1 PRE FEASIBILITY REPORT OF Submitted to MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE GOVT. OF INDIA Paryavaran Bhawan, CGO Complex Jor Bagh Road, New Delhi LORE SILICA SAND MIINE Village: Lore, Taluka: Kankavli, Dist: Sindhudurg, Maharashtra (Area Ha; Production 0.15 MTPA) * PROJECT PROPONENT M/S ESMO TRADING CORPORATION 255/A-1, Highway Park Aptt.,Old Poona -Banglore Road,Kolhapur * EIA Consultant SRUSHTI SEWA HariharApartment,Agresen Road, Near AdivasiBhavan, Giripeth, Nagpur (Maharashtra) Phone: srushtisewa@yahoo.in Accredited by NABET: No.- NABET/EIA/127/SA062/0613 Dated 26/06/2013 July 2015

2 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT... 4 i Identification of project & project proponent ii Brief description of nature of the project iii Need for the project iv Demand supply gap v Imports vs indigenous production vi Export possibility vii Domestic export market viii EMPLOYMENT generation (direct & indirect) 3. PROJECT DESCRIPTION... 6 i Type of project ii Location iii Alternate site iv Size of magnitude of operation v Process description vi Raw materials sources & transportation vii Resource recycling. viii Water requirement & supply ix Waste generation and waste management x Schematic representation 4. SITE ANALYSIS i Connectivity ii Landuse & land ownership iii Nearest distance from proposed site iv Topography v Existing landuse pattern vi Existing Infrastructure vii Soil classification viii Climate ix Social infrastructure 5. PLANNING BRIEF i Planning concept ii Population projection iii Landuse planning iv Infrastructure demand v Amenities & facilities II

3 6. PROPOSED INFRASTRUCTURE i Industrial area ii Residential area iii Green belt iv Social infrastructure v Connectivity vi Drinking water vii Sewerage system viii Industrial waste management ix Solid waste management x Power requirement & supply 7. REHABILITATION AND RESETTLEMENT PROJECT SCHEDULE & COST ESTIMATION ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS ANNEXURE 1. MINING PLAN APPROVAL LETTER ECONOMIC VIABILITY ENVIRONMENT MANAGEMENT PLAN.. 27 PLATE 1. KHASRA MAP SURFACE PLAN.. 30 III

4 1. EXECUTIVE SUMMARY The silica sand mine of M/s. Esmo Trading Corporation is located at Village Lore, Tahsil-Kankavli, District-Sindhudurg, Maharashtra. The original mining lease sanctioned was Ha. Mining plan for this area was sanctioned by DGM. However, while applying for 1 st renewal lessee had surrendered Ha of non-mineralized area, thereby reducing the mining lease area to Ha.Therefore, an application for the current mining lease area of Ha is made for Environmental Clearance. The peak production capacity of silica sand is proposed to be 0.15 MTPA which will be achieved from the allocated ML area of Ha. The silica sand is extracted from this area as good quality of silica sand is available in this area which caters the overgrowing need for silica sand in the industries. The mining will be carried out by semi-mechanized opencast method. The mining plan has been approved for Ha by DGM vide letter no. STC-852/ /2215 dated 20/07/2012. (Annexure-1) An application for 1 st renewal of silica sand mining lease has been submitted to Industries,Energy and Labour department for Ha which is enclosed in Form- 1 as Enclosure-1 The general topography of the study area is almost flat in nature. The general altitude of the study area varies between m above Mean Sea Level (MSL). The silica sand mine ( Ha) will be developed as semi-mechanized opencast method for the production of silica 0.15 MTPA. Commercially exploitable silica sand deposits occur in this mining lease. The net geological reserves are estimated to be about 2.90 Million tonnes. The cutoff grade of Si O2 i n silic a sand is 99.2% and F e2o3 0.18% which is suitable for industrial use. Considering the mineable proved reserves 2.90 million tonnes and the production of silica 0.15 MTPA,thus the life of the mine will be 20 years. Exploration program was carried out in the year Since this mine is operating from many years, pits have been open in the lease area. Systematic grid

