ENVIRONMENT MANAGEMENT PLAN



Similar documents
ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn: TPa

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

PROPOSED TERMS OF REFERENCE

Proposed Terms of Reference for EIA studies

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

Environment Management Plan

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

PRE FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan

Environmental Management Plan

Pre- FEASIBILITY REPORT

How To Conduct An Environmental Impact Assessment

ENVIRONMENT MANAGEMENT PLAN

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand)

PRE - FEASIBILITY REPORT

Project Details-Minor Minerals (Other Than Sand)

CHANDAM7AIL,P SAND DEPOSIT

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

ENVIRONMENT MANAGEMENT PLAN

Project Details Minor Minerals

Pre- FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

2. PRE-FEASIBILITY REPORT

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

2. PRE-FEASIBILITY REPORT

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

PROPOSED TERMS OF REFERENCE

Proposed Terms of Reference for EIA studies

Environment Management Plan

Environment Management Plan

To. State Level Expert Appraisal Committee, Paryavaran Bhavan, Sector-10/A, Gandhinagar.

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Environmental Management Plan

Pre- FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

Project Details-Minor Minerals ( Rajula Building Stone)

We herewith apply (in From-1) for environmental clearance with and other supporting documents.

PRE FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PROPOSED TOR FOR EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

PRE FEASIBILITY REPORT

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

BHARAT PETROLEUM CORPORATION LIMITED

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

Frequently Asked Questions (FAQs) on Hydropower

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information :

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PRE- FEASIBILITY STUDY REPORT

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

RISK ASSESSMENT REPORT

PRE-FEASIBILITY REPORT

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

RISK ASSESSMENT REPORT

ENVIRONMENTAL MANAGEMENT PLAN

How To Build A Mine In Gandhore

Environment Situation in Timor-Leste

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Environmental aspects of water fluoridation

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph -6) FORM I

ENVIRONMENTAL MANAGEMENT PLAN

PRE- FEASIBILITY REPORT

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links

M/s. Karshanbhai Bhagvanbhai Rabari

(IV) Proposed Terms of Reference for EIA Studies

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

PRE-FEASIBILITY REPORT

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details


APPENDIX I. (See Paragraph-6) FORM 1

APPLICATION OF GEOSPATIAL TECHNOLOGIES FOR SUSTAINABLE ENVIRONMENTAL MANAGEMENT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NIMAPALLI STONE QUARRY

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Transcription:

6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the area so, no resettlement and rehabilitation is required. 7. PROJECT SCHEDULE & COST ESTIMATES 7.1. Likely date of start of construction and likely date of completion (time schedule for the project to be given) The project activity will be taken up in parallel along with the opening of mine, after the environmental clearance & CTE/CTO is granted. The production will commence within two months of the environmental clearance & CTE/CTO. 7.2. Estimated project cost along with analysis in terms of economic viability of the project The project proponent will incur a total cost of Rs. 20 lakh and may vary from place to place and with magnitude of the limestone mining. This will include the rent/lease for land, cost of labor, cost of transportation, fuel charges etc. 8. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The project will bring economical benefits to the state by the way of royalty for mineral and people by the way of direct(10 persons) and secondary employment (3 persons) opportunities. Management will be helping nearby village by providing aid to school, conducting medical and social awareness camps, helping in formation of self help groups etc. especially keeping in the view the tribal and economically backward population in the area as part of its corporate social responsibility.

