be eligible for ARRA funding under Track 2, Corridor Programs as described in FRA s HSR Strategic Plan. Applications for Track 2 are due in September The application will be prepared for Mn/DOT review, approval, and submission to meet the timeline dictated by FRA s guidance that will be published by June 17, The application will include a request for funds to complete environmental study of selected alternatives [1) Madison route vs. Portage route, 2) River route vs. Eau Claire, WI route vs. Rochester, MN route, 3) St. Paul terminus vs. Minneapolis terminus] and thirty percent of preliminary engineering study for the preferred route. It may also include a request for funding the ongoing design, construction, equipping, and implementation of passenger rail service on the corridor, depending on how FRA s guidance allows these activities to be grouped into one application. Project Structure and Management - Overall direction of the project will be provided by a Mn/DOT Senior Management Team, responsible to the Commissioner. The Project Manager will report to this group. A standing Minnesota Passenger Rail Transportation Forum (Forum) will advise the Project Manager and the Senior Management Team. Information on the Forum can be accessed at the following website: The application will be a joint application submitted by Mn/DOT on behalf of Mn/DOT and WisDOT. Data Support - Mn/DOT will make available any relevant databases and GIS mapping information, including the statewide rail system, intermediate findings and data of the Minnesota Statewide Comprehensive Freight and Passenger Rail Plan, the Midwest Regional Rail Initiative, economic development data, demographic background, and project cost components. The Project Manager will work with staff at WisDOT to gather data relevant to the Wisconsin portion of the project corridor and include it in the application. Data Confidentiality Since the federal grant solicitation is a nationally competitive process, Mn/DOT requires that the consultant not share any elements regarding the application with other states which are/may apply for grants under the same program. Application The consultant shall be responsible for completing all aspects of the funding application, as required by FRA program guidance and official notices. The application will be compliant with the requirements of the second funding track, Track 2 Corridor Programs, and will need to address the following key elements critical to the success of HSR/IPR programs and projects as described in the Strategic Plan: Planning and Project Development Stakeholder Agreements - 3 -

4 Financial Plan Project/Risk Management Plan HSR/IPR grant applications will also be evaluated on the following criteria: Achieving Public Benefits Mitigating Risks Other St. Paul Union Depot Project Project Description Built in 1923 to serve passenger and freight railroad for the upper Midwest, the St. Paul Union Depot at its peak served more than 200 passenger trains daily. The structure is a combination of two spaces the Headhouse, or lobby building that once functioned as a passenger terminal, and the concourse. The once-bustling Depot closed its doors in The U.S. Postal Service, which owns the former concourse and adjacent track areas, expanded into the abandoned concourse. The Postal Service still uses the concourse for storage, but has an agreement to sell the property to the Ramsey County Regional Rail Authority (RCRRA). The RCRRA also has an agreement to purchase the public areas of the privately owned Headhouse, currently used for condos, offices and restaurants. When it is redeveloped, the Depot will serve Amtrak, Greyhound and Jefferson Lines intercity buses, Central Corridor light rail, Metro Transit buses, bicycle and pedestrian traffic. Eventually, plans call for the Depot to serve the Robert Street, I-94, Red Rock and Rush Line transit corridors, as well as Midwest High Speed Rail. The SAFETEA-LU bill provided $50 million through the Federal Highway Administration (FHWA) for the Union Depot project as a project of National and Regional Significance, plus $1.6 million in transit funds. An environmental assessment has been completed for this project. A Finding of No Significant Impact is expected from the FHWA. Project Parameters The following is a list of preferences and guidance on the suggested format of the application. Please present specific suggestions on development of the application and its components based on your experience with grant and funding application development for federal solicitations that have been useful in delivering competitive and successful applications. Timeline - The St. Paul Union Depot is expected to be eligible for ARRA funding under Track 1, Projects as described in FRA s HSR Strategic Plan. The first round of applications for Track 1 are due in August 2009 with the second round in March The application will be prepared - 4 -

