1 APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant M/s Maa Stone Works (Partner: Shri Sushil Kumar Singh) At.: Adhaura, P.O.: Pansa, P.S.: Haidar Nagar Palamu Jharkhand Crystal Consultants At: Kshitij, Kashyap Vihar Ranchi , Jharkhand November, 2015

2 CONTENTS Sl. No. Details 1. Form-I 2. Appendix- I (Certified by Project Proponent) 3. Appendix- II (Environmental Management Scheme) 4. Pre-Feasibility Report 5. DMO Report regarding Contiguous Mining 6. C.O. Report 7. DFO Report 8. Gram Sabha Consent Paper

3 (I) Sl. No. Basic Information Item APPENDIX I (See paragraph 6) FORM -1 Details 1. Name of the projects M/S Damdami Stone & Morum Mine (M/s Maa Stone Works) 2. Sl. No. in the schedule 1(a) 3. Proposed capacity/ area/ length/ tonnage to be Stone: 5001 TPD (Peak)/ ha (45.00 Ac) handled/ command area/lease area/ number of Year Production of Production of wells to be drilled Stone (In T) Moorum Soil (In M 3 ) 1 st 15,00,300 3,20,100 2 nd 15,00,300 1,80,000 3 rd 15,00,300-4 th 15,00,300-5 th 15,00, New/ Expansion/ Modernization New Lease 5. Existing Capacity/ Area etc. NA 6. Category of Project i.e A or B B2 7. Does it attract the general condition? If yes, please specify As per the EIA Notification 2006, it is a Category B2 project. 8. Does it attract the specific condition? If yes, No please specify 9. Location Mauza: Damdami, 24 o to N 84 o to E Plot/ Survey/ Khesara No./ 177 (P), Khata No. 53 Village Damdami Tehsil Hussainabad District Palamu State Jharkhand 10. Nearest railway station/ air port along with distance in kms. Japla Railway Station 10 km Ranchi Airport 250 kms 11. Nearest town, city, district headquarters along Hussainabad town (10 km) with distance in kms. 12. Village Panchayats, Zila Parisad, Municipal Damdami Panchayat, Palamu, Jharkhand Corporation, Local body (complete postal addresses with telephone nos. to be given 13. Name of the applicant M/s Maa Stone Works (Partner: Shri Sushil Kr. Singh) 14. Registered address At.: Adhaura, P.O.: Pansa, P.S.: Haidar Nagar, Palamu, Jharkhand. 15. Address for correspondence: Name Shri Sushil Kumar Singh Designation (Owner/ Partner/ CEO) Address Partner At.: Adhaura, P.O.: Pansa, P.S.: Haidar Nagar, Palamu, Jharkhand. Pin Code Glrc95@gmail.com Telephone No , Fax No Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects No 18. Whether separate application of interlinked N/A project has been submitted? No. Site specific industry. Lease applied for this area.

4 19. If yes, date of submission N/A 20. If no, reason N/A 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) No forest land involved. 24. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project (II) Activity No forest land involved. No No Govt. of Jharkhand has asked proponent to get EC vide letter no. 564/M dated Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) No Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes No The mining and allied activities will be limited to ha of barren land. Since mining of stone is a temporary activity, change in land use pattern is also temporary in nature. There is no growth of shrubs/ bush in lease area. There is no tree in lease area. Mining and allied activities will be preceded by clearance of site. Lease area does not fall in notified forest. 1.3 Creation of new land uses? Yes At the end of mining operation, lease area will be reclaimed as per approved mine closure plan, keeping in view the ecological consideration and societal need. 1.4 Pre-construction investigations e.g. bore holes, soil testing? Yes Geological formation within the lease area has been studied for estimation of mineral resource. 1.5 Construction works? Yes Mine office, rest shelter, internal and access road will be constructed. 1.6 Demolition works? No No demolition work involved. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthwork; including linear structures, cut and fill or excavations No Yes There is no need for providing temporary site for mine worker as they all are locals. Above ground buildings- limited to office and rest shelter. Excavation- This is an opencast mine for mining of

5 1.9 Underground works including mining or tunnelling? No stone. No underground mining or tunnelling is involved Reclamation works? Yes At the end of mining operation, the mine pit would be reclaimed as per approved mine closure plan Dredging? No 1.12 Offshore structures? No This is an inland project. No offshore construction involved Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long terms housing of operation workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipeline? 1.21 Impoundment, damming, culverting realignment or other changes to the hydrology of watercourses or aquifers? Yes Yes No No No No No No No The project under consideration is opencast mine to mine stone. Stone is to be mined by blasting using explosives. Blasted stone will be loaded into trucks/ tractors for transport. A small store will be provided to store mining tools and tackles. Solid waste disposal- Morum as OB will be produced during first two years, which will be sold. Liquid effluent- Mine water collected (during monsoon) in the mine pit will be pumped out and treated in sedimentation pond. Sewage generated in toilets provided at the mine site will be treated in septic tank Since all workers are local, no housing facilities needed. Approach road already exists. No new transport infrastructure to be provided. Existing infrastructure is to be used. Project does not involve closure or diversion of transport network. Project does not involve diversion of pipe line or transmission line. Mining and allied activities are not to affect hydrological regime in the area by way of damming, diversion etc Stream crossings? No 1.23 Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No Lease area is very small (18.21 ha) area. Mining and allied activities are not to alter drainage pattern in the area.

