Data Centre Proposed Solutions - A Guide to Bidding

Size: px
Start display at page:

Download "Data Centre Proposed Solutions - A Guide to Bidding"

Transcription

1 The Institute of Chartered Accountants of India Summary of Resolution to Queries as provided in Responder(s) Conference on Expression of Interest for provision, implementation and maintenance of IT Infrastructure at ICAI 4 th October 2010, 1 PM

2 SL.No. Query Response 1 Page 5, Clause 3.1 Guiding Principles, Point No.2- Proposed Data Centre and DR solution should be Tier-III+ standards - Can we propose hosting of entire solution on established Tier-III+ Data Centers through our partners which would be more economical & cost effective. Data Center envisaged for the current requirement will be owned and maintained by ICAI only. Bidders are requested to adhere to the requirements specified in the tender 2 Page 12, Clause 6.3 Annexure B, Point No. II- The main features of the proposed solution and any areas of financial, operational, development risks that are perceived - Do we need to propose any specific solution or just a general understanding of their scope of work. 3 CMC Page 12, Clause 6.3 Annexure B, Point No. IV- Upgrade strategy for the proposed infrastructure components across servers, network and associated equipments - The project duration as mentioned in the EOI document is 6 months implementation time plus 5 years support after go-live for which the bidder will provide FM services Hence, what is meant by upgrade strategy is not clear -does it refer to upgrade of existing IT infrastructure of ICAI? Bidder need to give the following details overview as part of their proposition: 1) Bidder's understanding of the requirement and 2) Bidder's proposition for the requirement based on the details made available in the EOI document. As part of the bid response, bidder's need to give 1) The best practices adopt in the industry w.r.t to IT infrastructure, which includes the current and future technology. 2) Upgrade strategy is for the servers and its guiding technology within or beyond 5 years of the duration 4 Please, clarify whether only parties that submit the EOI response will be allowed to bid in further application/infrastructure tenders or it will be open to all. As mentioned in the EOI. ICAI will retain the discretion to invite additional bidders if required for the stage. 5 Ecole Solutions PVT Ltd There is one section in the document that talks about Live Virtual Classes( Page 3). As a vendor, do we also have to provide the Solution for conducting Live Virtual Classes to the 5 regional offices, 125+ branch offices, 8 Decentralized offices (DCOs), 125+ stores and 150+ ITT training centers spread across India. Yes, requirements for the solution to be gathered designed and developed. Further implementation and change management to sustain the same will be part of scope of work. 6 3i Infotech 4. Eligibility Criteria/Prequalification (S.No.5) The bidder shall not be under a declaration of ineligibility or blacklisting with any of the Government/ Public sector unit agencies The bidder shall not be under a declaration of ineligibility or blacklisting in IT services with any of the Government/ Public sector unit agencies Awaited inputs from ICAI Legal Department 7 HP What is the extent and depth of solution expected the EOI stage? It is expected from individual bidders to give a over view of their understanding of the requirement, based on the information provided in EOI. However, the detailed for the released subsequent to the selection of qualified bidders after the evaluation Page 1

3 SL.No. Query Response 8 Do we also have to suggest any products /Brands/OEMs 9 Will the bidders be evaluated basis the eligibility criteria cum Solution Proposed or it is only basis the eligibility criteria only. 10 Can a bidder produce its international references also? We as HP being a global organization would have implemented projects of similar nature across the globe and can cross leverage our international expertise for the benefit of ICAI. Bidders are expected to propose technology and not the brands for EOI response Bidders will be primarily evaluated on the eligibility criteria and proposed solution (technology strength) of the firm Bidder can propose relevant implemented references across the globe 11 Page 8, Point 2 under Eligibility criteria The bidder or in case of consortium at least one company should have implemented at two data centre projects of Tier III/IV supply, commissioning & maintenance of, servers, routers, switches, LAN, SAN, security solutions and facilities management in India during the past 3 years. Facility Management of DC/DR support or Facility management of any other project for any organization, kindly clarify? Bidder should have implemented at least 2 data centers projects of Tier-III/IV, with in India which includes Supply, commissioning and maintenance of servers, routers, LAN, SAN, security solutions, including facility management for the same during past 3 years 12 Page 8, Point 2 under Eligibility criteria HCL The bidder or each member in case of a consortium should have positive net worth and an annual turnover of more than INR 200 Crores or above for the last three Financial Years (FY 07-08,08-09, 09-10). Our financial year ( ) ended on 30th June, 2010 and auditing for the same is still going on, so we request for the acceptance of turnover from the years , , Bidder need to provide a provisional certificate on the turn over from certified Charted Account 13 Page 11, point 6.1 Have you attached the documents pertaining to 5 years of experience in IT field? Kindly clarify the type of supporting document required. Please refer to page 8/14, where bidder need to provide certification of incorporation or registration document under the companies act, 1956 stating that bidder's firm is having a 5 years of experience in the IT field 14 Isolation transformer is required? Bidders should kindly note that, the current tender document floated is just an Expression of Interest. The detailed specifications of the floated separately to the shortlisted vendors. 15 Power distribution for the data center will be 16 ESDS Software Solutions in scope of supplier or not? Installation Transport and Commission of generator, cabling from generator to LT panel, cabling up to the panel, panel to UPS and other equipments will be in our scope? This EOI is only to evaluate the capabilities of the firms to execute the envisaged project. 17 How many number of ISP are to be considered? Page 2

4 SL.No. Query Response 18 Ideally there should be separate ISP room and USP room, where all the switches or other components of ISP are there and becomes easy to maintain. So is there provision we can get which is recommended as Tier III standards. 19 We assume the new hardware components is in our scope however is there specific brand that has been decided? 20 Procurement and installation of hardware, racks and cabling is in our scope? 21 What all monitoring features are required in the data center or level of monitoring or should we take as per Tier III? 22 General lighting apart from data center electrification is in vendors scope? 23 Humidity control is not specified, however as per Tier III it is required, we hope we can take it? 24 Earthing for data center equipments and UPS will be in our scope? 25 Can we get civil layout of the sites? 26 Should we consider the false ceiling? 27 What will be the built-up area for the DC site and DR site? 28 What is the approximate load bearing capacity at DC and the DR site? 29 How many 42U racks will be deployed in the DC and DR site? 30 In case of consortium is it mandatory to have the annual turnover of more than INR 200 Crores or above for the last three Financial Years (FY 07-08,08-09, 09-10) for each party? 31 What would be approximate budget for this project? 32 Customer need to freeze on RTO & RPO for DR 33 On replication, please specify whether host based replication or SAN based replication 34 Inhouse Data Centers built for commercial use Reliance (Internet Data Centers) should be accepted Communications LTD under eligibility criteria 35 Evaluation need to be considered on no of project of DC build of TIER III level. Each member or party need to have the annual turnover of more than INR 200 Crores As clarified above As clarified above As clarified above Proposed points on evaluation criteria are appreciated and well taken. However, the eligibility criteria and evaluation parameters are defined and clearly mentioned in the EOI. Bidders are expected to adhere to the specifications mentioned in the EOI Page 3