5 pattern exploration in the form of core drilling is carried out in the ML, excluding area covered by the pit. Silica sand is exposed in the existing pits. Two working pits are existing in the area. The same pits will be expanded in north western direction to win the ore by opencast semi-mechanized method. As stratum is very soft, no drilling and blasting will be required. Overall slope of the pit will be maintained at 45 o. The opencast excavation for silica sand will be continued in existing pit expanding laterally. The water requirement of the project is estimated to be m 3 /day. The 1000 m 3 /day water is required for sand washing. 6 m 3 /day of the water is required for dust suppression, 3 m 3 /day plantation. The water requirement will be met from the working pit where ground water gets collected. 5.7 m 3 /day is required for drinking purposes and source of water will be surface water from near ML.. The power requirement will be met from MSEB grid. Beneficiation of silica sand is basically separation of clay material. The beneficiation process initially comprises of manual crushing (breaking & fragmentation) to desired fraction of silica sand is transported to washing plant where 16 mesh size wet screening is being done, and oversized fraction separated thereby. The mining will be carried out as per the approved mining plan. The plantation program will be taken up in the areas in future in a systematic manner and plantation will be carried out, starting with soil binding grasses and shrubs followed by larger trees species. Local varieties of plants shall be given predominance. Broadcasting of seeds of local shrubs will be extremely useful in providing an immediate green cover. Especially Acacia, Subabhul, Cashew saplings will be planted. There is no top soil hence there will not be generation of top soil. 2

6 No historical monument or public building exists near the area and within 10 kms radius. However, few temples located at close proximity of the villages. Radhanagri Wildlife Sanctuary is located at 4.0 km towards Eastern direction from mining lease area. There is no National Park, defense installation or sensitive area located within 15 km radius of the proposed mine. 3

7 2. INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION. i) Identification of Project and Project Proponent M/s Esmo Trading Corporation has been operating Silica sand mine in Sindhudurg district of Maharashtra. Communicational details of the Lessee are as under; M/s Esmo Trading Corporation Phone: /A-1, Highway Park Aptt., Old Poona -Banglore Road, Kolhapur ii) Brief description of nature of the project The lessee has applied for obtaining environmental clearance for silica sand mine with 0.15 MTPA production capacity from the allocated ML area of Ha in order to cater the overgrowing need for silica sand in the industries. This production will be achieved by developing this mine by semi-mechanized opencast method. Commercially exploitable Silica sand deposits occur in this mining lease. The net geological reserves are estimated to be about 2.90 Million tonnes. Project appraisal: The mining plan has been approved for Ha by DGM vide letter no. STC-852/ /2215 dated 20/07/2012. (Annexure-1) An application for 1 st renewal of silica sand mining lease has been submitted to Industries,Energy and Labour department for Ha which is enclosed in Form- 1 as Enclosure -1. The statement showing the details of the area applied for renewal under mining lease alongwith 7/12 abstract to M/s ESMO Trading Corporation, Kolhapur is enclosed in Form 1 as Enclosure-2. In order to obtain environmental clearance as per the EIA Notification 2006 the prefeasibility report is being submitted along with the application Form I for the project with production capacity of 0.15 MTPA. The project is categorized as Category A project as per EIA Notification iii) Need for the project and its important to the country and or region. Silica sand is one of the important mineral deposits occurring in the Indian sub-continent. It has played a great role in development of civilization and industrialization. The occurrence of Silica sand ore in the proposed area is proved by the way of exploration and its 4

