Project Details Minor Minerals

Size: px
Start display at page:

Download "Project Details Minor Minerals"

Transcription

1 M/s.Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya Survey. 24/ 4 paiki Vill. Miyani, TAL: Porbandar, Dis. Porbandar. Mo To. State Level Expert Appraisal Committee, Paryavaran Bhavan, Sector-10/A, Gandhinagar. Sub: Application for Environmental Clearance for the Bldg.Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya Admeasuring Hector. Survey. 24/ 4 paiki,vill. Miyani, Tal. Porbandar Dis. Porbandar. Respected Sir, We propose to start the operation of the Building lime stone of mine in above mentioned location. As per the moef circular dated 18/05/2012. We require to obtain the prior environmental clearance. We herewith apply (in From-1) for environmental clearance with and other supporting documents. We request your good selves to kindly consider our case in earliest Committee meeting and grant us the recommendation/environmental Clearance. Thanking You, Sincerely Yours, Sajanbhai Bhurabhai Godhaniya (LEASE OWNER) Project Details Minor Minerals

2 (Other Than Sand) Sr.. About the Proposal Details Particulars 1 Name of the Lease Holder Sajanbhai Bhurabhai Godhaniya 2 Location Address Survey. 24/ 4 paiki Village Taluka District Miyani Porbandar Porbandar 3 Lease Area Hector 4 Ownership of Land (Gov./Private Land) Government Land 5 Status of Operation (New Project or Existing Project Operation Since ) 6 Status of Lease., Date of Issue, Lease Period, Date of Application for Lease Renewal etc.) Status Lease Code New project Grant Order. GP/QL/ 654/APIL REMAND/393 Date of Grant 03/02/2015 Date of Execution Lease Period 5 Years Date of Renewal Application 7 Name of Mineral to Mine Building Lime Stone 8 Mineral Reserve (M.T.) Rate of Mining Of Mineral (M.T./Annual) MT per Annum t applicable 10 Life of Mine the life of mine can be mineral reserve (mt):- 11 Whether project involves forest Land? If yes, status of application for diversion of forest land Life of mine = Sq. Meter X Depth Of Mine x Specific Gravity Of BLS Life of mine=10000 x 7 x 1.41 = = TPA 5 Years Life of mine 5 years Forest land involved

3 12 Applicability of the CRZ tification, 2011 This unit is not come under the CRZ tification Environment Setting 13 If located within 10 Km, aerial distance of the lease area from the nearest I. Water Bodies Caustal Zone 1.30 Km from direction ii. National Park/ Wildlife Sanctuary/ Biosphere reserve iii. Reserve Forest/ Protected Forest NA NA iv. Human Habitation Miyani Village 1.70 km v. Railway Line Porbandar Railway station NA NA 30 Km vi. Road National highway km vii. tified/ Protected Archaeological site NA NA viii. Social infrastructure, e.g. school, hospital, historic/ cultural/ religious places, defense establishment, etc. Miyani primary School Miyani Ram temple 1.70 km 1.70 km Porbandar Hospital 30 km 14 Present Land use of Lease area n use because of doing n agricultures 15 Geo-hydrological features surface water body exists in the core zone 16 Predominant Wind direction Predominant wind direction SW Wind Speed Max 12 Km/Hr & Min 04 Km/hr 17 Endemic & endangered Species of Flora & Fauna, if any, in the area Endemic & endangered species of flora & fauna found in the core Zone. 18 Width and condition of access road (Kacha/Paka) to the lease area Semi mechanized open cast method of excavation. The soil cover be remove by use of a JCB. The Production is in form of lime stone blocks. The limestone block is generated with help of stone cutter. Wet cutting is employed. The blocks are liberated manually and loaded into trucks or Tractor to be sent the construction site. The blocks measure around 15 X 09 X 09

4 Details of Mining/ Excavation Activities 19 Requirement of Power Supply and its Sources Power supply required is 60 HP at the mine site. 20 Requirement of Water Supply and its source About 3.00 KLD water is required for the purpose of drinking, dust suppression & green belt development & water will be made available Farmer well. 21 Type of mining (Manual/Semi-mechanized/ mechanized) 22 Equipment's to be used (Bulldozers, hydraulics, excavators, JCB, scrapers, loaders, etc.) 23 Details of method of working with phasing of activates (Sequence of mining operation) 24 Explosives, detonators to be used Open cast Semi mechanized method of mining. Cutter machine Semi mechanized open cast method of excavation. The soil cover be remove by use of a JCB. The Production is in form of lime stone blocks. The limestone block is generated with help of stone cutter. 25 Details of Drilling and Blasting Drilling & Blasting is involved in the mining Method. 26 Safety measures at the time of blasting need to store explosive Because there is no proposal for blasting. 27 Details of Over Burden (OB) removal and staking About 40 % waste as mineral reject will be generated in next 5 years which will be used for backfilling by step wise. 28 Height and Width of benches and side slope Semi mechanized open cast method of excavation. The soil cover be remove by use of a JCB. The Production is in form of lime stone blocks. The limestone block is generated with help of stone cutter. Wet cutting is employed. The blocks are liberated manually and loaded into trucks or Tractor to be sent the construction site. The blocks measure around 15 X 09 X Depth of ground water table (Meters). 45 to 50 meter 30 Maximum depth of working (Meters). Whether it will intersect ground water table? 07 meter 31 Land use pattern of the lease area

