1 Draft SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of a qualified and experienced transportation consultant or consultant team to assist the department in preparing an application to the Federal Railroad Administration (FRA) for one or more High Speed Rail (HSR)/Intercity Passenger Rail (IPR) grants. The top priority is the Milwaukee, WI to Twin Cities, MN portion of the High Speed Rail Corridor between Chicago and the Twin Cities through the $8 billion HSR/IPR program contained in the American Recovery and Reinvestment Act of 2009 (ARRA). The grant application will request funds to complete the environmental study of selected alternatives and thirty percent of preliminary engineering study for the preferred route of the Milwaukee to Twin Cities portion. Mn/DOT s intent is to acquire the services of knowledgeable and experienced transportation professionals for developing a joint grant application with the Wisconsin Department of Transportation (WisDOT) for the Milwaukee-Twin Cities corridor that is compliant with State and Federal guidelines, the FRA s Strategic Plan, released in April 2009, and Guidance that will be released by June 17, Please provide a work plan and cost estimate for developing this application package. There are two potential additions. Please provide a work plan and cost estimate for developing additional grant applications for each of the following: The St. Paul Union Depot will be renovated to again become a multi-modal transportation hub. The Northern Lights Express is a 140-mile corridor from the Twin Cities to Duluth, MN that may be eligible for funding other the ARRA or the Passenger Rail Improvement and Investment Act of 2008 (PRIIA). Milwaukee, WI to Twin Cities, MN Corridor Corridor Description The 415-mile corridor between the Twin Cities and Chicago is part of the Chicago Hub Network, one of ten designated regional high-speed rail systems in President Obama s vision to build a network of high-speed rail corridors across America ( This corridor is one of several major branches in the Chicago Hub Network, a system also known as the Midwest Regional Rail Initiative (MWRRI), a cooperative, multi-agency effort that - 1 -
2 began in 1996 and involves nine Midwest states (Indiana, Illinois, Iowa, Michigan, Minnesota, Missouri, Nebraska, Ohio, and Wisconsin) as well as the Federal Railroad Administration (FRA). Midwest Regional Rail Initiative elements include: Operation of a hub and spoke passenger rail system centered on Chicago Use of 3,000 miles of existing rail right of way to connect rural and urban areas Track and signal improvements and introduction of modern trains operating at speeds up to 110 mph Provision of multi-modal connections to improve system access Improvement in frequency, reliability, speed, and on-time performance Approximately 130 miles of this corridor are in Minnesota from La Crescent to the Twin Cities. Amtrak s current service takes eight hours to make the trip between the Twin Cities and Chicago, with a frequency of one trip each way daily. With the proposed MWRRI, Minnesotans could travel to Chicago on an additional six round trips per day in approximately five-and-a-half hours of travel time. The estimated capital cost of the Minnesota portion of the system is $500 million in 2008 dollars. The entire MWRRI is estimated at a capital investment of $9.65 billion in 2008 dollars. The Chicago-Milwaukee-Twin Cities corridor including a Milwaukee to Green Bay branch costs $1.86 billion in 2002 dollars. The FRA provided a grant to the MWRRI in 2008 to conduct alternatives analysis and public outreach and update cost estimates; this work will be initiated soon. The MWRRI timeline suggests for a corridor or corridor segment, two years to complete advanced planning and environmental assessment and two to five years for construction once funded. Amtrak is the assumed operator for this route. Wisconsin has conducted detailed studies of key segments of the Chicago-Milwaukee-Twin Cities route. Wisconsin has received a Finding of No Significant Impact from FRA covering improvements planned for the Milwaukee to Madison portion of the corridor and will be seeking ARRA funds for construction of this portion of the corridor through a separate application. For the Milwaukee-Twin Cities portion of the corridor, the MWRRI system map shows the corridor following the route defined in a Finding of No Significant Impact from Milwaukee to Madison, turning northwest to Portage, and joining the existing Amtrak alignment along the Mississippi River. However, route alternatives analysis is required by FRA for each of the segments in Minnesota and Wisconsin; this will include considering the existing Amtrak route from Milwaukee to Portage (missing Madison) and alternative alignments serving the City of Eau Claire in Wisconsin and the City of Rochester in Minnesota. Finally, analysis must be done to consider if the Twin Cities terminus should be at the St. Paul Union Depot or if trains can stop there, but continue on to a terminus in downtown Minneapolis. Project Parameters The following is a list of preferences and guidance on the suggested format of the application. Please present specific suggestions on development of the application and its components based - 2 -
