1

2 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 4 (iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY 4 /REGION (iv) DEMAND-SUPPLY GAP 4 (v) IMPORTS VS. INDIGENOUS PRODUCTION 4 (vi) EXPORT POSSIBILITY 5 (vii) DOMESTIC/EXPORT MARKETS 5 (viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO 5 THE PROJECT 3.0 PROJECT DESCRIPTION 5 (i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT 5 PROJECTS, IF ANY (ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC 5 LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES (iii) DETAILS OF ALTERNATIVE SITE CONSIDERED 7 (iv) SIZE OR MAGNITUDE OF OPERATION 7 (v) PROJECT DESCRIPTION WITH PROCESS DETAILS 7 (vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED 11 QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT (vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED 11 IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED (viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER 11 REQUIREMENT AND SOURCE (ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) 11 AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL 4.0 SITE ANALYSIS 12 (i) CONNECTIVITY 12 (ii) LAND FORM, LAND USE AND LAND OWNERSHIP 12 (iii) TOPOGRAPHY ALONG WITH MAP 12 (iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON- AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE 12 i

3 S. NO. CONTENTS PAGE NO. NOTIFICATION (v) EXISTING INFRASTRUCTURE 15 (vi) SOIL CLASSIFICATION 15 (vii) CLIMATIC DATA FROM SECONDARY SOURCES 15 (viii) SOCIAL INFRASTRUCTURE AVAILABLE PLANNING BRIEF 15 (i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND 15 TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION (ii) POPULATION PROJECTION 15 (iii) LAND USE PLANNING 15 (iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & 16 SOCIAL) (v) AMENITIES/FACILITIES PROPOSED INFRASTRUCTURE 16 (i) INDUSTRIAL AREA (PROCESSING AREA) 16 (ii) RESIDENTIAL AREA (NON PROCESSING AREA) 16 (iii) GREEN BELT DEVELOPMENT 16 (iv) SOCIAL INFRASTRUCTURE 16 (v) CONNECTIVITY 16 (vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF 17 WATER) (vii) SEWERAGE SYSTEM 17 (viii) INDUSTRIAL WASTE MANAGEMENT 17 (ix) SOLID WASTE MANAGEMENT 17 (x) POWER REQUIREMENT & SUPPLY/SOURCE REHABILITATION AND RESETTLEMENT (R& R) PLAN 17 (i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE 17 PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 8.0 PROJECT SCHEDULE & COST ESTIMATES 17 (i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE 17 OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN) (ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF 18 ECONOMIC VIABILITY OF THE PROJECT 9.0 ANALYSIS OF PROPOSAL 18 ii

4 ANNEXURE LIST S. NO. PARTICULAR ANNEXURE NO. 1. KHASRA DETAILS I 2. LETTER FOR INTENT (LOI) II LIST OF TABLES TABLE NO. NAME OF TABLE PAGE NO. 1. HIGHLIGHTS OF THE PROJECT SUMMARY OF MANPOWER REQUIRED 5 PROJECT DESCRIPTION 7 BREAK- UP OF WATER REQUIREMENT ENVIRONMENTAL SETTINGS 13 LIST OF FIGURES FIGURE NO. NAME OF FIGURE PAGE NO. 1 LOCATION MAP 6 2 ENVIRONMENTAL SETTING MAP 14 iii

5 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). 1.0 EXECUTIVE SUMMARY PRE-FEASIBILITY REPORT Table 1 Highlights of the Project S. No. Particulars Details A. Location Details 1. Villages Parewar & Joga 2. Tehsil Jaisalmer 3. District Jaisalmer 4. State Rajasthan 5. Latitude to N 6. Longitude to E 7. Toposheet No. 40 1/11 & 1 /15 B. Lease Area Details 8. Lease area ha (Govt. Land ha & Private and C. Details of Environmental Setting ha ) 10. Nearest National Highway NH-15 (~ 50 km in SSE) 11. Nearest Railway Station Jaisalmer (~ 50 km in SSE direction) 12. Nearest Airport Jaisalmer (~ 50 km in SSE direction) 13. National Park, Wild Life Sanctuaries, Biosphere Reserves, Reserved Forest etc. None within 10 km radius of mine site 14. Protected Forest within 10 km radius One protected forest (~9.5 km in SSE direction) 15. Water Bodies (within 10 km radius) Indira Gandhi Canal (~7.5 km in North direction) 16. Seismic Zone Zone III as per IS: 1893 (Part-I) : 2002 D. Cost Details 17. Total Project Cost Rs. 46 Crore/- + Land Cost /- 18. Cost for Environmental Protection Measures Capital Cost Rs. 2 Crore/- 19. Recurring cost on Environmental Protection Measures E. Requirements of The Project Rs. 60 Lakhs/ annum 20. Water Requirement 90 KLD water will be required for (dust M/s. Lafarge India Private Limited 1