5 Sr.. Particulars Per Operational Phase (Ha) Post Operational Phase (Ha) 1 Pits Dumps Plantation Road/ Building Mineral Stack Bake Filled Remaining Water 32 Man power requirement 7 person 33 of working days in a year 250 days 34 Time of Working hours in a day 8 hour Total Measure proposed for protection of environmental attributes like and water, air, human health etc. 36 Measures for noise, vibration and fly rock problems due to blasting 37 Plane for managing storm water. Details of garland drains to be provided. 38 Plan for managing dust, noise, silt and other pollutants during mining activates. Developed green belt around Lease area for environment. Provide noise mouse and air plug, helmet, spectacles and safely shoes for human health and safety measure Blasting pattern is not applicable in Building Lime stone process. Yes, Garland drain will be provided around working pit. Proper Plantation within and around working area. Regular water sprinkling to suppress dust Avoid unnecessary & idle running of machine &make its optimum use. Regular maintenance of machineries, vehicals etc and use PPE

6 39 Details on transportation route and measures proposed for control of fugitive emission during transportation. Creating berm on the side of benches/ haul roads of hight greater than or equal to ½ tyre radius. Minimum height of berm shall be 1.2 m and slop 45. Minimum clearance of 1.5 m will be maintained between outer tyre and berm. Fire fighting equipment in the machinery / workshop/ office will be maintained. Persons will be trained in the use of fire fighting equipment and mock rehearsal will be conducted 40 Plan for post mining use/ reclamation of pits. Reclamation works in way of backfilling & convert land for forestry and agriculture will be done. 41 Provision of fencing the pits in case of use as water reservoir. 42 Plan for green belt development, area of green belt, and Types of Species to be planted and budgetary outlay for the same. Yes We Have Attached environmental Management Plan. Proper plantation of saplings, suitable for the region will be carried out in consultation with forest department. Geologist Geology and Mining Dept. Porbandar te : (1) Details of Sr. 1 to 14 are Verified by Geology and Mining Dept., Porbandar, Other Details as Provided by Applicant.

7 APPENDIX I FORM 1 (As per New EIA tification dated vide S0 3067(E) Basic Information Sl.. Item Details 1. Name of the project/s M/s.Building Lime stone mine of Sajanbhai Bhurabhai Godhaniya 2. S.. in the schedule B Category project 3. Proposed capacity /area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. Proposed Capacity: mt per annum Area: Ha 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc hactor 6. Category of Project i.e. A or B B2 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location 21 49ˈ17.78" N 69 24ˈ14.86" E Plot/Survey/Khasra. 24/ 4 paiki Village Miyani Tehsil Porbandar District Porbandar State Gujarat 10. Nearest railway station/airport along with distance in kms. 11. Nearest Town, city, district Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Porbandar Railway Station 30 km Porbandar Airport 30 km Miyani 1.70 km Porbandar 30 km Porbandar 30 km State Gujarat Dist. Porbandar Tal. Porbandar Vill - Miyani 13. Name of the applicant Sajanbhai Bhurabhai Godhaniya 14. Registered Address Vill. Miyani, Tal. Porbandar, Dist. Porbandar 15. Address for correspondence:, At. Miyani, Tal. Porbandar, Dist. Porbandar

8 Name Designation (Owner/Partner /CEO) Pin code Telephone. Fax. 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. Sajanbhai Bhurabhai Godhaniya Owner alternative sites are examined. 17. Interlinked Projects 18. Whether separate application of interlinked project has been submitted? 19. If yes, date of submission t Applicable 20. If no, reason The proposed project is quarrying for Sand mine. 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i.the Forest (Conservation) Act, 1980? ii.the Wildlife (Protection) Act, 1972? iii. The C.R.Z. tification, 1991? 22. Whether there is any government Order/Policy relevant /relating to the site? 23 Forest land involved (hactor) 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case. c) Orders/directions of the Court, if any and its relevance with the proposed project. Activity Construction operation or decommissioning of the Project involving actions which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.N o Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes / Yes Details thereof (with approximate quantities/rates, wherever possible)with source of information data Change in the land use of Mining Lease area is envisaged as the existing land use category is barren land which shall continue to be so even after mining operations cease. Present topography is

9 1.2 Clearance of existing land, vegetation and building? having flat terrain. Please refer layout plan and short view is attached as per Annexure -6 & 7 respectively. Clearance of some weeds/grasses may take place. vegetation exists within the lease area. 1.3 Creation of new land uses? t Applicable 1.4 Pre-construction investigations e.g. bore t Applicable house, soil testing? 1.5 Construction works? Office and store house set up temporary basis so no new construction work is required. 1.6 Demolition works? NA 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or NO Most of the workers are from nearby village and they return to their homes after their work only rest shelter will be made on temporary. tunneling? 1.10 Reclamation works? Yes After completion of mining period, pit will be reclaimed as agriculture and cultivation purpose Dredging? NO NA 1.12 Offshore structures? t Applicable 1.13 Production and manufacturing processes? Yes Semi mechanizes open cast method of excavation. The soil cover will be removed by use of a JCB. The Production is in from of limestone blocks. The limestone blocks are generated with help of stone cutters. Wet cutting is employed. The blocks are liberated manually and loaded on to trucks or tractor trolleys to be sent to the client. The blocks measure around 15 X9 X Facilities for storage of goods or materials? Facilities for storage of goods or materials. Mineral will be kept at the working faces and directly sold to the local suppliers. The top soil will be stacked at separate site and the same will be used for the plantation purpose Facilities for treatment or disposal of solid waste or liquid effluents? yes About 40 % waste will be generated. This waste will be used for the backfilling Facilities for long term housing of operational workers? Enough construction workers available in nearby area New road, rail or sea traffic during new road, rail will be constructed. NA NA

