1 Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be undertaken to establish existing base line environmental conditions, predict impacts of the proposed project, suggest Environmental Management Plan and develop post project monitoring program. The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: The components of the EIA study will include: Determination of baseline data using primary data generation and secondary data available from various government published reports on air, meteorology, water, soil, flora & fauna, socio-economics, infrastructure, sensitive areas (forests, archaeological, historical, etc.); Detailed description of all elements of the project activities during the operational phase. The elements to be analyzed will include the infrastructures of the project including drainage features, roads, waste collection, disposal and management and utility requirements. Identifying the sources of pollution and assessing the impacts on the environment due to proposed minor mineral mining. Preparation of EIA/EMP document with recom mendations on preventive and mitigative measures for limiting the impact on environment to the desired level during various stages of project. EIA Report: Executive summery Executive summary contains objective of the proposal, use of resources, justification of the project, etc. In addition, it will provide a compilation of EIA report, EMP and the post-project monitoring plan in brief. Project description: Justification of the project. Process description with process flow chart Land requirement for the project including break up of land requirement and its availability. Process and operation flow diagram. Quantity of fuel required, source and transportation, etc. Water requirement, Source, etc. Environmental Baseline Status The data for EIA study is proposed to be collected through field studies, literature review, and interaction with concerned Govt. Departments. The study area for the EIA study shall be the area within the 10 km radius of the periphery of the land to be acquired for the project. The data/information on Environmental Baseline Status will be collected as described below:

2 Land use The information on Land-use pattern will be collected from the Revenue Department, census of India book, District Gazetteer, SOI topo-sheets and satellite imageries. The land-use pattern will be classified as follows: Forest land Un irrigated Land Cultivable land Waste land, Barren land Irrigated agricultural land Water bodies Wet land, etc. Based on the remote sensing data, GIS information and satellite imagery, a detailed land use map of the study area will be prepared. Water Requirement & Source The quantity of water required by the project will be estimated. The sources of water and wastewater, if any, will be described in the report. Water quality & Resources The surface and groundwater sampling will be carried out at various locations in the study area. Fields studies will be conducted for one season as a part of the EIA study. Meteorology As a part of the REIA study, a micro-meteorological station will be installed near proposed project site. The parameters to be monitored shall include wind speed, wind direction, temperature, rainfall, cloud amount and relative humidity. The collected data will be used for preparation of wind rose diagrams and running the air quality model. Biological Environment Primary field study will be conducted to identify and enlist existing flora and fauna observed in the 10 km radius study area of the project. As a part of the study, secondary information on flora and fauna of the area will be collected from State Forest Department. The publications available in the form of maps and documents will also be collected and utilized. The data on the availability of various floral and faunal species in the study area will also be collected form Department of Forests and utilized. Socio-economic Environment The data on demographic profile in the study area will be collected using secondary data sources. The data to be collected is as follows: Demography Caste profile Literacy profile Occupational profile BASELINE ENVIRONMENTAL DATA GENERATION 1. Ambient Air Quality (AAQ): The baseline air quality will be monitored at various locations twice a week for one season for PM 10, PM 2.5, SO2 and NO x. AAQ

3 monitoring locations will be selected as per guidelines specified for selection of AAQ sites. Design of ambient air quality sampling network with regard to topography, population, sensitive locations, emission sources, background concentrations and possible impact zones, through application of screening air quality models for assessing air quality prior to start of baseline study. 2. Meteorological data: Micrometeorological data will be collected near project site for 3 months. Data will be generated for temperature, Wind speed, Wind direction, rainfall, cloud amount and Relative Humidity (min & max). This will be further supported by the meteorological data for the area of interest collected from nearest IMD Station and Trend analysis of micrometeorological data generated at the site. 3. Water Quality: Water samples, surface as well ground water, will be collected covering 10-km radius area. The samples will be analyzed as per IS-10500/IS and EPA Act as applicable. 4. Soil Quality: Soil samples will be collected from various locations and will be analyzed for the parameters such as texture, ph, salinity, electrical conductivity, organic carbon, NPK, Na, Mg, and Ca, etc. 5. Noise Levels: Noise monitoring will be carried by using well calibrated sound level meter on hourly observations for 24 hours at various locations. The monitored data will be compiled and statistical analysis will be carried out for L 10, L 90 and L eq. 6. Land use: Land use as per the district census handbooks will be analysed to identify the present land use within the 10-km radius area. Various land use classifications will be computed.. Accordingly a landuse map will be prepared. The study will be carried out through field visits and secondary sources of information. 7. Geology and Hydro-geological aspects: These aspects will be covered for the study area based on Secondary information sources (Geological survey of India and Central Ground Water Board, Delhi). 8. Ecological Studies (Terrestrial and Aquatic): Primary as well as secondary data will be collected for Flora and fauna of the study area through field visits and secondary data will be collected from concerned forest department. The survey will include assessment of the species diversity, density, abundance, etc. in the study area and formulation of ecological indices, assessment of likely effects on flora and fauna due to the project related activities, suggestions for conservation and protection of flora and fauna in the study area. 9 Socio-Economic aspects: Socio-economic aspects will be covered for the project area based on the Census documents and NIC database. Local and District administration will also be contacted for collecting the required data.