6 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). M/s. Lafarge India Private Limited 2 suppression, drinking & sanitation, green belt) & will be sourced from nearby villages on contract basis or from Indira Gandhi Canal 7.5 km away from the lease area after taking permission from the concerned authority. 21. Power Requirement Power is only required for mines office, workshop 22. Man Power Requirement 114 persons. 1.1 MITIGATION MEASURES Air Pollution Control Measures and for illumination along the haul road/ active pit which is very insignificant i.e. 100 KWH sourced from state electricity board /captive power plant. Following measures will be taken to control air/fugitive pollution during mining operations: Sharp drill bits will be used for drilling to reduce generation of dust. Drilling machines will be equipped with water spraying system to prevent dust from getting air borne. Control Blasting will be done. Optimizing the blasting parameters to control & prevent the dust from getting air borne will be made to control the fly rock. Rock breaker will be used for breaking over sized boulders, which eliminates the generation of dust and noise due to secondary blasting activities. Water spraying on the haul roads will be done. De-dusting system will be provided at crushing plant with bag filter arrangements to collect the dust generated during crushing. Besides water spraying will also be done to suppress the dust. Green Belt will be developed around the periphery of the mining lease & plantation will be developed along haul roads, office, workshop etc. to reduce the propogation of air borne dust Water Quality Management Garland drains will be provided around the pit to prevent the entry of rainwater into the mining pit.

7 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Garland drain/ filtration bund will be provided around dumps to retain the water percolation coming from waste dumps for settling of solid particles. Septic tanks and soak pits will be provided for the disposal of domestic waste water. Rainwater falling in the catchments area of mining pit will be collected in sump of mines i.e. in lower benches Noise Pollution Control Drilling will be carried out with the help of sharp drill bits which will help in reducing noise. Controlled blasting will be carried out to minimize vibration. Rock breaker will be used to avoid secondary blasting. Earmuffs/Earplugs will be provided to all operators and employees working near the machinery. Proper maintenance, oiling and greasing of machines at regular intervals will be done to reduce generation of noise. Green belt will be done along the lease boundary & plantation will be developed along haul road, around workshop etc. to minimize the propagation of noise. Periodical monitoring of noise will be done. 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION (i) Identification of Project and Project Proponent Lafarge is world leader in building materials. Lafarge currently has 6 cement plants in India. In recent years, Lafarge has significantly enlarged its operations across its three business divisions - Cement, Aggregates and Concrete. The company has an established presence across all major cities and towns in India. Lafarge today is the market leader in the ready-mix concrete business with around 68 plants. To make advances in building materials, Lafarge places the customer at the heart of its concerns. Lafarge has cement plants in Chhattisgarh, Jharkhand, Rajasthan, Haryana and West Bengal. The total cement production capacity in the Indian market is currently around 11 MTPA. M/s. Lafarge India Private Limited 3

8 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). LOI letter has been granted to M/s. LIPL over an area of ha by Government of Rajasthan Mine (Group-2) department vide letter no. P.3(144) Mine/Group-2/2014 dated on (ii) Brief Description of the Nature of Project M/s. Lafarge India Pvt. Ltd. is proposing a New Limestone Mine (M.L. Area: ha) with production capacity of 2.4 MTPA & overburden 0.85 million m³/annum near Village- Parewar SN-II, Tehsil & District- Jaisalmer (Rajasthan). As per EIA Notification dated 14th September 2006, as amended from time to time, this project falls under Category A, Project or Activity 1(a) (3). (iii) Need for the Project & its Importance to the Country/ Region With respect to the importance of the project to the nation, it can be well said that in a developing nation like India, cement makes a backbone for infrastructural development. Thus, keeping in mind this requirement, mining of limestone is essential for the nation`s growth. M/s. Lafarge India Pvt. Ltd. (LIPL) has proposed this mining project in order to meet the requirement of Limestone for the manufacturing of cement in the Proposed Cement Plant. The proposed mine will be captive to proposed Cement plant of Lafarge India Pvt. Ltd.. Besides this, the project will prove beneficial in terms of socio-economic development as it will provide employment to locals. Further, the average income level, which is the indicator of socio economic status of households is expected to increase, which will ultimately result in better standard of living of the local people. (iv) Demand Supply Gap The proposed limestone mining project of LIPL will have a production capacity of 2.4 MTPA & overburden 0.85 million m³/annum which will meet the requirement/demand of limestone for the proposed Cement Plant located at Tehsil & District- Jaisalmer (Rajasthan). (v) Imports vs. Indigenous Production Limestone produced from the proposed limestone mine will be used for clinker/cement manufacturing in the proposed cement plant of LIPL. M/s. Lafarge India Private Limited 4