5 for Mn/DOT review, approval, and submission to meet the timeline dictated by FRA s guidance that will be published by June 17, The application will include request for funds to complete all design and engineering, construct, and equip the St. Paul Union depot to be ready serve Amtrak s Empire Builder train, intercity buses, local buses, taxis, and bicycles in 2012 and Central Corridor LRT from 4 th Street adjacent to the headhouse in Project Structure and Management - Overall direction of the project will be provided by a Mn/DOT Senior Management Team, responsible to the Commissioner. The Project Manager will report to this group. A standing Minnesota Passenger Rail Transportation Forum (Forum) will advise the Project Manager and the Senior Management Team. Information on the Forum can be accessed at the following website: The application will be a joint application submitted by Mn/DOT on behalf of Mn/DOT and the RCRRA. Data Support - Mn/DOT and RCRRA will make available any relevant databases and GIS mapping information, including project cost components. The Project Manager will work with staff at RCRRA to gather data and include it in the application. Data Confidentiality Since the federal grant solicitation is a nationally competitive process, Mn/DOT requires that the consultant not share any elements regarding the application with other states which are/may apply for grants under the same program. Application The consultant shall be responsible for completing all aspects of the funding application, as required by FRA program guidance and official notices. The application will be compliant with the requirements of the first funding track, Track 1 Projects, and will need to address the following key elements critical to the success of HSR/IPR programs and projects as described in the Strategic Plan: Planning and Project Development Stakeholder Agreements Financial Plan Project/Risk Management Plan HSR/IPR grant applications will also be evaluated on the following criteria: Achieving Public Benefits Mitigating Risks Other Northern Lights Express (Twin Cities to Duluth) Corridor - 5 -

6 Corridor Description The Northern Lights Express is a proposed 155-mile intercity passenger rail corridor between the Twin Cities and Duluth using the existing BNSF Railway tracks. One-way trip times of approximately two hours at speeds up to 110 mph would be offered on four round trips per day. A feasibility study is available with details of the corridor at: The project is estimated to cost approximately $500 million. Approximately 20 miles of the project, including the Superior station, are located in the state of Wisconsin so this project must also be pursued cooperatively with WisDOT. The FRA granted $1.1 million in 2008, matched by $900,000 in state and $200,000 in local funds, to conduct environmental documentation for this corridor. That work is now underway. Alternatives analysis will be necessary to consider a parallel route commonly referred to as the Rush Line. Project Parameters The following is a list of preferences and guidance on the suggested format of the application. Please present specific suggestions on development of the application and its components based on your experience with grant and funding application development for federal solicitations that have been useful in delivering competitive and successful applications. Timeline - This corridor may be eligible for ARRA funding under Track 2, Corridor Programs as described in FRA s HSR Strategic Plan. Applications for Track 2 are due in September Otherwise, this project can pursue funds through the PRIIA. It may have a similar set of funding tracks. The application will be prepared for Mn/DOT review, approval, and submission to meet the timeline dictated by FRA s guidance that will be published by June 17, The application will include a request for funds to complete preliminary engineering not covered by the existing environmental documentation currently underway. It may also include a request for funding the ongoing design, construction, equipping, and implementation of passenger rail service on the corridor, depending on how FRA s guidance allows these activities to be grouped into one application. Project Structure and Management - Overall direction of the project will be provided by a Mn/DOT Senior Management Team, responsible to the Commissioner. The Project Manager will report to this group. A standing Minnesota Passenger Rail Transportation Forum (Forum) will advise the Project Manager and the Senior Management Team. Information on the Forum can be accessed at the following website: The application will be a joint application submitted by Mn/DOT on behalf of Mn/DOT and WisDOT. Data Support - Mn/DOT will make available any relevant databases and GIS mapping information, including the statewide rail system, intermediate findings and data of the Minnesota - 6 -

7 Statewide Comprehensive Freight and Passenger Rail Plan, the Northern Lights Express Alliance, economic development data, demographic background, and project cost components. The Project Manager will work with staff at WisDOT to gather data relevant to the Wisconsin portion of the project corridor and include it in the application. Data Confidentiality Since the federal grant solicitation is a nationally competitive process, Mn/DOT requires that the consultant not share any elements regarding the application with other states which are/may apply for grants under the same program. Application The consultant shall be responsible for completing all aspects of the funding application, as required by FRA program guidance and official notices. The application will be compliant with the requirements of the second funding track, Track 2 Corridor Programs, whether under ARRA or PRIIA, and will need to address the following key elements critical to the success of HSR/IPR programs and projects as described in the Strategic Plan: Planning and Project Development Stakeholder Agreements Financial Plan Project/Risk Management Plan HSR/IPR grant applications will also be evaluated on the following criteria: Achieving Public Benefits Mitigating Risks Other Work Plans and Cost Estimates Please develop a work plan and cost estimate for developing an ARRA Track 2 (Corridor) grant application for the Milwaukee, WI to Twin Cities, MN leg of the MWRRI Please develop two additive options. None, either or both of these options could be added to the scope of work: A) A work plan and cost estimate for developing an ARRA Track 1 (Project) grant application for renovating the St. Paul Union Depot into an operating multi-modal transportation hub. B) A work plan and cost estimate for developing an ARRA Track 2 (Corridor) or PRIIA grant application for Twin Cities to Duluth Northern Lights Express Corridor