6 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Yes No Yes No Mined stone will be transported to crusher unit by road. Local man power will be deployed hence transport of workmen not involved. At the end of mining operation, the mine will be closed as per mine closure plan which is a short term activity. Decommissioning activities involved with mine closure plan and will be improve environment and ecological balance in the area. All mine workers will be local. There will be no influx of people to the area Introduction of alien species? No Only native species of plants will be used for green belt and bio reclamation Loss of native species or genetic diversity? No The lease area does not have growth of trees, shrubs etc. Hence mining activities will not cause loss of native species or genetic diversity Any other actions? No 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or especially any resources which are non-renewable or in short supply) : Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) Yes Mining and allied activities are limited to ha of barren land. 2.2 Water (expected source & competing users) unit KLD Yes 2.3 Mineral (MT) No Potable 1.5 KLD, dust suppression 10 KLD, green belt 3 KLD Total KLD. Source Bore well for drinking purpose. Water for sprinkling and green belt will be brought from local Pond by tankers. 2.4 Construction material stone, aggregates, and/soil (expected source MT) No Construction is limited to two small building needing small quantities of stone chips, brick and sand which are locally available in abundance. 2.5 Forests and timber (source MT) No 2.6 Energy including electricity and fuels (source, competing users) Unit : fuel (MT), energy (MW) 2.7 Any other natural resource (use appropriate standard units) Yes No The project is located in isolated place having no access to power network. A DG set is proposed for mining machinery and pumping.

7 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne disease) Yes For blasting, explosives will be used. Valid explosive license holder will be engaged for blasting. No 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Yes No The project operation will create new source of income generation and also CSR activities will improve socio-economic and cultural profile of the area. Activities related to project construction and operation is confined to lease area. Site is away from schools and hospitals. 3.5 Any other causes No 4. Production of solid wastes during construction or operation or decommission (MT/month) Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Yes During quarry development, Morum as OB requiring removal and disposal will be around 5,00,100 M Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No No No township is proposed for project. Hence no municipal solid waste will be generated. No solid waste containing hazardous waste will be generated. 4.4 Other industrial process wastes No No other industrial process is involved. 4.5 Surplus product No All mineral mined from project would be sold. 4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge from sedimentation pond will be removed at the end of monsoon season. This will be mostly inert inorganic material that will be used for road repair. 4.7 Construction or demolition wastes No No construction waste will be generated. 4.8 Redundant machinery or equipment No At the end of project all machineries will be moved away from site.

8 4.9 Contaminated soils or other materials No No contaminated soil will be generated Agricultural wastes No No agricultural waste will be generated Other solid wastes No No other solid waste will be generated. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction details) Yes Yes Yes No No No No Due to operation and movement of vehicles, marginal emissions of NOx & SO 2 will be there; NOx emission g/day SO 2 emission g/day Dust will be produced due to drilling, blasting and handling/ transporting of blasted materials which will be minimised by water sprinkling. Dust emission rate from blasting: 0.22kg/blast/100m 2. Due to operation and movement of vehicles, marginal emissions of NOx & SO 2 will be there; NOx emission g/day SO 2 emission g/day Dust emission rate from; Transportation: 5.08 gm/vkt Loading: 580 gm/t (Source: USEPA/AP- 42) Construction activities are very small limited to construction of two small rooms. Dust generation from this source will be for a short duration. No odour to be generated. No incineration of waste is involved. Covers in Sl. No. 5.6 above. 5.8 Emissions from any other sources No 6. Generation of Noise and Vibration, and Emissions of Light and Heat :

9 Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes 6.2 From industrial or similar processes Yes Covers in Sl. No 6.1 Noise will be generated from following sources; Drilling of blast holes, blasting, transport of stone by trucks and operation of DG set. Noise level range from 70 to 100 db. 6.3 From construction or demolition No No construction equipments are to be used. 6.4 From blasting or piling Yes Due to blasting 120 db(a) 6.5 From construction or operational traffic Yes Transporting trucks will generate noise (70 to 100 db). 6.6 From lighting or cooling systems No Lighting or cooling equipment will not be provided. 6.7 From any other sources No 7. Risks of contamination of land or water from release of pollutants into the ground or into sewers, surface waters, groundwater, coastal water or the sea : Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No There would be no discharge of hazardous substance from project activities. Only source of liquid effluent is mine water. The mine water is to be treated in sedimentation pond before discharged. 7.3 By deposition of pollutants emitted to air into the land or into water No 7.4 From any other sources No Dust will be generated on account of drilling, blasting and transport of minerals. These dusts are mostly inert inorganic substance. It is proposed to take appropriate dust control measures. 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No There is no risk of long term buildup of pollutants in the area. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Sl. No. Information / Checklist confirmation Yes/No. Details thereof (with approximate quantities / rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling use or production of hazardous substances. No All preventive and safety rules prescribed by DGMS will be followed. 8.2 From any other causes No No other cause for accident. 8.3 Could the project be affected by No Project is not likely to be affected by flood or