8 production has important role in the local foundry and various shell sand industries. The M.L. area over hectares is covered within the Survey of India 47 H/15. iv) Demand Supply Gap. Silica sand is an essential component in the various types of foundry industries such as iron & steel, metallurgical, other chemical manufacturing industries and shell coating units. Requirements of foundry industries are mainly based on the mesh size of sand. As the demand is flourishing in the surrounding area such as Kolhapur, Satara, Sangli, Pune and Belgaum,the presence of such industries in an around the area the supply of silica sand ore is in demand. v) Imports vs. Indigenous production. India ranks among the leading producers of Silica sand in the world. The Indian Silica sand market contains big suppliers and small regional companies. Silica sand suppliers work in collaboration with designers to create a strong demand for Silica sand in India. Backed by significant investments in commercial, infrastructure and residential projects, the Indian iron & steel, metallurgical, shell coating units has recording significant growth for more than a decade. Silica sand is a key raw material in production of iron & steel, metal, chemical industries is also expected to record growth. The interior and exterior design industry is also a key driving factor for the growth of the Silica sand industry. vi) Export Possibility. The policies of Government on economic development have given various subsidies like slashing the import duties and provisions for the Indian industry to grow indigenously. Hence, there is a good possibility of export of Silica sand but this Silica sand mine shall be supplier source for the foundry and shell sand industries. vii) Domestic / export Markets. Domestic market for Silica sand is also well established. viii) Employment Generation (Direct and Indirect) due to the project. The mine will directly employ about 106 workers. It is opted to employ the local population wherever possible in the project activities. 5

9 3 PROJECT DESCRIPTION i) Type of project including interlinked and Interdependent project, if any. In the mining lease area, the mining of Silica sand ore will be carried out by semimechanized opencast method as per approved mining plan. ii) iii) Location: The Silica sand mine is located in village Lore, Tahsil- Kankavli, District Sindhudurg in Maharashtra state. The M.L. area over Ha is covered within the Survey of India toposheet No. 47 H/15 on a scale of 1:50,000. Nearest Railway Station: Nandgaon- 12 KM (W) and Nearest Air Port: Kolhapur km from Kankavli town (NE). Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental consideration gone into should be highlighted. Mining is a site specific and has to be undertaken at the place of the occurrence of the mineral and hence no alternative sites explored. iv) Size or magnitude of operation. The mining lease area is Ha with production capacity of silica sand 0.15 MTPA. During the course of mining the exploration in the granted lease area was carried out with the help of 48 core drill bore holes, hence the reserves have substantially increased. The khasra map is attached as Plate 1. v) Project description with process details (a schematic diagram/ flow chart showing the project layout, components of the project etc. given). should be Regional Geology Geologically Sindhudurgdistrict,which is part of coastal Maharashtra (known as Kokan) forms part of Sahyadri hill range. Western coast has been formed as aresult of faulting.as such formations right from Precambrian to Recent are observed in the district.general stratigraphy of the region is as under: Age Recent,Sub-recent,Pleistocene Miocene Pliocene Formation Alluvium,laterite, Sand Tertiary,sediments,shale 6

10 Lower Ecocene-Upper Cretaceous Precambrian-Kaladgi Group Deccan Trap Sandstone,Limestone,Quartzite, conglomerate,shale Iron ore Group Quartzite,Phyllite,Schist,banded Haematite,Quartzite BMQ The ML and surrounding area is more or less a flat land with soil cover (lateritic)upto 2 meter depth. Kaladgi sandstone is observed below this lateritic soil cover. Clay intercalations are observed in the upper part of sandstone, in contact with overburden. These rocks are almost horizontal with ESE WNW trend and dipping due north with amount of dip varying between 10 o -15 o. Geology of the Area: The quartzites and sandstones are generally overlain directly by lateritic caprock instead of Basalt; though basalt is observed in surrounding areas. From the fact that sandstone is seen outcropping at many places. Lateritic soil covers most part of the area and wherever sandstone or quartzite is exposed and they exhibit a trend of N-10 o E/S-10 o W with the amount 17 o -19 o of dip. towardswest.exposures of sandstone are generally seen over northern slopes of the hill range in the area under study.the general sequence is given below. Top soil - Lateritic soil Yellow/Brown Sand stone Yellow to white sandstone 0-1.5m 0-3 m 0.10 m Details of Exploration: ML area has been explored with the 48 core drill bore holes during Reserves: A summarized table of reserve & quality are as under: Reserves Silicasand(tonnes) SiO 2% Fe 2 O 3% Proved 9,01, Additional 20,00, Total 29,01,565 7