3 on your experience with grant and funding application development for federal solicitations that have been useful in delivering competitive and successful applications. Timeline - The Milwaukee-Twin Cities portion of the corridor is expected to be eligible for ARRA funding under Track 2, Corridor Programs as described in FRA s HSR Strategic Plan. Applications for Track 2 are due in September The application will be prepared for Mn/DOT review, approval, and submission to meet the timeline dictated by FRA s guidance that will be published by June 17, The application will include a request for funds to complete environmental study of selected alternatives [1) Madison route vs. Portage route, 2) River route vs. Eau Claire, WI route vs. Rochester, MN route, 3) St. Paul terminus vs. Minneapolis terminus] and thirty percent of preliminary engineering study for the preferred route. It may also include a request for funding the ongoing design, construction, equipping, and implementation of passenger rail service on the corridor, depending on how FRA s guidance allows these activities to be grouped into one application. Project Structure and Management - Overall direction of the project will be provided by a Mn/DOT Senior Management Team, responsible to the Commissioner. The Project Manager will report to this group. A standing Minnesota Passenger Rail Transportation Forum (Forum) will advise the Project Manager and the Senior Management Team. Information on the Forum can be accessed at the following website: The application will be a joint application submitted by Mn/DOT on behalf of Mn/DOT and WisDOT. Data Support - Mn/DOT will make available any relevant databases and GIS mapping information, including the statewide rail system, intermediate findings and data of the Minnesota Statewide Comprehensive Freight and Passenger Rail Plan, the Midwest Regional Rail Initiative, economic development data, demographic background, and project cost components. The Project Manager will work with staff at WisDOT to gather data relevant to the Wisconsin portion of the project corridor and include it in the application. Data Confidentiality Since the federal grant solicitation is a nationally competitive process, Mn/DOT requires that the consultant not share any elements regarding the application with other states which are/may apply for grants under the same program. Application The consultant shall be responsible for completing all aspects of the funding application, as required by FRA program guidance and official notices. The application will be compliant with the requirements of the second funding track, Track 2 Corridor Programs, and will need to address the following key elements critical to the success of HSR/IPR programs and projects as described in the Strategic Plan: Planning and Project Development Stakeholder Agreements - 3 -
4 Financial Plan Project/Risk Management Plan HSR/IPR grant applications will also be evaluated on the following criteria: Achieving Public Benefits Mitigating Risks Other St. Paul Union Depot Project Project Description Built in 1923 to serve passenger and freight railroad for the upper Midwest, the St. Paul Union Depot at its peak served more than 200 passenger trains daily. The structure is a combination of two spaces the Headhouse, or lobby building that once functioned as a passenger terminal, and the concourse. The once-bustling Depot closed its doors in The U.S. Postal Service, which owns the former concourse and adjacent track areas, expanded into the abandoned concourse. The Postal Service still uses the concourse for storage, but has an agreement to sell the property to the Ramsey County Regional Rail Authority (RCRRA). The RCRRA also has an agreement to purchase the public areas of the privately owned Headhouse, currently used for condos, offices and restaurants. When it is redeveloped, the Depot will serve Amtrak, Greyhound and Jefferson Lines intercity buses, Central Corridor light rail, Metro Transit buses, bicycle and pedestrian traffic. Eventually, plans call for the Depot to serve the Robert Street, I-94, Red Rock and Rush Line transit corridors, as well as Midwest High Speed Rail. The SAFETEA-LU bill provided $50 million through the Federal Highway Administration (FHWA) for the Union Depot project as a project of National and Regional Significance, plus $1.6 