Claret Consulting 18 December 2015

Size: px
Start display at page:

Download "Claret Consulting 18 December 2015"

Transcription

1 The Denver-based Regional Transport District (RTD) 2004 FasTracks program is a multi-billion dollar regional transportation expansion plan that was designed to meet the Denver metro area s infrastructural needs. The plan will add 122 new miles of light rail and commuter rail, 21,000 parking spaces at commuter stations (such as RTD Park-n-Ride lots) and 18 miles of bus rapid transit to the region. This level of investment is justified by Denver s rapid population growth rate of more than 10 percent in with expectations of a further 50 percent growth by 2035 when the region is expected to top four million residents. The focus on transit supports not only Denver s general population growth but its increasing urbanization. During the past two decades, downtown Denver has transformed from an uninspiring industrial landscape to a trendy urban environment offering a high quality of life for professionals increasingly attracted by what the city has to offer. The past five years alone have seen nearly $5 billion invested in real estate projects. Several of these have followed public rail investments, such as the Cadence Union Station Apartments and Olde Towne Arvada. Denver s urbanization has seen an explosion in housing construction of both high-cost and affordable units, partially due to the FasTracks rail expansion. FasTracks includes investment in a number of new transit lines. The W line opened ahead of schedule in 2013 and next year will see the opening of four new rail lines in the Denver region. Additional lines are expected in the years to come, as is indicated in the chart below. The R line, an extension to existing Lincoln Station, is slated for Three more rail lines, implemented under the Eagle Public-Private Partnerships (P3) Project, are also slated to open in 2016 (line A to Denver International Airport, the first line B segment to Westminster and line G to Wheat Ridge). Future projects include an N line to Thornton that is scheduled to be operational in 2018, a central rail expansion called the L line, a 2.5-mile southwest rail line extension project that will extend the C and D lines one more station (C-470 Lucent), a 2.3 mile southeast rail line extension project that will extend the E and F lines three more stations to RidgeGate Parkway and an additional extension of the B line to Longmont. Overall, the FasTracks project includes $7.8 billion (up from $5.6 billion) in project expenditures. The project s financial plan includes $1.4 billion in Federal New Starts Grant funding as well as $215.1 million from other federal grants. A significant portion of FasTracks is funded by a 0.4% increase in the sales and use tax (RTD s primary revenue source) and additional sources include Transportation Infrastructure Finance and Innovation Act (TIFIA) loans, sales bonds, Certificates of Participation (COPs), pay as you go cash and local contributions. 1

2 FasTracks Project Summary Line Length (miles) Cost Opening Terminus W Line (West ) A Line (East Rail B Line (Northwest Rail G Line (Gold R Line (Aurora Line/I-225 Rail) N Line (North Metro Rail) 12.1 $707 mil (stayed within budget) 23 $2.2 billion Eagle P3 funds 6.2 (2016), eventually 41 total $17 mil for first segment (2016) from Eagle P3 funds 11.2 $2.2 billion Eagle P3 funds April 26, 2013 (8 months ahead of schedule) April 22, 2016 (scheduled) First segment to Westminster in 2016 (scheduled) Union Station to Jefferson County Government Center Union Station to Denver International Airport Union Station to Longmont 2016 Union Station to Wheat Ridge 22 $693.2 mil Winter 2016 Peoria to Lincoln 13 (2018), eventually 18.5 total Estimated $633.8 mil to first segment (Eastlake and 124 th Ave.) First segment to Eastlake and 124 th Ave. in 2018 Union Station to North Thornton Highway 7 L Line 0.8 Not yet available Not yet available A loop connecting rail trains between downtown Denver and the (planned) 38th Blake Station C Line D Line E Line F Line Project Descriptions 2.5 (Southwest 2.5 (Southwest 2.3 (Southeast 2.3 (Southeast $24.5 mil After 2040 Union Station to C-470 Lucent $24.5 mil After th Downing to C-470 Lucent $233.1 mil 2019 Union Station to RidgeGate Parkway $233.1 mil th California to RidgeGate Parkway The Eagle P3 Project, a component of the RTD s FasTracks plan for the Denver metro region, is a $2.2-billion-dollar project expected to be completed in It includes the A line (East Rail, the G line (Gold, the first segment of the B line (Northwest ) that runs to Westminster, construction of a commuter rail maintenance facility located near the intersection of routes I-25 and I-70, and acquisition of 54 commuter rail cars. The steel car bodies of the commuter rail cars were built in South Korea at the Hyundai Rotem plant and later sent to their Philadelphia, PA, plant for assembly and fittings (over 60 percent of the vehicle parts were made in the US). The trains are powered by overhead electric lines. Eagle P3 funding is derived from RTD sales taxes, federal loans and grants and private equity. The private partner, Denver Transit Partners (DTP) is a special purpose vehicle (SPV) owned by Fluor Enterprises, John Laing Investments and Uberior Infrastructure Investments (part of Lloyds Banking Group). It was awarded the design-build-finance-operate-maintain (DBFOM) contract in After the design-build phase is complete, Denver Transit Operators (DTO), a DTP subcontractor, will operate and maintain the infrastructure and commuter rail vehicles for 29 years. Macquarie sold its interest to Uberior and Laing at 2

