1 PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha)

2 Chapter EXECUTIVE SUMMARY Nuagada StoneQuarry over an area of 1.00 acres of Sri Kailash Chandra Goud is located in village Nuagada, Tahasil- Hinjilicut in Ganjam district of state Odisha. The Tehsildar, Hinjilicut has settled the sairat source vide letter no. 1864/Sairat, dt in favour of Sri Kailash Chandra Goud, resident of At:- Sompur, Po- Hinjilicut in the district of Ganjam for the period of fiveyears i.e to The lease area is bounded by N 19º to N 19º Latitide &. E 84º to E 84º Longitude. It is a part of the area covered in the Survey of India Toposheet No. 74-A/11.The lease area comes under Nuagada village of Hinjilicut Tahasil of Ganjam district, Odisha. The lease area is about 80km away from the Ganjam district head quarter. There is neither seasonal nor perennial nala within the lease area. Drainage system in the region basically depends on river flow/channel. Surface runoff water in the region will be discharged to the natural drainage course. In accordance with the provisions of the OMMC (amendment) Rules, 2014, the Sairat Source has been granted to the successful highest bidder vide letter no. 1598/Sairat dtd in favour of Sri Kailash Chandra Goud, At- Sompur, P.O- Hinjilicut, in the district of Ganjam, Odisha. The lessee has proposed to excavate a total of 3765Cu.m. of road metal (building/construction material- Minor Mineral which is saleable) from on payment of Royalty, Dead Rent, Surface Rent and Income Tax as assessed by the state government of Odisha. As per Environmental Impact Assessment Notification dated 14 th September, 2006, and subsequent amendments thereof, this project falls under Category B of the list of the Project or activities requiring environmental Clearance prior to operation of quarry/mines from the from the State Environmental Impact Assessment Authority, Odisha.The mining plan has been prepared in FORM-ZB under Rule 27-A (3) of the Odisha Minor Mineral Concession (Amendment) Rules, 2014 by the RQP, Sri Susanta Kumar Mishra, (Regn. No. RQP/BBS/049/2004-A), with detailed planning for the plan period to As per the approved mining plan it has been proposed to excavate a total of 3765 Cu.m of road metal from the Nuagada StoneQuarry Situated in the Nuagada village 2

3 on plot no of Khata no-586, by means of open cast Semi-mechanised mining method. The materials will be transported through tippers. Considering the cost of the project, cost towards production, sale value etc. the project is viable and bring some positive benefit directly or indirectly to the nearby locality. 3

4 Chapter Identification of Project and Project Proponent The proposed project, is a Stone quarry, which has been given on long term quarry lease basis to Sri Kailash Chandra Goud in Ganjam district of Odisha State. In this Stone quarry mining method is done by opencast semi mechanized method and the proponent is a businessman. 2.2 Brief Description of Nature of Project Area is over 1.00acres or 0.404Ha. in village Nuagada, Tahasil Hinjilicut, District Ganjam has been allotted to Sri Kailash Chandra Goud, the lessee through long term quarry lease basis for quarrying of ordinary stone/stone (minor mineral) by the Tahasildar, Hinjilicut on behalf of Governor of Odisha in accordance with the provision of the Minor Mineral Concession Rules (amendment), 2014 through long term quarry lease for the purpose of excavation of construction stone.the current allotment through long term quarry lease basis in the name of Sri Kailash Chandra Goud for five years from to Need for the Project and Its Importance to the Country and the Region The need and the importance of this Quarry Project are mainly for the construction infrastructural development of the area. The Stone excavated from the quarry is crushed in the crushing unit to produce the desirable material to be used in construction of house and road in domestic market. 2.4 Demand Supply Gap There is requirement of total 2000 cu.m of stone/boulder for crushing in the nearest stone crusher. Around 753cu.m of construction stone will be excavated from and the same will be supplied to crusher unit. For balance required quantity the crusher unit may procure from other quarry. 2.5 Imports Vs Indigenous Production As far as stone/boulder production is concerned with reference to the importing of the said material, it is advantages to mine the mineral rather than importing the same. 2.6 Export Possibility The excavation of stone/boulders is solely for the use in crusher and finished product in domestic market. 2.7 Domestic / Export Markets There is a huge domestic market for the stones/boulders. But the purpose of this project is only use the product in its own stone crusher. 4