9 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). (vi) Export Possibility Not applicable as the limestone production from proposed mine will be for captive use. (vii) Domestic/Export Markets Limestone will be only utilized in the proposed cement plant. Thus there will be no other users for the limestone from this mine. (viii) Employment Generation (Direct and Indirect) due to the Project Direct and indirect employment will be generated due to the proposed mining project. Some skilled manpower may be required from the nearby area to the extent available while remaining unskilled/ semi- skilled manpower will be sourced from the local. Preference will be given to locals as per eligibility. The total manpower needed to run the mine has been assessed as 114 persons for the proposed production capacity. Table 2 Summary of Manpower Required S. No. Category No. of persons 1. Highly Skilled 3 2. Skilled Semi skilled Unskilled 10 Total PROJECT DESCRIPTION (i) Type of Project Including Interlinked And Independent Projects, If Any: M/s. Lafarge India Pvt. Ltd. is proposing Limestone Mine (ML Area: 832 ha) with production capacity of 2.4 MTPA & overburden 0.85 million m³/annum near Village-Parewar SN-II, Tehsil & District- Jaisalmer (Rajasthan). Interlinked Project: Proposed Integrated Cement Plant project - Cement (2.6 MTPA), Clinker [1.6 MTPA], DG Set (2.5 MW) & WHRB (10 MW) near Village- Parewar, Tehsil & District- Jaisalmer (Rajasthan). (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates. Location map showing the proposed mine site is shown in figure no.- 1 on next page. M/s. Lafarge India Private Limited 5

10 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Figure No. 1: Location Map Showing General & Specific Location of the Proposed Mine Site M/s. Lafarge India Private Limited 6

11 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). M/s. Lafarge India Private Limited 7 Table- 3 Project Description S. No. Particulars Details A. Location Details 1. Villages Parewar & Joga 2. Tehsil & District Jaisalmer 3. State Rajasthan 4. Latitude N to N 5. Longitude E to E 6. Toposheet No. 40 1/11 & 40 1/15 (iii) Details of Alternate Sites Considered No alternative site has been taken into consideration as the mineral (limestone) is available at this site. (vi). Size or Magnitude of Operation Mining Lease area for the Proposed Limestone Mine is ha and proposed Production Capacity is 2.4 MTPA & overburden 0.85 million m³/annum. (v) Project Description with Process Detail (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given) A. Regional Geology: The limestone belt of Jaisalmer has a vast tract of over 90 km and is a part of Khuiala formation of lower Eocene age. It is overlained by Shumar formation (Pleistocene to sub recent). The present investigation was restricted to Khuiala formation which comprises hard compact bouldery limestone which is underlain by chalky limestone & it is further underlain by marl, shale and Bentonite clays. Limestone beds are structurally undisturbed and horizontally disposes with gentle rolling dips of 2-4 due N-NW. Theoretically there are no perfectly horizontal beds in nature but here due to undisturbed water conditions of the basin of deposition and tectonic stability, limestone beds are found horizontal or nearly sub- horizontal. On the whole the area is undulating without detectable dips or strike, Messa and butte land from are also noticed containing scree and talus over slopes.