5 SL.No. Query Response 36 The bidder should have more than 2,00,000 sq.ft of operational datacenter raised floor space in India. 37 The bidder should have experience of building and operating datacenters for more than six years. 38 The bidder should have more than 300 datacenter professionals on company payroll. 39 The bidder should have a NOC dedicated to datacenter operations and this NOC should be of minimum 100 seats. 40 The bidder should possess valid ISO 27001,ISO 9001 and ISO certificate for the datacenter operations. 41 In the EOI, there is a clause "Onsite support to end user whenever required and resolve the problem to user satisfaction." Please confirm scope of End User Support 42 The proposing responder s general understanding of the project requirements and the proposed total solution Does customer need solution from respondent along with EOI, pls clarify 43 The main features of the proposed solution and any areas of financial, operational, development risks that are perceived Does customer need detail from respondent along with EOI, pls clarify 44 Upgrade strategy for the proposed infrastructure components across servers, network and associated equipments Does customer need strategy from respondent along with EOI, pls clarify 45 Describe the strategy suggested for future upgrade of the supplied equipment and/or products and any impact this strategy may have on operation etc. Does customer need strategy for future upgrade from respondent along with EOI, pls clarify This is already part of eligibility criteria Please elaborate the query as it is not clear Please elaborate the query as it is not clear As clarified above As clarified above As clarified above Page 4

6 46 4, Pt#2 The bidder or in case of consortium at least one company should have implemented at two data centre projects of Tier III/IV supply, commissioning & maintenance of, servers, routers, switches, LAN, SAN, security solutions and facilities management in India during the past 3 years Data Centre projects of Tier III/IV are stringent and not many companies have certified Tier III/IV Data Centres. Is this criteria essential? Bidder is advised to adhere to the requirements 47 4, Pt#2 Individual companies bidding in specific areas must provide documentary evidence for the applicable areas of work certified by a practicing Chartered Accountant Which are the other independent bodies whose certificates will be acceptable Certified CA and Indian Govt. agencies certifications are acceptable 48-3(a), Data Centre (DC) setup to host all the envisaged applications Kindly share the desired environments for ERP implementation at the Data Centres (DC & DR) - Production, Test & Development, etc. 49-3(a), Disaster recovery setup as a fallback option in-case of a disaster: This should be near capacity of DC understanding is that DR shall be 100% of DC infrastructure (in terms of processing power). i) Is DR required for both Business critical applications and supporting applications. ii) Is HA and Redundancy etc is also required at DR site. 50-3(b), Disaster recovery setup as a fallback option in-case of a disaster:-should be capable of replicating the complete hosted business applications in DC. Pls share the existing Replication method 51-3(b), Disaster recovery setup as a fallback option in-case of a disaster: should be capable of replicating the complete hosted business applications in DC Kindly share the desired figures for RPO (Recovery Point Objective) and RTO (Recovery Time Objective) (c), 3(c), Connectivity at various ICAI offices including the head office, 5 regional offices, 125+ branch offices, Decentralized offices - 8 What is the existing Infrastructure setup and connectivity available at all locations? What is the preferred mode of connectivity required for Decentralized offices, stores and ITT training centres Whether redundancy in connectivity is required Page 5

7 54 3(c), Connectivity What is the Scope in terms of Monitoring & Management from a NMS perspective What are the Peripherals required at Stores and ITT training centres 55 3.c, Connectivity - Internet Links Whether separate internet links are required other than MPLS VPN connectivity at DC, DR and other offices? If so, pls specify the locations , Guiding Principles Solution proposed should be Scalable, Modular and Redundant and Highly Available Whether locations other than DC & DR,also requires redundancy in terms of N/w and security devices? Kindly clarify on the Modular aspect, with respect to Computing hardware , Guiding Principles Proposed solution should adhere to all the best practices and standards followed by the IT industry IT Infrastructure Setup Please share your views on the desired IT industry standard & practices for adherence. Whether centralized management and monitoring of application, n/w and security devices are required Bidder is expected to propose the best practices adopted within its organization, as a part of solution , IT Infrastructure Setup Design of servers, networking equipments and deployment topology For existing applications (if any)- Please share hardware requirements for the existing applications (business critical & supporting) , IT Infrastructure Setup Design of servers, networking equipments and deployment topology For new application - Please share the User details for Hardware sizing (User base, Internal & External user classification with numbers, Concurrency, desired utilization etc) for business critical & supporting applications. Page 6

8 , IT Infrastructure Setup It is responsibility of the bidder to bring out all the necessary inputs that are required to design and to deploy the same Please share the hardware landscape for Application deployment with following inputs. 1. Desired scalability (Vertical & Horizontal). 2. High Availability (Redundancy & Load balancing) 3. Fault Tolerance (Clustering) 4. Processor. Memory, disk requirement for each server with SAN connectivity requirement. 5. Network I/O requirement for each server etc (Application has to share all the hardware requirements for deployment) IT Security Deployment Whether Users at Data centre and other locations would require browsing of Internet, Is a Proxy solution required? Automation of Business centres and other offices. To supply and deploy all the necessary equipments, like workstations, laptops, networking equipments (switches, routers, modems and necessary cables) where upgrades are identified by ICAI as warranted What are N/w, security devices and other peripherals available currently and requires upgradation? Automation of Business centres and other offices What are the minimum Peripherals required at new offices Managed services Pls share details of type of Managed services ICAI is looking for post golive? Whether insource, outsource or co-source model? New offices Pl specify how many new offices are in line for five yrs period , Managed Services Bidder need to undertake the following Backup management activities o Onsite/Offsite backup For existing applications (if any) - Kindly share details about the existing backup plan - onsite/offsite for scope clarity , Managed Services Bidder need to undertake the following Backup management activities o Onsite/Offsite backup For new application - Kindly share requirements for the desired backup plan - onsite/offsite for scope clarity. Page 7