3 financial close. The project came to commercial close in July 2010 and financial close in August The RFQ was issued in August 2008 and the RFP in September Only two of the three prequalified teams submitted full technical proposals in response to the RFP. The FTA provided a Full Funding Grant of $1.03 billion (the highest amount awarded under the Obama administration) and DTP provided approximately $450 million of the $2.2 billion required to build the A, B and G lines, specifically, $397.8 million in Private Activity Bonds (PAB) and $54 million in private equity. The financing package includes a $280 million TIFIA loan, the first for a transit project. B (Northwest ): this rail line, a segment of which will open in 2016, will eventually cover a distance of 41 miles and run between Union Station and Longmont. The first segment of 6.2 miles, which runs from Union Station to Westminster, is part of the Eagle P3 project and will open in The line will be a diesel-run commuter rail except for the P3 segment, which is to be electric. G (Gold : this line running from Union Station to Wheat Ridge, scheduled to open in 2016, will have seven stations. Construction began in A $30.4 million transit hub is being built in Olde Town Arvada, which will be the line s fifth rail stop. RTD is providing $2.6 million, with $24.3 million from Arvada and $3.5 million from grant funding. Trammell Crow Company is the City of Arvada s chosen transit hub developer, and both Kiewit Building Group, Inc. and RNL Architects are contributing to the facility s design and construction. The Olde Town Arvada rail developments have helped to spur a reported $227 million in local development projects in a five-block radius. A (East ): this line will run from Union Station to the Denver International Airport that is 23 miles away. In 2014 the line s first commuter rail cars arrived from Philadelphia, PA and testing began in The line has eight stations. Denver Union Station: The renovated Union Station opened in 2014, now transformed with new commuter rail platforms and an underground bus concourse with 22 gates at the Union Station Transit Center, a multimodal hub where light rail, commuter rail, intercity rail, special rail services, Amtrak, intercity buses and RTD buses meet. (Other existing stations include Boulder Transit Station, Civic Center Station and larger transfer stations between the FasTracks rail lines.) The $500 million project, a publicprivate collaboration, also includes development of the 10 blocks surrounding the station, adding residential, office and retail space. The transit center was built under a design-build contract awarded to Kiewit Western, and their project team included AECOM (Architecture, Engineering, Consulting, Operations and Maintenance), Hargreaves Associates and SOM (Skidmore, Owings & Merrill). In 2014, the Union Station project received the Design-Build Institute of America s (DBIA) Project of the Year award. 3

4 W (West ): This is the first FasTracks light rail line that opened, having become operational on April 26, 2013, eight months ahead of schedule. The 12.1 mile electric rail line runs from Union Station to the Jefferson County Government Center in Golden and has 12 stations. The project was built under a Construction Manager/General Contractor (CM/GC) contract that was approved in The contractor was Denver Transit Construction Group (DTCG), a Lakewood-based, joint venture of Stacy Witbeck, Inc. from Alameda, California, and Herzog Contracting Corporation from St. Joseph, Missouri. Construction commenced in Construction included 10 light rail bridges, 20 at-grade crossings, two light rail tunnels, three street bridge reconstructions, over four miles of bike paths and a pedestrian tunnel. The Association of General Contractors (AGC) recognized the project by deeming it a Merit Winner of the 2013 Alliant Build America Award in their highway and transportation category. DTCG was one of six firms that received the merit award. The project also received the 2013 WTS (Women's Transportation Seminar) Colorado Large Innovative Transportation Solution of the Year award. The project cost $707 million, and a Full Funding Grant Agreement (FFGA) with the FTA provided around $309 million. Supplies and equipment cost $98,131,000, $71,020,000 was paid in direct wages and subcontractors (over 60 percent were local) were paid $250,000,000. N (North Metro Rail): This 18.5 mile electric commuter rail line will run from Union Station to the North Thornton Highway 7 in North Adams County and is scheduled to open in The line follows the Union Pacific path and is scheduled to have eight stations. RTD purchased the majority of the rail line s right-of-way for $119 million from Union Pacific Railroad in 2009 and, after receiving an unsolicited bid proposal in 2013, opened the bidding process and awarded the design-build contract for construction of the first 13 miles of the line to Eastlake to Regional Rail Partners (RRP), which includes six stations. RRP is a joint venture of Balfour Beatty Infrastructure, Inc. (BBII) and Graham. The first segment of the line has been estimated to cost approximately $633.8 million. The remainder of the line will be built when funds become available, at which point RTD can exercise an option for RRP to build the rest of the line. Twelve commuter rail cars were purchased for this line. The steel car bodies of the commuter rail cars were built in South Korea at the Hyundai Rotem plant and later sent to their Philadelphia, PA plant for assembly and fittings. They run via overhead electric lines. R (Aurora Line/I-225 Rail): this light rail line, at 22 miles total, is a 10.5 mile extension from the pre-existing Nine Mile station that will run north to the A Line. It currently has 18 stations. The R line will run 22 miles from the new Peoria station (part of the A line) to the existing Lincoln Station, which serves lines E and F. Construction for this $693.2 million project began in 2013 and is expected to open in

