1 APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand (Category- B2) Applicant M/s G. D. Stone Company (Prop.: Shri Ghanshyam Dokania) At.: Sabjimandi Road Barharwa, P.O. & P.S.: Barharwa Sahibganj Jharkhand Crystal Consultants At: Kshitij, Kashyap Vihar Ranchi , Jharkhand October, 2015

2 CONTENTS Sl.. Details 1. Form-I 2. Appendix- I (Certified by Project Proponent) 3. Appendix- II (Environmental Management Scheme) 4. Pre-Feasibility Report 5. DMO Report regarding Contiguous Mining 6. C.O. Report 7. DFO Report 8. Gram Sabha Consent Paper 9. Production Details 10. Consent to Operate by JSPCB 11. Approved Mine Plan

3 (I) Sl.. Basic Information Item APPENDIX I (See paragraph 6) FORM -1 Details 1. Name of the projects Telo Stone Mine (M/s G. D. Stone Company) 2. Sl.. in the schedule 1(a) 3. Proposed capacity/ area/ length/ tonnage to be 800 T/Day, Lease Area: 3.49 ha (8.62 Ac) handled/ command area/lease area/ number of wells to be drilled 4. New/ Expansion/ Modernization Renewal of Lease (Due on ) 5. Existing Capacity/ Area etc CFT/ Day, Area ha (8.62 Ac) 6. Category of Project i.e A or B B2 7. Does it attract the general condition? If yes, please specify 8. Does it attract the specific condition? If yes, please specify 9. Location Mauza: Telo 24 o N to N 87 o E to E Plot/ Survey/ Khesara./ Mauza Khata. Plot. Telo & 36 (P) (P) (P) & 29 (P) Village Telo Tehsil Pathna District Sahibganj State Jharkhand 10. Nearest railway station/ air port along with distance in kms. Barharwa Railway Station : 6 km Kolkata Airport : 300 kms 11. Nearest town, city, district headquarters along Barharwa Town (5 km) with distance in kms. 12. Village Panchayats, Zila Parisad, Municipal Dharampur Panchayat, Sahibganj, Jharkhand Corporation, Local body (complete postal addresses with telephone nos. to be given 13. Name of the applicant Shri Ghanshyam Dokania (Prop: M/s G. D. Stone Company) 14. Registered address At.: Sabjimandi Road Barharwa, P.O. & P.S.: Barharwa, Sahibganj , Jharkhand 15. Address for correspondence: Name Shri Ghanshyam Dokania Designation (Owner/ Partner/ CEO) Address (Proprietor: M/s G. D. Stone Company) At.: Sabjimandi Road Barharwa, P.O. & P.S.: Barharwa, Sahibganj , Jharkhand Pin Code Ashok.bhw14355@gmail.com, Glrc95@gmail.com Telephone , Fax Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. (As it is a site specific) 17. Interlinked Projects 18. Whether separate application of interlinked N/A project has been submitted? 19. If yes, date of submission N/A

4 20. If no, reason N/A 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. tification, 1991? 22. Whether there is any Government Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) 24. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) Case. (c) Orders/ directions of the Court, if any and its relevance with the proposed project (II) Sl.. Activity Govt. of Jharkhand has asked for environment clearance vide letter no. 3844/M dated Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information / Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/N o Yes Details thereof (with approximate quantities / rates, wherever possible) with source of information data The project requires 3.49 ha of land for mining of stone. This is presently an existing mine. The degraded land will be reclaimed as per approved mine closure plan at the end of mining operation There is growth of shrubs/ bush in lease area. There is no tree in lease area. Mining and allied activities will be preceded by clearance of site. However no tree will be cut without due permission from competent authority. Lease area does not fall in notified forest. There is no building within lease area. 1.3 Creation of new land uses? Yes At the end of mining operation, lease area will be reclaimed as per approved mine closure plan, keeping in view the ecological consideration and societal need. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geological formation within the lease area has been studied for estimation of mineral resource & mine planning. 1.5 Construction works? Yes Mine office, rest shelter, internal and access road has been constructed. 1.6 Demolition works? demolition work is involved. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthwork; including linear structures, cut and fill or excavations Yes There is no need for providing temporary site for mine worker as they all are locals. hutment for construction work within lease area. Above ground buildings- limited to office and rest shelter, haul road. Excavation- This is an opencast mine for mining of stone. underground mining or tunnelling is involved. 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? Yes At the end of mining operation, the mine pit and OB dump would be reclaimed as per