9 , Managed Services Bidder need to undertake the following Backup management activities o Onsite/Offsite backup Kindly clarify on the bidder scope on IT/Non-IT requirement for offsite backup , Managed Services Establishment of help desk support in doing the following activities Pls share current call volumes, expected growth y-o-y , Guiding Principles Proposed Data Centre and DR solution should be Tier-III+ standards Kindly clarify on the DC & DR scope - whether this includes Non-IT part also (like Civil, electrical, Cabling etc) IT Physical Infrastructure Civil Related 72 Please elaborate the scope of the complete Physical Infra. Does this include the areas listed below: IT Physical Infrastructure IT Physical Infrastructure Civil, HVAC,,SDS etc Please advice on the Floor area being designated for the Physical build activity. Please advice on which floor of the building the DC would be located Please advice on the floor strength /load bearing capacity of the floor on which the DC is to be built Please advice on the minimum floor area that can be segregated for the DC built purpose Please advice on the height available on the floor ( space between the Floor and the ceiling) Electrical Related Please advice on the 2 separate Power distribution company from which the power is being drawn in the building Please advice where the Power is getting terminated within the Building. Is it in the HT panel or not. Page 8

10 IT Physical Infrastructure Please advice on the capacity of the main cable from which the Power is being drawn Please advice whether the proposed DC location has got a separate LT Panel and Bus Bar Please advice if the building/floor will have its own dedicated Earth pit Please advice on the Power conditioning at the DC location ( Single Phase/3 Phase) Please advice on the Power Backup arrangements available at Data Centre location ( generator/ alternate Generation Company) Please advice on the availability of Power (Frequency of Failure, etc) HVAC Related 87 Please advice on the Temperature conditions in the premise - Max Temperature in Summer - Minimum Temperature in Winter 88 Is the building/floor having a Centralized Air-conditioning IT Physical Infrastructure Are there any Windows/Doors on the fore walls of the DC area Are any of the windows/doors SUN facing Security & Safety Related 91 Are there any major security issues in around the DC area? Any other nearby areas? Please advice on any specific area related requirements ( discussion room, strong room etc.) Please arrange to share the Floor plan. Page 9

11 IT Infrastructure setup Server Related 94 Please advice on the Application architecture 95 Please advice on the Application deployment model being envisaged (Centralized/Decentralized) 96 Please advice on different set of Applications(ERP, other business,administrative, Educational related application ) for which server and storage infrastructure is required 97 Please advice on the total number type of servers required for each Application modules (DB, Web, App, Reporting etc) 98 Please advice on the detailed configuration for each of the servers(cpu, RAM, HDD etc) 99 Please advice on the preferred Hardware Platform (RISC / CISC) 100 Please advice on the preferred OS for each of the server ( RHEL, MS) 101 Please define the High availability/ redundancy requirement for each of the servers IT Infrastructure Applications Please also suggest which of the servers require Load Balancing (Web, App etc) Please advice on the different environments required within the DC ( Production, Test, Development, Training) Please advice on the zone wise deployment architecture (DMZ, MZ etc.) Mail and Messaging related Please advice if there is an existing mailing solution in place Any preference on the mailing solution architecture in terms of Centralized or Decentralized Please advice on Preferred mail and Messaging solution Please advice on any specific features required in the mail and messaging (Chat, Calendar, Meeting etc.) Page 10

12 109 Please advice on the number of mail users 110 Please advice on the mail box size per user IT Infrastructure Applications Antivirus related 111 Please advice on any preference with regards to the antivirus solution(centralized/de centralized) 112 Please advice on the total number of desktop users and laptop users IT Infrastructure Applications Domain controller 113 How many internal users 114 What is the desired AD architecture (Centralized/ decentralized) 115 Whether AD need to be integrated with Proxy or not IT Infrastructure Applications RSA IT Infrastructure Setup Whether single sign on is required Is two factor authentication a requirement Storage and Backup related 118 Please advice on the nature and type of Data to be stored in the storage area (Design files, data files) 119 Please advice as to which all servers would have an external storage requirement (DB, APP) 120 Please advice on the total storage requirement (RAW, Usable) 121 Please advice on the duration for which the data needs to be stored in the storage area for quick retrieval 122 Please advice the duration after which the data should be send to the archival area 123 Please advice on year on year growth in the storage area. 124 Please advice on Tape Backup related requirement ( Data to be backed up on Tape etc) 3 (c ) Local Area Network at DC 125 Please advice on total number of nodes/users at the DC Page 11

13 How far are these nodes located from the Data Centre Please arrange to share the site Layout plan(blueprint) clearly indicating the: - Nodal Location(Building wise, floor wise) - Distances - Demarcations in terms of roads in the Plant/campus area 3 (c ) Location IT & Non IT requirement 3 (d) WAN related Please advice if the each location will have its own server room (Client Application or Offline operations ) Please advice on the server (Web, DB, App etc.) storage details at each location Please advice on the space and environment conditions( Power, Earthing, HVAC etc.) at each of the locations Please advice on total number of nodes/users at each location Please advice on the Printer and Peripheral requirement at each location with detailed specification Please advice if the devices required have to be network ready How far are these nodes located from the Server room Please arrange to share the site Layout plan(blueprint) clearly indicating the: - Nodal Location(Building wise, floor wise) - Distances - Demarcations in terms of roads in the Plant/campus area Please advice whether internet/ MPLS users will access the application through common Router Please advice on the bandwidth requirement for Internet and MPLS users Is redundancy to be envisaged for these users Please advice on the criticality of the link to be provided for each of these users/locations Page 12

14 140 Pleas advice as to who will provision for the WAN infrastructure at locations 141 Please advice who will bear the one time /recurring bandwidth cost 142 Please advice on the number of extranet users/ locations from where these users will get connected 143 Please advice whether these users will access the Application through their own infrastructure /bandwidth END OF Document Page 13

Response of bidders' queries for RFP for Hosting of Website(s) of PNB on Dedicated Server

Response of bidders' queries for RFP for Hosting of Website(s) of PNB on Dedicated Server Response of bidders' queries for RFP for Hosting of Website(s) of PNB on Dedicated Server Srno 1 Current RFP clause Clause Details Bidder Query Our Response 2.2 (Eligibilty Criteria), Page Parent company

More information

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest.

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest. Clarifications/Responses for Notice Inviting Tender From Companies/Agencies for Hiring Four Dedicated Servers (3 - Linux & 1 - Windows) Sr. No. Page No. Clause in Tender Clarification/Suggestion Sought

More information

Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries

Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries The pre-bid meeting for clarifications on the Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA was held

More information

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05 Corrigendum for the Tender for Web Based Project Monitoring Tool & MIS System Bidders Clarification Sl. Clause /Page no Tender Clause Clarification Sought Clarification No. 1 Page No:4 No consortium Consortium

More information

said period logs can be moved to Service

said period logs can be moved to Service Replies to Queries by Various by vendors for Centralised Desktop management Solution S# Page# Clause Point in the RFP Queries Clarification by UIIC e) Backup and Restore: Successful bidder should provide

More information

All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-751 019

All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-751 019 All India Institute of Medical Sciences, Bhubaneswar Sijua, Bhubaneswar, Odisha-75 09 Corrigendum II for Tender for Hospital Information System Date: 0/0/203 In reference to tender No.200(002)/203/S&P

More information

Bharat Heavy Electricals Limited Corporate Information Technology, Noida

Bharat Heavy Electricals Limited Corporate Information Technology, Noida Bharat Heavy Electricals Limited Corporate Information Technology, Noida EoI Ref. No: AA:CIT:DC/EoI Dated: 14.10.2009 Expression of Interest for Hiring of a Consultant for the Design of Data Centre 1.