5 E and F (Southeast Rail Extension): in 2015, RTD provided a $140 million two-phase design-build contract award to Balfour Beatty Infrastructure Inc. to extend the light rail E and F lines 2.3 miles south to RidgeGate Parkway, with three new stations. The entire project total cost is estimated at $233.1 million and funding requires receipt of a Full Funding Grant Agreement from the FTA. Construction is expected to start in 2016 and the project completion date is estimated for The project includes purchase of eight light rail vehicles. D and E (Southwest Rail Extension): this expansion of the light rail D and E lines 2.5 miles south to C- 470 Lucent (Lucent highway), with one new station. The cost of the project is estimated to be $24.5 million and the construction of this extension is expected to commence after L (Central Rail Extension): this Central Rail Extension will consist of a 0.8 mile loop connecting rail trains between downtown Denver and the (planned) 38th Blake Station. There are two new stations anticipated. The project is currently in the designing and planning stage. 5

Denver Union Station. Regional Transportation District Denver, Colorado

Denver Union Station. Regional Transportation District Denver, Colorado Denver Union Station Regional Transportation District Denver, Colorado Regional Transportation District Created in 1969 Eight-county service area Service area: 2,340 sq. miles 2.8 million population 15

More information

GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks

GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks APA Transportation Planning Division 2011 Student Paper Competition GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks Patrick Picard 2208 E. 17 th Ave., Apt. #4

More information

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total

More information

Risk Management in the Development of a Penta-P Project

Risk Management in the Development of a Penta-P Project Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don

More information

Dallas-Fort Worth Area Major Transportation Projects

Dallas-Fort Worth Area Major Transportation Projects Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional

More information

Eagle P3 Project Procurement Lessons Learned. Acronyms

Eagle P3 Project Procurement Lessons Learned. Acronyms Eagle P3 Project Procurement Acronyms Regional Transportation District August 31, 2011 1600 Blake Street Denver, Colorado 80202-1399 303.628.9000 RTD-Denver.com As the Regional Transportation District

More information

TOD Affordable Housing Preservation Policy Forum. Aaron Miripol, Urban Land Conservancy April 30, 2012

TOD Affordable Housing Preservation Policy Forum. Aaron Miripol, Urban Land Conservancy April 30, 2012 TOD Affordable Housing Preservation Policy Forum Aaron Miripol, Urban Land Conservancy April 30, 2012 Urban Land Conservancy (ULC) was established to acquire, develop and preserve real estate assets in

More information

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.

What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods. Mayor Hancock s Vision for Building a World-Class City What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.

More information

Massachusetts Public-Private Partnership Infrastructure Oversight Commission Introduction to Public-Private Partnerships

Massachusetts Public-Private Partnership Infrastructure Oversight Commission Introduction to Public-Private Partnerships Massachusetts Public-Private Partnership Infrastructure Oversight Commission Introduction to Public-Private Partnerships May 29, 2013 Introduction With you today from KPMG Years of Experience: 30+ Tim

More information

Who is TOD in Metro Denver? April 2010. Employee Survey Report. Appendix E: Survey Methodology. Benchmarking the Evolution of TOD in Metro Denver

Who is TOD in Metro Denver? April 2010. Employee Survey Report. Appendix E: Survey Methodology. Benchmarking the Evolution of TOD in Metro Denver Who is TOD in Metro Denver? April 2010 Benchmarking the Evolution of TOD in Metro Denver Employee Survey Report Appendix E: Survey Methodology DRCOG Who is TOD in Metro Denver? Survey of Employees near