5 approved mine closure plan Dredging? dredging work is involved Offshore structures? This is an inland project. offshore construction involved Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Yes The project under consideration is opencast mine to mine stone. Stone is to be mined by blasting using explosives. Blasted stone will be loaded into trucks/ tractors for transport. A small store has been provided to store mining tools and tackles. Solid waste disposal- Overburden material removed will be stored in OB dump area. other solid waste will be generated in course of mining operation. Liquid effluent- Mine water collected (during monsoon) in the mine pit will be pumped out and treated in sedimentation pond Facilities for long terms housing of operation workers? Since all workers are local, no housing facilities needed New road, rail or sea traffic during construction or operation? Only a small stretch of access road is to be provided New road, rail air waterborne or other new transport infrastructure to be transport infrastructure including new or provided. Existing infrastructure is to be used. altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport Project does not involve closure or diversion routes or infrastructure leading to of transport network. changes in traffic movements? 1.20 New or diverted transmission lines or pipeline? Project does not involve diversion of pipe line or transmission line Impoundment, damming, culverting Mining and allied activities are not to affect realignment or other changes to the hydrology of watercourses or aquifers? hydrological regime in the area by way of damming, diversion etc Stream crossings? stream crossing Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? Lease area is a very small (3.49 Ha). Mining and allied activities are not to alter drainage 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? Ongoing activity during decommissioning 1.27 which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Yes pattern in the area. Mined out stone will be transported to customers by road. Local man power will be deployed hence transport of workmen not involved. At the end of mining operation, the mine will be closed as per mine closure plan which is a short term activity. Yes Decommissioning activities involved with mine closure plan will improve environment and ecological balance in the area. All mine workers will be local. There will be no influx of people to the area Introduction of alien species? Only native species of plants will be used for 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? green belt and bio reclamation.

6 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or especially any resources which are non-renewable or in short supply) : Sl.. Information / Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes About 3.49 ha of barren land will be used for agricultural land (ha) 2.2 Water (expected source & competing users) unit KLD Yes 2.3 Mineral (MT) 2.4 Construction material stone, aggregates, and/soil (expected source MT) mining and allied activities. Potable 2 KLD, dust suppression 10 KLD, green belt 2.0 KLD Total- 14 KLD. Source bore well/ closed mine pit water located about 1 km from lease area. Construction is limited to two small building needing small quantity of stone chips, brick and sand which are locally available in abundance. 2.5 Forests and timber (source MT) forest or timber to be used. 2.6 Energy including electricity and fuels (source, competing users) Unit : fuel (MT), energy (MW) Yes 2.7 Any other natural resource (use appropriate standard units) Sl.. Power is needed to operate portable drill machine. For this purpose a DG set has been installed. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Information / Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne disease) 3.3 Affect the welfare of people e.g. by changing living conditions? Yes/N o Yes Yes 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes Details thereof (with approximate quantities / rates, wherever possible) with source of information data For blasting, explosives will be used. Blasting will be carried out by valid license holding blasters only. The project operation will create new source of income generation and also CSR activities will improve social profile of the area. Activities related to project construction and operation is confined to lease area. Site is away from schools and hospitals. 4. Production of solid wastes during construction or operation or decommission (MT/month) Sl. Information / Checklist confirmation Yes/ Details thereof (with approximate quantities /. rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes The mined off topsoil/ob will be stored in OB dump yard and will be utilized for reclamation 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous work and dressing of haul roads. township is proposed for project. Hence no municipal solid waste will be generated. solid waste containing hazardous waste will be generated. Waste Management Rules) 4.4 Other industrial process wastes other industrial process is involved. 4.5 Surplus product All mineral mined from project would be sold. 4.6 Sewage sludge or other sludge from effluent treatment Yes Sewage will be generated only from rest shelter which will be treated & disposed off in septic

7 tank- cess pool. 4.7 Construction or demolition wastes construction waste will be generated. 4.8 Redundant machinery or equipment At the end of project all machineries will be moved away from site. 4.9 Contaminated soils or other materials contaminated soil will be generated Agricultural wastes agricultural waste will be generated Other solid wastes other solid waste will be generated. Sl.. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Information / Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Due to operation and movement of vehicles, marginal emissions of NOx & SO 2 will be there; NOx emission g/day (100 lits. of diesel) SO 2 emission g/day 5.2 Emissions from production processes Yes Dust will be produced due to drilling, blasting and handling/ transporting of blasted materials which will be minimised by water sprinkling Dust emission rate from blasting: 0.22kg/blast/100m Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Due to operation and movement of vehicles, marginal emissions of NOx & SO 2 will be there; NOx emission g/day SO 2 emission g/day Dust emission rate from; Transportation: 5.08 gm/vkt Loading: 580 gm/t (Source: USEPA/AP-42) Construction activities are very small limited to construction of two small rooms. Dust generation from this source will be for a short duration. odour to be generated. 5.6 Emissions from incineration of waste incineration of waste is involved. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction details) Covers in Sl above. 5.8 Emissions from any other sources Sl.. 6. Generation of ise and Vibration, and Emissions of Light and Heat : Information / Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes ise will be generated from following sources; Drilling of blast holes, blasting, transport of stone by trucks and operation of DG set. ise level range from 70 to 120 db. 6.2 From industrial or similar processes Yes Covers in Sl From construction or demolition construction equipments are to be used. 6.4 From blasting or piling Yes Due to blasting 120 db(a) 6.5 From construction or operational traffic Yes Transporting trucks will generate noise (70 to 100 db (A). 6.6 From lighting or cooling systems Lighting or cooling equipment will not be provided. 6.7 From any other sources