10 construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culver ting, realignment or other changes to the hydrology of watercourses or aquifers? Existing road network will be used. closure or diversion of transportation Routes. In view of neither any surface drain/stream nor any water course (minor ) passing through the mining lease area, there will not be any changed in surface hydrology Stream crossings? ne 1.23 Abstraction or transfers of water from ground or surface waters? Abstraction of ground water proposed Changes in water bodies or the land surface NA affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or Decommissioning Yes During the operational phase, required materials and personnel will be transported to the mine lease area. The existing road network will be used Long-term dismantling or Decommissioning NA or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes temporarily or permanently? 1.29 Introduction of alien species? t Applicable 1.30 Loss of native species or genetic diversity? t Applicable 1.31 Any other actions? t Applicable Mining shall be done as per guidelines of Geology and Mining department. 7 personals shall be employed for the project. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible)with source of information data 2.1 Land especially undeveloped or Yes A copy of 7-12 and NA is attached as per agricultural land (ha) 2.2 Water (expected source & competing users unit: KLD Yes Annexure -9 Water consumption will be 3.00 KL/Day. Out of this 1.00 KL/Day will be used for Domestic purpose and 1.00 KL/Day will be use for sprinkling purpose KL/Day will be used

11 for greenbelt development. water will be use forfarmer well. 2.3 Minerals (MT) Yes Building Lime stone MT per Year. 2.4 Construction material stone, t Applicable aggregates, and/soil (expected source-mt) 2.5 Forests and timber (source MT) t Applicable 2.6 Energy including electricity and fuels Yes Electricity used 60 HP connection (source, competing users) Unit: fuel Electricity provided by PGVCL other (MT), energy (MW) energy is required 2.7 Any other natural resources (use appropriate standard units) t Applicable Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible)with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g.by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. Yes t applicable t Applicable 3.5 Any other causes t Applicable Local Persons will get direct & indirect employment and enhance the skill of the local people of nearby village. The proposed project shall not affect any vulnerable groups of people in the near vicinity. Production of solid waste during construction or operation or decommissioning (MT/month). S. Information/Checklist confirmation Yes/ Details thereof (with approximate. quantities/rates, wherever possible)with source of information data 4.1 Spoil, overburden or mine wastes Yes Total 40 % of the ROM will be generated as a waste, which will be further used for 4.2 Municipal waste (domestic and or commercial waste) backfilling. t Applicable

12 4.3 Hazardous wastes (as per Hazardous t Applicable Waste Management Rules) 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from t Applicable effluent treatment 4.7 Construction or demolition wastes t Applicable 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other t Applicable materials 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes t Applicable Release of pollutants or any hazardous, toxic or noxious substances to air(kg/hr) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible)with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or equipment Yes 5.4 Emissions from construction t Application activities including plant and equipment 5.5 Dust or odors from handling of NA materials including construction materials, sewage and waste. 5.6 Emission from incineration of waste t Application 5.7 Emissions from burning of waste in t Application open air (e.g. slash material s, construction debris) 5.8 Emissions from any other sources t Application Yes NO Dust will be generated during activities such as cutting, sizing, handling and transportation of minerals. A think green belt shall be developed around the periphery of the mine to attenuate the noise levels. Additionally, daily sprinkling of water will carry the dust suppression. NA

13 Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible)with source of information data 6.1 From Operation of equipment e.g. engines, ventilation plant, crushers Yes The mining operation will be open cast manual method. ise will be generated from operation of cutting and sizing only. However, earmuff will be provided to be the personals/operators at the time of operation. 6.2 From industrial or similar processes industrial process will be involved at mine lease area. 6.3 From construction or demolition t Applicable 6.4 From blasting or piling blasting is proposed. 6.5 From construction or operational NA traffic 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S Information/Checklist confirmation Yes/ Details thereof (with approximate.. quantities/rates, wherever possible)with source of information data 7.1 From handling, storage, use or t Applicable spillage of hazardous materials 7.2 From discharge of sewage or other t Applicable effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted NO NA to air into the land or into water 7.4 From any other sources t Applicable 7.5 Is there a risk of long term up of pollutants in the environment from these sources? There is no such risk. Risk of accidents during construction or operation of the project which could affect human health or the environment. S.. Information/Checklist confirmation Yes/N o Details thereof (with approximate quantities/rates, wherever possible)with source of information data

14 8.1 From explosions, spillages, fires etc from storage handling use or production of hazardous substances Hazardous substance will be in very negligible quantity as drilling and blasting is not proposed. 8.2 From any other causes From use of stone cutter. 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc.)? Area is susceptible to earthquake. Project area falls in zone III. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. S.. Information/Checklist confirmation Yes/N o Details thereof (with approximate quantities/rates, wherever possible)with source of information data 9.1 Lead to development of supporting. lities, ancillary development or development stimulated by the project which could have impact on the environment e.g. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after use of the site, which could haven impact on the environment Yes NA Only temporary rest shelter would be made. NA NA NA NA Part of the excavated Mine will be backfilled & will be developed as green belt. & Rest will be used for rain water storage and which will have a positive impact on nearby agricultural lands. 9.3 Set a precedent for later developments NA 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects As the area being rich with building lime stone mineral, number of mines in surrounding area, may either restart or