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

Project Management Oversight Services

Project Management Oversight Services Solicitation Number: Reference-Number-FTA-08-PMOC Project Management Oversight Services Federal Transit Administration Our fundamental business strategy is forging strong, long-term relationships with

More information

2013 Transit-Oriented Development Status Report

2013 Transit-Oriented Development Status Report 2013 Transit-Oriented Development Status Report RTD and FasTracks Overview RTD oversees a 47-mile rail transit system that services 46 stations on five corridors including: The 5.3-mile Central Corridor

More information

Program Management Lessons Learned West Rail Line Project. December 2014

Program Management Lessons Learned West Rail Line Project. December 2014 Program Management Lessons Learned West Rail Line Project December 2014 i Contents Acronyms... iv Glossary... v Executive Summary... 1 Background and Overview... 2 Project Background... 2 Project Overview...

More information

FINANCING OF THE DENVER UNION STATION

FINANCING OF THE DENVER UNION STATION FINANCING OF THE DENVER UNION STATION "If you can find a path with no obstacles, it probably doesn't lead anywhere." Frank A. Clark Anastasia Khokhryakova Of Counsel ak@ballardspahr.com 303.292.2400 1

More information

Transit Oriented Development Economic Analysis and Market Study

Transit Oriented Development Economic Analysis and Market Study Transit Oriented Development Economic Analysis and Market Study Task 2: Regional Demand Analysis & TOD Market Analysis PREPARED FOR City and County of Denver Community Planning and Development PREPARED

More information

July 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul

July 2010 Met Council contributes $1 million to small business loan fund More Downtown Downtown Minneapolis St. Paul July 2010 Chair Peter Bell of the Metropolitan Council speaks about the Met Council s contribution of $1 million to a $1.5 million small business loan fund during a July 20 news conference with Mayor R.T.

More information

BOARD OF DIRECTORS REPORT

BOARD OF DIRECTORS REPORT BOARD OF DIRECTORS REPORT To: Phil Washington, General Manager Date: From: Bruce Abel, Assistant General Manager of Bus Operations GM Date: April 9, 2012 Board Meeting Date: May 15, 2012 Subject: August

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

Public-Private Partnerships Forum PPP Law, Structures and Contracting

Public-Private Partnerships Forum PPP Law, Structures and Contracting Public-Private Partnerships Forum PPP Law, Structures and Contracting AGC California Fall Conference 2010 Hyatt Grand Champions, Indian Wells November 4, 2010 MAKING IT HAPPEN. Overview California PPP

More information

Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO

Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO Transit Agency Profile and Reason for Selection of Transit Agency Overview The Regional Transportation District (RTD) in Denver is one

More information

Introduction to Public-Private Partnerships (P3s)

Introduction to Public-Private Partnerships (P3s) Introduction to Public-Private Partnerships (P3s) Today s Instructor Patrick DeCorla-Souza P3 Program Manager Office of Innovative Program Delivery Program Development Team Course Outline Slide 2 Lesson

More information

Table of Contents. 3. The Lessons... 19

Table of Contents. 3. The Lessons... 19 Table of Contents Executive Summary... 3 Lessons Learned... 4 FasTracks Program Background... 5 FasTracks 2009 Lessons Learned Master Contact List... 7 Planning/Environmental Studies... 8 1. Overview...

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

Infrastructure Banking

Infrastructure Banking Public-Private Partnership Structures May 2013 Edward Fanter Managing Director 212-605-1614 edward.fanter@bmo.com Infrastructure Banking June 2011 0 Infrastructure Banking Leading P3 Platform BMO Capital

More information

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

3.09 Public Safety and Security

3.09 Public Safety and Security 3.09 Public Safety and Security Summary This section describes the existing public safety and security resources in the Longmont corridor and estimates the effect of the proposed alternatives on transit

More information

S-11: Tacoma Link Extension to Tacoma Community College

S-11: Tacoma Link Extension to Tacoma Community College Project Number S-11 Subarea Pierce Primary Mode Light Rail Facility Type Corridor Length 3.65 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT

More information

Transit, Rail, Program, Project & Construction Management Experience

Transit, Rail, Program, Project & Construction Management Experience Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: peter.cipolla@hatchmott.com Project Management Oversight Services Introduction & Background Hatch Mott MacDonald

More information

Strategic Economic Development Assets: Infrastructure in the East Valley

Strategic Economic Development Assets: Infrastructure in the East Valley : Infrastructure in the East Valley Presented by: February 2013 1 INFRASTRUCTURE Moving People, Goods and Services In today s global economy, success belongs to the well-connected, especially in the movement

