Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments



Similar documents
APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I (See Paragraph -6) FORM I

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information :

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

PRE-FEASIBILITY REPORT

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I FORM I. Basic Information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

M/s Gokul Stone Industries

Form-I for seeking clearance for project attracting CRZ notification

FORM 1. Basic Information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

List of Documents. List of Annexure

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

ENVIRONMENT MANAGEMENT PLAN

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

Project Details- Minor Minerals (Other Than Sand)

PROPOSED TERMS OF REFERENCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

Project Details-Minor Minerals (Other Than Sand)

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

ENVIRONMENT MANAGEMENT PLAN

APPENDIX I. Revised FORM 1

Extent : Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

PRE- FEASIBILITY STUDY REPORT

Project Details- Minor Minerals (Other Than Sand)

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Environment Management Plan

Proposed Terms of Reference for EIA studies

COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Environment Management Plan

STANDARD TEMPLATE FORM-1 PRE- FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN & MINING PLAN. COLOUR GRANITE QUARRY (QUARRY LEASE AREA: 1.00 ha.

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION FOR ENVIRONMENTAL CLEARANCE

Environment Management Plan

APPENDIX I FORM S. No. in the schedule 8(a) Building and Construction project.

BASIC CHECKLIST REQUIRED FOR SUBMISSION OF APPLICATION PARTICULARS

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT

CHANDAM7AIL,P SAND DEPOSIT

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

APPENDIX-I (See paragraph-6) FORM 1. S. No. Item Details. 1 Name of the project/s: Sand mining

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

Environment Management Plan

How To Conduct An Environmental Impact Assessment

ROUGH STONE QUARRY. S.F.NO: 33, Pudunaduvalur village, Perumabalur Taluk & District, Tamil Nadu. LEASE PERIOD: to

FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd.

BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area

ENVIRONMENTAL MANAGEMENT PLAN :-

Proposed Terms of Reference for EIA studies

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

Sub: Submission of application for Environmental Clearance.

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

Frequently Asked Questions (FAQs) on Hydropower

Q 4/17/13: Thank you for your quick response to our dated April 10, In looking over your comments, we have a few clarifying remarks.

APPENDIX 4. Risk Tables

ENVIRONMENT MANAGEMENT PLAN

Project Details Minor Minerals

Environmental guidelines for preparation of an Environment Management Plan

APPENDIX I (See Paragraph 6) FORM 1

PRE FEASIBILITY REPORT

Floodplain Development Land Use Review

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE FEASIBILITY REPORT

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

FORM I & FORM IA. PROJECT BY M/s. TWIN DEVELOPERS MUMBAI, MAHARASHTRA. PREPARED BY M/s. FINE ENVIROTECH ENGINEERS MUMBAI, MAHARASHTRA

NIMAPALLI STONE QUARRY

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

APPENDIX I. (See paragraph -6) FORM- 1

PRE-FEASIBILITY REPORT

APPENDEX I FORM 1. including Kharab Kharab Area ,540.96m 2. Net Plot Area 1,86, m 2 1,38, m 2. Total Built up Area

R. M. ESWARA NAIDU Bommaiahpalli Village, Nalagampalli Post, Bangarupalyam Mandal, Chittoor District, Andhra Pradesh Mobile No:

66 REFERRAL AND NOTICE PROVISIONS. Scope

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

Form -1 Mining Plan & Pre-feasibility Report

National Planning Policy for Waste

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

1. Purpose and scope. 2. SEPA's role in hydropower and planning

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

Transcription:

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR To Madhya Pradesh State Environmental Impact Assessment Authority (SEIAA) Page 1/13

Application # : 03893 Proponent Name : NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR Acknowledgement # : Pending for Scrutiny Registration # : t Allocated Master Category Name : Mining, extraction of natural resources and power generation (for a specified production capacity) Sub Category Name : 1(a) i (i) Mining of minerals Category Description : General condition shall apply. Except for project or activity of less than 5 ha of mining lease area for minor minerals. Provided that the above exception shall not apply for project or activity if the sum total of the mining lease area of the said project or activity and that of existing operating mines and mining projects which were accorded environmental clearance and are located within 500 meters from the periphery of such project or activity equals or exceeds 5 ha. te: (i) Prior Environmental clearance is required at the stage of renewal of mine lease for which an application shall be made up to two years prior to the date due for renewal. Further, a period of two years w.e.f the 04th April 2011 is provided for obtaining environmental clearance for all those mine leases, which were operating as on the 04th April 2011 with requisite valid environmental clearance and which have fallen due for renewal on or after 04th vember 2011. Provided that no fresh environmental clearance shall be required for a mining project or activity at the time of renewal of mining lease which has already obtained environmental clearance under this tification. (ii) Mineral prospecting is exempted. Application Description : BADGONE CRUSHER STONE QUARRY LEASE 1.200 HECT Processing fee details D.D.. : 008892 Date : 17/06/2015 Amount : 5000 Bank Name : HDFC BANK, Branch : M.P. NAGAR, BHOPAL, M.P Page 2/13