8 Sl.. 7. Risks of contamination of land or water from release of pollutants into the ground or into sewers, surface waters, groundwater, coastal water or the sea : Information / Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Sl.. During monsoon surface runoff flowing through degraded area will carry suspended solids. Only source of liquid effluent is mine water. The mine water is to be treated in sedimentation pond before discharged. Sewage generation from rest area to be treated in septic tank. Dust will be generated on account of drilling, blasting and transport of minerals. These dusts are mostly inert inorganic substance. It is proposed to take appropriate dust control measures. A part of this dust will settle on land and water surface. There is no risk of long term buildup of pollutants in the area. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Information / Checklist confirmation Yes/. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling use or production of hazardous substances. All preventive and safety rules prescribed by DGMS will be followed. 8.2 From any other causes Road accident may occur due to movement of transport trucks. 8.3 Could the project be affected by natural disasters Project is not likely to be affected by flood or earthquake. The site is located in Earthquake Zone- III. Sl.. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or potential for cumulative impacts with other existing or planned activities in the locality Information / Checklist confirmation Yes/ Details thereof (with approximate quantities / rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g. : a. Supporting infrastructure (roads, power supply, waste or waste water treatment, e.g.) b. Housing development c. Extractive industries d. Supply industries e. Other 9.2 Lead to after-use of the site, which could have an impact on the environment The project is not to develop ancillary development or infrastructure that could affect local infrastructure, housing development etc. The pit will be converted into water body which could be used for fisheries & ground water recharge.

9 9.3 Set a precedent for later developments Project is not likely to be affected by flood or earthquake. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects This project is located in isolated area. There is no other industry in vicinity. (III) Sl.. Environmental Sensitivity Information / Checklist confirmation Yes/. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountain forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging resting, over wintering, migration. 4 Inland, coastal, marine or underground waters Yes There is no area protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. I) There is no wetland in study area. II) List of Water courses/ water body: WATERBODIES Name Distance Direction Gumani River 2.0 km West III) Coastal Zone -300 km away IV) There is no notified biosphere in study area. Such area does not exist within 5 km study area. Inland Gumani River flows within 2.0 km. Coastal Underground Waters Ground Water table varies from 3.45m to 14.86m bgl. 5 State, National boundaries State Boundary 20 km (approx) Jharkhand West Bengal National Boundary More than 50km away. 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas routes or facilities used by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations defence installations within study area. 8 Densely populated or built-up area densely populated or built-up area except Barharwa (about 5km) an urban-rural area. 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Primary School Sitapahar (1.5 km) Primary Health Centre Sitapahar (2 km) High School 5 km (Barharwa) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standard are exceeded) areas containing important, high quality or scarce resources. notified areas already subjected to pollution or environmental damage in the study area.

10 12 Areas susceptible to natural hazard which could cause the project to present environmental problems. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) areas susceptible to natural hazard which could cause the project to present environmental problems. As it lies in Earthquake Zone : Zone 3 effect from other natural calamities including flood or cyclones. I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date : Ranchi Place : (Shri Ghanshyam Dokania) For M/s G. D. Stone Company Proprietor te: 1. The projects involving clearance under coastal Regulation zone tification, 1991 shall submit with the application a C.R.Z. map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of ToR) and the recommendations of the State coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R,Z tification, 1991 for the activities to be located in the C.R.Z. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory corridors of wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/ Environment Clearance subsequent clarifications as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