10 e. Other natural disasters earthquake. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or potential for cumulative impacts with other existing or planned activities in the locality Sl. No. Information / Checklist confirmation Yes/No Details thereof (with approximate quantities / rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g. : a. Supporting infrastructure (roads, power supply, waste or waste water treatment, e.g.) b. Housing development c. Extractive industries d. Supply industries 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Yes No No The project is not to develop ancillary development or infrastructure that could affect local infrastructure, housing development etc. The pit will be converted into water body which could be use for fisheries and ground water recharge. Project is not likely to be affected by flood or earthquake. The project is located in isolated area. There is no cumulative effect. (III) Environmental Sensitivity Sl. No. Information / Checklist confirmation Yes/No Details thereof (with approximate quantities / rates, wherever possible) with source of information data 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountain forests 3 Areas used by protected, important or sensitive species of flora or fauna for No No No There is no area protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related values. No ecologically sensitive area within the study area. Sone River near about 12.0 km away from lease area. No coastal zone/ notified biosphere in study area. Protected forest from the lease area is more than

11 breeding, nesting, foraging resting, over wintering, migration 260m (DFO report enclosed). 4 Inland, coastal, marine or underground waters No Inland Sone River about 12.0km. Coastal or Marine No Underground Waters Ground water table varies from 6.5m to 14m bgl in pre-monsoon. 5 State, National boundaries No State boundary 20 km (Bihar) National boundary More than 500km. 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No No routes or facilities used by the public for access to recreation of other tourist, pilgrim areas. 7 Defence installations No No defence installations within study area. 8 Densely populated or built-up area No No densely populated or built-up area except Hussainabad more than 10.0 km. 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Yes No Primary Health Centre- Sanda (1.5 km) Middle School- Kamgarpur (3.0 km) High School- Japla (10.0 km) Sadar Hospital- Japla (10.0 km) No such scarce resources exist within study area. 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standard are exceeded) No No critically polluted area exists within study area. 12 Areas susceptible to natural hazard which could cause the project to present environmental problems. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) No The area is not located in flood zone or earthquake area. I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information

12 submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date : Ranchi Place : Singh) (Sushil Kumar Partner Note: 1. The projects involving clearance under coastal Regulation zone Notification, 1991 shall submit with the application a C.R.Z. map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of ToR) and the recommendations of the State coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R,Z Notification, 1991 for the activities to be located in the C.R.Z. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory corridors of wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC). 2. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/ Environment Clearance subsequent clarifications as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. ENVIRONMENT MANAGEMENT SCHEME APPENDIX- II 1. Name and address of Lease Holder.

13 M/s Maa Stone Works (Partner- Shri Sushil Kumar Singh and Shri Lawkesh Kumar Singh) At.: Aghaura, P.O.: Pansa, P.S.: Haidar Nagar, Palamu , Jharkhand. 2. Features of Lease. I. Date of Application of Mine Lease : 14/08/2014 II. Period : 10 yrs. III. Boundary of Lease Area; North : Plot No. Mauza Kurmipur South : Plot No. 177 (P) East : Plot No. 177 (P) West : Plot No. 180, 181 & 193 IV. Mineral : Stone/ Moorum V. Khesra No. : Plot No. 177 (P), Khata No. 53 (Area Ha) VI. Panchayat & Tehsil : Panchayat: Damdami: Tahsil: Hussainabad. VII. District : Palamu VIII. Whether the land is ST or not, if yes, whether permission has been taken? Give details : GM land IX. Whether the lease is within outside provision of CNT Act. If not whether permission has been taken : Yes. 3. Specification of Equipments to be used Hydraulic Excavator (34-42 mm dia) : 02 nos. Truck mounted drilling machine & Compressor : 02 nos. Tipper/ Dumper (20 t) : 12 nos. Portable Pump (10/15 HP) : 02 nos. Water Tanker/ sprinkler (13,000 L cap) : 01 no. D.G. Set : 01 no. 4. Map of Region showing all pits already created and details within 1km from the lease boundary: Study area map covering 1 km and 5 Km enclosed. 5. Description of all excavation works done till now: New Mining Lease. 6. Scheme for plantation: Plantation is to be done at following locations; I. Along periphery of lease area. 3m wide comprising of 4 rows of trees. Species Native species, evergreen and fast growing II. Plantation along both sides of transport road. 7. Scheme for concurrent rehabilitation & reclamation of degraded Land: The land required for the project is owned by the government and there is no habitation on the applied lease area. Land is to be degraded on account of opencast mining. The mined out area cannot be filled back even partially. Moreover, the overburden material is not adequate to undertake backfilling operation at any stage. The mined out area can be developed as water reservoir after the conceptual plan period. Area in and around of the lease area can be used for afforestation purpose. 8. Air & Water Pollution Control Scheme: a. Air Pollution Control Following air pollution control measures will be implemented;