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

PURPOSE AND NEED FOR ACTION

PURPOSE AND NEED FOR ACTION Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to

More information

U.S. System Summary: EMPIRE CORRIDOR

U.S. System Summary: EMPIRE CORRIDOR U.S. System Summary: EMPIRE CORRIDOR Empire Corridor High-Speed Rail System (Source: NYSDOT) The Empire Corridor high-speed rail system is an established high-speed rail system containing 463 miles of

More information

Virginia s Approach to Intercity Passenger Rail Development

Virginia s Approach to Intercity Passenger Rail Development Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14, 2013 www.drpt.virginia.gov High Speed Rail

More information

IDOT Chicago - St. Louis High-Speed Rail Program Management

IDOT Chicago - St. Louis High-Speed Rail Program Management 1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff

More information

IDOT Chicago - St. Louis High Speed Rail Program Management. Lessons Learned

IDOT Chicago - St. Louis High Speed Rail Program Management. Lessons Learned 1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High Speed Rail Program Management Lessons Learned Phil Pasterak, PE Parsons Brinckerhoff Agenda AGENDA 2» Program Description» Construction

More information

SECTION 1 ECONOMIC IMPORTANCE

SECTION 1 ECONOMIC IMPORTANCE SECTION 1 ECONOMIC IMPORTANCE 1.01 INTRODUCTION The Beltline Planning and Environmental Linkages (PEL) corridor is a 20-mile study corridor of US 12/14/18/151. It begins at the US 12 and US 14 (University

More information

FOR IMMEDIATE RELEASE July 14, 20112. ATK-12-067 Amtrak Contact: Marc Magliari 312 544.5390 Town of Normal Contact: Mark Peterson 309 454.

FOR IMMEDIATE RELEASE July 14, 20112. ATK-12-067 Amtrak Contact: Marc Magliari 312 544.5390 Town of Normal Contact: Mark Peterson 309 454. FOR IMMEDIATE RELEASE July 14, 20112 ATK-12-067 Amtrak Contact: Marc Magliari 312 544.5390 Town of Normal Contact: Mark Peterson 309 454.9501 TOWN OF NORMAL, ILLINOIS, U.S. DEPARTMENT OF TRANSPORTATION

More information

Central Minnesota Freight Plan December 2012

Central Minnesota Freight Plan December 2012 6.0 RAIL PROFILE Statewide, Minnesota claims 4,481 miles of active railroad track in the state which ranks 8 th in the nation. Two Class I railroads and one switching/terminal railroad operate 391 miles

More information

Examples of Transportation Plan Goals, Objectives and Performance Measures

Examples of Transportation Plan Goals, Objectives and Performance Measures Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.

More information

Addendum to the Arterial Transitway Corridors Study

Addendum to the Arterial Transitway Corridors Study January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY

SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY Draft 7/2/08 The SAFETEA-LU Technical Corrections Bill (HR 1195) was enacted on June 6, 2008 (P.L. 110-244). The Bill can be found at: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h1195enr.txt.pdf

More information

Florida Transportation Commission: A Meeting of the Modes

Florida Transportation Commission: A Meeting of the Modes Florida Transportation Commission: A Meeting of the Modes Corridors of the Future: A National and I-95 Corridor Perspective George Schoener, Executive Director I-95 Corridor Coalition February 12, 2007

More information

Environmental Impact Statement for the Washington Union Station Expansion Project

Environmental Impact Statement for the Washington Union Station Expansion Project This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Riverview Corridor Transit Study Potential Routes and Transit Vehicles: Initial Screening Results Summary: Feb 2016

Riverview Corridor Transit Study Potential Routes and Transit Vehicles: Initial Screening Results Summary: Feb 2016 Riverview Corridor Transit Study Potential Routes and Transit Vehicles: Initial Screening Results Summary: Feb 2016 What is the Riverview Corridor Transit Study? The Riverview Corridor is a transportation