million in transit funds. An environmental assessment has been completed for this project. A Finding of No Significant Impact is expected from the FHWA. Project Parameters The following is a list of preferences and guidance on the suggested format of the application. Please present specific suggestions on development of the application and its components based on your experience with grant and funding application development for federal solicitations that have been useful in delivering competitive and successful applications. Timeline - The St. Paul Union Depot is expected to be eligible for ARRA funding under Track 1, Projects as described in FRA s HSR Strategic Plan. The first round of applications for Track 1 are due in August 2009 with the second round in March The application will be prepared - 4 -
5 for Mn/DOT review, approval, and submission to meet the timeline dictated by FRA s guidance that will be published by June 17, The application will include request for funds to complete all design and engineering, construct, and equip the St. Paul Union depot to be ready serve Amtrak s Empire Builder train, intercity buses, local buses, taxis, and bicycles in 2012 and Central Corridor LRT from 4 th Street adjacent to the headhouse in Project Structure and Management - Overall direction of the project will be provided by a Mn/DOT Senior Management Team, responsible to the Commissioner. The Project Manager will report to this group. A standing Minnesota Passenger Rail Transportation Forum (Forum) will advise the Project Manager and the Senior Management Team. Information on the Forum can be accessed at the following website: The application will be a joint application submitted by Mn/DOT on behalf of Mn/DOT and the RCRRA. Data Support - Mn/DOT and RCRRA will make available any relevant databases and GIS mapping information, including project cost components. The Project Manager will work with staff at RCRRA to gather data and include it in the application. Data Confidentiality Since the federal grant solicitation is a nationally competitive process, Mn/DOT requires that the consultant not share any elements regarding the application with other states which are/may apply for grants under the same program. Application The consultant shall be responsible for completing all aspects of the funding application, as required by FRA program guidance and official notices. The application will be compliant with the requirements of the first funding track, Track 1 Projects, and will need to address the following key elements critical to the success of HSR/IPR programs and projects as described in the Strategic Plan: Planning and Project Development Stakeholder Agreements Financial Plan Project/Risk Management Plan HSR/IPR grant applications will also be evaluated on the following criteria: Achieving Public Benefits Mitigating Risks Other Northern Lights Express (Twin Cities to Duluth) Corridor - 5 -
6 Corridor Description The Northern Lights Express is a proposed 155-mile intercity passenger rail corridor between the Twin Cities and Duluth using the existing BNSF Railway tracks. One-way trip times of approximately two hours at speeds up to 110 mph would be offered on four round trips per day. A feasibility study is available with details of the corridor at: The project is estimated to cost approximately $500 million. Approximately 20 miles of the project, including the Superior station, are located in the state of Wisconsin so this project must also be pursued cooperatively with WisDOT. The FRA granted $1.1 million in 2008, matched by $900,000 in state and $200,000 in local funds, to conduct environmental documentation for this corridor. That work is now underway. Alternatives analysis will be necessary to consider a parallel route commonly referred to as the Rush Line. Project Parameters The following is a list of preferences and guidance on the suggested format of the application. Please present specific suggestions on development of the application and its components based on your experience with grant and funding application development for federal solicitations that have been useful in delivering competitive and successful applications. Timeline - This corridor may be eligible for ARRA funding under Track 2, Corridor Programs as described in FRA s HSR Strategic Plan. Applications for Track 2 are due in September Otherwise, this project can pursue funds through the PRIIA. It may have a similar set of funding tracks. The application will be prepared for Mn/DOT review, approval, and submission to meet the timeline dictated by FRA s guidance that will be published by June 17, The application will include a request for funds to complete preliminary engineering not covered by the existing environmental documentation currently underway. It may also include a