More information

Quries and replies for the tender for the AMC of Server, Networking Products, UPS at 41 KMA ULBs. Name of the firm: CMC

Quries and replies for the tender for the AMC of Server, Networking Products, UPS at 41 KMA ULBs. Name of the firm: CMC 1 Provide onsite support and Maintenance Name of the firm: CMC Request to clarify whether comprehensive AMC (spare & labour) are required for the Bill of material or only FM support? Comprehensive AMC

More information

RFP For Operationalization of National Contact Center for ECI on Outsourced Model

RFP For Operationalization of National Contact Center for ECI on Outsourced Model 1 Please provide Bifurcation of agents in Voice, Email, SMS, Web chat alongwith the volume and the average handle time The bifurcation details shall be provided during the Project Preparatory Phase. The

More information

REQUEST FOR PROPOSAL FOR DATA CENTRE CO-LOCATION AND NETWORK CONNECTIVITY SOLUTION Pre-Bid Meeting Held On : May 18, 2010, 15:30 Hrs

REQUEST FOR PROPOSAL FOR DATA CENTRE CO-LOCATION AND NETWORK CONNECTIVITY SOLUTION Pre-Bid Meeting Held On : May 18, 2010, 15:30 Hrs REQUEST FOR PROPOSAL FOR DATA CETRE CO-LOCATIO AD ETWORK COECTIVITY SOLUTIO Pre-Bid Meeting Held On : May 18, 2010, 15:30 Hrs S. Section o Description 1 Present Setup 2.2.1 The servers are under AMC with

More information

School of Open Learning University of Delhi

School of Open Learning University of Delhi School of Open Learning University of Delhi LIMITED TENDER FOR CONFIGURATION & MAINTENANCE OF ORACLE RAC SERVICES Tender No. Dated: Cost: Rs.500/- Submission of tender 25/06/2015 (extended date) Limited

More information

Perceptive Software Platform Services

Perceptive Software Platform Services Perceptive Software Platform Services CLOUD SOLUTIONS process and content management Perceptive Software Platform Services Perceptive Software process and content management systems have been deployed

More information

AL RAFEE ENTERPRISES Solutions & Expertise.

AL RAFEE ENTERPRISES Solutions & Expertise. AL RAFEE ENTERPRISES Solutions & Expertise. Virtualization Al Rafee has strategically made substantial investment in building up a large end to end portfolio of Virtualization across the entire IT infrastructure

More information

Centre for Development of Imaging Technology (CDIT) Chithranjali Hills, Thirvallom PO, Thrivananthapuram (An Autonomous Body under Govt.

Centre for Development of Imaging Technology (CDIT) Chithranjali Hills, Thirvallom PO, Thrivananthapuram (An Autonomous Body under Govt. Centre for Development of Imaging Technology (CDIT) Chithranjali Hills, Thirvallom PO, Thrivananthapuram (An Autonomous Body under Govt. of Kerala) TENDER FOR HIRING OF DEDICATED SERVERS Introduction Centre

More information

About the Organization. About the present IT Infrastructure

About the Organization. About the present IT Infrastructure About the Organization Environment Department, Government of West Bnegal is tasked with regulation and policy formulation in matters related to conservation of the environment, natural resource management

More information

MIS PROJECT COST ESTIMATES. 8.1 Costs CHAPTER 8

MIS PROJECT COST ESTIMATES. 8.1 Costs CHAPTER 8 CHAPTER 8 MIS PROJECT COST ESTIMATES This chapter details the costs involved in implementation of the proposed IS and IT solution for UPID according to the implementation plan provided in chapter 7. These

More information

ISP Focus Area 1 IT Infrastructure Assessment

ISP Focus Area 1 IT Infrastructure Assessment ISP Focus Area 1 Bengkel Penyediaan Pelan Strategik IT Universiti Fasa 1 Organized by InfoTech Office 16 17 April 2012 Intekma Resort & Convention Center @ Shah Alam, Selangor, Malaysia To be filled by

More information

Response to Queries Received for RFP of Security Integrator - Tender No. 63

Response to Queries Received for RFP of Security Integrator - Tender No. 63 Sr.N RFP Clause Original Query Reply/Remark o. 1. Perform Incident Management with respect to the following: For Forensic Analysis of logs Please clarify the systems/devices Contain attacks through for

More information

Description Bidder s Queries GSPC s Reply

Description Bidder s Queries GSPC s Reply Tender No.: GSPC/KG-OSN-2001/3/FMS for IT & Allied Services/2015-16/275 Pre-Bid Clarification No. 2 dated. 3 rd August 2015 Sr No. 1 2 3 4 5 Clause No. Clause 2 Clause 3 Clause 4 Clause 6 Description Bidder

More information

Amendment 1 - Annexure 5 (C) Technical Criteria

Amendment 1 - Annexure 5 (C) Technical Criteria 1 - Annexure 5 (C) Technical Criteria S. Eligibility Criteria Documents required Complied Y/N Formatted: Heading 2, Indent: Left: 0", Hanging: 0.4" C) Technical Criteria (Experience and other Technical

More information

Thematic Unit of Excellence on Computational Materials Science Solid State and Structural Chemistry Unit, Indian Institute of Science

Thematic Unit of Excellence on Computational Materials Science Solid State and Structural Chemistry Unit, Indian Institute of Science Thematic Unit of Excellence on Computational Materials Science Solid State and Structural Chemistry Unit, Indian Institute of Science Call for Expression of Interest (EOI) for the Supply, Installation

More information

Hardware/Software Deployment Strategies. Introduction to Information System Components. Chapter 1 Part 4 of 4 CA M S Mehta, FCA

Hardware/Software Deployment Strategies. Introduction to Information System Components. Chapter 1 Part 4 of 4 CA M S Mehta, FCA Hardware/Software Deployment Strategies Introduction to Information System Components Chapter 1 Part 4 of 4 CA M S Mehta, FCA 1 Hardware/Software Deployment Strategies Learning Objectives Task Statements

More information

Hardware. Maintenance

Hardware. Maintenance Government Services available through the portal 1. The scope of the work is limited to the portal and its integration with service provider applications. It doesn't include any work on the service provider