11 Description of present mining methods: Present Size of Pits: Presently there are two working pits in the lease area. The present pit dimensions are as below; Pit No. Area in m 2 Max. Depth in m , , Silica sand is exposed in the pit. There are two working pits are formed in the area. The same pits will be expanded in north western direction to win the ore by opencast semi-mechanized method. As stratum is very soft, no drilling and blasting will be required. Overall slope will be maintained at 45 o. The opencast excavation for Silica sand will be continued in existing pit expanding laterally. The Proposed Production Programme: The development consists of removal of anoverburden, which occurs as a capping over silica sand. The details are as under the figures are rounded off to the nearest zero. There is no top soil. Year O/B +Ass.Waste Tons , , , ,084 Total 42,868 Year wise Production for the period to Year O/B +Ass.Waste Production Ratio Tons tons ,35,000 1:0.06 8

12 ,40,000 1: ,45,000 1: ,50,000 1:0.07 Taking into consideration of present proved reserve of silica sand is 0.90 million tonnes.in addition to above proved reserves, the ML area has been explored with 48 core drilled bore holes during the year 2014, and proved additional minable reserves of 2.00 million tonnes. Thus in all 2.9 million tonnes of minable reserves of silica sand ore made available.the production to the tone of 0.15 MTPA, thus the life of the mine would be around 20 years looking to the present schedule of availability of the ore. Final slope angle at the close of the mine: Overall slope will be maintained at 45 o. The opencast excavation for silica sand will be continued in existing pit expanding laterally. Post mining land use pattern: The post mining land use shall be as under : The original mining lease sanctioned was Ha. Mining plan for this area was sanctioned by DGM. However, while applying for 1st renewal we had surrendered Ha of non-mineralized area, thereby reducing the mining lease area to Ha. (Annexure-1 enclosed in Form-1 provides necessary documents submitted to competent Authority in this regard) Post mining land use pattern S.No. Description of Landuse Area (Ha) Present After 5 At the (Non -forest) years end life of the mine 1. Area excavated Area backfilled/afforested Area storage for top soil Area under overburden dump Area under Storage of mineral Area under infrastructure (workshop administrative building) 6. Area under Roads Railways Geen belts Tailing pond Effluent Treatment Plant Mineral Separation Plant Township area Others to be specify Mango Plantation

13 Sugarcane Plantation Palm Plantation Unutilized area Total Ground water: Ground water table is expected to be at more than m depth fromsurface level. The deposit is planned to be operated up to a maximum depth of 20 m from surface level during the mining plan period. Hence, the aforesaid depth of working would not affect the ground water table. vi) Raw material along with estimated quantity, likely source marketing area of final products, mode of transport of raw material and Finished product. There is no requirement of Raw Material in this project. Mode of transport of extracted silica sand from the mine to various industries is surface transport by road. vii) Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined. The waste generated or mineral rejects will be stacked separately in the non-mineralized zone. There is no top soil in ML hence there will not be generation of top soil.rainwater collected in mining pit will be used for dust suppression and plantation after sedimentation. viii) Availability of water its source, Energy / power requirement and source should be given. The total water requirement of the silica sand project is estimated to be m 3 /day. The water requirement for washing silica sand is about 1000 m 3 / day and for dust suppression 6 m 3 / day and 3 m 3 / day plantation. The source of water is ground water collected in the working pit. 5.7 m 3 /day is required for drinking purposes and source of water will be surface water from near ML. The power requirement will be met from MSEB grid. ix) Quantity of waste to be generated (liquid and solid) and scheme for their Management /disposal. There is no liquid effluent generation from the proposed mine. There will be hardly any waste rock during the mining. If at all any waste material/rock is encountered during 10

14 miningupto ultimate depth, the quantity the same will be negligible. It will be dumped on thenon-mineralized area and shall be biologically reclaimed. x) Schematic representation of the feasibility drawing which give information of EIA purpose. The EIA will include an assessment of the potential impacts envisaged as an effect of the project, during the operation of the mine. The assessment will be based on a consideration of the individual components of the project. 11

15 i) Connectivity. 4. SITE ANALYSIS ii) The area is located in the KankavliTahsil of Sindhudurg District and is well connected by SH-181 highway. The nearest town Kankavli lies at a distance of about 23Km (SW) from the mine. Public road from Phondaghat-Vaibhavwadi is located on the eastern side of mining lease area. Land use and Land ownership. As per the administrative records the Landuse of the Mine is as follows; Landuse Area (Ha) Non Forest Private Land iii) Topography (along with map). The general topography of the study area is almost flat in nature. The general altitude of the study area varies between m above Mean Sea Level (MSL). The difference in elevation within the area is about 12 m. The Surface plan of the lease area is enclosed as Plate 2. iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given. 12