14 I. Regular Water Sprinkling within lease area. II. Use of optimal quantity of explosives to minimize generation of dust during blasting. III. Regular maintenance of transport road. IV. Metalling of transport road outside lease area. V. Green belt along both sides of transport road. b. Water Pollution Control Following water pollution control measures are proposed; I. Provision of Garland Drain on edge of quarry to channelize water away from quarry to natural drains. II. Provision of Sedimentation Tank for treatment of mine water. 9. Any other matter that Leaseholder wants to present: - No. 10. Storage and use of top soil removed owing mining operation: - The average thickness of OB, which is moorum is about 3m. Quantity of moorum (OB) to be removed during the first three years will be around 5,00,100 m 3 which will be sold as one of the product. 11. Programme for Economic & Social Development of Area Around Project: Following provisions have been made for socio-economic development of the surrounding area; I. Financial grant to local school for repair & upkeep of school building and purchase of furniture. II. Digging of two open dug well in village in consultation with Panchayat. III. Maintenance of bore wells in Damdami village. 12. Budget for Environment Management Capital Budget i. Water sprinkler lacs ii. Green belt lacs iii. Maintenance of Road lacs iv. Sedimentation Tank/RWH lacs v. Garland Drain lacs vi. Septic Tank lacs. vii. Environmental Monitoring lacs. Total: lacs PLATE- 1 LEASE AREA MAP

15 PLATE- 2 Index Map Showing project Location

16 PLATE- 3 Study Area Map (5 KM Radius)

17 PRE - FEASIBILITY REPORT

18 FOR THE GRANT OF ENVIRONMENT CLEARANCE Of DAMDAMI STONE & MORUM MINE (LEASE AREA: ha) (New Lease) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand Applicant M/s Maa Stone Works (Partner: Shri Sushil Kumar Singh) At.: Adhaura, P.O.: Pansa, P.S.: Haidar Nagar Palamu Jharkhand PREPARED BY CRYSTAL CONSULTANTS AT: KSHITIJ, KASHYAP VIHAR RANCHI , JHARKHAND CONTENTS

19 CHAPTER DESCRIPTION PAGE 01 EXECUTIVE SUMMARY 01 to INTRODUCTION TO PROJECT 02 to PROJECT DESCRIPTION 04 to SITE ANALYSIS 08 to PLANNING BRIEF 10 to PROPOSED INFRASTRUCTURE 12 to REHABILITATION & RESETTLEMENT (R & R) PLAN 14 to PROJECT SCHEDULE & COST 15 to 15 ESTIMATES 09 ANALYSIS OF PROPOSAL 16 to 16 EXECUTIVE SUMMARY CHAPTER - I

20 1. The proposal relates to grant of Environmental Clearance for open cast stone mine for the purpose of grant of new mine lease. 2. The mining lease applicant/project proponent is M/s Maa Stone Works (Partner: Sri Sushil Kumar Singh and Sri Lawkesh Kumar Singh). 3. The proposed mine is located in Village Damdami, P.O.: Kamgarpur, P.S. Hussainabad, District Palamu, Jharkhand. 4. The applied Lease Area is Ha (45.0 Acre). 5. The Capacity of mine is 5001 TPD of Stone Boulders and in first two years only 5,00,100 m 3 of Morum. 6. The average thickness of OB, which is moorum is about 3m. Total quantity of morum is about 5,00,100 m3 which will be removed in first two years. Morum will be sold as one of the product. 7. Total project cost is Rupees 18,05,000/- (Rupees eighteen lakhs five thousand only). 8. Lease Area is barren land and is owned by the Government. 9. Soft overburden/ sub-grade material will be removed by excavator. For removal of hard rock, drilling and blasting will be used. 10. Stone will be mined by developing bench. Bench height will be limited to 6 m and width as 6 m. 11. The mine site is connected to Chatarpur Hussainabad Road (21 km from Hussainabad). Mine access road is about 1.0 km. 12. Water demand for potable purpose (1.5 KLD), dust suppression (10 KLD) and green belt (3 KLD) will be met by a bore well and pond water. Water for sprinkling and green belt will be bought from local pond by tankers. 13. As applied mine lease is located in remote area, no electricity connection is there. A DG set is proposed for mining machinery and pumping. 14. The boulder, mined from the quarry will be crushed to required size by crusher unit. 15. Sized stone chips will be transported by trucks/ tippers. 16. Mining will be resumed subsequent to grant of EC and grant of lease. CHAPTER II INTRODUCTION TO PROJECT 2.1 Identification of Project

21 The proposal relates to the grant of stone mine lease (New lease) by M/s Maa Stone Works (Partner: Sri Sushil Kumar Singh and Lawkesh Kumar Singh) having following details. Name of Applicant : M/s Maa Stone Works Address : At: Adhaura, P.O.: Pansa P.S. : Haidar Nagar District : Palamu State : Jharkhand Phone : Mobile : Regd. Office : At.: Adhaura, P.O.: Pansa, P.S.: Haidar Nagar, Palamu , Jharkhand. Details of the Lease Area District & state : Palamu, Jharkhand Thana no. : 472 Village : Damdami. Plot No. : 177 (P) Extent of Mining lease area : ha (45.0 acre) Latitude : Between 24 o to N Longitude : Between 84 o to E Topo sheet : 72 D/3 Whether the area is recorded to be in forest Ownership/occupation Status of Applicant : In Non- Forest area. : Government : Proprietorship Firm 2.2 Identification of Project Proponent Sri Sushil Kumar Singh and Lawkesh Kumar Singh (partners of M/s Maa Stone Works) resident of Adhaura Village, P.O. Pansa, P.S.: Haidar Nagar, District Palamu of Jharkhand state proposes to grant a lease of a new stone mine situated at Village Damdami, P.S. Hussainabad in Palamu District of Jharkhand. 2.3 Brief Description of Project Proponent As given in Para 1.1 & 1.2 above. 2.4 Need of the Project & Importance to Country/Region