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Jinabhai Govindbhai Bharda Area at near Village-Shil, Taluka- Mangrol, Dist. Junagadh,(Gujarat) has been granted to Jinabhai Govindbhai Bharda, resident of At. Shil, Tal. Mangrol, Dis. Junagadh Applied Area-00.70.12Ha. Proposed Production-1200 MTM. The building lime stone mine near Shil is a hub for building lime stone extraction. The building lime stone industry is a thriving industry because of profile use of lime stone in building industry. The project is aimed at producing building lime stone slabs from the lease mine. The mining methodology consists of carving up blocks of dimensions 15 x9 x9 with help of a stone cutter, in this method there is a reject of 40% of the production and about 60% of the yield is usable. Topography of the Area The topography of the lease area is almost flat. The mine has a thin veneer of soil having a thickness of about 0.5 to 1.5 meters. The applied area forms a part of survey of India topo-sheet no. Climate date From Secondary Sources The M/s. Building Lime Stone Mine of Bhaveshbhai Khimabhai Jotava& C/o. Masharibhai Bariya area is situated in district Junagadh. Junagadh has semi-arid climate, with hot, dry summers from mid-march to mid- June and the wet monsoon season from mid-june to oct., when the city receives 750 mm of rain on average. The months from November to February are mild, the average temperature being around 20 C, with low humidity. During summer time, the temperature ranges between 24 C and 42 C. In the months of winter, Junagadh temperature varies between 10 C and 22 C but on a whole winters are pleasant. Flora & Fauna No forests land the area. It is entirely a private Ag. Land. No endangered Species found in the core zone, so no adverse impact on the flora & Fauna. Since, there are no endangered spices of flora & fauna observed in core zone.

The environmental Management plan has been developed with a view to bring down the levels of impacts as discussed in the last chapter within limits. In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts are to be enhanced/ augmented so that the overall adverse impacts are reduced to as low level as possible. The mining in the area has been proposed with time bound management plan so that impacts on different environmental parameters are minimized at every stage of mining. Measures to be taken for each of the impact areas are detailed in the following para: Land Environment Air Environment Water Environment Noise Environment Reclamation & Rehabilitation of lands Discharge of Effluents Afforestation & Green belt development programme Corporate Social Responsibilities Risk assessment & Disaster Management Plan

2.0. ENVIRONMENT IMPACT & MEASURES 2.1. AIR ENVIRONMENT 2.1.1 Anticipated impacts The opencast mining operations are generally prone to generation of high levels of PM and to a limited extent SO2, NOx due to fossil fual based vehicles and machines etc. Air pollution due to SO2, NOx and PM may result in irritation and inflammation of eyes and congestion of throat and infection in lungs. 2.1.2 Mitigation Measures: In addition to the above the following measures will be adopted:- 1. Water spraying on the roads for suppression of dust. 2. Development of green belt. 3. Water sprinklers will be sprayed at all loading / transfer points. 4. Wet cutting will be adopted. 5. PPE will be provided to the workers. 6. To control the emissions regular preventative maintenance of equipment will be carried out. 2.2. WATER ENVIRONMENT 2.2.1 Anticipated impacts No impact on the surface water resources is envisaged. The rain water accululates in the area, which will be used for dust suppression and plantation purpose. The ground water table in this region range from 30-40 m from the surface level. Due to mining, ground water will not intersect in this project. Since no chemicals or explosives are used for mining of building Limestone, there is no source of contaminants that can contaminate surface waters or the ground waters. 2.2.2 Mitigation Measures There is not the case with this lease, as mineral or soil does not contain any harmful ingredients that could leach to the water table. Thus the area working shall not affect the ground water quality. The impact of mining on ground water is not anticipated ; therefore measures are not required. 2.3. LAND ENVIRONMENT 2.3.1 Anticipated impacts In open cast mining, the top crust of earth i.e. top soil/sub soil is completely removed below which are mineral deposits. The earth rock and other strata, called O/B are completely removed to provide access to the mineral deposit. In this manner land use pattern of an area always