15 increase production which will lead to increase combined environmental impacts, particularly due to increased road traffic for materials transport/dispatch S.. Environmental Sensitivity Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible)with source of information data 1. Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value t Applicable 2. Areas which are important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains forests. Yes Caustal Zone km. 3. Areas used protected, important or t Applicable sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or underground t Applicable waters 5. State, National boundaries t Applicable 6. Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas. t Applicable 7. Defense installations t Applicable 8. Densely populated or built-up area Yes Village Miyani 1.70 km in direction 9. Areas occupied by sensitive man-made uses (hospitals, schools, places of worship, community facilities) 10. Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, Yes Village Miyani primary school 1.70 km in direction t Applicable

16 tourism, minerals) 11. Areas already subjected to pollution or environmental damage.( those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, folding or extreme or adverse climatic conditions) (I) Proposed Terms of Reference for EIA studies t Applicable Area is susceptible to Earthquake. Projects are falls in Zone III. I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place:. Signature of the applicant With Name and Full Address (Project Proponent/ Authorized Signatory)

17 FROM i, pre FEasiBiLiTY REpORT & ENViRONMENT MaNaGEMENT plan FOR M/s. BUiLDiNG LiME stone MiNE OF sajanbhai BHURaBHai GODHaNiYa area (survey NO. 24/ 4 paiki, ViLL. MiYaNi, TaL. & Dis. porbandar) proposed production: Tpa project COsT: - 15 LaCs Details of Area Total Area hector, Near Village-Miyani Taluka- Porbandar, District-Porbandar (Gujarat) Applicant Sajanbhai Bhurabhai Godhaniya Vill. Miyani,Tal.Porbandar, Dis. Porbandar Mob

18 Chapter 2 1. INTRODUCTION OF THE PROJECT The proposed M/s. Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya Area at near Village-Miyani, Taluka- Porbandar, Dist.Porbandar,(Gujarat) has been granted to Sajanbhai Bhurabhai Godhaniya, resident of At. Miyani, Dis. Porbandar Applied Area Ha. Proposed Production TPA Copy of Mining Lease/ Letter of Intent. A letter of intent has been issued in Favor of Sajanbhai Bhurabhai Godhaniya, for extraction of Lime Stone, Near Village- Miyani, Taluka- Porbandar & Dist.- Porbandar (Guj.)., For The Period of 10 years Vide Letter no. GP/QL/654/APIL REMAND/393 Dated- 03/02/2015(Annexure 1) 2.2 Nature of the project: Mining of Building Limestone is proposed in the applied area hactor. (Private. Near land), Village-Miyani, Taluka- Porbandar, Dist.- Porbandar,(Gujarat).Mining will be carried out by Semi-Mechanized Opencast Method. Proposed Production TPA. The Building Limestone Area near Miyani is a hub for building limestone Extraction. There are various projects for production of limestone blocks in the mine. The building limestone industry is a thriving industry because of prolific use of limestone in building industry. The project is aimed at producing building limestone slabs from the applied area. TABLE 2.1 SHOWS THE ML AREA ALONG WITH ITS DIMENSIONS. SI. Near Village Area 1. Miyani hactor Need For The Project and its importance to the country: Building Limestone is an important mineral for the building Construction. It is naturally available in sample quantities and thus is important for construction of buildings due to its toughness. It is being used as bricks and khandas.

19 2.4. Demand - Supply gap The demand of building stone depends on the level of development and the rate of growth of the economy. However, there is a persistent demand for this commodity Imports vs. Indigenous Production Ther is no Import of building Limestone. All production of building Stone is earmarked for the indigenous demand/ local market Export Possibility There is no proposal to export the production Domestic/Export Markets The limestone (Building) will be only for domestic market/local Suppliers Employment Generation (Direct and Indirect) Due to the Project The proposed Miyani Limestone (Building) making activity is envisaged to improve the socio-economic condition on a micro-economic scale by generating local employment 10 direct and 3 indirect. TABLE NO. 2.2 EMPLOYMENT POTENTIAL S.. Particulars Numbers 1 Permit Manager 1 2 Forman 1 3 Others 5 Total 7 For the plantation, security, or any type of general labour shall be kept on contract basis.

20 Chapter PROJECT DESCRIPTION: 2.1. Type of project including interlinked and interdependent projects, if any. The limestone (Building) Area is a fresh application for environmental clearance and not interlinked or interdependent Location(Map Showing general location, Specific location, and Project site layout ) with co-ordinates. The Buillding Lime Stone mine of Sajanbhai Bhurabhai Godhaniya Area is located at near Village - Miyani, Taluka- Porbandar, Dist. Porbandar, Gujarat.