11 APPENDIX- II ENVIRONMENT MANAGEMENT SCHEME 1. Name and address of Lease Holder. Sri Ghanshyam Dokania (Proprietor M/s G. D. Stone Company), resident of Sabjimandi Road Barharwa, P.O. & P.S.: Barharwa, District: Sahibganj , Jharkhand. 2. Features of Lease. I. Date of execution of previous lease : (For 5 years) II. Date of renewal of lease : (2 nd renewal) III. Boundary of Lease Area; rth : Plot. 36(P), 26 & 25 South : Plot. 34 & 37 East : Plot. 22, 23, 40, 39, 34 & 35 West : Plot. 26, 27, 28, 29(P), 30 & 31 IV. Mineral : Stone V. Khesra. : Plot. 24, 36 (P), 27 (P), 28 (P) & 29 (P). VI. Mauza : Telo VII. Panchayat & Tehsil : Panchayat: Dharampur, Tahsil: Pathna. VIII. District : Sahibganj IX. Whether the land is ST or not, if yes, whether permission has been taken? Give details : Yes X. Whether the lease is within outside provision of CNT Act. If not whether permission has been taken : Yes. 3. Specification of Equipments to be used Loader/ Back hoe (0.8 m 3 bucket cap) Backhoe Attachment (0.5 m 3 ) Tippers Truck (10 T) Dumper (20t cap) Wagon Drill ( mm dia) Jack Hammer Drill (34-38mm dia) Compressor (100 cfm/min cap) Compressor (600 cfm/min cap) Rock Breaker Water Tanker with Sprinkler (13000L) Portable Pump (10/15 HP) : 2 nos. : 1 no. : 4 nos. : 2 nos. : 1 no. : 4 nos. : 3 nos. : 1 no. : 1 no. : 1 no. : 2 nos. 4. Map of Region showing all pits already created and details within 1km from the lease boundary: Study area map covering 1km and 5 Km enclosed. 5. Description of all excavation works done till now: Mining operation has covered 0.61 ha of land. 6. Scheme for plantation: Plantation is to be done at following locations; I. Along periphery of lease area. 7.5m wide comprising of 3 rows of trees. Species Native species, evergreen and fast growing II. Plantation along both sides of transport road. 7. Scheme for concurrent rehabilitation & reclamation of degraded Land: Land is to be degraded on account of opencast mining and external dumping of mine waste. Since, during the current lease period, no such void is to be created where mineral resource has exhausted, pits can t be backfilled. It is proposed to reclaim the external dumps biologically. 1 of 2

12 8. Air & Water Pollution Control Scheme: a. Air Pollution Control Following air pollution control measures will be implemented; I. Regular Water Sprinkling within lease area. II. Use of optimal quantity of explosives to minimize generation of dust during blasting. III. Regular maintenance of transport road. IV. Metalling of transport road outside lease area. V. Green belt along both sides of transport road. b. Water Pollution Control Following water pollution control measures are proposed; I. Provision of Garland Drain on edge of quarry to channelize water away from quarry to natural drains. II. Provision of Sedimentation Tank for treatment of mine water. 9. Any other matter that Leaseholder wants to present: Storage and use of top soil removed owing mining operation: - The overlying strata comprise of mostly soil mixed with very small sized pebbles. On an average the OB cover can be taken as 2m. During the earlier phase of mining, the quantity of overburdens removed has been used for road stabilization. During the next 5 years period, the quantity of overburden to be removed in each year has been estimated as per the mine working plans. The cumulative quantity of overburden expected to be removed, handled and dumped will be 55,314 m 3 which will be stored in OB dump area to backfilled the exhausted quarry. 11. Programme for Economic & Social Development of Area Around Project: Following provisions have been made for socio-economic development of the surrounding area; I. Financial grant to local school for repair & upkeep of school building and purchase of furniture. II. Digging of two open dug well in village in consultation with Panchayat. III. Maintenance of water sources in Telo village. 12. Budget for Environment Management Capital Budget i. Water sprinkler lacs ii. Green belt (1.01 ha, 1010 trees) lacs iii. Maintenance of Road lacs iv. Sedimentation Tank/RWH lacs v. Garland Drain lacs vi. Septic Tank lacs. vii. Environmental Monitoring lacs Total: lacs 2 of 2

13 PLATE- 1 Lease Area Map

14 PLATE- 2 Index Map Showing project Location

15 PLATE- 3 Study Area Map (5 KM Radius)

16 PRE - FEASIBILITY REPORT FOR THE GRANT OF ENVIRONMENT CLEARANCE Of TELO STONE MINE (LEASE AREA HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand Applicant M/s G. D. Stone Company (Prop.: Shri Ghanshyam Dokania) At.: Sabjimandi Road Barharwa, P.O. & P.S.: Barharwa Sahibganj Jharkhand PREPARED BY CRYSTAL CONSULTANTS AT: KSHITIJ, KASHYAP VIHAR RANCHI , JHARKHAND

17 CONTENTS CHAPTER DESCRIPTION PAGE 01 EXECUTIVE SUMMARY 01 to INTRODUCTION TO PROJECT 02 to PROJECT DESCRIPTION 04 to SITE ANALYSIS 09 to PLANNING BRIEF 11 to PROPOSED INFRASTRUCTURE 13 to REHABILITATION & RESETTLEMENT (R & R) 15 to 15 PLAN 08 PROJECT SCHEDULE & COST ESTIMATES 16 to ANALYSIS OF PROPOSAL 17 to 17

