Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT



Similar documents
Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE - FEASIBILITY REPORT

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT

PRE FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

[SIMPLIFIED MINING SCHEME] Index

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

PREFEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

M/s. Karshanbhai Bhagvanbhai Rabari

PRE FEASIBILITY REPORT

PROPOSED TERMS OF REFERENCE

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand)

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

Near Village- Gorir (Modi Pahari), Tehsil Khetri, District Jhunjhunu (Rajasthan) Pre- Feasibility Report

Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report

Project Details-Minor Minerals (Other Than Sand)

P.F.R. TABLE OF CONTENTS

Environmental Management Plan

Environment Management Plan

Environment Management Plan

INDEX 1.0 EXECUTIVE SUMMARY... 23

PRE FEASIBILITY REPORT

Form -1 Mining Plan & Pre-feasibility Report

ENVIRONMENT MANAGEMENT PLAN

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: Ha)-B2 Project

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan

Environment Management Plan

ENVIRONMENT MANAGEMENT PLAN

NIMAPALLI STONE QUARRY

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

PRE-FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

ENVIRONMENTAL MANAGEMENT PLAN

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Proposed Terms of Reference for EIA studies

ENVIRONMENTAL MANAGEMENT PLAN

Mineral Granite. Lease Area Near Villages- Chandma. Tehsil - Sarwar. District- Ajmer. (Rajasthan) PROJECT PROPONENT

ENVIRONMENTAL MANAGEMENT PLAN

PRE-FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

How To Conduct An Environmental Impact Assessment

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

ENVIRONMENT MANAGEMENT PLAN

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn: TPa

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

ENVIRONMENTAL MANAGEMENT PLAN

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

Environmental Management Plan

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

CHANDAM7AIL,P SAND DEPOSIT

FORM i, pre FEasiBilitY REpORt. EnViROnMEnt ManaGEMEnt plan FOR. area= proposed production: - 36,000 tpa. project COst: - 10 lacs

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE FEASIBILITY REPORT

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

PRE-FEASIBILITY REPORT FOR SHAHABAD STONE QUARRYING. In 1-30 Acres of Patta Land Survey Number: 48/2 Kallur Road Village

PRE-FEASIBILITY REPORT

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

PROPOSED TERMS OF REFERENCE


M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

(IV) Proposed Terms of Reference for EIA Studies

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

STANDARD TEMPLATE, FORM I, PRE-FEASIBILITY REPORT AND ENVIRONMENTAL MANAGEMENT PLAN FOR ENVIRONMENTAL CLEARANCE

LORE SILICA SAND MIINE

Project Details-Minor Minerals ( Rajula Building Stone)

G. M. Nagaraju Environment Management Plan

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Transcription:

PRE- FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to the presence of Interstate Boundary between Rajasthan and Haryana within 5km. Summarized Tabular Representation Project Name Nangal (M.L. No. 134/03) Masonary Stone Mine Applicant Shri Ali Mohammad Area of the lease area 1 ha Location of mine Latitude Longitude Village Nangal Tehsil -Pahari District - Bharatpur State - Rajasthan 27 47'09.18" to 27 47'12.01" N 77 02'19.29" to 77 02'12.46"E Topo sheet number GT Sheet No. 54 E/1 Minerals of mine Total Mineable reserves Life of mine Project Cost Proposed production of mine Method of mining No of working days Water demand & Source Man power 58 Masonary Stone 723271 Tonnes 10 years 45 lakh 1,34,395 MTPA Opencast Mechanized 300 days Total water requirement is about 6.6 KLD = 2.6 KLD (Drinking & Domestic Uses) + 1 KLD (Plantation) + 3 KLD (Dust Suppression).Water will be procured from nearby villages Nearest railway Govindgarh railway station about 33 km in S station direction Nearest State SH 22 about 4 km away in S direction highway/national highway Nearest airport Indira Gandhi International airport (about 85 km in N direction) Seismic zone Zone II as per IS 1893 (Part I): 2002 1 Applicant: Sh. Ali Mohammad