request for funding the ongoing design, construction, equipping, and implementation of passenger rail service on the corridor, depending on how FRA s guidance allows these activities to be grouped into one application. Project Structure and Management - Overall direction of the project will be provided by a Mn/DOT Senior Management Team, responsible to the Commissioner. The Project Manager will report to this group. A standing Minnesota Passenger Rail Transportation Forum (Forum) will advise the Project Manager and the Senior Management Team. Information on the Forum can be accessed at the following website: The application will be a joint application submitted by Mn/DOT on behalf of Mn/DOT and WisDOT. Data Support - Mn/DOT will make available any relevant databases and GIS mapping information, including the statewide rail system, intermediate findings and data of the Minnesota - 6 -
7 Statewide Comprehensive Freight and Passenger Rail Plan, the Northern Lights Express Alliance, economic development data, demographic background, and project cost components. The Project Manager will work with staff at WisDOT to gather data relevant to the Wisconsin portion of the project corridor and include it in the application. Data Confidentiality Since the federal grant solicitation is a nationally competitive process, Mn/DOT requires that the consultant not share any elements regarding the application with other states which are/may apply for grants under the same program. Application The consultant shall be responsible for completing all aspects of the funding application, as required by FRA program guidance and official notices. The application will be compliant with the requirements of the second funding track, Track 2 Corridor Programs, whether under ARRA or PRIIA, and will need to address the following key elements critical to the success of HSR/IPR programs and projects as described in the Strategic Plan: Planning and Project Development Stakeholder Agreements Financial Plan Project/Risk Management Plan HSR/IPR grant applications will also be evaluated on the following criteria: Achieving Public Benefits Mitigating Risks Other Work Plans and Cost Estimates Please develop a work plan and cost estimate for developing an ARRA Track 2 (Corridor) grant application for the Milwaukee, WI to Twin Cities, MN leg of the MWRRI Please develop two additive options. None, either or both of these options could be added to the scope of work: A) A work plan and cost estimate for developing an ARRA Track 1 (Project) grant application for renovating the St. Paul Union Depot into an operating multi-modal transportation hub. B) A work plan and cost estimate for developing an ARRA Track 2 (Corridor) or PRIIA grant application for Twin Cities to Duluth Northern Lights Express Corridor
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
More informationPURPOSE AND NEED FOR ACTION
Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to
More informationU.S. System Summary: EMPIRE CORRIDOR
U.S. System Summary: EMPIRE CORRIDOR Empire Corridor High-Speed Rail System (Source: NYSDOT) The Empire Corridor high-speed rail system is an established high-speed rail system containing 463 miles of
More informationIDOT Chicago - St. Louis High-Speed Rail Program Management
1 www.idothsr.org www.connectthemidwest.com IDOT Chicago - St. Louis High-Speed Rail Program Management Lessons Learned: Sealing the Corridor For 110 MPH Operations Thomas W. Hunter Parsons Brinckerhoff
More informationAddendum to the Arterial Transitway Corridors Study
January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors
More informationVirginia s Approach to Intercity Passenger Rail Development
Virginia s Approach to Intercity Passenger Rail Development Kevin B. Page Chief Operating Officer Virginia Department of Rail and Public Transportation June 14, 2013 www.drpt.virginia.gov High Speed Rail
More informationCentral Minnesota Freight Plan December 2012
6.0 RAIL PROFILE Statewide, Minnesota claims 4,481 miles of active railroad track in the state which ranks 8 th in the nation. Two Class I railroads and one switching/terminal railroad operate 391 miles
More informationExamples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
More informationUptown Station - A Model For the Coming Train Feeding Craze
FOR IMMEDIATE RELEASE July 14, 20112 ATK-12-067 Amtrak Contact: Marc Magliari 312 544.5390 Town of Normal Contact: Mark Peterson 309 454.9501 TOWN OF NORMAL, ILLINOIS, U.S. DEPARTMENT OF TRANSPORTATION
More informationSAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY
SAFETEA-LU TECHNICAL CORRECTIONS BILL SUMMARY Draft 7/2/08 The SAFETEA-LU Technical Corrections Bill (HR 1195) was enacted on June 6, 2008 (P.L. 110-244). The Bill can be found at: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=110_cong_bills&docid=f:h1195enr.txt.pdf