5 2.8 Employment Generation (Direct and Indirect) due to the Project Total number of employment will be around 4 including Management, Supervisory personnel, Skilled, Semiskilled and Unskilled. 5

6 Project Description Chapter Type of the Project Including Interlinked and Interdependent Project. Stone in the quarry area is proposed to be excavated by conventional method of opencast mining through the formation of safe benches which will be semimechanized and on single shift basis. Benches will be formed and worked in a top to downward manner. Because of presence of hard and competent rock mass, drilling and blasting will be performed for loosening of the rock mass. 3.2 Location (Map Showing General Location, Specific Location and Project Boundary & Project Site Layout) with Coordinates. The quarry area is located in Southern part of village Nuagada, under Hinjilicut Tahasil of Ganjam district, Odisha State. area forms a part of Survey of India Toposheet No. 74A/11. The quarry area bounded between the latitude of N 19º to N 19º Latitide &. E 84º to E 84º The quarry area is accessible from district head quarter Ganjam covering a distance of 80km. 3.3 Details of Alternate Sites Considered and the Basis of Selecting the Proposed Site, Particularly the Environmental considerations gone into should be Highlighted. Being a Stone Quarry it is site specific. No alternate site can be worked out. It has to be carried out within quarry area to be allotted by the State Government of Odisha as per the conditions of lease agreement document. As far as the environmental considerations, the proponent is abiding by all relevant acts & rule and provisions of EP Act. 3.4 Size or Magnitude of Operation Size of the quarry area is 0.404Ha. Magnitude of the proposed operation is excavation of 753 cu.m/annum of Stone/Boulders. 3.5 Project Description with Process Details (a Schematic Diagram / Flow Chart Showing the Project Layout, Components of the Project etc. should be given) Method of Quarrying: Stone in the quarry area is excavated by conventional method of opencast mining through the formation of safe benches which is semimechanized and on single shift basis. Benches are formed and worked in a top to downward manner. Because of presence of hard and competent rock mass, drilling and blasting is performed for loosening of the rock mass. Bench Geometry: Height/Width of the quarry benches are kept at 1.5m/5m. The individual bench faces are kept nearly vertical ( ) whereas the overall quarry slope angle (the angle between the line joining the toe of bottom bench and the crest 6

7 of the top bench with the horizontal) is maintained at around horizontal. with the Time Schedule: Total working days are 300 days in a year. Number of shift per day is 01 (One). The working hour in a shift is 8.00 hours. Production Planning: The maximum production of construction stone from this quarry is 753cu.m/annum. Extent of Mechanization: Nuagada area is enriched with Stone which is hard in nature. Since the hill track is boulder in nature, jointed & fractured, there will be drilling & blasting for loosening & fragmentation for ease in production and remaining is excavated directly by the machine. The monthly consumption of gelatin base explosive will be 100 kg & electrical detonator will be 600 nos. 3.6 Raw Material Required along with Estimated Quantity, likely Source, Marketing Area of Final Product/s, Mode of Transport of Raw Material and Finished Product. The said project is a minor mineral/stone excavation project. It does not involve any other raw material for stone excavation rather only production of construction stones from the available reserve within the quarry area. 3.7 Resource Optimization / Recycling and Reuse Envisaged in the Project, if any, should be briefly outlined. Excavation of stone / rock will be carried out strictly as per conditions given in the lease agreement with a view to optimize all resources available. 3.8 Availability of Water, Its Source, Energy / Power Requirement and Source should be given Availability of Water and Its Source Water is used only for drinking, potable use, dust suppression and plantation. A total 100 liters per day of water is used per day for the above activities. The water is made available from bore wells exist within the quarry area Energy / Power Requirement and Its Source No electricity is required as no operation after sun set. 3.9 Quantity of Wastes to be generated (Liquid and Solid) and Scheme for Their Management / Disposal During plan period 420cu.m of waste will be generated. Mainly soil (65% of the total volume) left out after separation of the dolerite boulders during development of the mine and the mine rejects including weathered rock fragments shall constitute the overburden which will be used for development of the approach road. Water sprinkling will be done regularly for compaction of haul road during summer season. If required lessee will stack waste material on proposed place for dumping/stacking with making garland drain & retaining wall to prevent wash-off Liquid Waste / Waste Water: The said Quarry area does not have any workshop within the lease area. Thus, no trade effluent is generated from the quarry site. 7