22 The proposal under consideration relates to mining of stone chips to be used as building material or road metal. Both of the products are to be used as building material for building and road construction. A large number of infrastructure projects including construction, of new roads & widening, upgrading & strengthen of existing roads have been taken up in the Region/ State. In addition a large number of building construction projects including new townships, industrial projects have been taken up in the region. All these projects will lead to industrial and economic development of the region which is comparatively a backward region. These projects will also open new opportunities for employment in the region. 2.5 Demand & Supply Gap In view of the fact that there is large growth in the construction sector involving use of stone chips i.e. road metals and aggregates, demand for such product is growing. There are limited source for such building materials. In the circumstances as stated above, there is always a gap in demand & supply. This is the reason, there has been rise in price of the product over past years. 2.6 Imported Vs Indigenous Production This is a product which the market is completely dependent on indigenous production for two products produced in the region. Imported product or product produced in other region will be too expensive. Projects under construction in the region have to depend on local resources. 2.7 Export Possibility In view of the fact that there already exists a gap between demand & supply scenario in the region, there is no possibility for export of the product to be produced from the mine. 2.8 Domestic / Export Market The product from the mine will be sufficient only to meet the demand for material in local market. There will be no scope for its export. 2.9 Employment Generation (Direct/ Indirect) This type of project generates direct & indirect employment for local peoples as well as non local peoples. CHAPTER III PROJECT DESCRIPTION 3.1 Type of Project

23 The project under consideration is a mining project involving mining of stone boulders. These boulders mined from the quarry will be crushed in crusher plant to designated size to be used either for coarse aggregate for building projects or as road metal. i. Land Use The total applied lease area is ha (45.0 acre). Break up of this area currently in use is given below; Existing Land Use Pattern: The deposit being virgin, there is no degradation of land due to quarrying, dumping, road making etc. There is no agricultural activity over the proposed mining area. Sl. No. Land Use Area Area (in ha) Area (in Ac) 1. Govt. Land Total: Land Use Pattern at the End of 5 Years is given below: Category Area in hectare Area In acre Mining OB dump - - Service facilities (office etc) Roads Green belt development over the boundary barrier Area unutilized Total area in use ii. Capacity Lease Area It is proposed to produce; - Stone Boulders : 5001 TPD (Peak) - Moorum : 5,00,100 M3 in first two years only. Lease area The lease area of the proposed quarry is ha (45.0 acre). 3.2 Location (Map showing general location, Specific Location, Project Boundary, Site Layout) Mine Site layout is shown in Plate 1. General Location: General Location of the project is shown in Plate 2. Specific Location: Specific Location of the project is shown in Plate- 3 on the Topo-sheet (1:50,000) 3.3 Details of Alternate Site

24 The project under consideration is a site specific. And the applied mining lease for stone quarry is owned by the State Govt. In this circumstance, alternate site has not been considered. 3.4 Size or Magnitude Lease Area Capacity Applied Mining Lease Area ha (45.0 Acre) Capacity of Mine - Stone Boulders TPD (Peak) - 5,00,100 M3 in first two years only. 3.5 Process Details The deposit within the leasehold will be worked from the top most level of the deposit. After removal of overburden cover, the mining faces in the stone zone will be formed within the stone deposit bench dimension being 6m x 6m (Height and Width). Because of deploying jack hammer drills for drilling purpose, the 6m high benches are to be mined by forming sub-benches of 3m. Mining operation will be of cyclic order i.e. drilling, blasting, excavating and loading followed by transport of materials from mined to plant/ consuming centers. The production target is around 170 t/day. The regime of mine operation will be as follows; No. of working days in a year No. of working shift in a day - 01 (general) Duration of shift - 8 hours Effective working hours in a shift - 6 hours The mine working boundary has been fixed after leaving a safety barrier of 7.5m wide all around the lease boundary. 3.6 Raw Material with Quantity, Source, use of final product, mode of transport of raw material of final product Raw Material For mining & stone boulders, explosives are required as raw material. Use of End of Product: Stone quarried from the quarry will be crushed to size required for road metal or aggregate for building material as per requirement. Mode of transport: Crushed & sized stone chips will be transported to customer/ construction site through roads. 3.7 Resource optimization, Reuse Recycling

25 Explosives: Quantity of explosives will be optimized in terms of optimal quantity of explosives for a given quantity of rocks to be quarried. Use of optimal quantity of explosive also reduces powering effect. Thus dust generation during blasting operation is minimized. Optional quantity of explosives shall be determined or basis of trial blasting in the area. Recovery of Building Material/ Road Metals: The crushing operation is to designed in a way that quantity of sized metal or coarse aggregate will be maximum & powdering effect will be minimum. Stone Powders: Stone powders generated during crushing operation shall be stored and disposed to concrete block manufacturers. 3.8 Availability of water its source A bore well is proposed to meet the drinking water requirement. Pond water (located in Damdami village at a distance of about 1 km) will be used for the purpose of plantation and Dust suppression. 3.9 Energy requirement & source As mine lease is located in remote area, electricity connection is not available. However a DG set is proposed to meet the energy requirement Quality of waste to be generated & its Disposal The average thickness of overburden, which is mostly moorum is around 3m. Quantity of moorum materials to be removed during the first two years of plan period will be around 5,00,100 M 3 which will be sold as one of the product. No other waste materials will be generated Schematic representation of the feasibility drawing which give information of EIA purpose. This is a category B-2 Project. Fig. 1.3 gives the information of EIA purpose.