More informationPresentation to: INFORMS Railway Applications Group CAPACITY PLANNING FOR SHARED-USE CORRIDORS
Presentation to: INFORMS Railway Applications Group CAPACITY PLANNING FOR SHARED-USE CORRIDORS Presented by: Context for a Capacity Screening Tool Freight Railroads need to be able to respond to preliminary
More informationSYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
More informationFlorida Transportation Commission: A Meeting of the Modes
Florida Transportation Commission: A Meeting of the Modes Corridors of the Future: A National and I-95 Corridor Perspective George Schoener, Executive Director I-95 Corridor Coalition February 12, 2007
More informationEnvironmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationPreapplication for HSIPR Program OMB No. 2130 0583
U.S. Department of Transportation Federal Railroad Administration Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in
More informationRegional Rail Briefing. March 24, 2010
Regional Rail Briefing March 24, 2010 Agenda o o o o o o o Welcome Special Greetings Overview of High Speed Rail for Florida Station Representatives Responses -Orlando International Airport (OIA) -Orange
More informationWI CHI MSP/GB Milwaukee Madison. Financial Plan. Wisconsin Department of Transportation
WI CHI MSP/GB Milwaukee Madison Milwaukee Madison High Speed Intercity Passenger Rail Service Financial Plan Wisconsin Department of Transportation October 1, 2009 Acceptance and Adoption of the Plan The
More informationU.S. Department of Transportation Transportation Investment Generating Economic Recovery (TIGER) Grants
U.S. Department of Transportation Transportation Investment Generating Economic Recovery (TIGER) Grants February 17, 2010 The U.S. Department of Transportation is proud to announce $1.5 billion in TIGER
More informationAssociated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project
Introduced By: Isaias Rumayor III, ASUCM Senator At-Large Authored By: Michael Lomio, ASUCM Senator At-Large Isaias Rumayor III, ASUCM Senator At-Large Sponsored By: Background: The California High-Speed
More information2.1 Prior Richmond to South Hampton Roads Rail Service
2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated
More informationClaret Consulting 18 December 2015
The Denver-based Regional Transport District (RTD) 2004 FasTracks program is a multi-billion dollar regional transportation expansion plan that was designed to meet the Denver metro area s infrastructural
More informationQuestions and Answers about the Orange Bus/Rail Investment Plan
Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range
More informationWisconsin Department of Transportation Beltline Planning and Environmental Linkages Existing Conditions Report
SECTION 5 TRANSIT 5.01 SUMMARY A. Summary The Madison metro area is served by an outstanding transit system for an area its size. Madison Metro s ridership increased 30 percent between 2005 and 2011 reaching
More informationFLORIDA HIGH SPEED RAIL UPDATE Florida Transportation Commission July 7, 2010 Orlando, FL
FLORIDA HIGH SPEED RAIL UPDATE Florida Transportation Commission July 7, 2010 Orlando, FL AGENDA Florida HSR Update Where are we? Where are we going? How long will it take to get there? 2 Tampa-Orlando-Miami
More informationSection ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
More informationAASHTO First Take at the New Surface Transportation Bill FIXING AMERICA S SURFACE TRANSPORTATION (FAST) ACT December 2, 2015
AASHTO First Take at the New Surface Transportation Bill FIXING AMERICA S SURFACE TRANSPORTATION (FAST) ACT December 2, 2015 OVERVIEW On December 1, 2015, the House-Senate Conference Committee on H.R.
More informationPerformance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
More informationINDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
More informationThe Gateway Program and Hudson Tunnel Project
The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway
More informationInnovation Builds Here
City of Greater Economic Development Corporation Innovation Builds Here ROCHELLE, IL Logistics Manufacturing Technology Our Success Stories Over the past two decades has quietly established itself as a
More informationEvaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in
More informationUSA: INFRASTRUCTURES DAY
USA: INFRASTRUCTURES DAY Business Opportunities for Infrastructures in the US Market Business Conference 21th November 2014 Auditório do Banco Popular Rua Ramalho Ortigão, 51 Lisboa Organização: Patrocinadores:
More informationWhen is BRT the Best Option? 1:30 2:40 p.m.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session
More informationDepartment of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...
Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...