APPENDIX - 1 (see paragraph 6) FORM 1 (I) Basic Information S. Items Details 1 Name of the Project/s BADGONE CRUSHER STONE QUARRY LEASE 1.200 HECT 2 S..in the schedule 1(a) i 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. 2784 CU MT/ YEAR QL AREA 1.200 HECT 4 New/Expansion/Modernization Expansion 5 Existing Capacity/Area etc. EXISTING QL 6 Category of project A or B B 7 Does it attract the general condition? If yes, please specify 8 Does it attract the specific condition? If yes, please specify NO ANY GENERAL CONDITION ATTRACT NO ANY SPECIFIC CONDITION ATTRACT 9 Location VILLAGE - BADGONE Plot/Survey/Khasra. KHASRA NO. - 140 Village Tehsil District State 10 Nearest railway station/airport along with distance in kms. 11 Nearest Town, city, District Headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) BADGONE AGAR SHAJAPUR MADHYA PRADESH SHAJAPUR RAILWAY STATION 50 KM & 128 KM INDORE AIRPORT VILL - BADGONE, TEHSIL - AGAR BADGONE VILLAGE PANCHYATS 13 Name of the applicant SHRI NITTEN PARMAR S/O SHRI NARENDRA SINGH PARMAR 14 Registered Address RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P 15 Address for correspondence: RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P Name Designation (Owner/Partner/CEO) SHRI NITTEN PARMAR S/O SHRI NARENDRA SINGH PARMAR OWNER Page 3/13

Address Pin code 465001 E-mail Telephone. 9893733613 Fax. 16 Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects NA 18 Whether separate application of interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) the Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) the C.R.Z. tification, 1991? 22 Whether there is any Government Order/policy relevant/relating to the site? 23 Forest land involved (Hectares) NA 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) name of the Court (b) Case. (c) Orders/direction of the Court, if any and its relevance with the proposed project. RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P enviro2000-np@yahoo.in NO FAX Village Distict State NA NA NA NA NA NA NA NA NA NA NA NA NA (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist confirmation / Details thereof (with approximate quantities 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? MINED OUT LAND/PIT WILL BE DEVELOPED AS WATER RESERVOIR VEGETATION OF SMALL PLANT(JHADIYAN)WILL BE REMOVE FROM Page 4/13

MINING AREA AND PROPOSED PLANTATION IN SURROUNDING OF QUARRY BOUNDARY AREA 1.3 Creation of new land uses? LAND WILL USE AS A WATER RESERVIOR 1.4 Pre-construction investigations e.g. bore houses, soil testing? 1.5 Construction works? 1.6 Demolition works? 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? OPEN CAST MINE PROPOSED 1.10 Reclamation works? SOME PIT AREA IS RELAMAIED BY MINE WASTE CRUSHER STONE 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing processes? CRUSHER STONE MINING PROPOSED 1.14 Facilities for storage of goods or materials? STORAGE PROPOSED, ALL MINED OUT CRUSHER STONE IS USED ONLY FOR SALE ONLY 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? NOT PROPOSED NOT PROPOSED NOT PROPOSED NOT PROPOSED 1.22 Stream crossings? NOT PROPOSED 1.23 Abstraction or transfers of water form ground or surface waters? MINING IS PROPOSED ABOVE TO GROUND WATER LEVEL 1.24 Changes in water bodies or the land surface INCREASE IN OUT LAND IS CONVERT INTO Page 5/13

affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? 1.29 Introduction of alien species? 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? WATER RESERVOIR WATER LEVEL WHEN MINED MINED OUT CRUSHER STONE IS TRANSPORT THROUGH TARPAULIN COVERED TRUCK 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/Checklist confirmation / Details thereof (with approximate quantities 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD BANJAR LAND NO AGRICULTURE USE LAND 5.000 KLD WATER REQUIREMENT IN THIS PROJECT ONLY DRINKING, GREEN BELT DEVELOPMENT AND SPRINKLING WATER IS REQUIRED WHICH IS ARRANGE 2.3 Minerals (MT) CRUSHER STONE MINING USE FOR STONE 2784 CU MT/YEAR 2.4 Construction material - stone, aggregates, sand / soil (expected source - MT) 2.5 Forests and timber (source - MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) NOT PROPOSED 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist confirmation / Details thereof (with approximate quantities 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) NO HAZARDOUS MATERIAL USE EMPLOYMENT AND MEDICAL CHECK UP IS PROVIDED BY LEASEE Page 6/13