4 IDENTIFICATION OF SOURCES OF POLLUTION Data Generation This includes the following: Identifying the sources of pollution of air, water, land and noise; Quantifying the emissions from the pollution generating sources; and Quantification of solid wastes and likely disposal methods will be suggested. Sources of Pollution The likely sources of air, noise, soil and water pollution will be identified and quantified; The proposed pollution control measures envisaged in project area for fugitive dust, noise pollution and other environmental effects of each project activities will be assessed ; The present and proposed changes in land use pattern will be identified; and Based on various project activities, the likely impact on the environment attributes in project area will be identified by: o Estimating the air pollution levels for SPM, PM10, PM2.5, SO2 and NO x in the study area; o Estimating the source emissions for each project specific pollutants; o Predicting the noise dispersions for all the noise generating sources; o Predicting the impact of wastewater discharges, if any; o Studying the short-term and long-term effects on sensitive targets like endangered species, crops and historically/archaeologically important sites (if any). ENVIRONMENT MANAGEMENT PLAN A Rapid EIA Report based on one season field data generation will be prepared for the purpose of getting clearance from MoEF&CC. EIA/EMP will be prepared based on one season data. The Environment Management Plan (EMP) will include all the mitigative measures proposed under each significant environmental attribute. Anticipated Environmental Impacts: With the knowledge of the baseline conditions, Project characteristics, the intensity of construction activities and current critical conditions, detailed projections shall be made of the influence of planned units of the project on all the areas of social, physical and biological environment in the area. Based on the predictions, the critically affected environmental parameters will be identified for the proposed project. Environmental Management Plan (EMP): Environmental Management Plan will be developed to selectively mitigate the adverse impacts due to the construction and operation of various activities planned for the proposed project. Any modification needed to make the project environmentally compatible will also be suggested. EMP will include all the aspects covered during impact assessment phase as mentioned above.

5 Risk Analysis and Disaster Management Plan: A detailed risk analysis study comprising the following will be conducted: Identification of potential accidents Consequence analysis for each identified failure will be conducted Assessment of what the calculated risk levels portray. As a part of the study, a detailed onsite Disaster Management Plan shall be formulated as a part of the EIA Study. Environmental Monitoring Program Appropriate monitoring network as per regulatory compliance will be suggested. Conclusion Disclosure

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA VISAKA INDUSTRIES LIMITED TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA Proposed Capacity : 200000 TPA Phase 1 : 40000 TPA

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

Guidance for assessment of representativeness and reliability of baseline environmental attributes

Guidance for assessment of representativeness and reliability of baseline environmental attributes Annex IV Methods of Monitoring and Analysis Guidance for assessment of representativeness and reliability of baseline environmental attributes (Also Please Refer CPCB Guidelines on Methods of Monitoring

More information

Proposed Terms of Reference (TOR) For

Proposed Terms of Reference (TOR) For Proposed Terms of Reference (TOR) For OBJECTIVE Environmental Impact Assessment of Proposed Delhi to Jaipur Expressway of 8/6/4 lanes ( Green Field Project) Terms of Reference (TOR) are proposed for preparation

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy

More information

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that

More information

Madagascar: Makira REDD+

Madagascar: Makira REDD+ project focus Madagascar: Makira REDD+ Madagascar is considered to be one of the top five biodiversity hotspots in the world due to more than 75% of all animal and plant species being endemic while less

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and

More information

ENVIRONMENTAL ASSESSMANT AND MANAGAMENT PLAN

ENVIRONMENTAL ASSESSMANT AND MANAGAMENT PLAN Consultancy Services for Preparation of Feasibility Report of Two- Laning of Km 0.0 to Km 38.750 of SH-22 comprising the section from Mandrayal to Karauli (Highway 1 Package 13) TERMS OF REFERENCE (proposed)

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR 'A'

TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR 'A' Dhauliganga Intermediate HEP TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR 'A' CATEGORY HYDRO POWER PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT (1) Scope of EIA

More information

Environment Situation in Timor-Leste

Environment Situation in Timor-Leste Environment Situation in Timor-Leste Historically; 1. East-Timor or Timor-Leste, the Portuguese name of the country. 2. It was colonialised by Portuguese 450 years and Occupied by Indonesian 24 years.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT

TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT TERMS OF REFERENCE for an ENVIRONMENTAL IMPACT ASSESSMENT for a PROPOSED RESORT DEVELOPMENT at BIG AND LITTLE PELICAN CAY PORTLAND BIGHT, ST. CATHERINE, JAMAICA TABLE OF CONTENTS BACKGROUND 4 1. Executive

More information

reviewed paper GIS for Urban Environmental Management Plan: Making it through the Crisis Piyali Bandyopadhyay

reviewed paper GIS for Urban Environmental Management Plan: Making it through the Crisis Piyali Bandyopadhyay reviewed paper GIS for Urban Environmental Management Plan: Making it through the Crisis Piyali Bandyopadhyay (Piyali Bandyopadhyay, Project Scientist, Central Pollution Control Board, Delhi, Flat no 437

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

APPENDIX D RISK ASSESSMENT METHODOLOGY

APPENDIX D RISK ASSESSMENT METHODOLOGY APPENDIX D RISK ASSESSMENT METHODOLOGY There are numerous human-health and ecological issues associated with the construction and operation of any large coal-fueled electric power generation facility.

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Dated: 27 th June 2014

Dated: 27 th June 2014 To Shri T.N. Venkatesh, I.A.S, CEO M/s. Tamil Nadu Cements Corporation Ltd. 2 nd Floor, LLA Building, 735 Anna Salai, Chennai-600002, Tamil Nadu. Email: co@tancem.com Fax: 044 28523991 F. No. J-11011/83/2014-IA-II

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

. (1) the prospectivity of Victoria s geology for commercial sources of onshore unconventional gas;

. (1) the prospectivity of Victoria s geology for commercial sources of onshore unconventional gas; To the Government of the day. From Rob & Sharon Rentsch, We have been farming at the above address for nearly 35 years and very fortunate to have been able to farm at Byaduk for the last 10 years. We are

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED

More information

Global environmental information Examples of EIS Data sets and applications

Global environmental information Examples of EIS Data sets and applications METIER Graduate Training Course n 2 Montpellier - february 2007 Information Management in Environmental Sciences Global environmental information Examples of EIS Data sets and applications Global datasets

More information

2015 2016 Environmental Science Scope & Sequence

2015 2016 Environmental Science Scope & Sequence 2015 2016 Environmental Science Scope & Sequence The suggested time frames in this document are for a year long environmental science class with approximately 45 minute class periods. All of the material

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

MODEL GUIDELINES FOR RIVER BASIN MANAGEMENT PLANNING IN ARMENIA

MODEL GUIDELINES FOR RIVER BASIN MANAGEMENT PLANNING IN ARMENIA MODEL GUIDELINES FOR RIVER BASIN MANAGEMENT PLANNING IN ARMENIA OCTOBER 2008 REPORT NO. 110 This publication was produced for review by the United States Agency for International Development. It was prepared

More information

Environmental Science

Environmental Science Environmental Science UNIT I: Introduction to Environmental Science The student will demonstrate the ability to use scientific skills necessary to identify and analyze environmental issues. a. Define environmental

More information

EU China River Basin Management Programme

EU China River Basin Management Programme Ministry of Water Resources Ministry of Environmental Protection EU China River Basin Management Programme Technical Report 075 Water Resource Supply Security Strategy Analysis Ben Piper, Zhang Wang and

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

TORs for proposed EIA & RA study

TORs for proposed EIA & RA study TORs for proposed EIA & RA study 1. The EIA study for the proposed project shall be carried out based on the latest environmental quality status around the project site (10 km radial distance) for one

More information

Analysis of Land Use/Land Cover Change in Jammu District Using Geospatial Techniques

Analysis of Land Use/Land Cover Change in Jammu District Using Geospatial Techniques Analysis of Land Use/Land Cover Change in Jammu District Using Geospatial Techniques Dr. Anuradha Sharma 1, Davinder Singh 2 1 Head, Department of Geography, University of Jammu, Jammu-180006, India 2

More information

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents F. No. J-11011/218/2013-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:gkk37@rediffmail.com Tele fax:

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Initial Environmental Examination Project Number: 43936 May 2010 Proposed Loan and Administration of Grant for Solar Power Project (Thailand) (Cofinanced by the Clean Energy

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report: Introduction Snowy Hydro Limited (Snowy Hydro) relies on precipitation falling over the catchments of the Snowy Mountains to supply water for the production of hydro-electricity. Cloud seeding over this

More information

Building & Developing the Environmental

Building & Developing the Environmental Building & Developing the Environmental Web Explorer for Riyadh City Authors: Engineer Yousef Bin Othman Al-Fariheedi Manager of Environmental Data Unit Environmental Management and Protection Department