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of Project and Project Proponent Nangal (M.L. No. 134/03) Masonary Stone Mine is situated at khasra no. 271,281 Village - Nangal, Tehsil- Pahari, District- Bharatpur, and State- Rajasthan over an area of 1 ha. Initially the mine lease was granted in favour of Shri Ali Mohammad S/o Sh. Jagmaal, R/o Village & post: Lavan Post Jalalpur, Bharatpur Raj., Vide order No.-3794 Kha A/Bhart/Ri/Kha p/132/03/3787 dated 15/11/2010 and was registered on dated 19/1/2011 for a period of 20 years. 2.2 Brief description of nature of Project The project has been proposed for mining of Mineral Masonary Stone by adopting opencast mechanized mining method. 2.3 Need for the Project and Its Importance to the Country or Region Masonary stone is most commonly used as building material. Masonry Stone finds extensive use in the construction and infrastructural works. The basic objective of the project is the effective utilization of Material in the country or region. Masonry Stone is the world's most commonly used material in construction of road, railway track construction etc. Masonry Stone will help in the economic growth of the country or region. 2.4 Demands-Supply Gap The demand for Masonary Stone is ever growing with the growth of the infrastructure sector in our country. The mineral is used in the construction activities like buildings, road construction etc. The requirement for the mineral is always high in the nearby cities and towns. Therefore there is always a good demand of the mineral in the domestic market. 2.5 Imports vs. Indigenous Production Development needs will be met only through indigenously produced Masonary stone against the high cost of imported material. 2.6 Export Possibility There is no proposal to export the mineral. However, Masonary stone produced from the mine will fulfill the needs of the region and surplus if 2 Applicant: Sh. Ali Mohammad

any, will be considered for export. 2.7 Domestic/ Export Markets Domestic Market Being a building stone, the principal use of this Masonary stone is in construction of buildings and roads. Export Market The proposed mining activity is for indigenous consumption only for real state, decorative accessories etc. 2.8 Employment Generation (Direct and Indirect) The proposed mining activity for the excavation of masonary stone will provide both direct and indirect employment in form of labors for mining process and through transport etc respectively. 3.0 PROJECT DESCRIPTION 3.1 Type of Project Including Interlinked and Interdependent Projects, If Any. The project falls under Category A Project or activity 1(a) as per EIA Notifications 2006. It is for Mining of Masonary stone. It is an opencast mechanized mining. The project dose not includes any interlinked or interdependent project. There are no interlinked projects involved. 3.2 Location The mining lease area is located at Khasra No: 271,281 Village - Nangal, Tehsil- Pahari, District- Bharatpur, and State- Rajasthan. The mining lease area falls in G.T sheet No. 54 E/1. Latitude Longitude 27 47'09.18" to 27 47'12.01" N 77 02'19.29" to 77 02'12.46"E 3 Applicant: Sh. Ali Mohammad

Project Area Fig 1: Location Map of proposed Project site 4 Applicant: Sh. Ali Mohammad

3.3 Details of Alternate Sites Mining is site specific so no alternative site is proposed. 3.4 Size or magnitude of operation The mining lease has been granted over an area of 1 ha. During five year total production of mineral shall be approximately 370558 MT Regional Geology Different formations belonging to Bhilwara super group, Delhi super group, Vindhyan group and Quaternary alluvium form the geological framework of the district. About 85% area of the district is occupied by alluvium and wind blown sand. The geological sequence in Bharatpur district is as follows: Era/Period Geological Cycle Quaternary Holocene Paleo-meso Proterozoic Middle to late pleistocene Delhi Group super Group Formation Lithology Ajabgarh Group Alwar Group Present day flood plain Ambala alluvium Arauli Formation Bhokol Formation Pratgarh formation Undifferentiated Aeolian and fluvial Polycyclic sequence of brownish oxidized silt, clay with kankar and grey brown micaceous sand Carbonaceous phyllite shale, slate interbeded with quartz Interbeded quartz and phyllite Quartzite Phyllite Massive quartize, interlayered feldspathic, ferruginous orthoquartzite Local Geology Geological Cycle Group Formation Lithology Delhi Super Ajabgarh Arauli Carbonaceous, phyllite, Group Formation shale, slate intercalated with quartzite. 5 Applicant: Sh. Ali Mohammad

3.6 Reserve Estimation The following parameters have been considered while estimating the Reserve: Average 0.5m cover has been considered as soil Average 242mRL depths of masonary stone has been considered for proved category of reserve. Average 5m depth of masonary stone below proved category has been considered. Average 5m depth below probable category has been considered for possible category reserve. Bulk density has been taken 2.5 tonnes/m3. Recovery of masonary stone is 95% of total reserve. Total mineable reserve has been calculated as 723271 Tonns Project Description with Process Details 1 2 3 4 Site prepration (demarcation by pillars) Excavation of mineral Loading of Mineral Transportation 3.6.1 Method of Mining The method of mining of the proposed project will be opencast mechanized method. The mining shall be started from the existing pit. Excavation of the mineral will be done by simple hand tools as well as by hydraulic machineries. The mining activity will be done by bench formation. Hydraulic machinery will be deployed time to time as and when required. The bench height and width is proposed to be 1-6 mts and width will be more than 1-6mts. The 6m benches shall be prepared in four slice height 1.5m. Blasting will be done. Blasting will be done during day time only. Muffle blasting will be done by an authorized person on contractual basis. Deep hole blasting after getting DGMS permission. 6 Applicant: Sh. Ali Mohammad