16 Significant features in 15 Km radius (aerial distance) of the project are tabulated below; Sr. DISTANCE No. FEATURES DETAILS /DIRECTION 1. River Water body : Kurli Dam Gaganbawda Lake Radhanagri Dam Reservoir 5.3 km(ne) 16.0 km(ne) 11 km(e) 2. Reserved Forest None - 3. Plantations None - 4. Industries None - 5. Thermal Power Plant None - 6. Mines None - 7. Railway Line Nandgaon Railway km(w) line 8. Archeological None - Monument 9. National Park,Wildlife sanctuary Radhanagri Wildlife Sanctuary 4.0 km(e) 11. Interstate Boundary None - v) Existing Infrastructure. Water supply in most of the villages is available. Latrine facility, Waste Water disposal, garbage disposal were totally absent. Inter-village transport facility is available only for the selected villages. While educational facilities & health facilities are not encouraging in most of the villages. There is well established road connection. vi) Soil classification. Soil is the most important feature of physiography, the formation of which largely depends upon the topography rock types and drainage. The cropping pattern in the area is governed by the thickness of soil mantle, its texture and constancy. The soils of Kankavali tehsil is clay loam soil and lateritic soil. The clay loamy soil occur in heavy rainfall areas which make good paddy fields. The lateritic soil

17 13 M/s ESMO TRADING CORPORATION generally occur in areas where rainfall is more than 2500mm.Since the soil of Sindhudurg district occur in heavy rainfall areas, practically no cultivation is done and normally jungle type of vegetation is prevalent. The soil of Kankavli tehsil is well drained, slightly deep, loamy soils on moderately sloping undulating lands with mesas and narrow valleys with severe erosion and moderate stoniness. The soil of Sindhudurg district falls under very high rainfall zone (Rainfall more than 2500 mm) of agro climatic zone. This zone has mostly lateritic soils. The soils are rich in nitrogen soils. The soils are rich in nitrogen and supports millet crops. These types of soils are least productive soils. vii) Climatic data from secondary sources. The climate of this district is generally moist. The rainfall is plentiful and regular. The year may be divided into four seasons, the summer season from March to May, the southwest monsoon season from June to September, the post monsoon season from October to November and the winter season from December to February. Rainfall: The average annual rainfall for the district as a whole is mm. Therainfall increases rapidly from the coast towards the Western Ghats on the eastern border of the district and also increases from north to south. In and near the Ghats, rainfall is very heavy. Practically the entire annual rainfall occurs during the months June to October. The rainiest month is July when one third of the annual rainfall is received. The variation from year to year in the rainfall is large. During the fifty year period 1941 to 1990, the year 1961 was one with the highest annual rainfall amounting to 125% of the normal. Rainfall amounting to only 52% of the normal occurred in 1941, the year with the lowest amount of rainfall. During the fifty year period there were six years with less than 80% of the normal rainfall. It will be seen from Table 2 that in 33 years out of 50 years the rainfall in the district was in between 2501 and 3500 mm. Temperature: Meteorological data are available for two observatories in & at Deogarh and Vengurla. Being a coastal Tehsils, the variation of temperature during the day and through the seasons is not large. 14