More information

2011 Boulder Valley Employee Survey for Transportation Report of Results

2011 Boulder Valley Employee Survey for Transportation Report of Results 2011 Boulder Valley Employee Survey for Transportation Report of Results June 2012 Image from emerson12 via Flickr, Creative Commons Attribution. 2955 Valmont, Suite 300 Boulder, CO 80301 303 444 7863

More information

KATHIE CANNING EXECUTIVE DIRECTOR

KATHIE CANNING EXECUTIVE DIRECTOR OVEMBER 20, 2013 DISTRICT NOVEMBER ADVISORY BOARD MEETING KATHIE CANNING EXECUTIVE DIRECTOR AGENDA INTRODUCTION/OVERVIEW 2014 PROJECTIONS COMPETITIVE OVERVIEW 2013 CLIENT ADVISORY BOARD CAPITAL IMPROVEMENT

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION CAPITAL TRANSPORTATION PROGRAM TRANSIT FACILITIES 3-306

STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION CAPITAL TRANSPORTATION PROGRAM TRANSIT FACILITIES 3-306 SUPPORT SYSTEM TRANSIT FACILITIES 3-306 NEWARK TRANSIT HUB PROJECT SCOPE/DESCRIPTION: Funding was authorized to begin a study to select a site for the Newark Transit Hub. Future improvements may include

More information

CITY OF EL PASO: SUN METRO Legislative Update Briefing

CITY OF EL PASO: SUN METRO Legislative Update Briefing CITY OF EL PASO: SUN METRO Legislative Update Briefing Updated March 2014 OUR VISION The mission of Sun Metro is to provide a first-class public transportation service to all El Pasoans and visitors so

More information

Cost and Financial Analysis

Cost and Financial Analysis Chapter 19: Cost and Financial Analysis A. INTRODUCTION The purpose of this chapter is to present examples of financial resources available to the Metropolitan Transportation Authority (MTA), which may

More information

peoria station Existing Conditions Report catalytic project Final 07.20.2014 4969 Broadway Boulder, CO 80304 303-440-9200 www.migcom.

peoria station Existing Conditions Report catalytic project Final 07.20.2014 4969 Broadway Boulder, CO 80304 303-440-9200 www.migcom. DENVER REGIONAL COUNCIL OF GOVERNMENTS peoria station catalytic project Final 07.20.2014 4969 Broadway Boulder, CO 80304 303-440-9200 www.migcom.com In association with: Fox Tuttle Transportation Group

More information

Getting Connected with the Colorado Department of Transportation (CDOT)

Getting Connected with the Colorado Department of Transportation (CDOT) Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding

More information

TOWN OF NEW CASTLE BUSINESS INCENTIVE POLICY. First Draft: For discussion only

TOWN OF NEW CASTLE BUSINESS INCENTIVE POLICY. First Draft: For discussion only TOWN OF NEW CASTLE BUSINESS INCENTIVE POLICY First Draft: For discussion only Incentives may be offered to businesses and industries which meet the Town s goal of developing a long-term, sustainable economic

More information

Impact Analysis: The Atlanta Braves new Stadium Project. March 2014. A Cushman & Wakefield Research Publication

Impact Analysis: The Atlanta Braves new Stadium Project. March 2014. A Cushman & Wakefield Research Publication Impact : The new Stadium Project A Cushman & Wakefield Research Publication March 2014 1 Executive Summary The new baseball stadium project will dramatically transform the Cumberland/Galleria area of Northwest

More information

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Commuter Rail Vehicle Cleaning Services Question/Answer Pre-Bid Session Dec. 4, 2015

Commuter Rail Vehicle Cleaning Services Question/Answer Pre-Bid Session Dec. 4, 2015 Commuter Rail Vehicle Cleaning Services Question/Answer Pre-Bid Session Dec. 4, 2015 How long are the vehicles? Each vehicle is 85 feet long. Each married pair (two trains connected) is 170 feet long.