Blasting parameters: Length of shot holes: 1.5 mt Diameter shot holes: 32mm Spacing: 1m Stemming: 30% Burden: 0.8 mt Type of explosives: Special gelatin, delay detonator, R-Cord No secondary blasting will be done. The excavated mineral will be directly loaded into trucks and will be transported to the local market and end users. The details of machinery, to be used Production details Machines Nos. Jack hammer 3 Compressor 1 D.G Set 1 Poklean 1 Dumper 4 Water Tanker 1 Wagon Drill 1 The Proposed year wise excavation: Years Total saleable Minerals in tonnes 1 st Year 35343.5 2 nd Year 44631 3 rd Year 65563 4 th Year 90625.5 5 th Year 134395 Total 370558 3.7 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/s, Mode of Transport of Raw Material and Finished Product No raw material will be required for production of Masonary Stone.The mine mineral shall be collected and sorted manually before its final dispatch to various industries through trucks. No waste will be generated in the process. 7 Applicant: Sh. Ali Mohammad

3.8 Resource Optimization/ Recycling and Reuse Not envisaged. 3.9 Availability of Water Its Source, Energy/ Power Requirement and Source 3.9.1 Water Requirement Water for domestic, dust suppression and plantation is required to be 6.6 KLD. 3.9.2 Power The operation will be done only from sun rise to sun set hence there is no power requirement for the project at site. All the vehicles and machinery will run on diesel, there is no requirement of electricity. If needed connection will be taken from the nearby village after taking proper permission. 3.10 Quantity of wastes to be generated (Liquid and Solid) and Scheme for their Management/Disposal 3.10.1 Solid Waste Generation& its Disposal The waste overburden in the area is only intermixed soil. The waste rock produced will be loaded by excavators & dumpers for its transportation to the reject dump yard & when require will be used for making road. The waste material shall be dumped outside the mine lease area. The total waste to be handled in five years is as follows: Years waste in m 3 1 st Year 1235 2 nd Year 1408 3 rd Year 1589 4 th Year 2019 5 th Year 3011 Total 9262 3.10.2 Liquid Effluent Not applicable. 8 Applicant: Sh. Ali Mohammad

4.0 SITE ANALYSIS 4.1 Connectivity The proposed lease area is easily approachable through SH 22. The nearest Railway station is Govindgarh Railway Station which is 33 km away from the site. Nearest Airport is 85 km in New Delhi. 4.2 Landform, Land use and Land ownership 4.2.1Landform The applied lease area is a part of a hillock which is a Govt. Land. 4.2.2 Land use The applied lease area is a Govt. land. The lease area comprises of undulated terrains. There is no village or human settlement in the lease area. Permanent vegetation in the area is very less prominent. 4.2.3 Land Ownership The proposed lease area is Govt. land. 4.3Topography The lease area comprises of undulated terrains. Maximum part of the lease area is covered by Masonary Stone. 4.4 Existing land Use Pattern The lease area is a Govt. Land. In general the area is hilly. There is no village or human settlement in the lease area. Permanent vegetation in the area is also very less prominent. There is no forest land involved in the lease area. Also there is no eco sensitive area present near the lease area. 4.5 Existing Infrastructure No existing infrastructure within lease area. 4.6 Soil Classification The soils of the Bharatpur district are greyish brown and yellowish brown with wide variation in texture from sandy loam to clayey loam. The soils at some places are affected by salinity/ alkalinity. The soils of Bharatpur, Bayana and Deep subdivisions are fertile. In northeastern part of the district, the soils are compact and have low permeability, which causes water to stagnate on the surface during rainy season. 9 Applicant: Sh. Ali Mohammad

4.7 Climate data from Secondary Sources: The climate of the district being dry, it becomes extremely hot during summer and extremely cold during winter. The cold season is from December to February and is followed by summer from March to June. Period from mid of September to end of November constitute post monsoon season. Average annual rainfall (1971-2011) of the district is 605.3 mm. The rainfall has decreased over the years. The average annual rainfall during the period 2001 2011 varied from 401 mm at Sikari to 741 mm at Sewar Bundh. The district experiences either mild or normal drought once in two years. Severe type of drought was recorded in 1979. Most severe type of drought had occurred 3 only in Nadbai subdivision in 1979 and Deeg subdivision in 1986. Moderate drought has also occurred in the district during 1987, 1989 and 1991. 4.8 Social Infrastructure available: 1) The applied mine is not facilitated with power line. 2) The state transport buses and private buses are available up to village Nangal and mine site. 3) The nearest police station applicable is at pahari. 4) Permanent offices and other buildings at mine proposed. 5) Mobile Phone connectivity is available at mine site. 6) Medical facility is available at Nangal. 7) No National Park/sanctuary falls within 10 km of the lease area. 5.0 PLANNING BRIEF 5.1 Planning Concept The proposed project is for the mining of Masonary stone. Mining is proposed to be done through mechanized method. Rajasthan Minor Mineral Rules & MCDR will be followed in the mining. Mining will be done in benches and will not intersect the ground water table. 10 Applicant: Sh. Ali Mohammad