18 CHAPTER - I EXECUTIVE SUMMARY 1. The proposal relates to grant of Environmental Clearance for renewal of lease of an open cast stone mine with enhanced capacity. 2. The lease holder/ project proponent is Shri Ghanshyam Dokania (Prop. of M/s G. D. Stone Company) and owner of Telo Stone Mine. 3. The Mine is located in Village Telo, P.O.: Pathna, P.S.: Ranga, Dist. Sahibganj, Jharkhand. 4. The Lease Area is 3.49 ha (8.62 Ac). 5. Mine has valid CTO from JSPCB having production capacity of 1800 CFT/day and past production is within the limit of CTO. violation. 6. The proposed capacity of mine is 800 TPD of Stone Boulders. Life of mine is 5 years. 7. Total project cost is Rupees 19,25,000/- (Rupees nineteen lakhs twenty five thousand only). 8. First mining lease was granted in favour of M/s G. D. Stone Company on for ten years i.e. up to Proponent wish to get EC with enhanced capacity to renew the mining lease. It will be 2 nd renewal. 10. The hilly deposit is covered by overburden of about 2m height on an average. 11. Soft overburden is being removed to expose the stone. For removal of hard rock, drilling and blasting is being used. Same technique will be used in future. 12. Stone is being mined by developing benches. Bench height is limited to 6 m and width as 6 m. 13. The mine site is connected to Barharwa Berhait State Highway (5 km from Barharwa). Mine access road is 0.4 km long. 14. Water demand for potable purpose (2 KLD), dust suppression (10 KLD) and green belt (2 KLD) will be met by a bore well and closed mine pit water located near lease area. 15. Electricity connection has not been taken. However a DG set is available to meet the energy requirement. 16. The boulder, mined from the quarry will be crushed to required size by crusher located within the lease area. 17. Sized stone chips are transported by trucks/ tippers to consumers. 18. Production will be started after getting EC from SEIAA and NOC/ Consent to Operate from JSPCB.

19 CHAPTER II INTRODUCTION TO PROJECT 2.1 Identification of Project The proposal relates to grant environment clearance for renewal of mining lease of M/s G. D. Stone Company having following details. Name of Proprietor : Shri Ghanshyam Dokania Address : At.: Sabjimandi Road Barharwa, P.O.: Barharwa P.S. : Barharwa District : Sahibganj State : Jharkhand Phone : - Mobile : , Regd. Office : At: Sabjimandi Road Barharwa, P.O.: Barharwa, Dist.: Sahibganj, Jharkhand. Details of the Lease Area District & state Thana Village Plot. Extent of Mining lease area Latitude Longitude Topo sheet : Sahibganj, Jharkhand : Ranga : Telo. : 24, 27(P), 28 (P), 29 (P) & 36 (P). : 3.49 ha (8.62 acre) : 24 o N to N : 87 o E to E : G45 V9 and G45 V13 Whether the area is recorded to be in forest Ownership/occupation Status of Applicant : In n- Forest area. : Private land (on lease)/business : Proprietor 2.2 Identification of Project Proponent Shri Ghanshyam Dokania (Prop. of M/s G. D. Stone Company) resident of Sabjimandi Road Barharwa, P.O. Barharwa, P.S.- Ranga, District Sahibganj of Jharkhand state proposes to grant environment clearance for his stone mining lease to renew the mining lease located at village Telo, P.S. Ranga in Sahibganj District of Jharkhand.

20 2.3 Brief Description of Project Proponent As given in Para 2.1 & 2.2 above. 2.4 Need of the Project & Importance to Country/Region The proposal under consideration relates to mining of stone chips to be used as building material or road metal. Both of the products are to be used as building material for building and road construction. A large number of infrastructure projects including construction, of new roads & widening, upgrading & strengthen of existing roads have been taken up in the Region/ State. In addition a large number of building construction projects including new townships, industrial projects have been taken up in the region. All these projects will lead to industrial and economic development of the region which is comparatively a backward region. These projects will also open new opportunities for employment in the region. 2.5 Demand & Supply Gap In view of the fact that there is large growth in the construction sector involving use of stone chips i.e. road metals and aggregates, demand for such product is growing. There are limited source for such building materials. In the circumstances as stated above, there is always gap in demand & supply. This is the reason, there has been rise in price of the product over past years. 2.6 Imported Vs Indigenous Production This is a product which the market is completely dependent on indigenous production for two products produced in the region. Imported product or product produced in other region will be too expensive. Projects under construction in the region have to depend on local resources. 2.7 Export Possibility In view of the fact that there already exists a gap between demand & supply scenario in the region, there is no possibility for export of the product to be produced from the mine. 2.8 Domestic / Export Market The product from the mine will be sufficient only to meet the demand for material in local market. There will be no scope for its export. 2.9 Employment Generation (Direct/ Indirect) This type of project generates direct & indirect employment for local peoples as well as non local peoples.