8 However, during rainy season surface runoff containing suspended solids and silts flows out Schematic Representations of the Feasibility drawing which give information of EIA Purpose. As the project is categorized in category-b of Schedule under item 1(a) in the EIA notification, 2006 and its subsequent amendments; it will be considered at the State Expert Appraisal Committee (SEAC) for the purpose of obtaining Environment Clearance and also for determining whether or not the project or activity requires further environmental studies for preparation of an Environmental Impact Assessment (EIA) for its appraisal prior to the grant of Environmental Clearance depending up on the nature and location specificity of the project. 8

9 Chapter 4 Site Analysis 4.1 Connectivity The quarry area is located in village Nuagada, under Hinjilicut Tahasil of Ganjam district in Odisha State. The quarry area is accessible from state head quarter Bhubaneswar by covering a distance of 180 km and district head quarter at a distance of 80kms by road. The quarry is 2kms away from the state highway. 4.2 Land Form, Land Use and Land Ownership The quarry lease area over 0.404ha. is Govt. owned non-forest area as per land schedule of the revenue department as given in below Land Schedule Mouza Khata No Plot No Kissam Area In Acres Nuagada Parbat Topography (Refer Map No. 1) The area covers a land of 1.00acres or 0.404Ha.and is located at south of village Nuagada in Ganjam district of odisha. The area can be featured in Survey of India Toposheet No. 74A/11. The floor level at the end of period will be of concession will be RL50m 4.4 Existing Land Use Pattern (Agriculture, Non- Agriculture, Forest, Water Bodies (including area under CRZ)), shortest distances from the periphery of the Project to the periphery of the Forest, National Park, Wild Life Sanctuary, eco-sensitive areas, water bodies (distance from the HFL of the River), CRZ. There is neither seasonal nor perennial nala within the lease area. Drainage system in the region is dendritic. Surface water in the region is drained by dry nala. Surface runoff water from the quarry will be discharged to the natural drainage course through garland drain and settling tank. Therefore, there is no possibility of ground water puncture during the plan period. There is no national park, wild life sanctuary, eco sensitive areas and industrial area situated within 10Kms radius of the lease area. 9

10 During rainy season only the rain water passing through the working benches and accumulate at the bottom of the quarry, so the wash off consisting of loose sediments settled at the bottom of the quarry so there is no adverse effect at present all parameters are within specified limits. 4.5 Existing Infrastructure There is no existing infrastructure, however during mining temporary rest shelters for workers will be provided. Sl. No. Important Place Station Distance (km) 1 Bus Stop Hinjilicut 2 2 Railway Station Berhampur 36 3 Hospital Hinjilicut 2 4 High School Hinjilicut 2 5 College Hinjilicut 2 6 Post Office Hinjilicut 2 7 Police Station Hinjilicut Soil Classification and Geology both Regional & Local As no toxic substance will be generated or involved, the impact on soil quality is not likely to be more intensive than the existing level. However, the dust generated during operation of mining activity, loading and unloading and vehicular movements normally constitute heavier particles that would readily settle on very small areas within the lease area. 4.7 Climate Data from Secondary Sources The Climate of Ganjam is characterized by an equable temperature all through the year, particularly in the coastal regions and by high humidities. The cold season from December to February is followed by hot season from March to May. The period from June to September marks the South West Monsoon and 70% of annual precipitation is received during this period. The normal rain fall of this district is 1444 mms. May is the hottest month. With the arrival of the monsoon by about the second week of june the day temperature decreases slightly while the night temperature continue as it was in the summer. Towards the end of September, after the withdrawal of south west monsoon, temperature decreases progressively. December is the coldest month. The 10