5.2 Land use Planning At the end of mine lease period: 5.3 Assessment of Infrastructure demand (Physical & Social) On the basis of the preliminary site visit, the infrastructure demand in the village was assessed on the basis of need and priority. The health infrastructure of the study area requires improvement. The lack of medical facilities needs improvement. 5.4 Amenities/Facilities Workshop For maintenance of machinery it is proposed to establish a workshop nearby to mine site welding, puncture etc. Power supply Electric power supply does not exist at mine site and it is proposed to take connection. Water Supply A tractor mounted tanker is proposed for supply of water to mining work, spraying, watering the plants and drinking purposes. First Aid A first aid facility is proposed at Mines office Rest Shelter Rest shelter is proposed near mine site. Latrines and Urinals At the mine site urinal and Bath is proposed for staff and labours. 11 Applicant: Sh. Ali Mohammad

5.4.1Budget for facilities provided to Labours Sl. No. Scheme Capital Cost (in Rs) Annual Recurring Cost (in Rs) 1 Drinking water facility 10,000 2 Shelter 10,000 3 Health facility 10,000 4 Education for children, 10,000 crèche.etc 5 sanitation facility 10,000 Total 20,000 30,000 6.0 Proposed Infrastructure 6.1 Industrial Area (Processing Area) No infrastructure is proposed. 6.2 Residential Area (Non Processing Area) As local workers from nearby areas will be engaged for the mining activity, no residential area/ housing are proposed. 6.3 Green Belt Plantation will be carried out under restoration works. 33% of the total lease area will be planted. Plantation will be done: Nearby area of school At the Dump At the Govt. waste land provided by the Govt. At own private land Nearby roads 6.4 Social Infrastructure No social Infrastructure is proposed however 2% of the project cost will be utilized for the development of the existing social infrastructure of area as per the needs of the local people/residents. Budget for Corporate Social Responsibility (CSR) SI.No. Activity Annually (In Rs.) 1 Health camps and free medicine 30,000 3 Educational support poor 50,000 students. TOTAL (Annual) 80,000 12 Applicant: Sh. Ali Mohammad

6.5 Sewerage System Domestic waste water will be treated into septic tank followed by soak pit 6.6 Industrial Waste Management Not applicable 6.7 Solid Waste management The waste overburden in the area is only intermixed soil. The waste rock produced will be loaded by excavators & dumpers for its transportation to the reject dump yard & when require will be used for making road. The waste material shall be dumped outside the mine lease area. 6.8Power Requirement & Supply/Source The operation will be done only from sun rise to sun set hence there is no power requirement for the project at site. The electricity line passes out side near the Lease area. The electricity facility is not available at mining lease area. Only diesel equipment will be used. 7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN As no personnel are expected to be migrated due to mining in the lease area and the adjoining region is also having a good mineral potential, the rehabilitation of the employees is not going to be a problem. The workers and other staff can get job in the neighboring areas after the end of life of mine. The applicant shall also try for employment of the workers. 8.0 PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely Date of Start of Construction and Likely Date of Completion No construction activities are proposed. The mining activity will commence only after receiving environmental clearance and other statutory clearance. 8.2 Estimated Project Cost along with analysis in Terms of Economic Viability of the Project Estimated project cost is Rs. 45 Lakh. The lessee has all the mining equipments used for the scientific mining. The mine is Eco-Friendly. Economically the ore is mineable as compared to overburden thickness. The entire mineable reserve as estimated is categorized as 121. 13 Applicant: Sh. Ali Mohammad

Environmental Management Plan The environmental management plan consists of the set of mitigation, management, monitoring and institutional measures to be taken during the implementation and operation of the project, to eliminate adverse environmental impacts or reduce them to acceptable levels. The present environmental management plan addresses the components of environment, which are likely to be affected by the different operations in the mine area. SI. No. 1 2 Budget Allotted for the EMP Measures Pollution Control i) Dust Suppression ii) Garland drain & ground dump Pollution Monitoring i) Air pollution ii) Water pollution Capital cost (in Rs.) Annual recurring cost (in Rs.) -- 30,000 /- 20,000 /- -- 30,000 /- 30,000 /- 3 Green Belt 50,000 /- 40,000 /- Total 50,000 /- 1,50,000 /- 9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The proposed mine will bring economical benefits to the state by the way of Royalty for mineral and to the local people by way of direct and secondary employment opportunities. Masonary stone is used for a variety of structural and decorative purposes. The material is in high demand at the local market for real estate industry. The project will bring about socio-economic improvement of the area and will prove beneficial to the area. **************** 14 Applicant: Sh. Ali Mohammad