More information

Regional Rail Briefing. March 24, 2010

Regional Rail Briefing. March 24, 2010 Regional Rail Briefing March 24, 2010 Agenda o o o o o o o Welcome Special Greetings Overview of High Speed Rail for Florida Station Representatives Responses -Orlando International Airport (OIA) -Orange

More information

Preapplication for HSIPR Program OMB No. 2130 0583

Preapplication for HSIPR Program OMB No. 2130 0583 U.S. Department of Transportation Federal Railroad Administration Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in

More information

Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project

Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project Introduced By: Isaias Rumayor III, ASUCM Senator At-Large Authored By: Michael Lomio, ASUCM Senator At-Large Isaias Rumayor III, ASUCM Senator At-Large Sponsored By: Background: The California High-Speed

More information

2.1 Prior Richmond to South Hampton Roads Rail Service

2.1 Prior Richmond to South Hampton Roads Rail Service 2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated

More information

WI CHI MSP/GB Milwaukee Madison. Financial Plan. Wisconsin Department of Transportation

WI CHI MSP/GB Milwaukee Madison. Financial Plan. Wisconsin Department of Transportation WI CHI MSP/GB Milwaukee Madison Milwaukee Madison High Speed Intercity Passenger Rail Service Financial Plan Wisconsin Department of Transportation October 1, 2009 Acceptance and Adoption of the Plan The

More information

Presentation to: INFORMS Railway Applications Group CAPACITY PLANNING FOR SHARED-USE CORRIDORS

Presentation to: INFORMS Railway Applications Group CAPACITY PLANNING FOR SHARED-USE CORRIDORS Presentation to: INFORMS Railway Applications Group CAPACITY PLANNING FOR SHARED-USE CORRIDORS Presented by: Context for a Capacity Screening Tool Freight Railroads need to be able to respond to preliminary

More information

Wisconsin Department of Transportation Beltline Planning and Environmental Linkages Existing Conditions Report

Wisconsin Department of Transportation Beltline Planning and Environmental Linkages Existing Conditions Report SECTION 5 TRANSIT 5.01 SUMMARY A. Summary The Madison metro area is served by an outstanding transit system for an area its size. Madison Metro s ridership increased 30 percent between 2005 and 2011 reaching

More information

U.S. Department of Transportation Transportation Investment Generating Economic Recovery (TIGER) Grants

U.S. Department of Transportation Transportation Investment Generating Economic Recovery (TIGER) Grants U.S. Department of Transportation Transportation Investment Generating Economic Recovery (TIGER) Grants February 17, 2010 The U.S. Department of Transportation is proud to announce $1.5 billion in TIGER

More information

AASHTO First Take at the New Surface Transportation Bill FIXING AMERICA S SURFACE TRANSPORTATION (FAST) ACT December 2, 2015

AASHTO First Take at the New Surface Transportation Bill FIXING AMERICA S SURFACE TRANSPORTATION (FAST) ACT December 2, 2015 AASHTO First Take at the New Surface Transportation Bill FIXING AMERICA S SURFACE TRANSPORTATION (FAST) ACT December 2, 2015 OVERVIEW On December 1, 2015, the House-Senate Conference Committee on H.R.

More information

Claret Consulting 18 December 2015

Claret Consulting 18 December 2015 The Denver-based Regional Transport District (RTD) 2004 FasTracks program is a multi-billion dollar regional transportation expansion plan that was designed to meet the Denver metro area s infrastructural

More information

Easily Accessible Modal Choices Tangible Result Driver Michelle Teel, Multimodal Operations Director

Easily Accessible Modal Choices Tangible Result Driver Michelle Teel, Multimodal Operations Director Tangible Result Driver Michelle Teel, Multimodal Operations Director MoDOT plays an active role in supporting all modes of transportation. By linking the individual modal types in to a single statewide

More information

Performance Goals and Objectives:

Performance Goals and Objectives: Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,

More information

Section ALTERNATIVES. 3. Alternatives

Section ALTERNATIVES. 3. Alternatives Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of

More information

The Gateway Program and Hudson Tunnel Project

The Gateway Program and Hudson Tunnel Project The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway

More information

Dallas-Fort Worth Area Major Transportation Projects

Dallas-Fort Worth Area Major Transportation Projects Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional

More information

WELCOME Dallas-Fort Worth High Speed Rail Industry Forum June 20, 2016 Michael Morris, P.E.