21 Fig.1: LOCATION PLAN OF M/s. BUILDING LIME STONE MINE OF SAJANBHAI BHURABHAI GODHANIYA

22 Fig.2:GOOGLE IMAGE OF THE M/s. BUILDING LIME STONE MINE OF SAJANBHAI BHURABHAI GODHANIYA 2.3. Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental consideration done into should be highlighted. The site is suitable because of its location and availability of resources. The topography is flat along with scanty overburden to remove. The site is also away From major habitation centers Size and Magnitude of operation The maximum rated capacity of the project will be TPA productions and the area is spread over hactor. The bricks formation is in form of 15 X 9 X Project Description with process details The soil cover is firstly stacked with use of an hired JCB/excavator and piled for backfilling and plantation later on. The surface to be mined is scrapped to a level and 3-4 stone cutters are put into use. The standard saleable limestone block measures 15 x9 x9. Depth is kept constant at 9 to 10 inches for a cutter and cuts are made by wet cutting. The blocks are carefully liberated manually thereafter and are ready for sale.

23 2.6. Raw material Required along with estimated quantity, likely source, marketing area o final products, mode of transport of raw material and finished product. raw materials are required in preparation of final products Resource Optimization/ Recycling and reuse envisaged in the project, if any. NA Availability of water and its source, Energy/ Power requirement and source should be Given. Water will be brought from nearby Villages through water tankers TABLE NO WATER DEMAND Purpose Requirement (KLD) Drinking Purpose 0.3 Domestic use 0.7 Dust Suppression/Stone 1.0 cutting Plantation 1.0 Total Quantity of wastes to be generated (Liquid and Solid) and scheme for their Management/disposal. About 40% wastes will be generated & waste will be used for the backfilling.

24 Chapter SITE ANALYSIS 3.1. Connectivity TABLE-4.1: CONNECTIVITY DETAILS FROM SITE: Sr.. Particulars Details 1. Road Connectivity 2. Nearest Highway 3. Nearest Railway Station 4. Nearest Airport The village Miyani, nearest population center is 1.70 km away from the lease area & it is connected with other important towns and cities through a good network of roads with regular public transport services. The District Headquarter Porbandar is 30 km connected by tar road. NH Km in direction. The nearest railhead is at Porbandar Railway station 30 km lease area. The nearest civilian airport for regular commercial flights is at Porbandar Airport the road distance from the lease area is around 30 km Land form, land use and land ownership Applied Area hactor State Gujarat District Porbandar Taluka Porbandar Village Miyani Land ownership The land is of private land and the LoI has been granted in favor of Sajanbhai Bhurabhai Godhaniya for the period of 5 years Topography The topography of the lease area is almost flat. The mine has a thin veneer of soil having a thickness of about 0.5 to 1.5 meters. The applied area forms a part of survey. 24/ 4 paiki

25 3.4. Existing land use Pattern TABLE-4.2: LAND USE PATTERN OF THE AREA S.. Particular 1 Pits Road Backfill Mineral Stack Plantation Water Reservoirs Remaining Virgin Area Existing Land Use Pattern in Hect Existing Infrastructure Commensurate with the scale of mining operations, the Requisite support facilities are Proposed to be Provided, which are adequate to meet the functional requirement of the mine. In the next coming years it is proposed to construct and provide site services as mine office cum rest shelter, first aid box, toilet etc. The drinking water is made available through water tankers Soil / Rock Formation Around Morvi and Wankaner area Sandstone & Shale of Jura- Cretaceous to lower Eocene age. The Sandstone belongs to Sedimentary group of Rocks. It occupies most of the area of NE part of Rajkot district, in particular Wankaner. The Sandstone is pinkish white to violet in colour and Serves As a very good aquifer. The thickness Sandstone exceeds 4 mts at some places and has a medium to coarse grained texture. The Sandstones here are available in red, grey and black shades with occasional thin coal strings. The variation in colour reflects deposition from various geological provenances and hence variation in composition. Stratigraphic Sequence of the Formations with their geological age are given as below:

26 Land / Soil Characteristic The Soils are generally developed from sandstone formation and are coarse in texture with satisfactory internal drainage. The sub soil condition below the Existing ground level is almost uniform in nature. Sub soil is Composed of clay mixed with little fine grained silty sand, Moram and Kankar with Low Resistivity due to clay and soil moisture. The area is covered with recent to Sub Recent alluvial deposits comprising of brownish clay mixed with little fine grained Sand, silty Sand. The soil below ground level consist of top silty low plastic soil layer having no swelling nature. Blackish Brown to yellowish brown clayey silt or sand silt layer extends to the depth of 2 to 3 mts. Extend of Mechanization & Mining Machinery Deployed: The only Machinery deployed are the stone cutter for cutting the blocks and JCB. ORE BODY DIMENSION BODY LENGTH WIDTH DEPTH MINERAL REMARKS LIMESTONE As per layout plan As per layout plan 6.0 LIMESTONE - LOSSES ALONG LEASE BOUNDARY - TOTAL TONNE MT REMAINING RESERVE LIFE OF MINE@ RATE OF MT 5 YRS Recovery Factor: 60% of building Limestone & remaining 40% is rejected.