More information

RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh

RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh MAP_IT Madhya Pradesh Agency for Promotion of Information Technology Corrigendum 2 RFP for Case Management & Tracking System for the Office of Advocate General, Madhya Pradesh Sr.No. RFP Reference Existing

More information

State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14

State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14 fcgkj ljdkj lllllljdkj State Health Society, Bihar Pariwar Kalyan Bhawan, Sheikhpura, Patna-14 NOTICE INVITING TENDER From Companies/Agencies for Hiring Four Dedicated Servers (1 Linux Application Server

More information

Corrigendum Document. For. Selection of Agency

Corrigendum Document. For. Selection of Agency Corrigendum Document For Selection of Agency To Establish Comprehensive Call Centre for Department of Health & Family Welfare, Govt. of Himachal Pradesh Mission Director, National Health Mission Department

More information

www.cadline.co.uk www.midastechnology.co.uk Page 1 of 5

www.cadline.co.uk www.midastechnology.co.uk Page 1 of 5 Page 1 of 5 Support Are you confident that you have all eventualities covered and that your current IT support provider can handle all of your issues? Are you frustrated with your application supplier

More information

Invitation for Expression of interest : e-maintenance management system

Invitation for Expression of interest : e-maintenance management system Invitation for Expression of interest : e-maintenance management system Introduction 1. The maintenance responsibility in the IAF spans across a diverse range of aircraft, associated equipment, support

More information

ITFS COMPANY PRESENTATION IT FLOOR SERVICES PRIVATE LIMITED: AN IT INFRASTRUCTURE SOLUTION COMPANY

ITFS COMPANY PRESENTATION IT FLOOR SERVICES PRIVATE LIMITED: AN IT INFRASTRUCTURE SOLUTION COMPANY COMPANY PRESENTATION About IT Floor Services (P) Limited ABOUT IT Floor Services (P) Limited is an IT Infrastructure solution provider company in North India, established at New Delhi. We provide complete,

More information

ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT

ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT OVERVIEW The New Jersey Statewide Voter Registration System (SVRS) was purchased from Covansys, Inc in 2005 based on their ElectioNet application. While the core

More information

RFP DOCUMENT FOR SUPPLY AND INSTALLATION OF BIOMETRIC FACIAL RECOGNITION TIME ATTENDANCE & ACCESS CONTROL SYSTEM FOR

RFP DOCUMENT FOR SUPPLY AND INSTALLATION OF BIOMETRIC FACIAL RECOGNITION TIME ATTENDANCE & ACCESS CONTROL SYSTEM FOR RFP DOCUMENT FOR SUPPLY AND INSTALLATION OF BIOMETRIC FACIAL RECOGNITION TIME ATTENDANCE & ACCESS CONTROL SYSTEM FOR STOCK EXCHANGE BUILDING, 9/F MOTIJHEEL C/A, DHAKA BANGLADESH Phone: 88-02-9564601, 9576210-18,

More information

Managed Services Agreement. Hilliard Office Solutions, Ltd. PO Box 52510 Phone: 432-617-4677 Midland, Texas 79710 Fax: 432-617-3043

Managed Services Agreement. Hilliard Office Solutions, Ltd. PO Box 52510 Phone: 432-617-4677 Midland, Texas 79710 Fax: 432-617-3043 Managed Services Agreement Hilliard Office Solutions, Ltd. PO Box 52510 Phone: 432-617-4677 Midland, Texas 79710 Fax: 432-617-3043 SERVICE DESCRIPTIONS By purchasing these Services from Hilliard Office

More information

Attachment 4-E Service Tier Matrix

Attachment 4-E Service Tier Matrix Attachment to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-003 Between The State of Texas, acting by and through the Texas Department of Information

More information

E f f e c t i v e p r o c e s s - d r i v e n

E f f e c t i v e p r o c e s s - d r i v e n E f f e c t i v e p r o c e s s - d r i v e n S e r v i c e S u p p o r t Frontier Business Systems has over a decade of experience in design, delivery, deployment and support of complex IT infrastructure

More information

MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator

MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator Job Number: 07229P Date Finalized: 7/14/11 Service Department: Information Accountable To: Director, Information

More information

EOI - Empanelment of Vendors for Load Testing. Expression of Interest (EOI) Empanelment of Vendors for Load Testing

EOI - Empanelment of Vendors for Load Testing. Expression of Interest (EOI) Empanelment of Vendors for Load Testing Expression of Interest (EOI) Empanelment of Vendors for Load Testing IDBI Bank proposes to invite response to EOI for the empanelment of vendors for Load Testing of Bank s various applications. The last

More information

JOHNSON COUNTY COMMUNITY COLLEGE 12345 College Blvd., Overland Park, KS 66210 Ph. 913-469-3812 Fax 913-469-4429

JOHNSON COUNTY COMMUNITY COLLEGE 12345 College Blvd., Overland Park, KS 66210 Ph. 913-469-3812 Fax 913-469-4429 JOHNSON COUNTY COMMUNITY COLLEGE 12345 College Blvd., Overland Park, KS 66210 Ph. 913-469-3812 Fax 913-469-4429 ADDENDUM #1 September 21, 2015 REQUEST FOR PROPOSALS #16-033 FOR CLOUD BASED BACKUP & RECOVERY

More information

ERP Infrastructure Guide APPENDIX B

ERP Infrastructure Guide APPENDIX B ERP Infrastructure Guide APPENDIX B for State of Georgia State Road and Tollway Authority 47 Trinity Avenue, SW Atlanta, GA 30334 June 2013 Updated by: Updated on: Description of Update: Revision # DRY

More information

M.Sc. IT Semester III VIRTUALIZATION QUESTION BANK 2014 2015 Unit 1 1. What is virtualization? Explain the five stage virtualization process. 2.

M.Sc. IT Semester III VIRTUALIZATION QUESTION BANK 2014 2015 Unit 1 1. What is virtualization? Explain the five stage virtualization process. 2. M.Sc. IT Semester III VIRTUALIZATION QUESTION BANK 2014 2015 Unit 1 1. What is virtualization? Explain the five stage virtualization process. 2. What are the different types of virtualization? Explain

More information

Hosted SharePoint: Questions every provider should answer

Hosted SharePoint: Questions every provider should answer Hosted SharePoint: Questions every provider should answer Deciding to host your SharePoint environment in the Cloud is a game-changer for your company. The potential savings surrounding your time and money

More information

Q1. Will there be any preference given to firms certified as a small, minority owned business? Specifically, a firm certified in Virginia?