More information

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT January 2014 CONTENTS Study Purpose 4 Data Sources 5 Existing Conditions 5 Market

More information

Michael I. Schneider Senior Vice President and Managing Director HDR / InfraConsult

Michael I. Schneider Senior Vice President and Managing Director HDR / InfraConsult Senior Vice President and Managing Director HDR / InfraConsult Michael Schneider is co-founder and Managing Partner of InfraConsult LLC, a program management and strategic advisory firm with primary focus

More information

BAKERY SQUARE 2.0 DEVELOPMENT (FORMER REIZENSTEIN SCHOOL)

BAKERY SQUARE 2.0 DEVELOPMENT (FORMER REIZENSTEIN SCHOOL) BAKERY SQUARE 2.0 DEVELOPMENT (FORMER REIZENSTEIN SCHOOL) FAST FACTS LOCATION: Pittsburgh, PA SIZE: 12 acres FEATURES: Proximity to Downtown OWNER: Walnut Capital INTENDED USE: Office Space, Residential

More information

Need last-minute help with directions? Just call us at 309-691-7263. We look forward to welcoming you to our offices.

Need last-minute help with directions? Just call us at 309-691-7263. We look forward to welcoming you to our offices. 7620 N. University, Suite 203 Peoria, IL 61614-1297 Directions: Heiple Law Offices is located in the Pioneer Park area on Peoria's far north side, just South of the intersection of University Street and

More information

L E G I S L A T I V E A N A L Y S T S O F F I C E

L E G I S L A T I V E A N A L Y S T S O F F I C E November 29, 2011 High-Speed Rail Authority: The Draft 2012 Business Plan and Funding Plan L E G I S L A T I V E A N A L Y S T S O F F I C E Presented to: Assembly Transportation Committee Hon. Bonnie

More information

EXPERIENCE INVESTMENT MANAGEMENT & REAL ESTATE SERVICES

EXPERIENCE INVESTMENT MANAGEMENT & REAL ESTATE SERVICES INVESTMENT & REAL ESTATE SERVICES Who We Are A trusted advisor. A consistent presence. A valued resource. Forest City Investment Management & Real Estate Services is the investment management and third-party

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

Transit Technology Alternatives

Transit Technology Alternatives Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Owner s Procurement Forum

Owner s Procurement Forum Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:

More information

Bolder Policies Brighter Future. Chrissy Mancini Nichols Metropolitan Planning Council

Bolder Policies Brighter Future. Chrissy Mancini Nichols Metropolitan Planning Council Bolder Policies Brighter Future Chrissy Mancini Nichols Metropolitan Planning Council Metropolitan Planning Council Since 1934, the Metropolitan Planning Council (MPC) has been dedicated to shaping a more

More information

Parsons Transportation Moving the world forward.

Parsons Transportation Moving the world forward. Parsons Transportation Moving the world forward. Alternative Delivery Get on the fast track to project success. In a changing marketplace, everyone has decisions to make. And Parsons innovative delivery

More information

DESIGN-BUILD IN CALIFORNIA

DESIGN-BUILD IN CALIFORNIA DESIGN-BUILD IN CALIFORNIA 1. Why Design-Build Design Build Drivers, Goals and Challenges (see Reed Construction Data and DGS handouts) 2. Who Can Do Design-Build Design-Build Authorizing Statutes for

More information

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT Technical Memorandum and Concept of Operations Prepared for: Prepared by: March

More information

BLENDING FUNDING IN SUPPORT OF TOLL PROJECTS. Marcus Coronado, P. E. PPP Project Manager Strategic Projects Division

BLENDING FUNDING IN SUPPORT OF TOLL PROJECTS. Marcus Coronado, P. E. PPP Project Manager Strategic Projects Division BLENDING FUNDING IN SUPPORT OF TOLL PROJECTS Marcus Coronado, P. E. PPP Project Manager Strategic Projects Division Table of Contents 1 Legislative Appropriation Re quest: Budget & Method of Finance 3-5

More information

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? Jose Gonzalez SVP - Florida East Coast Industries Wednesday, August 12, 2015 1 Florida East Coast Industries

More information

Understanding Value Capture as a Transportation Finance Strategy in Massachusetts. March 15, 2013

Understanding Value Capture as a Transportation Finance Strategy in Massachusetts. March 15, 2013 Understanding Value Capture as a Transportation Finance Strategy in Massachusetts March 15, 2013 Background The Massachusetts Legislature will soon explore options to increase transportation revenue. One

More information

How To Understand And Understand Transportation Engineering

How To Understand And Understand Transportation Engineering 1 Transportation Engineering CEE 362 Spring 2006 Dr. Zong Tian, P.E. 2 ABOUT MYSELF Hello http://unr.edu/homepage/zongt/ 3 SYLLABUS Text: Traffic and Highway Engineering, 3rd Edition, Nicholas J. Garber

More information

Total Capital Budget Review

Total Capital Budget Review Finance, Administration and Oversight Committee Information Item IV-A May 14, 2009 Total Capital Budget Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