12 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Due to thin soil cover and windblown sand, limestone is exposed intermittently As we know that ground water charged with necessary chemicals seeps along stratification, joints planes, cracks, and other openings in the rocks and slowly dissolved the soluble rock but here due to arid climate limestone is subjected to more mechanical erosion rather than chemical. However certain degree of solution effect was noticed in form of minor solution cavities. DESCRIPITON OF LITHOLOGICAL UNITS: (A) PSEUDO CONGLOMERATIC /IRONSTONE Weathered ironstone is present in the northern portion of the area over mount or hillocks. Weathered stone form thin float over sloping surface and ground iron enrichment. Bacterial activity in iron rich water is believed to be effective in the deposition of ferruginous soluble substances. (B) HARD COMPACT LIMESTONE Exposed is southern and central portion of block as disseminated patches and is intermittently covered by blown sand of 0.50m. thickness. It is bouldary creamish white to pinkish, fine grained, hard and fossiliferous in nature. It contains thickness 2-3 mts and underlain by chalky (Cement grade) limestone of whitish colour. Fossils of Gastropods, Biralves and Foraminifera commonly occur in hard compact limestone. (C) CHALKY LIMESTONE It is white to yellowish white moderately hard to friable limestone of cement grade. It is exposed at the surface only along the natural section and escarpment. Chalky limestone mts thick and contains fossils of Bivalves, Branchiopods, Gastropods. (D) MARL It is yellowish white calcarious mudstone encountered below chalky limestone in some bore holes. It is not exposed on surface. (E) SHALE M/s. Lafarge India Private Limited 8

13 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). An argillaceous rock which has a well marked bedding plane fissility primarily due to the orientation of the clay minerals parallel to the bedding planes. Shales are soluble in water and do not form plastic mass when wet. Shales are encountered in the bore holes. (F) BENTONITIC CLAY It is present at the bottom of boreholes on an average of 20m of depth. It has not well developed partings along bedding planes. B. Local Geology: As per the surface exposures and sub surface data available from the bore holes drilled in the area it is observed that the lithological unit in the area varies widely in its contents and nature within the mining lease area. In some parts of the area has the alluvium capping and the upper horizon consists of iron stone as overburden. Below this iron stone is the bentonitic siltstone as overburden. These two litho unites are located in the eastern part of the area. The limestone occurs below these two litho units spread all over the lease area applied for. Thin to thick bands bentonitic clay, bentonitic siltstone, clayey limestone etc. occur within the cement grade limestone as waste. The general sequence of lithological units in descending order with their thicknesses found in the area is as given below:- Nil to 3.00m: Alluvium 3.00 to 8.00m: Iron stone 0.5 to 4.50m: Bentonitic Siltstone and clay 3.00 to 8.00m: Cement grade limestone Nil to 10.00: Bentonitic clay, clayey and chalky limestone etc. occur alternatively or otherwise within the cement grade Bottom: Sandstone M/s. Lafarge India Private Limited 9

14 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Shape and size of the mineral/ore deposit: The Mineral limestone suitable for cement manufacture occurs in the entire lease area applied for up to the lease boundary. Thus the shape of the deposit the same as the lease area applied for with varying thickness in depth ranging from 27 to 35m. The overall size of the deposit is 3800m in length and 2600 m in width. C. Mining Methodology Mining operation will be carried out by fully mechanized opencast metod, utilizing Heavy Earth Moving Equipment (HEME) in conjunction with Deep Hole blasting. Type of working: Opencast mechanized Process: Drilling by larger diameter drills Blasting by conventional explosives Loading by high bucket capacity shovel Transporting by dumpers up to crusher. Table 4 Mining details S. No. PARTICULARS DETAILS 1. Method of Mining Opencast mechanized method 2. Proposed Production 2.4 MTPA & Overburden 0.85 million m³/annum 3. Total Reserves Million tonnes 4. Total Mineable Reserves Million tonnes 5. Life of Mine 92 Years 6. Bench Height 8 m 7. Working Width 30 m 8. Elevation Range 171 to 186 mrl 9. Overall Pit Slope Number of Working Days 300 days M/s. Lafarge India Private Limited 10

15 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). (vi) Raw Material required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product This is a mining project; hence no raw material will be required. Limestone will be used in captive cement plant, so no marketing area will be required. Limestone will be transported from mine to the proposed cement plant by dumpers as mine site is adjacent to the proposed Cement Plant. (vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be briefly Outlined. No waste water will be generated during mining operations. Waste water form workshop in the mine will be recovered by oil- water separator & same will be used for dust suppression. Top soil will be utilized for development of green belt and Afforestation. (viii) Availability of Water, Its Source, Energy /Power Requirement and Source a. Water Requirement Total water requirement for the proposed limestone mine will be 90 KLD which will be sourced from nearby villages on contract basis or from Indira Gandhi Canal 7.5 km away from the lease area after taking permission from the concerned authority. b. Power Requirement Power is only required for mines office, workshop and for illumination along the haul road/active pit which is very insignificant i.e. 100 KW which will be sourced from State Electricity Board/captive power plant. (ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their Management/Disposal A. Liquid No waste water will be generated during mining operations. Waste water generated from mine office will be disposed off in soak pits via septic tank. M/s. Lafarge India Private Limited 11