18 In the hot season, temperatures rise slowly from March and May is the hottest month. With the onset of the monsoon temperature drops by two to three degrees. Day temperatures during the monsoon are low than those in the cold season. In the post monsoon months of October and November, day temperatures increase and days in November are as hot as in May. Night temperatures are the lowest in January. Areas within 20 to 25 kilometres of the coast are the most pleasant, particularly in the hot months with the sea breeze blowing, nearly throughout the day hours. Further inland, during the hot months,both days and nights are oppressive and more so in the tract at the foot of the Western Ghats. Along the coast maximum temperatures rarely go beyond 38 C. Highest maximum temperature ever recorded at Devgarh was 39.2 C on 5th March 1981 and the lowest minimum temperature ever recorded was 14.1 C on 17th November Highest and lowest temperature values for Vengurla were 40.0 C on 16th April, 1956 and 10.6 C on 30 th December 1954 respectively. Humidity: Owing to the proximity of the sea, the district is on the whole very humid.even during the winter and summer months the relative humidity is above 60% in the afternoons. It is more in the mornings on most of the occasions. Wind Velocities and Wind Direction: Winds are moderate to strong and are mainlywesterly or northwesterly during the monsoon months. They are more strong towards north in the district. In the rest of the 81 year winds blow from directions between north and east in the mornings and between west and northwest in the afternoons. viii) Social Infrastructure available. Education: Education is a basic requirement for every human being. The governmentsshould utilize its entire recourses irrational manner to encourage people to become literate to some extent since educated persons are assets to help in proper development of the country. In the Kankavli Tehsil, there are number of primary, middle and Higher secondary school and colleges. Hospital: There are number of Hospital, dispensaries, primary health centre and Subprimary health centre available in that tehsil. Transport: The transport facilities in the tehsil are well developed and wide spread.state or national highway link most of the urban areas. 15

19 Communication: Communication facilities go a long way in information collectionand its dissemination in an effective and speedy manner. In the modern society, the roll of the facilities in the socioeconomic development of the society is very well recognized. Communication facility help in the flow of information from one place to another in shortest time, thus helping administration and corporate managers to take crucial decisions relating to daily functioning of administration and business dealings in shortest possible time. The importance of developed communication network for the common men judged from the fact that in rural areas. All communication facility like as phone, fax, printer, scanner, computer etc are available in Kankavli tehsil. 16

20 5. PLANNING BRIEF i) Planning Concept (type of Industries, facilities, transportation etc) Town and country planning/ Development authority Classification. The mining will be carried out as per the approved mining plan. During mining plan period, the mining operation will be done by semi-mechanized opencast method. The statutory provisions for the development of mine shall be followed to ensure safe mining practices and conservation of mineral. During the course of mining protection and conservation of natural resources and protection of environment will be ensured. The Environment Management Plan in brief is described at Annexure -3. ii) Population Projection. The mine will provide direct employment to nearly 106 workers. The local persons have been given preference in employment for mine as per their eligibility. Necessary training will be given to train the unemployed youths of the nearby villages. The indirect employment opportunities will automatically created with the click mining industry in the region. iii) Land use planning (breakup along with green belt etc.). S.No. Description of Landuse Area (Ha) Present After 5 At the (Non -forest) years end life of the mine 1. Area excavated Area backfilled/afforested Area storage for top soil Area under overburden dump Area under Storage of mineral Area under infrastructure (workshop administrative building) 6. Area under Roads Railways Geen belts Tailing pond Effluent Treatment Plant Mineral Separation Plant Township area Others to be specify Mango Plantation Sugarcane Plantation Palm Plantation Unutilized area Total

21 iv) Assessment of Infrastructure Demand (physical & social). The mine will require roads for the transport of the mineral besides it will require manpower to operate the mine. v) Amenities/Facilities. These include community toilets, drinking water facilities like public stand posts. 18

22 6. PROPOSED INFRASTRUCTURE i) Industrial area (processing area). Mineral processing such as screening and washing shall be carried out in ML area. ii) Residential Area (Non processing Area). None iii) Green Belt. It is proposed to undertake plantation of local tree species within lease. iv) Social Infrastructure. Under Corporate Social Responsibility (CSR) the felt needs of the nearby villages will be identified and accordingly social infrastructures will be developed. v) Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc.) Well established vi) Drinking Water management (Source & Supply of water) Drinking water for the workers will be met from the surface water from near ML. and nearby wells. Drinking water arrangement for the nearby villages under Corporate Social Responsibility (CSR) will be also made. vii) Sewerage System. None proposed viii) Industrial Waste Management. Not required ix) Solid Waste Management. None x) Power Requirement & Supply / Source. Through MSEB grid 19