27 3.7. Climate date From Secondary Sources M/s Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya area is situated in district Porbandar. Porbandar has semi-arid climate, with hot, dry summers from mid-march to mid- June and the wet monsoon season from mid-june to oct., when the city receives 650 mm of rain on average. The months from vember to February are mild, the average temperature being around 20 C, with low humidity. During summer time, the temperature ranges between 24 C and 42 C. In the months of winter, Porbandar temperature varies between 10 C and 22 C but on a whole winters are pleasant Social infrastructure available. The infrastructure like, toilets, shelter etc. is proposed at mine site. The nearest village is Miyani, health & educational facilities (in the form of Primary and secondary schools) are available there. Medical facilities, Primary Health centre are therein the mine, imparting services, for advance medical facilities. In each village one health worker has been appointed by the Govt. to Provide primary health facilities. Village people are availing drinking water facilities generally from the hand pump, open well and tube well. The water supply is also supplied through tanker in few villages. Communication services like post office and telephones are available in the nearby village. Some of the villagers are having mobile phones. An occupational health unit will be organized and the proposed measures will be adopted: Pre & Periodical Medical checkup program for all the workers. Compulsory medical checkup program and first aid box with necessary equipment will be provided. Training for workers Regarding occupational hazards. Safety equipment i.e. dusts mask, safety shoes, gloves etc.

28 4. PLANNING BRIEF Chapter Planning concept It is a mining project of mineral building limestone. The proposed production of is TPA. Opencast, Semi- Mechanized method of mining will be adopted and transportation of minerals shall be done through road by trucks Man Power Requirement Man Power requirement for mining is estimated to be 10 s. Most of the employees will be recruited from neighboring village. The laborers are provided along with tractor trolley by contractor or from nearby villages. So there will no permanently migration of people, hence there will be no population projection Land use Planting TABLE-5.1: LAND USE PATTERN OF THE AREA S.. Land use Pre Operational Operational Post Category Phase Phase Operational Phase 1 Pits Dumps Plantation Road Mineral Stack Black Filled mine out mine 6 Remaining Virgin land Total Total hect. Area will be covered under the plantation, which includes hect. Area will be used for plantation on statutory barrier, hect. Area will be used for backfilling along with plantation and hect. Area will be used for plantation on mined out benches.

29 4.4. Facilities Provided Infrastructure The infrastructure like, toilets, shelter etc. are proposed at mine site. For drinking, water will be brought from water tanker outside the applied mine. A first aid box will also be constructed and maintained. Communication services like post office and telephones are available in the nearby villages. Medical facilities are also provided Landscaping and Green belt development It is proposed to plant total 350 Saplings, covering an area of hect. During the post- Operational Stage Health And Safety System During the opencast working, and allied activities, all the precautionary measures shall be taken into account as per GMMR 1961 and GMCDR 1988 for safety and security. Following Safety & security measures will be enforced; Moving front of the quary shall have temporary fencing. Permanent fencing will be provided where quarry has reached the ultimate pit limit. Mine entrance will have a permanent check post and record shall be maintained of all persons/vehicles entering the mine area. Round the clock security arrangement shall be provided to prevent inadvertent entry of persons Disaster Management and Risk Assessment Inspite of following all the precautionary measures and following all safety rules, regulations and Procedures, in mining accidents cannot be ruled out completely. The project proponent will formulate a disaster Management plan with the approval of DGMS. Following are the accidents which can take place in mechanised opencast mining and measures proposed to be taken. Fall of human beings or fall of machines from benches/ dumps/ haul roads. Fire & Explosion in machinery Emergency situation due to social reason such as public unrest, terrorism etc.

30 Preventive Measures: Creating berm on the side of benches/ haul roads of hight greater than or equal to ½ tyre radius. Minimum height of berm shall be 1.2 m and slop 45. Minimum clearance of 1.5 m will be maintained between outer tyre and berm. Fire fighting equipment in the machinery / workshop/ office will be maintained. Persons will be trained in the use of fire fighting equipment and mock rehearsal will be conducted. Training of security personnel. Procedures as laid down in disaster management plan to be followed. Training Persons will be trained in the following: Knowledge of chemicals and use of protective equipment Procedure for reporting emergencies Location and use of fire fighting equipment Knowledge of alarm system and siren Evacuation procedures. Training in first aid as per mines rules 1955 Emergency Equipment & Facilities: Mobiles Fire fighting equipment s Emergency medical supplies Other protective equipment s i.e. goggles, helmet, face shield, hand gloves, safety belts, barricade tape. First aid station as per the provisions of mines rules 1955.

31 Chapter PROPOSED INFRASTRUCTURE S.. Particulars Details 1 Mining area Ha. 2 Residential Area t applicable 3 Green belt It is proposed to plant total 290 samplings, covering an area of ha. During the Operational stage. 4 Social infrastructure NA 5 Connectivity Sr. Particulars Details 1 Nearest Highway 2 Nearest Railway station 3 Nearest airport 6 Drinking Water 0.3 Management 7 Sewerage system Industrial 0.7 waste/domestic management 9 Solid waste management 0 10 Power Requirement and 60 HP supply/ source NH km Porbandar Railway station 30 KM Porbandar 30 km Airport

32 Chapter REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the area so, no resettlement and rehabilitation is required. Chapter PROJECT SCHEDULE & COST ESTIMATES 7.1. Likely date of start of construction and likely date of completion (time schedule for the project to be given) The project activity will be taken up in parallel along with the opening of mine, after the environmental clearance & CTE/CTO is granted. The production will commence within two months of the environmental clearance & CTE/CTO Estimated project cost along with analysis in terms of economic viability of the project The project proponent will incur a total cost of Rs. 15 lakh and may vary from place to place and with magnitude of the limestone mining. This will include the rent/lease for land, cost of labor, cost of transportation, fuel charges etc. Chapter ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The project will bring economical benefits to the state by the way of royalty for mineral and people by the way of direct(10 persons) and secondary employment (3 persons) opportunities. Management will be helping nearby village by providing aid to school, conducting medical and social awareness camps, helping in formation of self help groups etc. especially keeping in the view the tribal and economically backward population in the area as part of its corporate social responsibility.