21 CHAPTER III PROJECT DESCRIPTION 3.1 Type of Project The project under consideration is a mining project involving mining of stone boulders. These boulders mined from the quarry will be crushed in crusher plant to designated size to be used either as road metal or coarse aggregate for building projects. i. Land Use The total lease area is 3.49 ha (8.62 acre). Break up of this area currently in use is given below; Existing Land Use Pattern: Category Area in hectare Area in acre Quarry OB/ waste Dump - - infrastructure facilities (Road etc.) Service facilities (office, stores etc.) Crushing plant Safety Barrier* Balanced Area Total area in use *At present proper plantation has not been made over safety barrier, but now we commit to develop green belt properly over safety barrier. Land Use Pattern after first 5 years plan is given below: Category Area in hectare Area in acre Quarry OB/ waste Dump - - Infrastructure facilities (Road etc.) Service facilities (office, stores etc.) Crushing plant Plantation over Safety Barrier Balanced Area Total area in use (Green belt will also be developed on 0.14 ha other identified areas to achieve 33% plantation)

22 Land Use Pattern on Conceptual Stage: Category Green Belt (in ha) Water Body (in ha) Quarry OB/ waste Dump - - Infrastructure facilities (Road etc.) Service facilities (office, stores etc.) Crushing plant Plantation over Safety Barrier Total area in use ii. Capacity Lease Area It is proposed to produce a peak of 800 TPD. Total lease area 3.49 ha (8.62 acre). 3.2 Location (Map showing general location, Specific Location, Project Boundary, Site Layout) Mine Lease Map is shown in Plate 1. General Location Map: General Location of the project is shown in Plate 2. Specific Location Map: Specific Location of the project is shown in Plate- 3 on the Topo-sheet (1:50,000) 3.3 Details of Alternate Site The project under consideration is a site specific and the mining lease for stone quarry is granted by State Govt. Mining has to be done in lease allotted by the State Govt. In this circumstance, alternate site has not been considered. 3.4 Size or Magnitude Lease Area Capacity Mining Lease Area ha (8.62 Acre) Capacity of Mine TPD 3.5 Process Details Schematic Diagram Flow Chart Component of Projects The deposit is proposed to be worked by mechanized means (opencast). The overlying strata comprise of mostly loose soil admixture weathered rocks. The height of OB varies from 1.0 m to 3.0 m. On an average the OB cover has been taken as 2m. The OB will not require drilling and blasting. Excavator/ Loader will loosen the material and the same will be sent to dumps by dumpers. The general bench height will be maintained at 6m and the width of bench will be minimum 6m to facilitate dumper movement. Targeted production level is 800 t/day. The mining operation will be of cyclic order i.e. drilling, blasting, excavating and loading followed by transportation of stone from mine to crusher unit and dispatching waste/ OB material to dumps.

23 Regime of mine operation will be;. of working days in a year : 300. of working shift in a day : One (general) Duration of shift : 8 hours Effective working hours in a shift : 6 hours. 3.6 Raw Material with Quantity, Source, use of final product, mode of transport of raw material of final product Raw Material For mining & stone boulders, explosives are required as raw material. Use of End of Product: Stone quarried from the quarry will be crushed to size required for road metal or aggregate for building material as per requirement. Mode of transport: Crushed & sized stone chips will be transported to construction site through rail and roads. 3.7 Resource optimization, Reuse Recycling Explosives: Quantity of explosives will be optimized in terms of optimal quantity of explosives for a given quantity of rocks to be quarried. Use of optimal quantity of explosive also reduces powering effect. Thus dust generation during blasting operation is minimized. Optional quantity of explosives shall be determined or basis of trial blasting in the area. Recovery of Road Metals/ Building Material: The crushing operation is to designed in a way that quantity of sized metal or coarse aggregate will be maximum & powdering effect will be minimum. Stone Powders: Stone powders generated during crushing operation shall be stored and disposed to concrete block manufacturers.