11 relative humidity is high throughout the year especially in coastal areas. Winds are fairly strong particularly in coastal regions in summer and monsoon months. 4.8 Social Infrastructure Available Accessibility: The quarry area is accessible by all weather & Well-connected by road and rail. The quarry site is connected through 180kms road from state head quarter Bhubaneswar and 55kms long road from district head quarter. The nearest railway station is Berhampur located at a distance 36km from the quarry area. Market Facility: Market is at Hinjilicut which is located at a distance of 2 km from the quarry site. Water availability: Water supply for the Quarry including drinking is made available from existing bore well from Hinjilicut. Medical & Educational Facilities: Medical facilities are available at Hinjilicut at a Distance of 2Kms from the quarry area. High School for educational facilities is at Hinjilicut at a distance of 2km, Govt. college is situated at Hinjilicut at a distance of 2kms. Postal & Telephonic facilities: Postal and telephonic facilities are available at Hinjilicut. 11

12 Chapter 5 Planning Brief 5.1 Planning Concept (type of industries, facilities, transportation etc.) Town and Country Planning / Development Authority Classification The said proposal is a stone quarry industry. The Lessee does not have any plan for construction of town ship for its employees. Mostly local villagers are employed. They are commuting from local areas. Public and self transport facilities are used for commuting from their residence to the Quarry site. 5.2 Population Projection It has been proposed that the work will be carried out by semi-mechanised method. The labours are mainly required for sorting of mineral from ROM. It has been calculated that, about 4nos. persons are required. Hence, there will be an overall improvement of socio-economic status of the people of surrounding areas. 5.3 Plantation Program The proposed land use pattern for mining in the mining lease area is 1.00acre. Afforestation and Reclamation/Rehabilitation: There is no forest growth in the quarry site. Bushes are found scattered. During plan period 200 numbers of saplings will be planted. This worked out area will be reclaimed/rehabilitated by way of plantation in the following manner after the reserve is completely exhausted. (1) Watering and maturing will be done periodically as per requirement. (2) Post plantation care such as soil working, pruning etc will be done. (3) Casual replacement will be done. (4) Insecticides will be spread for pest control. (5) Proper watch and ward will be there to save the trees from cattle and fire. 12

13 5.4 Assessment of Infrastructure Demand (Physical & Social) No new infrastructures will be constructed to handle the proposed production. Existing facilities are adequate. 5.4 Amenities / Facilities All the site services and other facilities including regular & periodic health check up, Eye camp, Adult & Female education & training programmes shall be provided outside nearer to the lease. 13

14 Chapter 6 Proposed Infrastructure 6.1 Mining Area (Processing Area) It is an excavation of Stone quarry project. Area around Ha will be used for excavation. The detail of land use of the area is given as below: LAND USE Sl. No. Area put to use in Acre/Hect. Type of land use 1 Area under excavation Area for plantation Dump Area Total Residential Area (Non Processing Area) As the local person are to be employed, No residential facilities envisaged in the project. 6.3 Green Belt 7.5 meter width all along the lease boundaries will be utilized for plantation. This area is proposed to be planted by saplings during the plan period. Local species like Mango, Neem, Chakunda, Mahaneem, Babul etc. is proposed to be planted at 5m spacing. 6.4 Social Infrastructure In-line with the social responsibility activities at other operational sites, relevant developmental assistance shall be rendered depending on the local needs identified during operation. Site office is used for day to day quarry administration and management. So no social infrastructures are required for this Quarry. 6.5 Connectivity (Traffic and Transportation Road / Rail / Metro / Waterways etc.) The quarry area is accessible by all weather roads and Well-connected by road and rail. The quarry site is connected through 180kms road from state head quarter Bhubaneswar & 80kms long from district head quarter towards. The nearest railway 14

15 station is Berhampur located at a distance 36km from the quarry area. Majority of tele towers including BSNL are available in the locality. 6.6 Water management (Source & Supply of Water). There is neither seasonal nor perennial nala within the lease area. Drainage system in the region is dendritic. Surface runoff water from the quarry will be discharged to the natural drainage course through garland drain and settling tank. There is no possibility of ground water puncture during the plan period. There are no perennial nalas within the lease area. Drinking water source for the area is from tube wells. 6.7 Air Quality Management Since the proposed mining project will have the deployment of small capacity machinery of power tipper and excavation machinery a little amount of noxious gas will be released and emitted to air during the mining operation. There will be, however, generation of a negligible amount of dust during excavation and sizing of road metal. Suitable measures for dust suppression will be carried out by spraying water at dust generating points. Emission of noxious gas from vehicles can be controlled by regular maintenance.residential facilities envisaged in the project. 6.8 Waste Management Waste will be utilized for construction and maintenance of haul road. Water sprinkling will be done regularly for compaction of haul road during summer season. If required lessee will stack waste material on proposed place for dumpling/stacking with making garland drain & retaining wall to prevent wash-off. Catch drains will be developed on either side of the road and receive the wash off during rainy season and these drains will be cleaned periodically depending upon the siltation on the floor of the drains. 6.9 Top-Soil Management In the lease area the topsoil generation is negligible. During plan period Lessee has proposed to use all the top soil for plantation purpose. Lessee will maintain the records of top soil generation and utilization in plan period 6.10 Disposal of Mining Machinery As most of the machineries are on hired, removal of machinery can be done any time as per requirement Safety and Security During mining, proper haulage roads will be provided for movement of machinery and workers between the benches with or without load. Exhaust of road metal will result deep quarry floor. Therefore, there will be risk of falling down of man or animal to the quarries. So, barbed wire fencing shall be required all around the working quarry. 15