changes in the form of voids formed due to excavation of mineral. Topography of the surrounding area will remain unchanged. The drainage pattern due to proposed mining will not be disturbed within core zone as well as buffer zone. The thickness of the top soil is 1.0 m, it shall be scrapped and stack at separate place and will be used for plantation. 2.3.2 Mitigation measures The mining area will be affected to the land environment. The excavated area will be backfilled for aesthetic purpose at the life of area. The top soil will be stack at separate earmarked site and use for the plantation. 2.4. NOISE ENVIRONMENT 2.4.1 Anticipated impacts As far as noise pollution is concerned, Limestone mining does not contribute much to noise pollution, except the noise generated from stone cutter. Noise level in the working environment is compared with the standards prescribed by central pollution control board which will be adopted and enforced by the govt. of india through the noise pollution (Regulation and control) Rules, 2000 The exposures to excessive noise levels can lead to: Prevention of sleep, insomnia & fatigue. Decrease in speech reception, communication, disturbance and diminished concentration thus adversely affecting job performance efficiency. Irreparable psychological disturbance including impaired hearing. 2.4.2 Mitigation measures Mitigate the noise level following control measures will be adopted:- 1. Periodical monitoring of noise will be done. 2. Regular and proper maintenance of noise generating machinery. 3. Proper PPE in form of earplugs and safety eye wear shall be provided to workers working with the stone cutter and those in immediate vicinity of it. 4. Plantation in applied area will also reduce propagation of noise outside the core zone. 5. Green belt shall provide at the lease periphery, within the applied area. 2.5. BIOLOGICAL ENVIRONMENT No forests land the area. It is entirely a private Ag. Land. No endangered species found in the applied area, so no adverse impact on the flora & fauna. Since, there are no endangered spices of flora & fauna observed in core zone as well as buffer zone. Therefore, measures are not required. 2.5.1 GREENBELT DEVELOPMENT

The implementation for development of green belt will be of paramount importance as it will not only add up as an aesthetic feature, but also act as a pollution sink. The species to be grown in the area should be dust tolerant and fast growing species so that permanent green belt is created. Apart from the green belt and aesthetic plantation for elimination fugivitive of emission and noise control, all other plantation efforts shall be decided and executed with the assistance and co-operation of the local community. Trees proposed for green belt development SI. Scientific name Common Name No. 1. Azadirachtaindica Neem 2. Eucalyptus globulus Nilgiri 3. Mangiferaindica Aam 4. Scigiumcumuni Jamun 2.6.Socio-Economic The impact of mining on social demographic profile is positive because displacements of habitat are not involved in this project. Mangrol project will generate rural employment. The mining activities in the area will raise economic status of the mine workers. 3.0. ENVIRONMENTAL MANAGEMENT PLAN IMPLEMENTATION Environmental Management plan serves no purpose if it is not implemented with true spirit. Thus, an implementation and monitoring program has to be prepared. Implementation of proposed control measures and monitoring programmed has an implementation on the surrounding area as well as for the region. Therefore mining management should be strengthen the existing control measures implemented within the sandstone mining area relating to the following specific areas. Collection of air and water samples at strategic location with frequency suggested and by analyzing thereof. If the parameters exceed the permissible tolerance limits, corrective regulation measure should be taken. Collection of soil samples at strategic locations once in a year and analysis thereof with regard to deleterious constituents, if any. Regular visual examination will be carried out to look for possibilities of erosion. Any abnormal condition, if observed should be taken care of.

Measurement of noise levels at mine site, stationary and mobile sources, and adjacent villages will be done. Plantation will be done as per program i.e. along the boundary. 3.1. ENVIRONMENTAL OFFICER Environmental professional/ officer should be appointed/ hired to implement the environment management plan. The officer shall ensure the suitability, adequacy and effectiveness of the environment management program:- Environmental officer will be responsible for proper maintenance and operation of the program and it will oversee the following aspect: Conduct environmental awareness program to the workers, supervisory staff and contract laboer during the mining and operation period. Regularly monitor the environmental parameters and prepare reports as required by the GPCB. Recommend necessary measures to improve environmental conditions. Conduct safety program to create safety awareness among workers/staff. Train the staff and other workers on safety measures and conduct safety drills to educate them. Environmental officer will be in regular touch with state pollution control board and state mining department and send them annual progress report. Any new regulations considered by state/central pollution control board for the building stone mining would be taken care of. 3.2. PROPOSED SET UP The Environmental professional/ officer will be responsible for: Liasion with environment monitoring laboratory for collecting and analyzing water and air samples from surrounding area and work zone monitoring for pollutants. Implementing the control and protective measures. Co-coordinating the environment related activities within the project as well as with outside agencies. Collecting statistics of health of workers and population of surrounding villages. Monitoring the progress of implementation of environmental management program. Greenbelt development along the area.