16 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Water generated from workshop will be treated by oil- separator & treated water will be used for dust suppression. B. Solid Top soil will be utilized for development of green belt & Afforestation. OB/ SB/ IB will be used for backfilling the excavated area. There will be no 4.0 SITE ANALYSIS overburden dump at the conceptual stage. (i) Connectivity The nearest railway station is Jaisalmer, which is about 50 km away from the mine site in SSE direction and NH 15 is at about 50 km in SSE direction from proposed limestone mine. The nearest airport is Jaisalmer, which is about 50 km away from the mine site in SSE direction. (ii) Land Form, Land Use and Land Ownership Total Mining lease area for the proposed project is ha, which falls in villages Parewar & Joga. Out of the total lease area, ha is private agricultural land and ha is govt. waste land. At the end of life of mine total excavated area will be partly backfilled and partly converted into water reservoir. (iii) Topography The region is characterized by flat topography with ground undulation restricted within 2.5 m to 5-10m. The undulating prominent escarpments and mounds terminate abruptly against the valley portion for mile together. The escarpment having low lying circular areas comprises limestone toward the south. The ground assumes to raised table land with flat areas. The slope of the ground is towards north. The topography due to plateau feature with gentle slope develops a step like profile. (iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies (Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified Industrial Area, A Copy Of The Gazette Notification. M/s. Lafarge India Private Limited 12

17 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Table - 5 ENVIRONMENTAL SETTINGS OF THE AREA S. No. Particulars Details 1. Nearest National Highway NH-15 (~50 km in SSE) 2. Nearest Railway Station Jaisalmer ( 50 km in SSE direction) 3. Nearest Airport Jaisalmer ( 50 km in SSE direction) 4. National Park, Wild Life Sanctuaries, None within 10 km radius of mine site Biosphere Reserves, Reserved etc. 5. Protected Forest within 10 km radius Protected forest at (~9.5 km in SSE direction) 6. Water Bodies (within 10 km radius) Indira Gandhi Canal (~7.5 km in North direction) 7. Seismic Zone Zone III as per IS: 1893 (Part-I): 2002 M/s. Lafarge India Private Limited 13

18 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). Figure 2: Environmental Settling Map M/s. Lafarge India Private Limited 14

19 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). (v) Existing Infrastructure The nearest railway station is Jaisalmer, which is about 50 km away from the mine site in SSE direction and NH 15 is at about 50 km in SSE direction from proposed limestone mine. The nearest airport is Jaisalmer, which is at about 50 km in SSE direction from proposed mine. (vi) Soil Classification The soil is mostly yellowish brown in color with sandy texture. (vii) Climatic Data from Secondary Sources The weather and climate of Jaisalmer is arid in nature typical of any desert region. Summers are very hot but winters are relatively very pleasant. Temperature in this region ranges from 12 to 45 C occasionally it rises up to 49 C during summer months and falls as low as 1 C in winter.the city is situated in Thar Desert region so monsoon is as good as negligible. Annual rainfall varies from cm and quite often erratic, so behavior of rainfall is very much erratic and occurs mainly in July to August months. (viii) Social Infrastructure Available The site is well connected with social infrastructure facilities like medical, post office, schools, police stations etc. and as such no constraints are envisaged in this aspect. Tehsil and district headquarter are near to the site. 5.0 PLANNING BRIEF a. Planning Concept (Type of Industries, Facilities and Transportation etc.) Town and Country Planning/Development Authority Classification Limestone will be loaded by dumpers & transported to the Proposed Cement Plant by road. b. Population Projection Temporary influx of people will be there as the managerial and supervisory staff will be generally from outside the area. There will be a marginal increase in population. M/s. Lafarge India Private Limited 15

20 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). c. Land Use Planning There will be construction of some infrastructure like mine office & workshop within the lease area. Area for built- up structures, green belt etc. will be as per approved mining plan. Land use planning for the proposed project will be followed as per approved mining plan. d. Assessment of Infrastructure Demand (Physical & Social) LIPL will assess the demand of infrastructure (Physical & Social) in nearby area of the proposed mine site and same will be developed under corporate social responsibility programs. e. Amenities/Facilities LIPL will develop the amenities/facilities in the nearby area of the proposed mine site as per requirement of local people of the nearby area under corporate social responsibility programme. 6.0 PROPOSED INFRASTRUCTURE (i) Industrial Area (Processing Area) Proposed limestone mining lease area is ha and required infrastructure for limestone mining activities will be provided by LIPL. (ii) Residential Area (Non Processing Area) This is not required as mine workers will come from nearby villages. At a later stage, residential colony may be developed for mine workers in the Proposed Cement Plant premises/area. (iii) Green Belt Green Belt will be developed around the lease boundar. Plantation will be done on undisturbed area, along haul roads, on reclaimed area, near workshop & mine office etc. The dead plants will be replaced by fresh plants. Local species will be planted in consultation with local forest officer and as per CPCB guidelines. M/s. Lafarge India Private Limited 16