Triangle Transit Financial Plan. Durham Orange Light Rail Transit Project

Triangle Transit Financial Plan. Durham Orange Light Rail Transit Project Durham Orange Light Rail Transit Project September 2012 TABLE OF CONTENTS LIST OF TABLES... ii LIST OF FIGURES... iii 1. Introduction... 1 1 1.1. DESCRIPTION OF PROJECT SPONSOR... 1 1 1.1.1. Durham Transit

More information

Financial Plan Documentation

Financial Plan Documentation B Financial Plan Documentation Introduction Transportation funding has undergone significant transformation from relying on federal and state funds, to increased dependence on local funds over the past

More information

Questions and Answers about the Orange Bus/Rail Investment Plan

Questions and Answers about the Orange Bus/Rail Investment Plan Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range

More information

Uptown Station - A Model For the Coming Train Feeding Craze

Uptown Station - A Model For the Coming Train Feeding Craze FOR IMMEDIATE RELEASE July 14, 20112 ATK-12-067 Amtrak Contact: Marc Magliari 312 544.5390 Town of Normal Contact: Mark Peterson 309 454.9501 TOWN OF NORMAL, ILLINOIS, U.S. DEPARTMENT OF TRANSPORTATION

More information

Central Puget Sound Regional Transit Authority

Central Puget Sound Regional Transit Authority Central Puget Sound Regional Transit Authority 2015 Financial Plan (June 2015) 2015 FINAL FINANCIAL PLAN (June 2015) TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 Financial Policies... 1 INTRODUCTION... 3 Description

More information

Chapter 8 Funding Considerations

Chapter 8 Funding Considerations Chapter 8 Funding Considerations Expanding transit services into El Dorado Hills under any of the service alternatives has associated operating and capital costs. This chapter considers the funding sources

More information

Cost Reduction Opportunities

Cost Reduction Opportunities Cost Reduction Opportunities 9 December 2015 Presentation to MassDOT Board of Directors & MBTA Fiscal and Management Control Board Arup 2 A global, integrated, multidisciplinary firm of professionals 13,000

More information

FREIGHT RAILROAD PRESERVATION PROGRAM SFY 2017 PART I - APPLICATION INSTRUCTIONS

FREIGHT RAILROAD PRESERVATION PROGRAM SFY 2017 PART I - APPLICATION INSTRUCTIONS FREIGHT RAILROAD PRESERVATION PROGRAM SFY 2017 SECTION 1.0 INTRODUCTION PART I - APPLICATION INSTRUCTIONS The Freight Railroad Preservation Program (FRPP) documents are composed of four parts. Part I contains

More information

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT I 20 West Heavy Rail Northside Drive Bus Rapid Contingent Multi Jurisdicitional Projects Atlanta Light Rail Clifton Light Rail * I 20 East Bus Rapid * Atlanta BeltLine Central Loop Irwin AUC Line Downtown

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

PRESIDIO PARKWAY FINANCIAL PROPOSAL 2.1.2. FINANCIAL PROPOSAL EXECUTIVE SUMMARY GOLDEN LINK PARTNERS

PRESIDIO PARKWAY FINANCIAL PROPOSAL 2.1.2. FINANCIAL PROPOSAL EXECUTIVE SUMMARY GOLDEN LINK PARTNERS 2.1.2. EXECUTIVE SUMMARY The Presidio Parkway Project (the Project ) is a landmark transaction in a high profile location and as the Project is the first transportation P3 in the State, its success is

More information

Environmental Impact Statement for the Washington Union Station Expansion Project

Environmental Impact Statement for the Washington Union Station Expansion Project This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION

More information

Consolidated Debt Service. #254 Consolidated Debt Service

Consolidated Debt Service. #254 Consolidated Debt Service #254 Consolidated Debt Service Fund Overview This LOB provides for the debt service expenditures for the general obligation bonds of the County as well as the general obligation bonds for the Fairfax County

More information

RESIDENTIAL LOT FOR SALE

RESIDENTIAL LOT FOR SALE RESIDENTIAL LOT FOR SALE North Lot 11 - Brentwood Subdivision Morristown (Hamblen County), Tennessee Offering Memorandum CONTACT US Jeff G. Jones at 615-445-9984 Bruce Nelson at 615-651-4677 or Toll Free

More information

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System

More information

Chapter 5 Financial Plan

Chapter 5 Financial Plan The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to

More information

Proposed Capital Improvement Program (CIP) for FY 2015-2019

Proposed Capital Improvement Program (CIP) for FY 2015-2019 RELATED TO AGENDA ITEM 17 Proposed Capital Improvement Program (CIP) for FY 2015-2019 February 20, 2014 Presentation Overview Planning Agency roles District s capital needs Bridge funding plan Capital