WELCOME Dallas-Fort Worth High Speed Rail Industry Forum June 20, 2016 Michael Morris, P.E. WELCOME Dallas-Fort Worth High Speed Rail Industry Forum June 20, 2016 Michael Morris, P.E. Welcome, Introductions, and Forum Purpose Michael Morris, P.E. 2 Agenda Welcome, Introductions, and Forum Purpose

More information

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in

More information

LAUTENBERG, MENENDEZ JOIN AMTRAK TO ANNOUNCE NEW TRANS-HUDSON GATEWAY TUNNEL PROJECT

LAUTENBERG, MENENDEZ JOIN AMTRAK TO ANNOUNCE NEW TRANS-HUDSON GATEWAY TUNNEL PROJECT FOR IMMEDIATE RELEASE: CONTACT: Monday, February 7, 2011 Lautenberg Press Office 202.224.3224 Menendez Press Office 202.224.4744 Amtrak Media Relations 212-630.6933 LAUTENBERG, MENENDEZ JOIN AMTRAK TO

More information

Innovation Builds Here

Innovation Builds Here City of Greater Economic Development Corporation Innovation Builds Here ROCHELLE, IL Logistics Manufacturing Technology Our Success Stories Over the past two decades has quietly established itself as a

More information

Questions and Answers about the Orange Bus/Rail Investment Plan

Questions and Answers about the Orange Bus/Rail Investment Plan Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range

More information

Freight and Commuter Trains on the North Carolina Railroad. Can They Work Together?

Freight and Commuter Trains on the North Carolina Railroad. Can They Work Together? Freight and Commuter Trains on the North Carolina Railroad Can They Work Together? Mission of the North Carolina Railroad To manage, improve and protect the State of North Carolina s rail properties and

More information

FLORIDA HIGH SPEED RAIL UPDATE Florida Transportation Commission July 7, 2010 Orlando, FL

FLORIDA HIGH SPEED RAIL UPDATE Florida Transportation Commission July 7, 2010 Orlando, FL FLORIDA HIGH SPEED RAIL UPDATE Florida Transportation Commission July 7, 2010 Orlando, FL AGENDA Florida HSR Update Where are we? Where are we going? How long will it take to get there? 2 Tampa-Orlando-Miami

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

Bicycle and Pedestrian Planning Purpose and Process

Bicycle and Pedestrian Planning Purpose and Process Prepared By: Jefferson County Transportation and Engineering Division 100 Jefferson County Parkway, Suite 3500, Golden, CO 80419 September 2013 This page was intentionally left blank Jefferson County Division

More information

The Heartland Corridor: Crossing Mountains, Crossing Sectors

The Heartland Corridor: Crossing Mountains, Crossing Sectors Nathan Dorfman MPA Candidate; University of Pittsburgh 2014 ASPA Founders Fellows Application Executive Summary The Heartland Corridor: Crossing Mountains, Crossing Sectors This paper will discuss how

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

Nevada State Rail Plan

Nevada State Rail Plan Nevada State Rail Plan Nevada State Transportation Board September 2012 Enhancing Rail Infrastructure and Services to Fulfill Nevada s Transportation Needs Rail Law Federal Passenger Rail Investment and

More information

Justin Fox. David Simpson. Paula Hirsch. Senior Project Manager, CDM Smith. Principal at David P. Simpson Consultants LLC

Justin Fox. David Simpson. Paula Hirsch. Senior Project Manager, CDM Smith. Principal at David P. Simpson Consultants LLC 1 Justin Fox Senior Project Manager, CDM Smith David Simpson Principal at David P. Simpson Consultants LLC Paula Hirsch Senior Admin Assistant, CDM Smith 2 NCHRP Report 657 is the general guidebook for

More information

New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril

New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril New Haven Hartford Springfield Rail Project Gateway to New England Program Update July 2011 1 New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

The Central Corridor Light Rail Transit (LRT) Project and Saint Paul s Central Corridor Development Strategy. Railvolution Conference Nov.

The Central Corridor Light Rail Transit (LRT) Project and Saint Paul s Central Corridor Development Strategy. Railvolution Conference Nov. The Central Corridor Light Rail Transit (LRT) Project and Saint Paul s Central Corridor Development Strategy Railvolution Conference Nov. 2, 2007 What is Central Corridor? The Twin Cities second LRT line,

More information

Regional Transportation District

Regional Transportation District October 2015 Regional Transportation District Created in 1969 Eight-county service area Service area: 2,340 sq. miles 2.8 million population 15 elected Board members 1 percent sales tax.6 base system.4

More information

Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation

Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation FY 2017 Budget Summary The Obama s Administration s proposed budget for FY 2017, which was submitted to Congress February

More information

Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...

Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety... Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...

More information

RAILROAD INVESTMENT PROJECTS CREATE JOBS, STIMULATE ECONOMY

RAILROAD INVESTMENT PROJECTS CREATE JOBS, STIMULATE ECONOMY $525 billion in private investment helps keep America competitive Unlike trucks, barges, and airlines in the U.S., freight railroads do not strain the public purse. Privately owned railroads have spent

More information

COMMENTS AND COORDINATION

COMMENTS AND COORDINATION Section 8 COMMENTS AND COORDINATION 8. Comments and Coordination 8.0 Comments and Coordination The environmental process for the Chicago to St. Louis High Speed Rail Corridor Program Tier 1 DEIS began

More information

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations

More information

DRAFT FREIGHT AND RAIL TRANSPORTATION ELEMENT

DRAFT FREIGHT AND RAIL TRANSPORTATION ELEMENT DRAFT FREIGHT AND RAIL TRANSPORTATION ELEMENT TEA-21 identifies seven factors to consider in the long range planning process and two of those specifically refer to freight transportation. The first is

More information

Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work

Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen

More information

USA: INFRASTRUCTURES DAY

USA: INFRASTRUCTURES DAY USA: INFRASTRUCTURES DAY Business Opportunities for Infrastructures in the US Market Business Conference 21th November 2014 Auditório do Banco Popular Rua Ramalho Ortigão, 51 Lisboa Organização: Patrocinadores:

More information

Guideway Status Report

Guideway Status Report Guideway Status Report January 2012 1 Guideway Status Report Prepared by the Minnesota Department of Transportation in collaboration with the Metropolitan Council January 2012 Report Development Cost As

More information

The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon

The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon American Association of Port Authorities - AAPA Communicating the Importance of Infrastructure

More information

Chapter 9: Transportation

Chapter 9: Transportation Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation

More information

Wisconsin Thought Leadership Roundtable. May 3 rd 2010 Madison Wisconsin

Wisconsin Thought Leadership Roundtable. May 3 rd 2010 Madison Wisconsin Wisconsin Thought Leadership Roundtable May 3 rd 2010 Madison Wisconsin Welcome and Introductions Agenda The growth of EE in the Midwest over the last 10 years Wendy Jaehn, MEEA Wisconsin accomplishments

More information

APPENDIX B: NO BUILD LIST APPENDIX B: NO BUILD LIST

APPENDIX B: NO BUILD LIST APPENDIX B: NO BUILD LIST APPENDIX B: NO BUILD LIST APPENDIX B: NO BUILD LIST Illinois Chicago to St. Louis High-Speed Rail Midwest rail equipment procurement CREATE P1 Englewood Flyover CREATE WA-1 Ogden Junction CREATE WA-2 Signalization

More information

Chapter 5 Financial Plan

Chapter 5 Financial Plan The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to

More information

HENNEPIN COUNTY REGIONAL RAILROAD AUTHORITY STAFF REPORT ON FREIGHT RAIL RELOCATION

HENNEPIN COUNTY REGIONAL RAILROAD AUTHORITY STAFF REPORT ON FREIGHT RAIL RELOCATION HENNEPIN COUNTY REGIONAL RAILROAD AUTHORITY STAFF REPORT ON FREIGHT RAIL RELOCATION August, 2011 Introduction This report provides a summary of the findings contained in six consultant studies conducted

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

Pedestrian & Bicycle Plan

Pedestrian & Bicycle Plan RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left

More information

VRE SYSTEM PLAN SUMMARY

VRE SYSTEM PLAN SUMMARY VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial

More information

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects

More information

Chicago to St. Louis Tier 1 Environmental Impact Statement

Chicago to St. Louis Tier 1 Environmental Impact Statement Chicago to St. Louis Tier 1 Environmental Impact Statement DRAFT Scoping Document July 2011 Illinois Department of Transportation Federal Railroad Administration Table of Contents 1.0 PROJECT DEFINITION...