More informationDallas-Fort Worth Area Major Transportation Projects
Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional
More informationSouthwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)
Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations
More informationNew Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril
New Haven Hartford Springfield Rail Project Gateway to New England Program Update July 2011 1 New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
More informationRed Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013
Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement
More informationMIPRC Universities & Colleges Passenger Rail Survey: Regional Results and Analysis
The Midwest Interstate Passenger Rail Commission s survey of students, faculty and staff at 30 colleges and universities along Amtrak passenger routes across nine states suggests good overall news for
More informationLight Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
More informationGuideway Status Report
Guideway Status Report January 2012 1 Guideway Status Report Prepared by the Minnesota Department of Transportation in collaboration with the Metropolitan Council January 2012 Report Development Cost As
More informationHow To Plan A City Of Mason
Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen
More informationCOMMENTS AND COORDINATION
Section 8 COMMENTS AND COORDINATION 8. Comments and Coordination 8.0 Comments and Coordination The environmental process for the Chicago to St. Louis High Speed Rail Corridor Program Tier 1 DEIS began
More informationThe Heartland Corridor: Crossing Mountains, Crossing Sectors
Nathan Dorfman MPA Candidate; University of Pittsburgh 2014 ASPA Founders Fellows Application Executive Summary The Heartland Corridor: Crossing Mountains, Crossing Sectors This paper will discuss how
More informationPedestrian & Bicycle Plan
RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left
More informationChapter 9: Transportation
Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation
More informationVRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
More informationBackground and Goals for the Project
City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering
More informationSummary of MAP-21 Matrix
Summary of MAP-21 Matrix Overview On July 6, 2012, President Obama signed into law P.L. 112-141, the Moving Ahead for Progress in the 21st Century Act (MAP-21). Funding surface transportation programs
More informationFLORIDA HIGH SPEED RAIL UPDATE. Presented by:
FLORIDA HIGH SPEED RAIL UPDATE Presented by: AGENDA Florida HSR Update Federal Railroad Approvals Florida HSR Program Overview Phase 1 Tampa Orlando Current Activities 2 FRA Approvals Jan 28, 2010: President
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update JULY 2015 Table of Contents Executive Summary... i Funding Sources... v Next Steps... v Land Use and Station Area Planning... v Pedestrian and Bicycle
More informationAnalysis of the Obama Administration s FY 2017 Budget Proposal for Transportation
Analysis of the Obama Administration s FY 2017 Budget Proposal for Transportation FY 2017 Budget Summary The Obama s Administration s proposed budget for FY 2017, which was submitted to Congress February
More informationSPO Technical Capacity Review. June 24, 2015
SPO Technical Capacity Review June 24, 2015 Southwest Project Context The Southwest Light Rail Transit (LRT) project (METRO Green Line Extension) will operate from downtown Minneapolis through the communities
More informationWilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
More informationto imagine a transportation vision
to imagine a transportation vision Before 2007 many wondered Was collaboration and coalition building even possible in Los Angeles County? Creating the Measure R coalition sent a new message This is how
More informationChapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
More informationRegional Transit Vision
Regional Transit Vision Vision Scenarios - Summary December, 2013 The Heartland Connections Regional Transit Vision (RTV) was a yearlong study intended to help the region identify a future vision for public
More information2015 WisDOT Annual Freight Railroad Conference
2015 WisDOT Annual Freight Railroad Conference Scott Greene Chief, Freight Rail Policy Division Office of Policy and Planning Federal Railroad Administration November 17, 2015 1 Today s Topics Federal
More informationEffect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain
Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37
More informationRPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS
RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects
More informationA Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission
A Presentation by the Project Managers: Rick Canizales Prince William County & Jana Lynott, AICP Northern Virginia Transportation Commission for the: Public Open House and Hearing December 6, 2005 George
More informationThe Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon
The Coos Bay Rail Line Preserving Rail as an Intermodal Link for Marine and Industrial Sites in Southwest Oregon American Association of Port Authorities - AAPA Communicating the Importance of Infrastructure
More informationTH 23 Access Management Study Richmond to Paynesville
TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...