33 ENVIRONMENT MANAGEMENT PLAN

34 ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya Area at near village Miyani, Tal. Porbandar, District- Porbandar, (Gujarat) has been granted to Sajanbhai Bhurabhai Godhaniya resident of Porbandar applied area ha. Proposed production TPA The building lime stone mine near Porbandar is a hub for building lime stone extraction. The building lime stone industry is a thriving industry because of profile use of lime stone in building industry. The project is aimed at producing building lime stone slabs from the lease mine. The mining methodology consists of carving up blocks of dimensions 15 x9 x9 with help of a stone cutter, in this method there is a reject of 40% of the production and about 60% of the yield is usable. Topography of the Area The topography of the lease area is almost flat. The mine has a thin veneer of soil having a thickness of about 0.5 to 1.5 meters. Climate date From Secondary Sources The M/s. Building Lime Stone Mine of Sajanbhai Bhurabhai Godhaniya area is situated in district Porbandar. Porbandar has semi-arid climate, with hot, dry summers from mid-march to mid- June and the wet monsoon season from midjune to oct., when the city receives 650 mm of rain on average. The months from vember to February are mild, the average temperature being around 20 C, with low humidity. During summer time, the temperature ranges between 24 C and 42 C. In the months of winter, Porbandar temperature varies between 10 C and 22 C but on a whole winters are pleasant.

35 Flora & Fauna forests land the area. It is entirely a private Ag. Land. endangered Species found in the core zone, so no adverse impact on the flora & Fauna. Since, there are no endangered spices of flora & fauna observed in core zone. The environmental Management plan has been developed with a view to bring down the levels of impacts as discussed in the last chapter within limits. In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts are to be enhanced/ augmented so that the overall adverse impacts are reduced to as low level as possible. The mining in the area has been proposed with time bound management plan so that impacts on different environmental parameters are minimized at every stage of mining. Measures to be taken for each of the impact areas are detailed in the following para: Land Environment Air Environment Water Environment ise Environment Reclamation & Rehabilitation of lands Discharge of Effluents Afforestation & Green belt development programme Corporate Social Responsibilities Risk assessment & Disaster Management Plan

36 2.0. ENVIRONMENT IMPACT & MEASURES 2.1. AIR ENVIRONMENT Anticipated impacts The opencast mining operations are generally prone to generation of high levels of PM and to a limited extent SO2, NOx due to fossil fual based vehicles and machines etc. Air pollution due to SO2, NOx and PM may result in irritation and inflammation of eyes and congestion of throat and infection in lungs Mitigation Measures: In addition to the above the following measures will be adopted:- 1. Water spraying on the roads for suppression of dust. 2. Development of green belt. 3. Water sprinklers will be sprayed at all loading / transfer points. 4. Wet cutting will be adopted. 5. PPE will be provided to the workers. 6. To control the emissions regular preventative maintenance of equipment will be carried out WATER ENVIRONMENT Anticipated impacts impact on the surface water resources is envisaged. The rain water accululates in the area, which will be used for dust suppression and plantation purpose. The ground water table in this region range from m from the surface level. Due to mining, ground water will not intersect in this project. Since no chemicals or explosives are used for mining of building Limestone, there is no source of contaminants that can contaminate surface waters or the ground waters Mitigation Measures There is not the case with this lease, as mineral or soil does not contain any harmful ingredients that could leach to the water table. Thus the area working shall not affect the ground water quality.

37 The impact of mining on ground water is not anticipated ; therefore measures are not required LAND ENVIRONMENT Anticipated impacts In open cast mining, the top crust of earth i.e. top soil/sub soil is completely removed below which are mineral deposits. The earth rock and other strata, called O/B are completely removed to provide access to the mineral deposit. In this manner land use pattern of an area always changes in the form of voids formed due to excavation of mineral. Topography of the surrounding area will remain unchanged. The drainage pattern due to proposed mining will not be disturbed within core zone as well as buffer zone. The thickness of the top soil is 1.0 m, it shall be scrapped and stack at separate place and will be used for plantation Mitigation measures The mining area will be affected to the land environment. The excavated area will be backfilled for aesthetic purpose at the life of area. The top soil will be stack at separate earmarked site and use for the plantation NOISE ENVIRONMENT Anticipated impacts As far as noise pollution is concerned, Limestone mining does not contribute much to noise pollution, except the noise generated from stone cutter. ise level in the working environment is compared with the standards prescribed by central pollution control board which will be adopted and enforced by the govt. of india through the noise pollution (Regulation and control) Rules, 2000 The exposures to excessive noise levels can lead to: Prevention of sleep, insomnia & fatigue. Decrease in speech reception, communication, disturbance and diminished concentration thus adversely affecting job performance efficiency. Irreparable psychological disturbance including impaired hearing.