More information

FasTracks Overview. Pranaya Shrestha, PE Sr. Manager, Program Management (303)

FasTracks Overview. Pranaya Shrestha, PE Sr. Manager, Program Management (303) FasTracks Overview Pranaya Shrestha, PE Sr. Manager, Program Management (303) 299-2461 Pranaya.Shrestha@RTD-Denver.com The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of bus

More information

Midwest Regional Rail Initiative Phase 7. South of the Lake Route Alternatives Analysis Report

Midwest Regional Rail Initiative Phase 7. South of the Lake Route Alternatives Analysis Report South of the Lake Alternatives Analysis Report Table of Contents Midwest Regional Rail Initiative Phase 7 South of the Lake Route Alternatives Analysis Report Prepared for: Indiana Department of Transportation

More information

Financial Analysis and Funding

Financial Analysis and Funding California High- Speed Rail Authority Revised 2012 Business Plan Chapter 7 Financial Analysis and Funding Introduction This chapter presents the financial analysis and funding strategy for the California

More information

Vision for High Speed Rail in NEC

Vision for High Speed Rail in NEC Vision for High Speed Rail in NEC PenJerDel Council and Central Philadelphia Development Corporation Page 1 Amtrak Highlights National railroad: May 1,1971 Congressionally chartered corporation Acela Express

More information

MIPRC Universities & Colleges Passenger Rail Survey: Regional Results and Analysis

MIPRC Universities & Colleges Passenger Rail Survey: Regional Results and Analysis The Midwest Interstate Passenger Rail Commission s survey of students, faculty and staff at 30 colleges and universities along Amtrak passenger routes across nine states suggests good overall news for

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

DRAFT Alternatives Analysis

DRAFT Alternatives Analysis DRAFT Alternatives Analysis for the Coachella Valley-San Gorgonio Pass Corridor Rail Service Study October 12, 2015 Contents ES Executive Summary... ES-1 ES.1 Study Area... ES-1 ES.2 Purpose and Need for

More information

Light Rail Corridors of the Twin Cities Area APWA Fall Conference November 22, Mark W. Fuhrmann

Light Rail Corridors of the Twin Cities Area APWA Fall Conference November 22, Mark W. Fuhrmann Light Rail Corridors of the Twin Cities Area APWA Fall Conference November 22, 2013 Mark W. Fuhrmann Transitways System Map Weld Connects Green Line to the Blue Line Blue Line (Hiawatha) LRT Opened in

More information

Technical Memorandum PERFORMANCE MEASURES. Prepared by:

Technical Memorandum PERFORMANCE MEASURES. Prepared by: Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP

More information

FOR IMMEDIATE RELEASE June 24, 2013. ATK-13-064 Contact: Cliff Cole 212 630.6933

FOR IMMEDIATE RELEASE June 24, 2013. ATK-13-064 Contact: Cliff Cole 212 630.6933 FOR IMMEDIATE RELEASE June 24, 2013 Contact: Cliff Cole 212 630.6933 AMTRAK COMPLETES NIANTIC RIVER BRIDGE REPLACEMENT PROJECT New span provides improved reliability for rail passengers, less disruption

More information

Summary of MAP-21 Matrix

Summary of MAP-21 Matrix Summary of MAP-21 Matrix Overview On July 6, 2012, President Obama signed into law P.L. 112-141, the Moving Ahead for Progress in the 21st Century Act (MAP-21). Funding surface transportation programs

More information

Regional Transit Vision

Regional Transit Vision Regional Transit Vision Vision Scenarios - Summary December, 2013 The Heartland Connections Regional Transit Vision (RTV) was a yearlong study intended to help the region identify a future vision for public

More information

Eastside Rail Corridor Regional Advisory Council. Meeting Summary. June 26, 2013, 2:00 4:00 PM Bellevue City Council Chambers

Eastside Rail Corridor Regional Advisory Council. Meeting Summary. June 26, 2013, 2:00 4:00 PM Bellevue City Council Chambers Eastside Rail Corridor Regional Advisory Council Meeting Summary June 26, 2013, 2:00 4:00 PM Bellevue City Council Chambers Advisory Council members present: Sound Transit CEO Joni Earl; County Council

More information

I-85 CORRIDOR LIGHT RAIL TRANSIT FEASIBILITY STUDY

I-85 CORRIDOR LIGHT RAIL TRANSIT FEASIBILITY STUDY May 2009 I-85 CORRIDOR LIGHT RAIL TRANSIT FEASIBILITY STUDY Executive Summary Prepared for: Gwinnett Village Community Improvement District 1412 Oakbrook Drive, Suite 181 Norcross, Georgia 30093 Gwinnett

More information

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal

More information

Characteristics of State Funding for Public Transportation

Characteristics of State Funding for Public Transportation Characteristics of State Funding for Public Transportation The following report provides a summary of state transit funding for 50 states and the District of Columbia (DC). Information includes funding