Q1. Will there be any preference given to firms certified as a small, minority owned business? Specifically, a firm certified in Virginia? QUESTIONS AND ANSWERS As of June 20, 2012 BELOW ARE QUESTIONS AND ANSWERS RELATED TO THE REQUEST FOR PROPOSAL Provide Technical Support for PeopleSoft FSCM version 8.4 Q1. Will there be any preference

More information

OBC-IT MSP Corrigendum 5 Form 13: Bill of Material Instructions

OBC-IT MSP Corrigendum 5 Form 13: Bill of Material Instructions OBC-IT MSP Corrigendum 5 Form 13: Bill of Material Instructions S.no Guidelines A Overall 1 All monetary figures are to be quoted in Indian Rupees only. The bidder is expected to quote the costs for all

More information

MSP Service Matrix. Servers

MSP Service Matrix. Servers Servers MSP Service Matrix Microsoft Windows O/S Patching - Patches automatically updated on a regular basis to the customer's servers and desktops. MS Baseline Analyzer and MS WSUS Server used Server

More information

RFP - Equipment for the Replication of Critical Systems at Bank of Mauritius Tower and at Disaster Recovery Site. 06 March 2014

RFP - Equipment for the Replication of Critical Systems at Bank of Mauritius Tower and at Disaster Recovery Site. 06 March 2014 RFP - Equipment for the Replication of Critical Systems at Bank of Mauritius Tower and at Disaster Recovery Site Response to Queries: 06 March 2014 (1) Please specify the number of drives required in the

More information

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 TENDER NOTICE FOR INTERNET CONNECTIVITY

Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 TENDER NOTICE FOR INTERNET CONNECTIVITY Rajya Sabha Secretariat Rajya Sabha Television 12 A, Gurudwara Rakab Ganj Road, New Delhi 110001 No. RSTV/TKSA/Technical/2014 Admn 07 April, 2014 TENDER NOTICE FOR INTERNET CONNECTIVITY Sealed tenders

More information

Request for Information (RFI) for Managed Hosting Service

Request for Information (RFI) for Managed Hosting Service FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS ORGANISATION DES NATIONS UNIES POUR L ALIMENTATION ET L AGRICULTURE ORGANIZACION DE LAS NACIONES UNIDAS PARA LA AGRICULTURA Y LA ALIMENTACION Viale

More information

Disaster Recovery Hosting Provider Selection Criteria

Disaster Recovery Hosting Provider Selection Criteria Disaster Recovery Hosting Provider Selection Criteria By, Solution Director 6/18/07 As more and more companies choose to use Disaster Recovery (DR), services the questions that keep coming up are What

More information

Request For Proposal (RFP) for Empanelment of IT Consultants for Bank

Request For Proposal (RFP) for Empanelment of IT Consultants for Bank RFP Reference No : OBC/HO/DIT/RFP-CONS/03 / 2010-11 Request For Proposal (RFP) for Empanelment of IT Consultants for Bank Oriental Bank of Commerce Department of Information Technology Head Office New

More information

COM(106)/AMC-Server/50/2011/NCRB Government of India Ministry of Home Affairs National Crime Records Bureau. Limited Tender Notice

COM(106)/AMC-Server/50/2011/NCRB Government of India Ministry of Home Affairs National Crime Records Bureau. Limited Tender Notice Limited Tender Notice Date: 24/04/202 Sealed quotations are invited from reputed vendors for Comprehensive Annual Maintenance Contract (CAMC) of high-end server machines and local area network along with

More information

National Aluminium Co. Ltd.

National Aluminium Co. Ltd. National Aluminium Co. Ltd. [NALCO] EXPRESSION OF INTEREST FOR DATA CENTRE CO-LOCATION SERVICES Address for Communication The Project Manager ERP P/1, NALCO BHAWAN NAYAPALLI, BHUBANESWAR 751061 E mail:

More information

Solutions as a Service N.Konstantinidis Technical Director - MNG

Solutions as a Service N.Konstantinidis Technical Director - MNG Med Nautilus Greece Connected World April 10, 2014 Solutions as a Service N.Konstantinidis Technical Director - MNG MedNautilus Greece Solutions as a Service 2014 SINCE 2002 Data Center Physical Colocation

More information

Information Services hosted services and costs

Information Services hosted services and costs Information Services hosted services and costs 1. Overview Information Services (I.S.) has provided a popular hosting service for specialized departmental servers for many years. Servers hosted by I.S.

More information

Position 1: Service Delivery Manager IT Infrastructure. Area: Information Technology - Infrastructure. Location: Mumbai. Qualification & Experience:

Position 1: Service Delivery Manager IT Infrastructure. Area: Information Technology - Infrastructure. Location: Mumbai. Qualification & Experience: Position 1: Service Delivery Manager IT Infrastructure Area: Information Technology - Infrastructure 1. Engineer / Masters/PG in Computer Applications 2. 6-10 years of experience in Customer Service Management

More information

Remote Infrastructure Support Services & Managed IT Services

Remote Infrastructure Support Services & Managed IT Services Remote Infrastructure Support Services & Managed IT Services Remote Desktop Services are designed to optimize the customers IT resource utilization and provide a standardized end-user environment. The

More information

ADDENDUM 2 TO APPENDIX 1 TO SCHEDULE 3.3

ADDENDUM 2 TO APPENDIX 1 TO SCHEDULE 3.3 ADDENDUM 2 TO APPENDIX 1 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT Overview EXHIBIT E to Amendment No. 60 The Disaster Recovery (DR) Services, a Tier-Level DR Solution, addresses the

More information

Please share the EoI in the format provided in Annexure I of this document Applications not submitted in the prescribed format will not be considered.

Please share the EoI in the format provided in Annexure I of this document Applications not submitted in the prescribed format will not be considered. NATIONAL RURAL LIVELIHOODS PROJECT (NRLP) Ministry of Rural Development, Government of India 6 th Floor, Hotel Samrat, Chanakya Puri, New Delhi. India Letter for Expression of Interest Please share the

More information

TENDER FOR. Supply, Installation, Commissioning and Maintenance of 04 Mbps Internet Leased Line at NSIC Head Office, Okhla, New Delhi for One Year.

TENDER FOR. Supply, Installation, Commissioning and Maintenance of 04 Mbps Internet Leased Line at NSIC Head Office, Okhla, New Delhi for One Year. TENDER FOR Supply, Installation, Commissioning and Maintenance of 04 Mbps Internet Leased Line at NSIC Head Office, Okhla, New Delhi for One Year. Tender Inquiry No. NSIC/HO/TISDC/05 National Small Industries

More information

Government of Himachal Pradesh Transport Department Shimla

Government of Himachal Pradesh Transport Department Shimla Government of Himachal Pradesh Transport Department Shimla Pre-Qualification of Consultants / Architects for the Construction of I&C Building and Infrastructure for Baddi at Himachal Pradesh On behalf

More information

Empanelment of Vendors for Load Testing

Empanelment of Vendors for Load Testing Expression of Interest (EOI) Empanelment of Vendors for Load Testing IDBI Bank proposes to invite response to EOI for the empanelment of vendors for Load Testing of Bank s various applications. The last

More information

Addendum 03. This is the Final Extension in response and due to the above received request:

Addendum 03. This is the Final Extension in response and due to the above received request: RFP 13-44 Questions 05-29-2013: Can the due date be extended 1 week? There is very little time between posting of answers and the proposal due date. We want to be sure we have sufficient time to prepare

More information

City of Coral Gables

City of Coral Gables City of Coral Gables Information Technology Department IT TECHNICAL SUPPORT DIVISION Infrastructure Upgrade Plan Systems, Applications, Network, and Telecommunications Infrastructure OVERVIEW Last revision:

More information

STATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK. System Center Configuration Manager.

STATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK. System Center Configuration Manager. STATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK System Center Configuration Manager Statement of Work June 19, 2015 1.0 INTRODUCTION The purpose of this document is to

More information

Enterprise Cloud Services HOSTED PRIVATE CLOUD

Enterprise Cloud Services HOSTED PRIVATE CLOUD Enterprise Cloud Services HOSTED PRIVATE CLOUD Delivering Business Value From DataCenter & Cloud Technologies Redefine Your Business Introduction Driven by a team with over 100 years of combined experience

More information

Managed Services. Business Intelligence Solutions

Managed Services. Business Intelligence Solutions Managed Services Business Intelligence Solutions Business Intelligence Solutions provides an array of strategic technology services for life science companies and healthcare providers. Our Managed Services

More information

Department of the Taoiseach

Department of the Taoiseach Department of the Taoiseach REQUEST FOR TENDER FOR WINDOWS SUPPORT August 2005 Date of issue: 5 August 2005 Date for submission: 26 August 2005 Section I Invitation to Tender 1. The Department of the Taoiseach

More information

SAN TECHNICAL - DETAILS/ SPECIFICATIONS

SAN TECHNICAL - DETAILS/ SPECIFICATIONS SAN TECHNICAL - DETAILS/ SPECIFICATIONS Technical Details / Specifications for 25 -TB Usable capacity SAN Solution Item 1) SAN STORAGE HARDWARE : One No. S.N. Features Description Technical Compliance

More information

Network Router Monitoring & Management Services

Network Router Monitoring & Management Services Network Router Monitoring & Management Services Get different parameters of routers monitored and managed, and protect your business from planned and unplanned downtime. SERVICE DEFINITION: NETWORK ROUTER

More information

Request for Proposal to

Request for Proposal to Request for Proposal to ( 2016 /ح ك/ 3 ) No. Tender General Response for All Raised Questions Taking into consideration the requirements outlined in the RFP and this Q&A document, bidders need to respond

More information

INDUSTRIAL TRAINING DEPARTMENT, HARYANA

INDUSTRIAL TRAINING DEPARTMENT, HARYANA INDUSTRIAL TRAINING DEPARTMENT, HARYANA 30- BAYS BUILDING, SECTOR -17, CHANDIGARH EXPRESSION OF INTEREST TO CONDUCT ONLINE ADMISSION FOR SESSION 2016 IN ALL GOVT. & PVT. ITIs Introduction: The Department

More information

Introduction. Vision & Mission. Environmental Overview

Introduction. Vision & Mission. Environmental Overview Wizertech Informatics (P) Ltd A true IT Services Company Data Centre Services Profile 1 Wizertech Informatics P Ltd 162/C/529, Lake Gardens Kolkata 700 032 West Bengal +t 033 2422 2503/04 Introduction

More information

Tecknodreams Software Consulting Pvt. Ltd. Managing IT Services in an Insurance Company

Tecknodreams Software Consulting Pvt. Ltd. Managing IT Services in an Insurance Company Tecknodreams Software Consulting Pvt. Ltd. Managing IT Services in an Insurance Company Company Profile This Insurance Company is a specialist in Health Insurance and provides quality service at the best

More information

Secure, Compliant and Flexible Cloud Services

Secure, Compliant and Flexible Cloud Services www.ricohidc.com Secure, Compliant and Flexible Cloud Services Key to continuous success is EVOLUTION RICOH CLOUD SERVICES - Next Generation Cloud Services Our ISO 27001 certified datacenters provide wide

More information

How Modernizing Backup and Recovery Helped the Housing Authority of the Cherokee Nation. Tonia Williams Housing Authority of the Cherokee Nation

How Modernizing Backup and Recovery Helped the Housing Authority of the Cherokee Nation. Tonia Williams Housing Authority of the Cherokee Nation How Modernizing Backup and Recovery Helped the Housing Authority of the Cherokee Nation Rebuild PRESENTATION its IT TITLE Infrastructure GOES HERE Tonia Williams Housing Authority of the Cherokee Nation

More information

Questions and Answers, PA0950243, Web Hosting and Data Analysis

Questions and Answers, PA0950243, Web Hosting and Data Analysis Questions and Answers, PA0950243, Web Hosting and Data Analysis Question #1: 5.1.4 Key areas of technical expertise: 1) Microsoft Structured Query Language (SQL) Server 2003 Management & Support: There

More information

Request for Proposal MDM0031012338. Offeror s Questions for RFP for Virtual Private Network Solution (VPN)

Request for Proposal MDM0031012338. Offeror s Questions for RFP for Virtual Private Network Solution (VPN) Request for Proposal MDM0031012338 Offeror s Questions for RFP for Virtual Private Network Solution (VPN) 1. How much throughput must the VPN support long-term? Answer: 10 GB firewall, 4 GB 3DES/AES VPN

More information

Your Infrastructure. Our Responsibility.

Your Infrastructure. Our Responsibility. Know Us The SRM group is four decades old multi-million dollar business house currently operational in 15 cities worldwide. SRM group has made its presence felt in education, training, Electronics, Technology,

More information

ACME Enterprises IT Infrastructure Assessment

ACME Enterprises IT Infrastructure Assessment Prepared for ACME Enterprises March 25, 2014 Table of Contents Executive Summary...2 Introduction...2 Background...2 Scope of IT Assessment...2 Findings...2 Detailed Findings for Key Areas Reviewed...3

More information

Partnership to Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program. Centralised Monitoring Centre.