23 7. REHABILITATION AND RESETTLEMENT (R & R ) PLAN i) Policy to be adopted (central/state) in respect of the project affected person including home oustees, land oustees and landless laborers (a brief outline to be given.) Not Applicable 8. PROJECT SCHEDULE & COST ESTIMATES The capital budget for environmental protection measure is estimated to be 7.05 Lakhs. while the recurring budget is estimated to be 1.05 Lakhs. i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given.) The mining operations are being carried out as per approved mining plan. ii) Estimated project cost along with analysis in terms of economic viability of the project. The cost analysis in terms of economic viability of the project is Rs. 78 Lakhs. 20

24 9. ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS) i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. The liberalization of the Indian economy has catapulted the Indian industry into new realms of development through global thinking and related progress. The policies of Government on economic development have given various subsidies like slashing import duties and provisions for the Indian industry to grow indigenously, also there are clearly spelled guidelines for environmental management. The project under consideration aims to contribute in the national objective of economy and ecology developing hand in hand. The region, where the project is situated is mostly dependent on agriculture forest and mineral resources where silica sand has a major share. The development of mining in the area is directly and indirectly going to contribute in increasing employment, infrastructure, communication, and socioeconomic infrastructure. It is proposed to employ the local population wherever possible in the proposed project activities directly or indirectly. This silica sand mine would naturally have implications on the neighborhood with reference to socio-economic aspects of society, environmental attributes such as land, water, air, aesthetics, flora and fauna. In assessing the environmental impact, collection, collation and interpretation of baseline data is of prime importance. Environmental impact analysis and assessment, which is required for every industrial project, should preferably be carried out at the planning stage itself.in compliance with the environmental procedure the environmental clearance application is made. Necessary scientific studies will be undertaken as per the guidelines set by the Ministry of Environment and Forests (MoEF) and prescribed Terms of Reference. The suggestions/recommendations of all the experts, competent authorities, and government officials are being sought for the impacts of the proposed project. Views and guidance of the local residents, community based organizations, social organizations are extremely important in order to devise a full proof Environment Management Plan for the proposed mining project and also mitigate the damages caused due to the project. Allocation of necessary funds, manpower and machinery will be made to for the protection and conservation of all the components of environment. It is ensured that all mandatory clearances will be sought from respective competent authorities. 21

25 Annexure-1 MINING PLAN APPROVAL LETTER 22

26 23

27 24

28 25

29 Economic Viability of Project Annexure 3 M/s ESMO TRADING CORPORATION 25

30 Annexure For Water Environment ENVIRONMENT MANAGEMENT PLAN Surface water is in the form of seasonal rain fall. It takes normal course and flows out of the area along natural slope. No impact on surface or ground water is expected as no chemical processing is involved. 1.2 For Air Environment The mining operations are semi mechanized and shall be done through deployment of mining machineries. The dust from the haul roads during transportation is expected to pollute the air to some extent. However, considering the production and nature of proposed mining operations SPM level will not be more than the permissible limit. However, on the haulage road water will be sprinkled to minimize the raising of dust in the area. There is no drilling and blasting. 1.3 For Noise Environment: Noise Level is likely to increase due to movement of machineries etc. The measures will be taken to maintain the noise levels within limits. Periodical maintenance of equipment will be carried out. Moreover, the building of green belt that would be continued along lease boundary, dumping yards, haulage roads will help in restricting noise level. Noise due to blasting is controlled by using NONEL. 1.4 Stabilization of Overburden Dumps: The stabilizations of dumps will be undertaken by means of terracing of dumps wherever necessary. The dumps will be pitched from the slope side to a suitable height. Further, suitable vegetation / grass shall be planted on the dumps for making it biologically stable. 1.5 For Socio -Economic Environment The mining activity is expected to have a positive impact on the socio-demographic profile of the area. The local people shall get opportunities of employment in the unskilled semi-skilled category. The overall standard of living in the area is expected to improve due to this existing silica sand mining project. 27

31 Plate 1 KHASRA MAP 28

32 Plate 2 SURFACE GEOLOGICAL PLAN 29

33

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal

More information

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa Finance, Mining & Sustainability The Gamsberg Zinc Project South Africa Project Summary Discovered in 1971 Anglo American purchased 33% interest in 1974 and increased interest to 100% in 1998 Feasibility

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information