More informationFlorida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
More informationDRAFT Alternatives Analysis
DRAFT Alternatives Analysis for the Coachella Valley-San Gorgonio Pass Corridor Rail Service Study October 12, 2015 Contents ES Executive Summary... ES-1 ES.1 Study Area... ES-1 ES.2 Purpose and Need for
More informationProject: Setting the Stage: Planning the Hennepin Avenue Cultural Corridor on Downtown Minneapolis' Oldest Street
Applicant: HENNEPIN THEATRE TRUST, Minneapolis, MN Project: Setting the Stage: Planning the Hennepin Avenue Cultural Corridor on Downtown Minneapolis' Oldest Street ATTACHMENT 2: DETAILS OF THE PROJECT
More informationTechnical Memorandum PERFORMANCE MEASURES. Prepared by:
Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP
More informationFREIGHT RAILROAD PRESERVATION PROGRAM SFY 2017 PART I - APPLICATION INSTRUCTIONS
FREIGHT RAILROAD PRESERVATION PROGRAM SFY 2017 SECTION 1.0 INTRODUCTION PART I - APPLICATION INSTRUCTIONS The Freight Railroad Preservation Program (FRPP) documents are composed of four parts. Part I contains
More informationFinancial Analysis and Funding
California High- Speed Rail Authority Revised 2012 Business Plan Chapter 7 Financial Analysis and Funding Introduction This chapter presents the financial analysis and funding strategy for the California
More informationGraduate School Rankings By U.S. News & World Report: ACCOUNTING PROGRAMS
2 University of Illinois, Urbana-Champaign 2 University of Michigan, Ann Arbor 4 Indiana University, Bloomington 6 University of California, Berkeley 7 Michigan State University 8 Ohio State University
More informationNarrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any
More informationPublic Involvement Meeting Handout
Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department
More information30 Years of Smart Growth
30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,
More informationCharacteristics of State Funding for Public Transportation
Characteristics of State Funding for Public Transportation The following report provides a summary of state transit funding for 50 states and the District of Columbia (DC). Information includes funding
More informationRouch, Jean. Cine-Ethnography. Minneapolis, MN, USA: University of Minnesota Press, 2003. p 238
Minneapolis, MN, USA: University of Minnesota Press, 2003. p 238 http://site.ebrary.com/lib/uchicago/doc?id=10151154&ppg=238 Minneapolis, MN, USA: University of Minnesota Press, 2003. p 239 http://site.ebrary.com/lib/uchicago/doc?id=10151154&ppg=239
More informationMidwest Regional Rail Initiative Phase 7. South of the Lake Route Alternatives Analysis Report
South of the Lake Alternatives Analysis Report Table of Contents Midwest Regional Rail Initiative Phase 7 South of the Lake Route Alternatives Analysis Report Prepared for: Indiana Department of Transportation
More informationNCHRP 8-84/Report 735: Long-Distance and Rural Transferable Parameters for Statewide Travel Forecasting Models
NCHRP 8-84/Report 735: Long-Distance and Rural Transferable Parameters for Statewide Travel Forecasting Models presented to Atlanta Regional Commission Model Users Group Presented by Robert G. Schiffer,
More informationLos Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
More informationDevelopment of Link-Level Mobile Source Emission Inventories
Development of Link-Level Mobile Source Emission Inventories Stella Shepard John Haasbeek Alison K. Pollack ENVIRON International Corporation Mark Janssen Lake Michigan Air Directors Consortium (LADCO)
More informationJanuary 2006. Tuition Reciprocity Data Overview
January 2006 Tuition Reciprocity Data Overview Author Jack Rayburn Research and Policy Analyst Tel: 651-642-0593 jack.rayburn@state.mn.us About the Minnesota Office of Higher Education The Minnesota Office
More informationMichael B. Hancock Mayor. October 31, 2014
Michael B. Hancock Mayor City and County of Denver OFFICE OF THE MAYOR CITY AND COUNTY BUILDING DENVER, CO 80202-5390 TELEPHONE: (720) 865-9090 FAX: (720) 865-8787 TTY/ TTD: (720) 865-9010 October 31,
More informationWEAVING IT TOGETHER: A TAPESTRY OF INNOVATIVE FUNDING SOURCES FOR RURAL & INTERCITY TRANSIT
WEAVING IT TOGETHER: A TAPESTRY OF INNOVATIVE FUNDING SOURCES FOR RURAL & INTERCITY TRANSIT Jana Lynott, AICP Senior Strategic Policy Advisor AARP Public Policy Institute @JanaLynott TRB Rural and Intercity
More informationMidtown Corridor Alternatives Analysis Scope of Work. April 18, 2012
Midtown Corridor Alternatives Analysis Scope of Work April 18, 2012 Table of Contents PART 1: STUDY AREA MAPS... 1 Attachment A: Existing and Planned Transit Service... 2 Attachment B: Corridor Boardings
More informationSouth Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...