More information

Alternate Concentration Limits/Groundwater Cleanup Levels. Title slide

Alternate Concentration Limits/Groundwater Cleanup Levels. Title slide Alternate Concentration Limits/Groundwater Cleanup Levels Title slide 1 Alternate Concentration Limits (ACL) Terms and Definitions 40 CFR 264 Subpart F Definitions Regulated Unit Ground Water Protection

More information

sustainability report

sustainability report sustainability report Sustainable development In the midst of turbulent macro-economic conditions adversely impacting the coal sector, we maintain our focus on building a business that has a viable, long-term

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

GIS Database Template for Environmental Management of Mining in Indonesia

GIS Database Template for Environmental Management of Mining in Indonesia Journal of Geographic Information System, 2012, 4, 62-70 http://dx.doi.org/10.4236/jgis.2012.41009 Published Online January 2012 (http://www.scirp.org/journal/jgis) GIS Database Template for Environmental

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

SPATIAL DISTRIBUTION MAPPING FOR VARIOUS POLLUTANTS OF AL-KUFA RIVER USING GEOGRAPHICAL INFORMATION SYSTEM (GIS)

SPATIAL DISTRIBUTION MAPPING FOR VARIOUS POLLUTANTS OF AL-KUFA RIVER USING GEOGRAPHICAL INFORMATION SYSTEM (GIS) International Journal of Civil Engineering and Technology (IJCIET) Volume 6, Issue 10, Oct 2015, pp. 01-14 Article ID: IJCIET_06_10_001 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=6&itype=10

More information

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

Published in Official Gazette of the Republic of Macedonia No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

How to do it Manual No. 3: ArcMap10 in Remote Desktop mode and Landgate slip files. Jeremy Green

How to do it Manual No. 3: ArcMap10 in Remote Desktop mode and Landgate slip files. Jeremy Green How to do it Manual No. 3: ArcMap10 in Remote Desktop mode and Landgate slip files Jeremy Green Report Department of Maritime Archaeology No. 268 2010 Getting started with ArcInfo10 The ArcInfo10 exists

More information

NOVEL STRATEGIES FOR ASSESSMENT OF AMBIENT AIR QUALITY USING GIS AND ONLINE POLLUTION MONITORING TOOLS I. Jaykumar 2, V. Hima Bindu 2, P.

NOVEL STRATEGIES FOR ASSESSMENT OF AMBIENT AIR QUALITY USING GIS AND ONLINE POLLUTION MONITORING TOOLS I. Jaykumar 2, V. Hima Bindu 2, P. NOVEL STRATEGIES FOR ASSESSMENT OF AMBIENT AIR QUALITY USING GIS AND ONLINE POLLUTION MONITORING TOOLS I. Jaykumar 2, V. Hima Bindu 2, P.V Mukunda Rao 2, G. Sagareshwar 2 K.V. Ramani 3, & Y. Anjaneyulu

More information

ECONOMIC ANALYSIS OF WATER USES GESTÃO INTEGRADA DE BACIAS HIDROGRÁFICAS INSTITUTO SUPERIOR TÉCNICO

ECONOMIC ANALYSIS OF WATER USES GESTÃO INTEGRADA DE BACIAS HIDROGRÁFICAS INSTITUTO SUPERIOR TÉCNICO Purposes of water pricing to ensure efficient use of water. to ensure equity among water users. to ensure the recovery and prevention of degradation of water quality and aquatic ecosystems. to prevent

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X The Royal Society for Protection of Nature (RSPN) in collaboration with Department of Curriculum Research & Development (DCRD) of Ministry of Education

More information

A quick overview of geographic information systems (GIS) Uwe Deichmann, DECRG <udeichmann@worldbank.org>

A quick overview of geographic information systems (GIS) Uwe Deichmann, DECRG <udeichmann@worldbank.org> A quick overview of geographic information systems (GIS) Uwe Deichmann, DECRG Why is GIS important? A very large share of all types of information has a spatial component ( 80

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

Maverick Consulting. Engineering and Management Consulting Company

Maverick Consulting. Engineering and Management Consulting Company Maverick Consulting Engineering and Management Consulting Company At Maverick, we have access to experienced team of experts who provide consultancy services for the benefit of the organization. The services

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

Status of Environment Statistics in Mauritius

Status of Environment Statistics in Mauritius Workshop on environment Statistics (16 20 July 2007) Addis Ababa Ethiopia Status of Environment Statistics in Mauritius Country Report Prepared by: Mrs. P. THAUNOO CHADEE Ministry of Environment and National

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

For additional information on qualifications and experience of representative EDGE senior staff members, please contact us.

For additional information on qualifications and experience of representative EDGE senior staff members, please contact us. About Us Edge Engineering & Science, LLC (EDGE) is a privately owned professional services firm headquartered in Houston, Texas. EDGE was established with the primary goal of providing high quality environmental

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information