26 SITE ANALYSIS CHAPTER IV

27 4.1 Connectivity The mine site is connected to Chatarpur Hussainabad Road (21 km from Hussainabad). Mine access road is about 1.0 km. 4.2 Land Form, Land use, Land ownership Land within the lease area is hilly devoid of any vegetation with outcrop of rocks/ moorum. The land within the lease area is barren land & is owned by the government. Land ownership - land is owned by the government. The application for the grant of new mine lease has been submitted to Department of Mines & Geology, Govt. of Jharkhand for a period of 10 years in favour of project proponent. 4.3 Topography with map The land within the lease area is undulating. 4.4 Existing Land use pattern (Agriculture, Non-Agriculture forest, water bodies, shortest distance from periphery of project of forest to national park, wild life sanctuary from sensitive area, water bodies (distance from HFL of River) Non agricultural barren land. Nearest protected forest is more than 260 m from the mining lease Boundary. The nearest river is Sone River which is about 12 km from the mine boundary. Sl. No Particular Name Distance (in km) 1. Forest - More than 0.26 km 2. National Park - More than 10 km 3. Wild life sanctuary - More than 10 km 4. Water Body Sone River More than 12.0 km 5. Sensitive Area Primary Health More than 1.5 km. Centre, Sanda 4.5 Existing Infrastructure Road Railway - The mine site is connected to Chatarpur Hussainabad Road (21 km from Hussainabad). Mine access road is about 1.0 km. - Japla Railway Station (10 km away).

28 4.6 Soil Classification Achean Granite and Gneisses. 4.7 Climate Data from secondary source IMD Data from Ranchi 4.8 Social Infrastructure Available Place Distance High School Japla 10.0 km Middle School Kamgarpur 3.0 km Sadar Hospital Japla 10.0 km Primary School Sanda 1.5 km CHAPTER V PLANNING BRIEF 5.1 processing Area (Crusher)

29 Stone mined from the quarry are to be crushed to size for the use as road metal or building aggregate. For this purpose a crusher unit will be installed nearby mine lease area. 5.2 Residential Area The skilled & semi-skilled staffs are to be recruited from nearby area. For them no residential facilities are required. 5.3 Green Belt 7.5m wide green belts consisting of 6 rows of trees are proposed to be developed along the periphery of the leasehold as well as promises in which infrastructures are located. It is proposed to use native species that are evergreen and fruit bearing. 5.4 Social Infrastructure Social infrastructures like school, primary health centers already exist around the mine site. And since no residential complex is proposed to be developed, there is no proposal to develop additional social infrastructure for the project. 5.5 Connectivity The mine site is connected to Chatarpur Hussainabad Road (21 km from Hussainabad). Mine access road is about 1.0 km. 5.6 Drinking Water Management A bore well will be provided for drinking water purposes. Drinking water requirement is estimated as 1.5 KLD. 5.7 Sewerage System A septic tank cum cess pool is proposed to be provided to treat sewage produced from toilets, washroom etc located in office rest shelter & first aid centre. 5.8 Industrial Waste Management

30 There is no source for industrial waste water generation however during raining season, water will accumulate in the stone quarry. This will be pumped and stored in a tank located in green belt area. 5.9 Solid Waste Management The mined off solid waste/ sub grade material (if any) will be utilized for reclamation work and dressing of haul roads outside the mine lease area Power Requirement As mine lease is located in remote area, electricity connection is not available. However a DG set is proposed to meet the energy requirement. CHAPTER- VI PROPOSED INFRASTRUCTURE 6.1 Introduction

31 The proposal relates to obtaining Environmental Clearance for an opencast stone mine. Environmental Clearance is required for a new mining lease. Infrastructures required to operate the mine have been developed. 6.2 Industrial Area Project involves mining of stone boulder by opencast mining method. Mined out boulders are to be transported to crusher. Thus in lease area industrial activity is limited to mining and crushing of stone boulder only. This covers an area of Ha (45.0 Ac). 6.3 Residential Area mine. There is no provision for residential area. Local people will be employed in the 6.4 Green Belt It is proposed to develop green belt of 7.5 m width consisting of 6 rows of Trees. Only native species of trees will be used. 6.5 Social Infrastructure Social infrastructures like School, Primary Health Centre, post office etc already exist in proximity (within 3 km) of mine site. 6.6 Connectivity The mine site is connected to Chatarpur Hussainabad Road (21 km from Hussainabad). Mine access road is about 1.0 km. 6.7 Drinking Water Management One bore well is proposed to meet the water requirement for drinking purposes. 6.8 Sewerage System A septic tank has been developed to treat sewage being generated in Rest Shelter.