24 3.8 Availability of water its source A bore well is there to meet the drinking water requirement. For dust suppression and green belt development, closed mine pit water and pond water will be used which is located near the mine. 3.9 Energy requirement & source Since the mine site is located in isolated area, electricity connection has not been taken. A DG set is being used for energy requirement Quantity of waste to be generated & its Disposal The overlying strata comprise of mostly soil mixed with very small sized pebbles. On an average the OB cover can be taken as 2m. For the next five years of working, the OB zone likely to be encountered as per mine working plan/ schedule has been considered and the quantities involved estimated as m 3. The mined off overburden/ waste rocks will be stored in OB dump yard and will be utilized for reclamation work and dressing of haul roads.

25 3.11 Schematic representation of the feasibility drawing which give information of EIA purpose. This is a category B-2 Project. Fig. 1.3 gives the information of EIA purpose.

26 CHAPTER IV SITE ANALYSIS 4.1 Connectivity The mine site is connected to Barharwa Berhait State Highway (5 km from Barharwa). Mine access road is 0.4 km long. 4.2 Land Form, Land use, Land ownership Land within the lease area is hilly devoid of any vegetation with outcrop of rocks. The land within the lease area is barren Raiyati land & is taken on lease by lessee for which lessee paid rent to raiyats. Department of Mines & Geology, Govt. of Jharkhand had granted mine lease for a period of 5 years. 4.3 Topography with map The land within the lease area is hilly. 4.4 Existing Land use pattern (Agriculture, n-agriculture forest, water bodies, shortest distance from periphery of project of forest to national park, wild life sanctuary from sensitive area, water bodies (distance from HFL of River) n agricultural barren land. Nearest forest is more than 0.5 km from project Boundary. The nearest river is Gumani River which is about 2.0 km from the mine boundary. Sl. Particular Name Distance (in km) 1. Forest - More than 0.5 km 2. National Park - More than 10 km 3. Wild life sanctuary - More than 10 km 4. Water Body Gumani River More than 2.0 km 5. Sensitive Area Sitapahar Primary More than 1.5 km. School/health centre 4.5 Existing Infrastructure Road Railway - The mine site is connected to Barharwa Berhait State Highway (5 km from Barharwa). Mine access road is 0.4 km long. - Barharwa Railway Station (5 km away).

27 4.6 Soil Classification Alluvial Sandy Soil. 4.7 Climate Data from secondary source IMD Data from Ranchi 4.8 Social Infrastructure Available Place Distance Primary School High School Middle School Hospital Primary Health Centre Sitapahar 1.5 km Barharwa 5.0 km Ratanpur 4.0 km Barharwa 5.0 km Sitapahar 2.0 km

28 CHAPTER V PLANNING BRIEF 5.1 processing Area (Crusher) Stone mined from the quarry are to be crushed to size for the use as road metal or building aggregate. For this purpose a crusher unit has been installed within the lease area. 5.2 Residential Area The skilled & semi-skilled staffs are to be recruited from nearby area. For them no residential facilities are required. 5.3 Green Belt 7.5m wide green belts consisting of 6 rows of trees are proposed to be developed along the periphery of the leasehold as well as promises in which infrastructures are located. It is proposed to use native species that are evergreen and fruit bearing. 5.4 Social Infrastructure Social infrastructures like school, primary health centers already exist around the mine site. And since no residential complex is proposed to be developed, there is no proposal to develop additional social infrastructure for the project. 5.5 Connectivity The mine site is connected to Barharwa Berhait State Highway (5 km from Barharwa). Mine access road is 0.4 km long. need for constructing new connectivity. 5.6 Drinking Water Management A bore well has already been provided for drinking water and other purposes. Drinking water requirement has been estimated as 2 KLD. 5.7 Sewerage System A septic tank cum cess pool is proposed to be provided to treat sewage produced from toilets, washroom etc. located in office rest shelter & first aid centre.

29 5.8 Industrial Waste Management There is no source for industrial waste water generation however during raining season, water will accumulate in the stone quarry. This will be pumped and stored in a tank located in green belt area. 5.9 Solid Waste Management The mined off topsoil will be stored in OB dump yard and will be utilized for reclamation work and dressing of haul roads Power Requirement Since the mine site is located in isolated area, electricity connection has not been taken. However a DG set is there to fulfill energy requirement.

30 CHAPTER- VI PROPOSED INFRASTRUCTURE 6.1 Introduction The proposal relates to obtaining Environmental Clearance for an existing opencast stone mine. This is an existing mine. So infrastructures required to operate the mine have already been developed. 6.2 Industrial Area Project involves mining of stone boulder by opencast mining method. Mined out boulders are to be transported to crusher unit located within the lease area. This covers an area of 3.49 hectare (8.62 acre). 6.3 Residential Area There is no provision for residential area. Local people will be employed in the mine. 6.4 Green Belt It is proposed to develop green belt over an area of ha of land of 7.5 m width consisting of 6 rows of Trees. Only native species of trees will be used. 6.5 Social Infrastructure Social infrastructures like School, Primary Health Centre, post office etc already exist in proximity (within 1 to 5 KM) of mine site. 6.6 Connectivity The mine site is connected to Barharwa Berhait State Highway (5 km from Barharwa). Mine access road is 0.4 km long. 6.7 Drinking Water Management One Tube well has been developed within Lease area. This is sufficient to meet potable water demand which is 2 KLD.