21 Parewar Limestone Mines SN - II with Proposed Limestone Production Capacity of 2.4 MTPA & Overburden 0.85 million m³/annum (M.L. Area ha) near Village Parewar SN-II, Tehsil & District Jaisalmer (Rajasthan). (iv) Social Infrastructure The Proposed project will result in growth of the surrounding areas by increased direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. (v) Connectivity (Traffic and Transport Road/Rail/Metro/Water ways etc) The nearest railway station is Jaisalmer, which is about 50 km away from the mine site in SSE direction and NH 15 is at about 50 km in SSE direction from proposed limestone mine. The nearest airport is Jaisalmer, which is about 50 km in SSE direction from proposed mine. (vi) Drinking Water Management (Source& Supply of water) 1.14 KLD water is proposed for drinking purpose which will be sourced from nearby villages on contract basis. (vii) Sewerage System Domestic waste water generated from mine office will be disposed off in soak pits via septic tanks. (viii) Industrial Waste Management No industrial waste will be generated from the proposed mining project. (ix) Solid Waste Management Top soil will be stacked properly and will be used in plantation & afforestation. Initially, waste dump will be created but at the conceptual stage, entire waste will be backfilled in the excavated area. There will no waste dump at the conceptual stage. (x) Power Requirement & Supply/Source Power is only required for mines office, workshop and for illumination along the haul road/active pit which is very insignificant i.e. 100KW which will be sourced from State Electricity Board/captive power plant. M/s. Lafarge India Private Limited 17

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1.1 ENVIRONMENTAL MANAGEMENT PLAN 2 1.1.1 AIR QUALITY MANAGEMENT 2 1.1.2 WATER QUALITY MANAGEMENT 2 1.1.3 NOISE QUALITY MANAGEMENT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PFR PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY This is an proposed mine. Proposal of obtaining Environmental Clearance for masonry stone with production Capacity 1,00,260TPA (ROM), Near Village: Gorir (Modi

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh

LOK CEMENTS LTD Chinnadandlur and Kallamalla Villages, Yerraguntla Mandal Y S R Kadapa District, Andhra Pradesh Table of Contents PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction of the project/ Background information 3 Project Description. 4 Site Analysis Of 5. Planning Brief. 6 Proposed Infrastructure

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

LORE SILICA SAND MIINE

LORE SILICA SAND MIINE PRE FEASIBILITY REPORT OF Submitted to MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE GOVT. OF INDIA Paryavaran Bhawan, CGO Complex Jor Bagh Road, New Delhi-110 003 LORE SILICA SAND MIINE Village: Lore,

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

Mineral Granite. Lease Area-1.6884. Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT PREFEASIBILITY REPORT Mineral Granite Mining project- Category B 2 Lease Area-1.6884 Ha. Near Villages- Chandma Tehsil - Sarwar District- Ajmer (Rajasthan) PROJECT PROPONENT SHRI SHANKAR LAL SAHU S/O Shri

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION OF EXISTING ASBESTOS CEMENT SHEETS & ACCESSORIES PRODUCTION FROM 72000 TPA TO 175000 TPA OF Limited JASIDIH Dist.: Deoghar 814 142 (Jharkhand) INDEX Contents

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. D.BHARATHI 11.76 Acres Silica Sand Mine, Sy.No. 44/3,50/4,50/5&50/6 ADDEPALLI (V), CHILLAKUR (M), SPSR NELLORE DISTRICT ANDHRA PRADESH Prepared by SV ENVIRO LABS &

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS 2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR MARBLE MINE(MINOR MINERAL) NEAR VILLAGE KHO(PALPUR), TEHSIL: RAJGARH, DISTRICT: ALWAR, RAJASTHAN NON- FOREST LAND PRE-FEASIBILITY REPORT CATEGORY A (Sariska Wild life Sanctuary is located in 5.0 km

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information