32 6.9 Solid Waste Management The mined off solid waste/sub-grade material will be utilized for reclamation work and dressing of haul roads outside the mine lease area Power Requirement/ Supply As mine lease is located in remote area, electricity connection is not available. However a DG set is proposed to meet the energy requirement. CHAPTER VII REHABILITATION AND RESETTLEMENT (R & R) PLAN

33 7.1 Policy to be adopted (central/ State) in respect of the project affected persons including home oustees, land oustees and landless laborers (a brief outline to be given). The land required for the mining project has been owned by the Government. There is no habitation on the lease area. Hence there is no issue related to resettlement & rehabilitation of project affected persons related to the project. CHAPTER VIII PROJECT SCHEDULE & COST ESTIMATES

34 8.1 Likely date of start of Construction and likely date of completion (time schedule for the project to be given) Zero date to be reechoed from the date of the last statutory clearance is obtained. Mining work will be restarted as soon as all statutory clearances obtained. 8.2 Estimated project cost along with analysis in terms of economic viability of the project. Sl. No. Items/Details Amount (in Rs.) 1. Machinery and Equipment etc. 8,00, Environment Management Cost - Water sprinkling 2,00, Green belt 50, Sedimentation tank 50, Maintenance of road 1,00, Septic tank 50, Garland drain 50, Revenue Budget - O & M cost (Rs. 50,000/- x 5 years) 2,50, Peripheral area development (Rs. 51,000/- x 5 years) 2,55, Total Project Cost: 18,05, Price of the product to be determined by prevailing rates in the market for such products. CHAPTER IX ANALYSIS OF PROPOSAL (Final Recommendations)

35 9.1 Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. The project assumes importance in both national & local context as the project will supply raw material for construction of roads, industrial projects and housing projects in the area. The project will offer opportunity for employment in the mine. New job opportunity will also open in secondary & tertiary projects & industrial projects. These projects will also lead to industrial & economic development of the area. MINING PLAN & PROGRESSIVE MINE CLOSURE PLAN For DAMDAMI STONE & MORUM MINE Area 45.00Acre (18.21 Ha) in Non-Forest Land,

36 Stone Production 5001 tonne per day, Mouza Damdami, Thana - Husenabad Block Husenabad, Dist. Palamu, Jharkhand Category of Mine: B-2 Category Fully Mechanized Mine with Blasting Type of Land: Barren Khas land Period of Mining Plan: New Plot Nos. 177 (Part) Khata No 53 UNDER SUB-SECTION- 2(b) OF SECTION- 5 OF MMRD ACT 1957, RULE & CONSERVATION RULE 2002 and UNDER JMMC(A) RULE 2014 Applicant M/S MAA STONE WORKS Sri Sushil Kumar Singh At - Aghaura, P.O - Pansa Dist. - Palamu, Jharkhand Sri Lawkesh Kumar Singh At & P.O. - Kamgarpur, Dist - Palamu, Jharkhand Prepared by Dr. Amarjeet Kumar Singh C.D. Singh Colony, Near CMRI Gate, Dhanbad (valid upto ) Mob: / amarjeet.dhanbad@gmail.com M/S MAA STONE WORKS Sri Sushil Kumar Singh Sri Lawkesh Kumar Singh At - Aghaura, P.O- Pansa AT & PO - Kamgarpur Dist. Palamu, Jharkhand Dist. - Palamu, Jharkhand Mob: Mob:

37 CONSENT LETTER FROM LESSEE The Mining Plan & Progressive Mine Closure Plan of Damdami stone & Morum Mine, M/S Maa Stone works of Sri Sushil Kumar Singh at Aghaura, P.O. Pansa, District Palamu, Jharkhand and Sri Lawkesh Kumar Singh AT & PO- Kamgarpur, District - Palamu, Jharkhand over the Mining Lease area of Acre (18.21 Ha) has been prepared by Dr. Amarjeet Kumar Singh, C.D. Singh Colony, Near CMRI Gate, Dhanbad , Regd. No.. I request the DMO, Palamu and Director (Mines), Department of Mines and Geology, Government of Jharkhand for further correspondence regarding modification etc. of the Mining Plan and Progressive Mine Closure Plan with the said Recognized person on the following address: Dr. Amarjeet Kumar Singh, C.D. Singh Colony, Dhanbad , Jharkhand, Mob / , amarjeet.dhanbad@gmail.com. I hereby undertake that all the data so made in the Mining Plan and Progressive Mine Closure Plan prepared by the said Recognized Person be deemed to have been made with my knowledge and consent and shall be acceptable and binding on me in all respect. I, hereby authorize Dr. Amarjeet Kumar Singh, C.D. Singh Colony, Near CMRI Gate, Dhanbad to collect the approved Mining Plan and Progressive Mine Closure Plan and all the papers / document on my behalf from the office of the Director (Mines), Department of Mines and Geology, Government of Jharkhand, Ranchi. For, M/S MAA STONE WORKS Date: Place: (Sushil Kumar Singh & Lawkesh Kumar Singh) Applicant