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) NO HAZARDOUS MATERIAL USE 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes EMPLOYMENT AND MEDICAL CHECK UP IS PROVIDED BY LEASEE NO ANY BAD EFFECT BY THIS MINING PROJECT 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. Information/Checklist confirmation / Details thereof (with approximate quantities 4.1 Spoil, overburden or mine wastes VERY VERY LESS MINE WASTE GENERATE WASTE STONE USE AS ROAD MANUFACTURING OF VILLAGE 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) 4.4 Other industrial process wastes 4.5 Surplus product 4.6 Sewage sludge or other sludge from effluent treatment 4.7 Construction or demolition wastes 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials 4.10 Agricultural wastes 4.11 Other solid wastes 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist confirmation / Details thereof (with approximate quantities 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources VERY VERY LESS BECOZ MOSTLY MINING DONE BY MANNUALLY 5.2 Emissions from production processes ONLY FUGITIVE EMISSION DUE TO VEHICULAR ACTIVITY 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment ONLY FUGITIVE EMISSION DUE TO VEHICULAR ACTIVITY NO CONSTRUCTION PROPOSED Page 7/13

5.5 Dust or odours from handling of materials including construction materials, sewage and waste VERY VERY LESS, GARLAND DRAIN SURROUNDING OF DUMP 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources 6. Generation of ise and Vibration, and Emissions of Light and Heat: S. Information/Checklist confirmation / Details thereof (with approximate quantities 6.1 From operation of equipment e.g. engines, ventilation plant, crushers VERY LESS 6.2 From industrial or similar processes 6.3 From construction or demolition 6.4 From blasting or piling VERY LESS 6.5 From construction or operational traffic VERY LESS 6.6 From lighting or cooling systems 6.7 From any other sources 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. Information/Checklist confirmation / Details thereof (with approximate quantities 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist confirmation / Details thereof (with approximate quantities 8.1 From explosions, spillages, fires etc from Page 8/13

storage, handling, use or production of hazardous substances 8.2 From any other causes 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/Checklist confirmation / Details thereof (with approximate quantities 9.1 Lead to development of supporting. utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment NO BAD IMPACT ON ENVIRONMENT FROM MINING CRUSHING AND TRANSPORTING ACTIVITY LEASE IS ENSURE TO YOU FOR PREVENT ENVIRONMENT FROM TAKING VARIOUS STEP LIKE PLANTATION WATER SPRINKLING SOAK PIT ETC MINED OUT LAND WILL USE AS WATER RESERVOIR 9.3 Set a precedent for later developments I WILL COMPLY MINING AND ENVIRONMENTAL RULES AND REGULATION WHICH ARE APPLICABLE ON ME 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects (III) Environmental Sensitivity S. Areas Name / Identity 1 Areas protected under international conventions,national or local legislation for their ecological,landscape,cultural or other related value Aerial distance (within 15 km.) Proposed project location boundary 2 Areas which are important or sensitive for Page 9/13

ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters 5 State, National boundaries 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations 8 Densely populated or built-up area 9 Areas occupied by sensitive man-made land uses(hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources(ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems(earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Page 10/13

Page 11/13

UNDERTAKING (a) I hereby give an undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: 17 Jun, 2015 Applicant Signature Name: SHRI NITTEN PARMAR S/O SHRI NARENDRA SINGH PARMAR Designation: OWNER Address: RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P Ph.. (M): 9893733613 Authorized Signatory Name: SHRI NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR Designation: LESSEE Address: RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P Ph.. (M): 9897583483 te : 1. The projects involving clearance under Coastal Regulation Zone tification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provision of the C.R.Z tification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-s-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. Page 12/13

Powered by TCPDF (www.tcpdf.org) CERTIFICATE (b) I/ we hereby declare that Sri SHRI NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR of M/s. RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P is/ are authorized to submit the application and to do all necessary correspondence for obtaining environmental clearance from State Level Expert Appraisal Authority (SEIAA), MP and to attend the meeting(s) of State Level Expert Appraisal Authority (SEIAA), MP to present our case and to clarify the points raised by Members of SEAC and SEIAA. Date: 17 Jun, 2015 Applicant Signature Name: SHRI NITTEN PARMAR S/O SHRI NARENDRA SINGH PARMAR Designation: OWNER Address: RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P Ph.. (M): 9893733613 Authorized Signatory Name: SHRI NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR Designation: LESSEE Address: RES - AGAR, TH - AGAR, DISTT - SHAJAPUR, M.P Ph.. (M): 9897583483 Page 13/13