More information

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? Jose Gonzalez SVP - Florida East Coast Industries Wednesday, August 12, 2015 1 Florida East Coast Industries

More information

Statewide Intercity and Regional Bus Network Study

Statewide Intercity and Regional Bus Network Study Colorado Department of Transportation Division of Transit and Rail Statewide Intercity and Regional Bus Network Study DRAFT TECHNICAL MEMORANDUM 1 POLICY CONTEXT UPDATE March 11, 2013 Technical Memorandum

More information

OUR COMMITMENT TO SERVE THE NORTHERN CORRIDOR IS STRONGER THAN EVER

OUR COMMITMENT TO SERVE THE NORTHERN CORRIDOR IS STRONGER THAN EVER OUR COMMITMENT TO SERVE THE NORTHERN CORRIDOR IS STRONGER THAN EVER This year, BNSF plans to invest $5 billion of capital, which is a record for the industry, to make our network even stronger and more

More information

FLORIDA HIGH SPEED RAIL UPDATE. Presented by:

FLORIDA HIGH SPEED RAIL UPDATE. Presented by: FLORIDA HIGH SPEED RAIL UPDATE Presented by: AGENDA Florida HSR Update Federal Railroad Approvals Florida HSR Program Overview Phase 1 Tampa Orlando Current Activities 2 FRA Approvals Jan 28, 2010: President

More information

14.0 AVIATION. I. Introduction 6/142010

14.0 AVIATION. I. Introduction 6/142010 14.0 AVIATION I. Introduction Aviation plays an important role in the MARC region. As a mode of transportation, aviation provides vital connections for people and goods to destinations inside and outside

More information

Appendix D Engineering Assessment of the Potential Passenger Rail Alternatives: By Sub-Segment

Appendix D Engineering Assessment of the Potential Passenger Rail Alternatives: By Sub-Segment Appendix D Engineering Assessment of the Potential Passenger Rail Alternatives: By Sub-Segment Milwaukee-Twin Cities High-Speed Rail Corridor Program Appendix D Technical Report Engineering Assessment

More information

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL.

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL. CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL June 10, 2008 I. INTRODUCTION The for the Central Corridor LRT project

More information

2014 FRA Intercity Passenger Rail Corridor Investment Plan Grant Funding Application

2014 FRA Intercity Passenger Rail Corridor Investment Plan Grant Funding Application 2014 FRA Intercity Passenger Rail Corridor Investment Plan Grant Funding Application Project Title Project Location Type of Application Applicant Point of Contact: Chicago-Fort Wayne-Columbus Passenger

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

SPO Technical Capacity Review. June 24, 2015

SPO Technical Capacity Review. June 24, 2015 SPO Technical Capacity Review June 24, 2015 Southwest Project Context The Southwest Light Rail Transit (LRT) project (METRO Green Line Extension) will operate from downtown Minneapolis through the communities

More information

Bicycle and Pedestrian Traffic Generators

Bicycle and Pedestrian Traffic Generators Bicycle and Pedestrian Traffic Generators Corridors used by bicyclists and pedestrians typically link major generators and activity centers. Schools and recreational facilities serve as destinations for

More information

Graduate School Rankings By U.S. News & World Report: ACCOUNTING PROGRAMS

Graduate School Rankings By U.S. News & World Report: ACCOUNTING PROGRAMS 2 University of Illinois, Urbana-Champaign 2 University of Michigan, Ann Arbor 4 Indiana University, Bloomington 6 University of California, Berkeley 7 Michigan State University 8 Ohio State University

More information

Project: Setting the Stage: Planning the Hennepin Avenue Cultural Corridor on Downtown Minneapolis' Oldest Street

Project: Setting the Stage: Planning the Hennepin Avenue Cultural Corridor on Downtown Minneapolis' Oldest Street Applicant: HENNEPIN THEATRE TRUST, Minneapolis, MN Project: Setting the Stage: Planning the Hennepin Avenue Cultural Corridor on Downtown Minneapolis' Oldest Street ATTACHMENT 2: DETAILS OF THE PROJECT

More information

Regional Rail in Los Angeles County

Regional Rail in Los Angeles County Regional Rail in Los Angeles County Presented by Don Sepulveda, P.E. Executive Officer Regional Rail What is Regional Rail in L.A. County? Metrolink Commuter Rail, Amtrak Intercity Rail, LOSSAN/I-5 Corridor,

More information

Public Involvement Meeting Handout

Public Involvement Meeting Handout Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department

More information