16 Rehabilitation and Resettlement (R & R Plan) Chapter Policy to be adopted (Central / State) in respect of the project affected person including Home Oustees, Land Oustees and Land Less Laborers (a Brief Out line to be given) The Quarry area is over 0.404ha. is Govt. owned non-forest area as per land schedule of the revenue department and the kissam is Parbat. There is no human settlement with in the Quarry area. People of the buffer zone are mostly engaged in business and agriculture. R & R Policy of Govt. of Odisha will not be required as there is no human settlement within the quarry area. 16

17 Chapter 8 Project Schedule & Cost Estimate 8.1 Likely date of Start of Construction and Likely Date of Completion. For the financial year to , it is allotted to Sri Kailash Chandra Goud through long term quarry lease process. The commencement of production is after obtaining environmental clearance. The excavated construction stone will be completely used for stone crushing unit. 8.2 Estimated Project Cost along with Analysis in terms of Economic Viability of the Project. Considering cost of production in all aspects and market rate of the produced building stone, the project is economically viable. The approximate cost of the project is comes round Rs 6 lakhs. 17

18 Chapter 9 Analysis of Proposal: Final Recommendations 9.1 Financial and Social Benefits with Special Emphasis on the Benefit to the Local People including Tribal Population, if any, in the area. As the project is to process and generate road and building construction material, it brings improvements in the physical and social infrastructures in the area definitely to some extent, apart from providing direct employment, contractual employment and indirectly employment and mostly from the local community due to construction Stone Mining. Tangible Benefits: Local community near the Quarry area finds good employment potential in the quarry directly and in ancillary activities indirectly. The construction Stone mining operations also result in financial gains for the state and central exchangers, through collection of various taxes like royalty, welfare cess and central excise. Improvement of the general living standard of the people in the vicinity to some extent. Growth of allied industries in the area to some extent. 9.2 Recommendation for EC The said Stone Quarry project is categorized as B2 project as per office Memorandum no: J-13012/12/2013-IA II(I), dtd of Government of India, Ministry of Environment and Forests, New Delhi (Annexure 1). Hence issuance of E. C. by SEIAA Bhubaneswar may kindly be considered. 18

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02. COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.09 PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED. PERIOD

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR DANKARI BLACK STONE QUARRY EXTENT-4.00Acres PLOT NO-600, KHATA NO-221 SAIRAT CASE NO-74/2014-15 VILLAGE: DANKARI, TAHSIL: DHARMASALA DISTRICT: JAJPUR, STATE-ODISHA. LESSEE M/S

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a 1 CHAPTER-01 1. Introduction PROJECT DETAILS Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a mining lease M.L.No 2425, over an area of 2.78 Ha, in the Sy.Nos. 76/2, Patta Land

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. SRINIVASA GRANITES 5.010 HA COLOUR GRANITE MINING SY. NO. 539/B & 546/P UPPAMAGULUR (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by SV ENVIRO LABS

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. MARAM VENKA REDDY GRANITES 2.077 HA COLOUR GRANITE MINING SY. NO. 103/P (USH-VEERLAKONDA) KONIDENA (V), BALLIKURAVA (M) PRAKASAM (DT), ANDHRA PRADESH Submitted by

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village Chincholi Taluk Kalaburagi District, Karnataka By Sri. Jagannath S/o Sri. Shiva Reddy

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information