38 2.4.2 Mitigation measures Mitigate the noise level following control measures will be adopted:- 1. Periodical monitoring of noise will be done. 2. Regular and proper maintenance of noise generating machinery. 3. Proper PPE in form of earplugs and safety eye wear shall be provided to workers working with the stone cutter and those in immediate vicinity of it. 4. Plantation in applied area will also reduce propagation of noise outside the core zone. 5. Green belt shall provide at the lease periphery, within the applied area BIOLOGICAL ENVIRONMENT forests land the area. It is entirely a private Ag. Land. endangered species found in the applied area, so no adverse impact on the flora & fauna. Since, there are no endangered spices of flora & fauna observed in core zone as well as buffer zone. Therefore, measures are not required GREENBELT DEVELOPMENT The implementation for development of green belt will be of paramount importance as it will not only add up as an aesthetic feature, but also act as a pollution sink. The species to be grown in the area should be dust tolerant and fast growing species so that permanent green belt is created. Apart from the green belt and aesthetic plantation for elimination fugivitive of emission and noise control, all other plantation efforts shall be decided and executed with the assistance and co-operation of the local community.

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

To. State Level Expert Appraisal Committee, Paryavaran Bhavan, Sector-10/A, Gandhinagar.

To. State Level Expert Appraisal Committee, Paryavaran Bhavan, Sector-10/A, Gandhinagar. M/s.Building Lime Stone Mine of Mashribhai Devshibhai Bariya Survey. 50/ Paiki 2 Vill. Madhavpur(Ghed), TAL: Porbandar, Dis. Porbandar. Mo.. 9898370462 To. State Level Expert Appraisal Committee, Paryavaran

More information

We herewith apply (in From-1) for environmental clearance with and other supporting documents.

We herewith apply (in From-1) for environmental clearance with and other supporting documents. Building Lime Stone Mine of Jitubhai Parbatbhai Chudashma & Others Survey no. 595/p 1, 595/p 2/ p2, 595/ p 4/ p 1, Vill.chorvad, Tal.Maliya Hatina, Dis.Junagadh. Mo..9824232784. To. State Level Expert

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

FORM i, pre FEasiBilitY REpORt. EnViROnMEnt ManaGEMEnt plan FOR. area=1.01.16. proposed production: - 36,000 tpa. project COst: - 10 lacs

FORM i, pre FEasiBilitY REpORt. EnViROnMEnt ManaGEMEnt plan FOR. area=1.01.16. proposed production: - 36,000 tpa. project COst: - 10 lacs FORM i, pre FEasiBilitY REpORt & EnViROnMEnt ManaGEMEnt plan FOR M/s. BUILDING LIME STONE MINE OF SHREE MONGHIBEN JINABHAI MAKWANA area=1.01.16 (survey no. 59/ p 2,59/p1/p1/p 2, Vill.ElaMpuR, tal. una

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

M/s Gokul Stone Industries

M/s Gokul Stone Industries Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

APPENDIX I FORM I. Basic Information

APPENDIX I FORM I. Basic Information APPENDIX I (I) Basic Information FORM I S.. Item Details 1 Name of the project/s Enhancement of Phosphoric Acid Production from 700 MTPD to 1000 MTPD P2O5 and other auxiliary Facilities within the Existing

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

How To Build A Mine In Gandhore

How To Build A Mine In Gandhore FORM i, pre FeasiBilitY RepORt & environment ManageMent plan FOR M/s. BUILDING LIME STONE MINE OF SHREE KESHUBHAI ARASHIBHAI VADAR & OTHERS area=1.61.88 (survey no. 191/1 / paiki 43 and 191/1/ paiki 25,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Form-I for seeking clearance for project attracting CRZ notification

Form-I for seeking clearance for project attracting CRZ notification Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Form 1 as per EIA tification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu Application Form for Obtaining Environmental Clearance

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

FORM 1. Basic Information

FORM 1. Basic Information (I) Basic Information FORM 1 S. Item Details 1 Name of the Project /s Establishment of 1.5 M KCal/Hr (500 kg/hr) Hazardous Waste Incinerator (Upgradation) by M/s Ramky Enviro Engineers Limited. 2 S.. in

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF OLMUNDA SAND MINE (LEASE AREA- 5.67 HA.) (IN THE RIVER BED OF KOEL RIVER) (NEW LEASE) AT Village & P.O.: Olmunda, Tehsil & P.S.: Sisai District: Gumla,

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA) Tamilnadu Form 1 as per EIA tification 2006 for Vengadampatti Part-2 Rough Stone, Jelly and Gravel Quarry of Tmt. B.Lakshmi Rajam, Vengadampatti Part-2 Village, Alangulam Taluk, Tirunelveli District and Tamilnadu

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX

Proposed Brick Clay Mining Project for M/s Batra Industries at Village Tutwala, Teh. Abohar, District- Fazilka, Punjab INDEX INDEX Sl.. Contents Page. 1 FORM I APPLICATION FOR CLAY MINING FOR BRICK KILN 3 BASIC INFORMATION 6 ACTIVITY 7 2 PRE-FEASIBILITY REPORT 21 3 MINING PLAN 35 ` ENCLOSURES Sl.. Contents 1 UNDERTAKING 2 UNDERTAKING

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) Environmental Clearance For Minor Mineral Mine Rampuri Stone Mine Mining Lease Area: 4.85Ha, Proposed Production: 50,107 TPA Quartzite AT Village- Rampuri,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project.

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project. 1568651343757 01234567418199129126 76566544740738 313148746568 012204653107 81664 633840 91 APPENDIX I FORM 1 Basic Information Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT TABLE OF CONTENTS Sr. Content Page No. No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.No. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s PITAIBAND SAND QUARRY 2. S.. in the schedule Mining of Minor Quarryral (sand) 3. Proposed capacity/area/length/tonnage

More information