Partnership to Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program. Centralised Monitoring Centre. Partnership to Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program Centralised Monitoring Centre February 18, 2015 Presentation Overview 1. Setting the Context for Centralised Monitoring

More information

Karen Winter Service Manager Schools and Traded Services 01823 355267 KWinter@somerset.gov.uk

Karen Winter Service Manager Schools and Traded Services 01823 355267 KWinter@somerset.gov.uk Somerset Services to Education Providers 2014-2015 SOUTHWEST ONE TECHNOLOGY SERVICES Service Provider: Southwest One Service Category: Academy Schools - Chargeable Contact: Karen Winter Service Manager

More information

Support Services for Bespoke Online Software for Environmental Business Support. Contract Ref: T16033. Document F Questions and Answers

Support Services for Bespoke Online Software for Environmental Business Support. Contract Ref: T16033. Document F Questions and Answers Support Services for Bespoke Online Software for Environmental Business Support Contract Ref: T16033 Document F Questions and Answers 1. How often will the Questions and Answers Document be updated? Answer:

More information

The Ultimate Business & Enterprise Hosting Solutions. www.radonhosting.com

The Ultimate Business & Enterprise Hosting Solutions. www.radonhosting.com The Ultimate Business & Enterprise Hosting Solutions Radon is for businesses that demand high performance, versatile and scalable solutions. From hosting your Website, Email, Voice, SMS and Business Applications,

More information

JAWAHARLAL NEHRU UNIVERSITY

JAWAHARLAL NEHRU UNIVERSITY School of Biotechnology JAWAHARLAL NEHRU UNIVERSITY New Delhi 110 067 Tender No. JNU/SBT/DBT-BUILDER/Data Centre/2015-16 Sealed Quotation for the establishment of a Data Centre for High-End Computational

More information

Documentation for data centre migrations

Documentation for data centre migrations Documentation for data centre migrations Data centre migrations are part of the normal life cycle of a typical enterprise. As organisations expand, many reach a point where maintaining multiple, distributed

More information

MCSE 5053/5054 - Designing a Messaging Infrastructure and High Availability Messaging Solution Using Microsoft Exchange Server 2007

MCSE 5053/5054 - Designing a Messaging Infrastructure and High Availability Messaging Solution Using Microsoft Exchange Server 2007 MCSE 5053/5054 - Designing a Messaging Infrastructure and High Availability Messaging Solution Using Microsoft Exchange Server 2007 Duration: 5 Days Course Price: $2,975 Software Assurance Eligible Course

More information

To follow are answers to questions submitted regarding the Request for Proposals (RFP) Packet distributed on Friday, March 6, 2015.

To follow are answers to questions submitted regarding the Request for Proposals (RFP) Packet distributed on Friday, March 6, 2015. Request for Proposals Website Services and Hosting for Drupal Sites Response to Questions To follow are answers to questions submitted regarding the Request for Proposals (RFP) Packet distributed on Friday,

More information

Managed Hosting is a managed service provided by MN.IT. It is structured to help customers meet:

Managed Hosting is a managed service provided by MN.IT. It is structured to help customers meet: Managed Hosting Service Description Version 1.10 Effective Date: 3/3/2015 Purpose This Service Description is applicable to Managed Hosting services (MH) offered by MN.IT Services (MN.IT) and described

More information

Is Cloud-Based WMS an Option for Complex Distribution Centers?

Is Cloud-Based WMS an Option for Complex Distribution Centers? Welcome to Session 233 Is Cloud-Based WMS an Option for Complex Distribution Centers? Presented by: Sponsored by: Chuck Fuerst 2012 Material Handling Industry. Copyright claimed as to audiovisual works

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Department of Mechanical Engineering

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Department of Mechanical Engineering INDIAN INSTITUTE OF TECHNOLOGY KANPUR Department of Mechanical Engineering Enquiry No: Enq/IITK/ME/JB/02 Enquiry Date: 14/12/15 Last Date of Submission: 21/12/15 Formal quotations are invited for HPC cluster.

More information

Rastriya Beema Company Ltd Ramshahpath, Kathmandu. Terms of Reference For Development & Implementation of Integrated Software System

Rastriya Beema Company Ltd Ramshahpath, Kathmandu. Terms of Reference For Development & Implementation of Integrated Software System Rastriya Beema Company Ltd Ramshahpath, Kathmandu Terms of Reference For Development & Implementation of Integrated Software System 1. Background In this age of information and technology, the importance

More information

Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher

Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher ERP Implementation Update Implementation Overview High Level Project Plan Monthly Milestones July Activities

More information

IT Labor (Hourly Billable) Data Base Hosting

IT Labor (Hourly Billable) Data Base Hosting Cost Pool Definitions for Information Technology (IT) Services FY16/17 (Effective July 1, 2015) IT Labor (Hourly Billable) B/A 1365 - Programmer/Developer: EITS provides a variety of software development

More information

2012 Countywide IT Environment Questionnaire

2012 Countywide IT Environment Questionnaire 2012 Countywide IT Environment Questionnaire Unless otherwise specified, please answer questions with data as of January 23, 2012. Respondent Information Department Name: Name of the person completing

More information

Cloud Computing Disaster Recovery (DR)

Cloud Computing Disaster Recovery (DR) Cloud Computing Disaster Recovery (DR) Dr. Sanjay P. Ahuja, Ph.D. 2010-14 FIS Distinguished Professor of Computer Science School of Computing, UNF Need for Disaster Recovery (DR) What happens when you

More information

This is an RFI and not a RFQ or ITN. Information gathered will lead to possible RFQ/ITN. This is a general RFI for all proposed solutions.

This is an RFI and not a RFQ or ITN. Information gathered will lead to possible RFQ/ITN. This is a general RFI for all proposed solutions. Item Number 1 2 Vendor Question Are you already requesting this information from the manufactures directly? What if one manufacture can do some of what you need, and another can do the other part of what

More information

Virtualization s Evolution

Virtualization s Evolution Virtualization s Evolution Expect more from your IT solutions. Virtualization s Evolution In 2009, most Quebec businesses no longer question the relevancy of virtualizing their infrastructure. Rather,

More information

What is the count of the Google Mail and Office365 mailboxes that LIC would like to include in the sizing?

What is the count of the Google Mail and Office365 mailboxes that LIC would like to include in the sizing? LIC of India,Central Office,IT dept, 2 nd flr,jeevan Seva Annexe,Santacruz W,Mumbai 400054 date 26/12/2014 Request for Expression of Interest for Email Archival dated 12.12.2014 Tender Enquiry No :CO/IT-BPR/CMS/RFP/2014-15/02

More information

NOS for Network Support (903)

NOS for Network Support (903) NOS for Network Support (903) November 2014 V1.1 NOS Reference ESKITP903301 ESKITP903401 ESKITP903501 ESKITP903601 NOS Title Assist with Installation, Implementation and Handover of Network Infrastructure

More information

Client Hardware and Infrastructure Suggested Best Practices

Client Hardware and Infrastructure Suggested Best Practices Client Hardware and Infrastructure Suggested Best Practices While it is the responsibility of our Clients to support their hardware and infrastructure, the Pretty Good Practices below are provided for

More information