More information

Schenk-Atwood Neighborhood Business District Master Plan

Schenk-Atwood Neighborhood Business District Master Plan Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,

More information

SURVEY OF ECONOMIC DEVELOPMENT PROGRAMS IN MICHIGAN

SURVEY OF ECONOMIC DEVELOPMENT PROGRAMS IN MICHIGAN Citizens Research Council of Michigan SURVEY OF ECONOMIC DEVELOPMENT PROGRAMS IN MICHIGAN 2ND EDITION June 2007 Repor ort 347 CITIZENS RESEARCH COUNCIL OF MICHIGAN MAIN OFFICE 38777 West Six Mile Road,

More information

Federal Transit Administration. Options for Financing Public Transportation in the United States

Federal Transit Administration. Options for Financing Public Transportation in the United States Options for Financing Public Transportation in the United States Capital Leasing Revenue Bonds Fare Box Revenue Bonds Grant Anticipation Notes Financing Options Debt Service Reserve Public Private Partnerships

More information

SALT LAKE AND OGDEN/ LAYTON URBAN AREA. Federal Transit Administration (FTA)

SALT LAKE AND OGDEN/ LAYTON URBAN AREA. Federal Transit Administration (FTA) SALT LAKE AND OGDEN/ LAYTON URBAN AREA Public Transit Program Federal Transit Administration (FTA) Section 5307 Urbanized Area Formula Section 5309 Capital Investment Program New Starts Section 5309 Capital

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

MULTI-FAMILY DEVELOPMENT AND INVESTMENT

MULTI-FAMILY DEVELOPMENT AND INVESTMENT MULTI-FAMILY DEVELOPMENT AND INVESTMENT IT S ALL ABOUT LIVING HIGH STREET RESIDENTIAL, a wholly-owned operating subsidiary of Trammell Crow Company, specializes in the development of multifamily housing.

More information

01LG Corp. Overview. Korea Employee 125,000 Plants 40 R&D Center 70. Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20

01LG Corp. Overview. Korea Employee 125,000 Plants 40 R&D Center 70. Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20 01LG Corp. Overview Korea Employee 125,000 Plants 40 R&D Center 70 Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20 01LG Corp. Business Area z 12 14 31 02LG CNS Overview LG N-Sys

More information

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation

More information

Michael B. Hancock Mayor. October 31, 2014

Michael B. Hancock Mayor. October 31, 2014 Michael B. Hancock Mayor City and County of Denver OFFICE OF THE MAYOR CITY AND COUNTY BUILDING DENVER, CO 80202-5390 TELEPHONE: (720) 865-9090 FAX: (720) 865-8787 TTY/ TTD: (720) 865-9010 October 31,

More information

A knowledge-sharing report to help RTD find better ways to serve the public. Best Practices

A knowledge-sharing report to help RTD find better ways to serve the public. Best Practices A knowledge-sharing report to help RTD find better ways to serve the public. Best Practices Table of Contents Executive Summary From the General Manager 7 Purpose of the Best Practice Initiative 8 How

More information

Seizing an Opportunity

Seizing an Opportunity Take the A-Train By Rich Sampson Near the end of 2010, the Green Line light-rail route of the Dallas Area Rapid Transit (DART) network will open for service, reaching its northernmost station in the city

More information

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida National Bus Rapid Transit Institute (NBRTI) At the University of South Florida History of the NBRTI In January 2001, the National BRT Institute was created at USF s Center for Urban Transportation Research

More information

Chicago Neighborhoods 2015: Assets, Plans and Trends A project of The Chicago Community Trust

Chicago Neighborhoods 2015: Assets, Plans and Trends A project of The Chicago Community Trust NEAR WEST SIDE Near West Side Area Land Use Plan July 2000 Community Area: Near West Side Department of Planning and Development (DPD), Alderman Walter Burnett, University of Illinois at Chicago (UIC),

More information

Utilizing Value Capture for Transportation Funding

Utilizing Value Capture for Transportation Funding Utilizing Value Capture for Transportation Funding Transport Chicago 2011 Conference Go To 2040 Capital Transportation Projects Go To 2040 Fiscally Constrained Projects 5 Extension/new projects 10 Transportation

More information

Professional transport planning, traffic engineering, transport economics and program management solutions

Professional transport planning, traffic engineering, transport economics and program management solutions Professional transport planning, traffic engineering, transport economics and program management solutions PSA Consulting (Australia) commenced in 2004 and over the PSA Consulting (Australia) is a specialist

More information