More informationARRA Efforts Related to Acquisition and Relocation
ARRA Efforts Related to Acquisition and Relocation Requested by: Christine Rees Survey Deadline: June 24, 2009 The Transportation Resource Board (TRB) in cooperation with FHWA is conducting a survey of
More informationMidwest Regional Office
Patent Public Advisory Committee Quarterly Meeting Midwest Regional Office Dr. Christal Sheppard Regional Director, Midwest Regional Office November, 19, 2015 Midwest Regional Office - By the Numbers 154
More informationWISCONSIN DOT Wisconsin Department of Transportation Research & Library Unit
Implementing High-Speed Rail in Wisconsin Peer Exchange Hosted by the Division of Transportation Investment Management June 2 4, 2009 WISCONSIN DOT Research & Library Unit Implementing High-Speed Rail
More informationAppendix 8. Funding and Finance
Appendix 8 Funding and Finance Appendix 8 Funding and Finance Introduction Transportation investment should be guided by policy direction or objectives that serve broad goals such as economic development
More informationPompano Education Corridor Transit Study - Existing Conditions Technical Memorandum #1. Figure 59 Total Number of Employees (2040)
The total number of projected employees within Broward County in 2040 is 917,206. A total of 49,943 new employees are estimated within Broward County between 2010 and 2040, which represents a 5.7 percent
More informationLincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
More informationMAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda
MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal
More informationHow To Fund A Rail Bank
Appendix 2. State Rail s in Neighboring States and Peer Review Inventory 118 P age 1. Rail Line Rehabilitation 1. Rail Industrial Access 1. Ohio Rail Assistance ConnectOregon 2. Rail Preservation s Rail
More informationFLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? Jose Gonzalez SVP - Florida East Coast Industries Wednesday, August 12, 2015 1 Florida East Coast Industries
More informationGraduate School Rankings By U.S. News & World Report: COUNSELING/PERSONNEL SERVICES
Graduate School ings AAU Public Universities 2 University of Florida 3 Penn State University, University Park 4 Ohio State University, Columbus 4 University of Wisconsin, Madison 6 University of Missouri,
More informationIntelligent Transportation Systems (ITS) Concept of Operations for Arterial Traffic Management
Intelligent Transportation Systems (ITS) Concept of Operations for Arterial Traffic Management Prepared for: Minnesota Department of Transportation (Mn/DOT) Prepared by: Athey Creek Consultants and Alliant
More information14.0 AVIATION. I. Introduction 6/142010
14.0 AVIATION I. Introduction Aviation plays an important role in the MARC region. As a mode of transportation, aviation provides vital connections for people and goods to destinations inside and outside
More informationMichigan City indiana. It all works here. Economic Development Corporation Michigan City. www.edcmc.com
Michigan City indiana It all works here Economic Development Corporation Michigan City www.edcmc.com Where Business and Pleasure INSIDE Community Profile Business Environment Business Programs/Support
More informationStatewide Intercity and Regional Bus Network Study
Colorado Department of Transportation Division of Transit and Rail Statewide Intercity and Regional Bus Network Study DRAFT TECHNICAL MEMORANDUM 1 POLICY CONTEXT UPDATE March 11, 2013 Technical Memorandum
More informationMEDIA KIT TransferTimes.com
MEDIA KIT TransferTimes.com Since 1999, Transfer Times has been a leading regional resource for helping transfer students learn about and connect with four-year colleges and universities. Our unique distribution
More information