38 M/S MAA STONE WORKS Sri Sushil Kumar Singh Sri Lawkesh Kumar Singh At - Aghaura, P.O- Pansa AT & PO - Kamgarpur Dist. Palamu, Jharkhand Dist. - Palamu, Jharkhand Mob: Mob: CERTIFICATE Mining Plan & Progressive Mine Closure Plan of Damdami Stone & Morum Mine complies all statutory rules, regulation, orders made by the Central or State Government, statutory organization, court etc. have been taken into consideration and wherever any specific permission is required, the Lessee will approach the concerned authorities. I hereby also undertake that all the measures proposed in the Progressive Mine Closure Plan will be implemented in a time bound manner as proposed. For, M/S MAA STONE WORKS Date: Place: (Sushil Kumar Singh & Lawkesh Kumar Singh) Applicant

39 M/S MAA STONE WORKS Sri Sushil Kumar Singh Sri Lawkesh Kumar Singh At - Aghaura, P.O- Pansa AT & PO - Kamgarpur Dist. Palamu, Jharkhand Dist. - Palamu, Jharkhand Mob: Mob: CERTIFICATE The Provisions of Mine Act, Rules & Regulations made there under have been observed in the Mining Plan of Damdami Stone & Morum Mine at Damdami Mouza, Thana Husenabad, block- District Palamu, State Jharkhand over the Mining Lease area of Acre (18.21 Ha). The area is non-forest as per survey record of Government in Palamu district, Jharkhand state and wherever any specific permission is required the Lessee will approach the appropriate authority for approval. Further, standards prescribed by DGMS in respect of Miners Health will be strictly implemented. For, M/S MAA STONE WORKS Date: Place: (Sushil Kumar Singh & Lawkesh Kumar Singh) Applicant

40 M/S MAA STONE WORKS Sri Sushil Kumar Singh Sri Lawkesh Kumar Singh At - Aghaura, P.O- Pansa AT & PO - Kamgarpur Dist. Palamu, Jharkhand Dist. - Palamu, Jharkhand Mob: Mob: Certificate I /We, M/S MAA Stone Works its partners Sri Sushil Kumar Singh & Sri Lawkesh Kumar Singh the holder of Damdami Stone & Morum Mine over an area of Ha is located Damdami Mouza, Thana & Block Husenabad, District Palamu and State Jharkhand, hereby solemnly affirm that the plans and programmers in this mining plan will be scrupulously implemented by me and I will be strictly held responsible for any deviation thereof. I also hereby certify that the provisions of Mines and Minerals (Development & Regulations) Act, 1957, and the Mines Act, 1952 and Rules and Regulations made under these Acts, along with the provisions of Jharkhand Minor Mineral Concession Rules, 2004 (as amended up-to-date) will be strictly adhered to while implementing this mining plan and wherever specific permissions will be required. I will approach the concerned authorities of Directorate General of Mines Safety and the state government as the case may be. Signature of Concessionaire Dr. Amarjeet Kumar Singh

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Form-I for seeking clearance for project attracting CRZ notification

Form-I for seeking clearance for project attracting CRZ notification Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

APPENDIX I FORM I. Basic Information

APPENDIX I FORM I. Basic Information APPENDIX I (I) Basic Information FORM I S.. Item Details 1 Name of the project/s Enhancement of Phosphoric Acid Production from 700 MTPD to 1000 MTPD P2O5 and other auxiliary Facilities within the Existing

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

M/s Gokul Stone Industries

M/s Gokul Stone Industries Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS 2 BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION SR. NO. PARTICULARS YES/ NO Page no. 1 2 3 Is the application contain covering letter by the project proponent addressed to Member Secretary, SEIAA?

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

FORM 1. Basic Information

FORM 1. Basic Information (I) Basic Information FORM 1 S. Item Details 1 Name of the Project /s Establishment of 1.5 M KCal/Hr (500 kg/hr) Hazardous Waste Incinerator (Upgradation) by M/s Ramky Enviro Engineers Limited. 2 S.. in

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

List of Documents. List of Annexure

List of Documents. List of Annexure List of Documents S.No. Description Page No. 1 Form I Application 1 to 15 2 Standard Template and Checklist 16 to 24 3 Form IA for Building & Construction Projects 25 to 35 4 Environmental Management Plan

More information

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State

More information

APPLICATION FOR ENVIRONMENTAL CLEARANCE

APPLICATION FOR ENVIRONMENTAL CLEARANCE APPLICATION FOR ENVIRONMENTAL CLEARANCE CREATIVE ENGINEERS & CONSULTANTS NABET ACCREDITED, NABL ACCREDITED TESTING LABORATORY& ISO 9001: 2008 CERTIFIED COMPANY 9B/4, BHARATHWAJAR STREET, EAST TAMBARAM,

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha. STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN For COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.) At SY. NO.266 OF HAVALIGI VILLAGE, VIDAPANAKAL MANDAL,

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX INDEX Sl.. Contents Page. 1 FORM I APPLICATION FOR CLAY MINING FOR BRICK KILN 3 BASIC INFORMATION 6 ACTIVITY 7 2 PRE-FEASIBILITY REPORT 21 3 MINING PLAN 35 ` ENCLOSURES Sl.. Contents 1 UNDERTAKING 2 UNDERTAKING

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information