31 6.8 Sewerage System A septic tank has been developed to treat sewage being generated in Rest Shelter. 6.9 Solid Waste Management The mined off topsoil will be stored in OB dump yard and will be utilized for reclamation work and dressing of haul roads Power Requirement/ Supply Since the mine site is located in isolated area, electricity connection has not been taken. A DG set is there to meet the energy requirement

32 CHAPTER VII REHABILITATION AND RESETTLEMENT (R & R) PLAN 7.1 Policy to be adopted (central/ State) in respect of the project affected persons including home oustees, land oustees and landless laborers (a brief outline to be given). The land required for project has been taken on lease by the lessee from raiyats. Land is barren. Land has been taken on lease for which lessee pays annual rent to land owners. There is no habitation on the lease area. Hence there is no issue related to resettlement & rehabilitation of project affected persons related to the project.

33 CHAPTER VIII PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely date of start of Construction and likely date of completion (time schedule for the project to be given) Zero date to be reechoed from the date of the last statutory clearance is obtained. Mining work (with enhanced capacity) will be started as soon as all statutory clearances obtained. 8.2 Estimated project cost along with analysis in terms of economic viability of the project. Sl.. Items/Details Amount (in Rs.) Sub Total (in Rs.) 1. Machinery and Equipment etc. 3,00, ,00, Environment Management Cost 7,25, Water sprinkling 1,50, Green belt (1010 trees in 1.01 ha area) 3,00, Sedimentation tank/rwh 1,25, Maintenance of road 25, Septic tank 50, Garland drain 25, Environment monitoring 50, Revenue Budget O & M cost per annum 4,00, ,00, CSR/Peripheral area development. 5,00, Education (30%) 1,50, Health care (20%) 1,00, Sanitation (20%) 1,00, Drinking Water (15%) 75, Community facilities (15%) 75, Total Project Cost: 19,25, Price of the product to be determined by prevailing rates in the market for such products.

34 CHAPTER IX ANALYSIS OF PROPOSAL (Final Recommendations) 9.1 Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. The project assumes importance in both national & local context as the project will supply raw material for construction of roads, industrial projects and housing projects in the area. The project will offer opportunity for employment in the mine. New job opportunity will also open in secondary & tertiary projects & industrial projects. These projects will also lead to industrial & economic development of the area.

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Form-I for seeking clearance for project attracting CRZ notification

Form-I for seeking clearance for project attracting CRZ notification Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

APPENDIX I FORM I. Basic Information

APPENDIX I FORM I. Basic Information APPENDIX I (I) Basic Information FORM I S.. Item Details 1 Name of the project/s Enhancement of Phosphoric Acid Production from 700 MTPD to 1000 MTPD P2O5 and other auxiliary Facilities within the Existing

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

M/s Gokul Stone Industries

M/s Gokul Stone Industries Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

List of Documents. List of Annexure

List of Documents. List of Annexure List of Documents S.No. Description Page No. 1 Form I Application 1 to 15 2 Standard Template and Checklist 16 to 24 3 Form IA for Building & Construction Projects 25 to 35 4 Environmental Management Plan

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

FORM 1. Basic Information

FORM 1. Basic Information (I) Basic Information FORM 1 S. Item Details 1 Name of the Project /s Establishment of 1.5 M KCal/Hr (500 kg/hr) Hazardous Waste Incinerator (Upgradation) by M/s Ramky Enviro Engineers Limited. 2 S.. in

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS 2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

APPLICATION FOR ENVIRONMENTAL CLEARANCE

APPLICATION FOR ENVIRONMENTAL CLEARANCE APPLICATION FOR ENVIRONMENTAL CLEARANCE CREATIVE ENGINEERS & CONSULTANTS NABET ACCREDITED, NABL ACCREDITED TESTING LABORATORY& ISO 9001: 2008 CERTIFIED COMPANY 9B/4, BHARATHWAJAR STREET, EAST TAMBARAM,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX INDEX Sl.. Contents Page. 1 FORM I APPLICATION FOR CLAY MINING FOR BRICK KILN 3 BASIC INFORMATION 6 ACTIVITY 7 2 PRE-FEASIBILITY REPORT 21 3 MINING PLAN 35 ` ENCLOSURES Sl.. Contents 1 UNDERTAKING 2 UNDERTAKING

More information

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information